elkon elektrik san.tic. a.s erdeniz erol - zendesk · elkon elektrik san.tic. a.s erdeniz erol...
TRANSCRIPT
ELKON Elektrik San.Tic. A.S Erdeniz Erol
Interna'onalBrokerageEventBrussels,26-27/10/2017
ELKON
Company overview
• LargestLowVoltageElectricCompanyinTurkishShipbuildingIndustry
AreaofAc'vity
• 1980Founda'onYear
• Deliveredover490electrical,540automa'onprojects
SuccessRecord
• IntegratedQualitySystemISO9001-14001–18000
• NATOFacilitySecurityClearance
CompanyCer'ficates
2
Descrip-onoftheOrganiza-on
elkon Marine and Electrical Technologies R&D Center
• ELKON has been awarded as R&D Center byMinistryofScience,IndustryandTechnologyofTurkey
• ELKONMarine and Electrical Technologies R&DCenter has 24 Researchers and 4 TechniciansspecializedinMarineElectric.
3
Descrip-onoftheyourresearchinterest
4
Seaspan Swi^, the first of two innova'vero-paxferries• DCBusbarandMul'pleDriveApproach
ofELKON
• LNG/Hybr id propu ls ion sys temconsis'ngofWärtsiläduel fuelengineswhichrunmainlyonLNGandaCorvusbaderyenergystoragesystem.
• 14percentefficiencyimprovementanda massive reduc'on in the GHGemissions calculated on a per trailerbasis compared to the ships they arereplacing.
• Nor-Shipping 2017 Energy EfficiencyAwardsNominee
elkonMarineandElectricalTechnologiesR&DCenterpreviousprojects
elkonMarineandElectricalTechnologiesR&DCenter
Ongoing R&D Projects
• VesselElectricalDistribu-onEmulatorProject,
(wai&ngforTUBİTAKapproval)
• ShipandOffshoreunitsREsilienceAtSea(SOREAS)appliedtoMARTERA20172ndPhase(elkonisCoordinator)
– Partners:TUDel^,Uni.ofCalabria,TurkLoydu
May2017 5
PartnershiprequestforMarineElectricSystemIntegratorforfollowingcalls:
Interna-onalBrokerageEvent.Brussels26-27/10/2017 6
CallCode CallName TypeofAc-on
BudgetperProject
TOTALBudgetforcall
Deadline
LC-MG-1-8-2019 RetrofitSolu'onsandNextGenera'onPropulsionforWaterborneTransport IA-RIA 3M-6MEUR 8M
EUR16Jan201912Sep2019
MG-3-2-2018 TheAutonomousShip IA 10M-20MEUR 20MEUR 30Jan201819Sep2018
MG-3-3-2018"Driver"behaviourandacceptanceofconnected,coopera'veandautomatedtransport
RIA 3M-4MEUR 12MEUR 30Jan201819Sep2018
MG-BG-01-2018 Unmannedandautonomoussurveyac'vi'esatsea RIA 8M
EUR8MEUR 04Apr2018
MG-BG-02-2019 Shipemissioncontrolscenarios,marineenvironmentalimpactandmi'ga'on RIA 8M
EUR8MEUR 24Apr2019
May2017 7
ELKONHorizon2020PartnershipsforProjectIdeasProfile of the partners sought:
-Project Coordinator -Ship Design firms (Already cooperation with Turkish ship design company) -Shipyards (Existing cooperation with Turkish Shipyards, EU shipyards are welcomed) -Battery Manufacturers (Already talks are ongoing with some of marine battery manufacturers) -Research Institutes (all research institutes are welcomed) -Universities (EU universities’ electrical, mechanical and shipbuilding engineering departments are welcomed.)
Consor-um-requiredpartners
Recommenda-ons
• Thepresenta'onhastolastupto4minutes(maximum)
• Donotoverloadyourslides
• Provideweblinkstoaddi'onalmaterial
• SlidesshouldbeinEnglish
• Donotusevideosetc.–theymightbenotsupportedbytheInfodayITsystem• Sendyourpresenta'onsinPDFformatto:[email protected]'l23September2016.
Interna-onalBrokerageEvent.Istanbul30/9/2016 9