Project Purpose
Study Objectives
Develop a phased implementation plan for improvements to modernize and accommodate the increasing number of riders at Embarcadero and Montgomery Stations.
EMBARCADERO - MONTGOMERY CAPACIT Y PLAN & STATION MODERNIZATION
1 Understand the setting, concerns of stakeholders and BART riders, and the relationship of project elements and setting.
Explore the viability of project elements:• New Side Platforms
• Platform Screen Doors
• Additional Elevator
• Pedestrian Connection to Transbay Terminal
• Direct BART-MUNI Transfer
Identify implementation and phasing issues.
2
3
Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
October 2015
UNDERSTANDING THE EXISTING CONDITIONS & C APACIT Y CHALLENGES
Platforms get crowded during peak evening commute times.
BART’s two busiest stations are Embarcadero and Montgomery.
The number of BART riders has been steadily increasing and ridership growth is expected to continue.
Planning Context
The demand for BART during peak morning hours is forecast to continually increase. Above is a preview of the year 2025.
Long lines develop at stairs and escalators
during peak morning commute times.
UNIONSQUARE
UCSF - MISSIONBAY CAMPUS
CHINA BASIN
MISSIO
N CREEK
PIER 23
PIER 19
PIER 17
PIER 15
PIER 9
PIER 3
PIER 1
FERRY
BLDG
PIER 24
PIER 26
PIER 28
PIER 30
PIER 32
PIER 34
PIER 36
PIER 38
PIER 40
PIER 48
PIER 50
PIER 54
BAYBRID
GE
LOMBARD ST
STOC
KTON
ST
NUT ST
GREEN ST
COLUMBUS AVE
VALLEJO ST
UNION ST
GR
ANT AVE
PACIFIC AVE
ST
7TH ST
POST ST
6TH ST
MISSION ST
8TH ST
9TH ST
POW
ELL ST
TAYLOR
ST
MASO
N ST
ELLIS ST
POW
ELL ST
HOWARD ST
FOLSOM ST
TAYLOR
ST
HARRISON ST
BUSH ST
JON
ES ST
SACRAMENTO ST
MASO
N ST
10TH ST
9TH
15TH ST
ALAMEDA ST
DIVISION STDIVISION ST
FRO
NT ST
SANSO
ME ST
DAV
ISST
BATTERY ST
WASHINGTON ST
THEEM
BARCADERO
UNION ST
VALLEJO ST
BROADWAY
KE
AR
NY
ST
JACKSON ST
MO
NTG
OM
ERY ST
TELEGR
APH
H
IL L BLVD
MO
NTG
OM
ERY ST
FILBERT ST
GREENWICH ST
GR
ANT AVE
KING ST
MAIN ST
CLAY ST
POST ST
SPEAR STBEALE ST
DR
UM
M ST
STEUART ST
FREMONT ST
MISSION ST
MISSION ST
PINE ST
BATTERY ST
3RD ST
3RD ST
4TH ST
4TH ST
TOWNSEND ST
THE
EM
BAR
CAD
ERO
2ND ST
2ND ST
HOWARD ST
HOWARD ST
5TH ST
5TH ST
FOLSOM ST
FOLSOM ST
MARKET ST
MARKET ST
CALIFORNIA ST
HARRISON ST
SACRAMENTO ST
BEALE ST
BUSH ST
HARRISON ST
HARRISON ST
1ST ST
BRANNAN S
BRANNAN ST
BRYANT ST
BRYANT ST
UTHPARK
CLAY ST
GR
ANT AVE
MO
NTG
OM
ERY ST
BLUXOME ST
DAVIS
ST
NEW MONTGOMERY ST
6TH ST
FRO
NT ST
GEARY ST
OFARRELL ST
SUTTER ST
CALIFORNIA ST
KEARN
Y ST
SANSO
ME ST
BERRY ST
MISSION ROCK ST
TOWNSEND ST
TERRY
AFR
AN
BRANNAN ST
CHANNEL ST
KING ST
3RD
ST
KAN
RH
OD
E IS
LA
SA
N B
R
UCSF LN
VE
RM
ON
T ST
SOUTH ST
CAMPUS WAY
BRID
GE V
I EW
