Technical Information Project Completion Date: October 31, 2014 Project Location: Hillsboro, OR Size of Project: The hotel consists of 7 stories with a basement, 165 guest rooms, and 6,411 cubic yards of concrete. Strength Requirements: 4,000 – 6,000 psi Water/Cement Ratios: 0.38 – .047
Embassy Suites – Hillsboro
Embassy Suites – Hillsboro
The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting
Rooms, Exercise Room, and Indoor Pool.
Embassy Suites – Hillsboro
The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting
Rooms, Exercise Room, and Indoor Pool.
Embassy Suites – Hillsboro
The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting
Rooms, Exercise Room, and Indoor Pool.
Embassy Suites – Hillsboro
This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.
Embassy Suites – Hillsboro
This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.
Embassy Suites – Hillsboro
The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs
with longer spans between supporting walls and columns.
Embassy Suites – Hillsboro
The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs
with longer spans between supporting walls and columns.
Embassy Suites – Hillsboro
The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.
Embassy Suites – Hillsboro
The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.