WA Y
7TH ST
8TH ST
8TH ST
DE
HA
RO
ST
CO
ISBLVD
OWENS ST
DIVISION ST
HOOPER ST
IRWIN
ST
HUBBELL ST
ST
7TH ST
3RD
STBRYANT ST
MAIN S
MAIN STT
FREMONT S
FREMONT STT
MISSIO
MISSIO
HOWARD SARD S
WARDS
AR
HOWARTT
FOLSOM S
FOLSOM S
FOFOFO
TTTT
BEALE ST
BEALE ST
1ST S1STT SS1ST ST STT
SPEAR S
SPEAR STT
HARRISON S
SISON S
ISO
HARRISO
TT
RD SRRD STT
MISSION S
MISSION STT
4TH ST4T4THTH S
4THTT
5THSS
5TH S
2ND S2N2N2N2ND STTTTT
NEW MONTGOMERY S
NEWNEWWW
MOTG
RYRY
MONTG
RY S
WNEW
TGTGOMERYTT
KING S
KING S
KING S
KING STTTT
BEALE S
BBEALE S
B
TT
SSTT
THE
EM
BAR
CAD
ERO
BRANNAN S
BRANNAN S
BBBRRRYYYAAAYYYYNNNTTT SSSTTTT
7TH S7TH STT
6TH SSS6TH SSTT
3RD S3R3R3R3RD STT
3RD S3RD STT
TOWNSEND S
TOWNSENDNDND STT
2ND S2ND STT
HOWARD S
OWARD S
HOW
TT
5TH SS5TH SSTT
FOLSOM S
FOLSOM STT
HARRISON SON S
HARHA
ON
HARRISONTT
SSTT
UUTTHHPPPAAAARRKK
7TH S7TH STT
8TH SS8TH SSTT
9TH SH
S9TH
SH
STT
HOWARD S
HOWARD STT
FOLSOM S
FOLSOM STT
HARRISON S
SON S
ARRISOSO
HARR
TT
10TH S
10TH STT
DDIV
7TH S7TH STT
BRYANT S
BRYANT STTT
HARRISON S
HARRISON STT
BRYANT S
BRYANT STT
SSTT
FOLSOM S
FOLSOM STT
99TTHH
15TH SS15TH STTTT
ONNN SSTTTTTTTTSSOOVIS NN SOSIOOVISION ST
TOWNSEND S
TOWNSEND STT
BRANNAN S
BRANNAN STT
CHANNEL S
CHANNEL STT
KING SG
S
KING STT
KKAAKKKNN
OD
E IS
LAO
DE
ISLA
RH
OR
HO
DE
ISLA
OR
HOO
SA
N B
RSS
AN
BR
SS T ST
SV
ER
MO
NV
ER
MO
NT S
NT
VE
RM
ONN
TTTT
8TH S8TH STT
8TH S8TH S8
TT
DE
HA
RO
SD
EH
AR
O S
DTT
DIVISION STSTON STDIVISSIOISION
HOOPER STR ST
HOOPER ST
HOOPER ST
IRWIN
ST
IRWIN
ST
HUBBELL ST
L ST
HUBBELL ST
HUBBELL ST
SSTT
7TH S7TH STT
BRYANT S
BRYANT STTTT
ALAMEDA SALAMEDA SSTTTT
DIVISI IOIOS ODIVISIO
ON
T SN
TS
FRO
FROO
NFR
OON
T SO
NTTT
DDAAVVAAAA
IISSSSTT
TTTHHHEEEEEEMMM
BBBAAARRRCCCAAADDDEEERRROOO
BROADWAYWAWAYBROADWWA
4THS
4THS
BEBBERRY SRRY S
BBERBERRY S
ERRRRY STTT
7TH SH
S7TH
TT
OWEN
OWEN
OWOOWE
5TH S5TH STT
BRANNAN S
BRANNAN STT
BLUXOME S
BLUXOME S
BLUXOME STTT6TH ST
6TH ST
TT
H SS7THH STH
7THTT
Transit Center District PlanRecent / Current Area Plans
Recent / Current Planning Studies
Active Redevelopment and Major DevelopmentTransbay Redevelopment Plan: Zone 1 (Transbay Downtown Residential)Transbay Redevelopment Plan: Zone 2 (Transbay C-3)Mission Bay North Redevelopment Plan
Mission Bay South Redevelopment Plan
Rincon Point / South Beach Redevelopment Plan
Treasure Island / Yerba Buena Island (not shown)
Rincon Hill Area Plan
East SoMa Area Plan
Central SoMa Area Plan
Western SoMa Community Plan
Showplace Square / Potrero Hill Area Plan
Mission Area Plan
Northeast Embarcadero Study
Railyard Alternatives and I-280 Boulevard Feasibility Study
Major planned development projects in the South of Market area are projected to bring additional ridership.
The Transbay Transit Center Project.
Land Use Context - San Francisco Planning Department - City and County of San Francisco
BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
October 2015
YOU SPOKE, WE LISTENED!
BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
AM AND PM IN-STATION EVENTS ON 10/28/2014
2,858 survey respondents
AM AND PM IN-STATION EVENTS ON 10/28/2014
2,042survey respondents
Word cloud created from words most mentioned in the 2,746 individually written comments received for both stations combined. (The bigger the word, more often it was mentioned).
GREAT IMPROVEMENT SUGGESTIONS!
THANK YOU for providing survey feedback!
All your comments and priorities were reviewed and considered in
the planning process.
Survey Results: Your Top Priorities for both stations Station Environment Station Access Capacity Improvements
Real-time train arrival displays at street and concourse levels (81%)Canopies to protect entrances(54%)Clearer public announcements (50%)
More cleaning (70%)More safety patrols/enforcement (47%)Additional or improved lighting (36%)
Additional platforms to relieve crowding (73%)Faster escalators (65%)Reducing clutter on platforms (56%)
How your feedback was considered in the Recommended Capacity + Modernization Plans:
Embarcadero Montgomery
• Improve station environment: > Cleanliness and brightening
• Better Information: > Better signage, more Real-time infor-mation on concourse and at street level
More frequent service, longer trains Will be implemented incrementally as new railcars are delivered to increase BART’s fleet size, and as a new train control system is in-stalled.
• Improve passenger flow during rush hours: > Additional street entrances, new stairs, escalators, elevators
• Improve elevator redundancy and reliability: > Larger, BART-dedicated elevator for existing platform and 2 elevators per side platform
• Reduce platform crowding: > Reorganization of platform elements to reduce clutter and create more space, new side platform
• Better space planning: > Expanded paid areas, free circulation between all entrances at concourse level, new retail/amenity space
BART• held 4 in-station public information events
during AM and PM commute times • handed out 15,000+ ‘postcards’ • received 4900 survey responses Cleanliness
RushhourRestrooms
FrequencyBroken
ReliabilityHomeless
Platform
ElevatorsLonger trainsDisplay
Flow Better signageAir conditioningBike parking
Better ventilation
Trash cans
Transbay Tube
October 2015
Embarcadero: elevator upgrades and more stairs
BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
0-10 years
5-15 years
CAPACITY PHASING AND IMPLEMENTATION (as funding becomes available)Analysis and review of ways to improve capacity has resulted in a list of specific projects and a general timeframe for implementation pending funding. Next steps are integration with the station modernization effort and seeking funds.
Timeframe
10-20 years
BART General Engineering Services BART General Engineering Services Appendix A.1 2
Embarcadero StationNew Platform/Tunnel Longitudinal Section
(N) BART Platform
(N) Emergency Stair Shaft
(N) BART Platform Portals
(N) Stair/Escalator to BART Platform
(N) Elevator to BART Platform
New side platformsNew stairs, escalators, and elevators would also be added to access the new side platforms.
Platform screen doorsPlatform doors increase capacity and safety on very crowded station platforms.
Embarcadero east- and westbound
Montgomery eastbound only
Montgomery: new stairs and elevatorsA new elevator to the MUNI platform, additional stairs and escalators, replaced platform seating, to reduce platform crowding.
Early wins Real-time information, different seating and relocating the janitorial closet creates more platform space.
Creating better access and more flow: Construct more stairs next to existing escalators and add another platform elevator
• Relocate existing zigzag stairs to end of platform
• Construct new elevator for primary BART use
• Modify existing elevator for primary MUNI use
October 2015
Reduces platform crowding and
improves passenger flow
EMBARC ADERORECOMMENDED C APACIT Y IMPROVEMENTS
BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
CO
NC
OU
RS
E
PLA
TFO
RM
COLOR LEGEND
0-10 YEARS
10-20 YEARS
Potential pedestrian tunnel toTransbay Transit Center
(underneath Beale Street)
Fremont Street
East Bay
Front Street Spear Street
See station cross-section below
Paid area
New or relocatedvertical circulation
Paid area
BART Muni Metro
Existing
New or relocated
Street access
Construct new stairs next to
existing escalators
Circulation
Early Wins
Platform Doors
Replace platform seatingand janitorial closet to
create more platform space
Install platform doors on existing platform
s
Embarcadero westbound
Embarcadero eastbound
Move stairway Construct new elevator and decking
Modify current elevatorfor primary Muni use
Move Stairs and Add New BART-only Elevator
October 2015
New Side Platforms with Platform Doors
MONTGOMERY RECOMMENDED C APACIT Y IMPROVEMENTS
BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
CO
NC
OU
RS
E
Platform Screen Doors
PLA
TFO
RM
See station cross-section below
COLOR LEGEND
5-15 YEARS
10-20 YEARS
Construct new stairs and escalators
New elevator to Muni platform at west end
Circulation Improvements
Install platform doors on existing platforms
Platform CapacityImprovements
Modify platform seating to create more platform space
New Side Platformwith Platform Doors
Montgomery eastbound only
October 2015
Street access
Existing
Free area
New or relocated
BART
Paid areaNew northside corridor New or relocated
stairs or escalators to platform
MUNI Metro
Paid area
New MUNI elevator to platform
MONTGOMERY MODERNIZ ATION PROGRAM UPDATE
BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
CO
NC
OU
RS
EP
LAT
FOR
M
Major Renovations Being Studied
Opening up lobby spaces• Improve visibility & circulation • New ceiling design• Larger real-time information displays • Better incorporation of public art projects
Renovation of ticketing areas• Differentiate vending areas in station • New flooring & finishes • New ceiling & lighting • Integrated real-time information
Deep Station Cleaning
Improvements to Platform
• Brighten the entire passenger area • New lighter colored flooring• New ceiling design • Better integrated lighting
Repair flooring, improve displays, and increase overall lighting
Deep Station CleaningNew street level canopies at entries
Deep Station CleaningImprove ventilation and dead areas
Deep Station CleaningReplace outdated signage and maps
Deep Station Cleaning Deep Station CleaningDifferentiate appearance from Powell
October 2015
Replace seating to create more platform space
Opportunities for ImprovementsStation improvements provide modernization possibilities. Program objectives include:• Creating and implementing a new visual
and functional concept for the station, and also:• Returning facilities and systems to a state of good repair• Replacing components and features at the end of their useful life
EMBARC ADEROMODERNIZ ATION PROGRAM UPDATE
BART … and you’re there.Preparation of this report was made possible with the financial participation of the Federal Transit Administration and Caltrans.
CO
NC
OU
RS
E
Major Renovations Being Studied
New Ceiling• Improve appearance and reinvigorate• New lighting and ceiling • Possible new bridges between sides of concourse
Improved Entries• Better signage to surface transit and integrated
real-time information• New flooring, lighting & finishes
Renovated Ticketing Areas• New vending wall design• Replace dirty ceilings and lighting• Clean and polish existing walls/floors• More real-time information
Deep Station CleaningNew street level canopies at entries
Deep Station CleaningReinvigorate empty “dead” spaces
Deep Station CleaningMore storage/reduced clutter
Deep Station CleaningConsolidate free-standing items
Deep Station CleaningUpgrade elevator
PLA
TFO
RM Before Before
October 2015
Opportunities for ImprovementStation improvements provide modernization possibilities. Program objectives include:• Creating and implementing a new visual
and functional concept for the station, and also:• Returning facilities and systems to a state of good repair• Replacing components and features at the end of their useful life