emc profile updated (25-11-2015)_opt
TRANSCRIPT
E MC PAKI STAN PVT LT D
INTRODUCTION
CONSULTING CAPABILITIES
TRAININGS ON EHS
EMC GEO-TECHNICAL
STUDIES/EIA/IEE EXPERIENCE
AUDIT EXPERIENCE
ENVIRONMENTAL SITE ASSESSMENT
MISCELLANEOUS
WORK IN HAND
STUDIES/EIA/IEE EXPERIENCE (BRIEF DETAILS)
INDUSTRIAL HYGIENE
AUDIT EXPERIENCE(BRIEF DETAILS)
ENVIRONMENTAL SITE ASSESSMENT (BRIEF DETAILS)
ISO SPECIFIC EXPERIENCE (BRIEF DETAILS)
WASTE MANAGEMENT EXPERIENCE
WASTEWATER TREATMENT PLANT EXPERIENCE
C O N T E N T S
CO
MP
AN
Y P
RO
FIL
E
E MC PAKI STAN PVT LTD
MONITORING EXPERIENCE
SOIL & GROUNDWATER ASSESSMENT/MANAGEMENT
SOCIO-ECONOMIC IMPACT ASSESSMENT
HYDROLOGICAL STUDIES
KEY PERSONNEL
C O N T E N T S
CO
MP
AN
Y P
RO
FIL
E
EMC PAKISTAN PvT. LTd. 1
EMC Pakistan (Pvt) Limited is based in Karachi, Pakistan and was established in
January 1997. It is managed and operated by highly qualified, technical and
motivated team of professionals.
Leading staff members hold master's and doctorate degrees in the field of Environment
from some of the world's most prestigious institutions.
Our services are targeted at several disciplines of Environmental Engineering and
Management. We are especially focusing on Health Safety and Environment (HSE) and
their international standards which include all the aspects and considerations to improve
the HSE performance of an Organization.
We emphasize on information sharing and team work within the Company & with our
clients so that every client receives the best possible results.
CAPABILITY STATEMENT
EMC is a part of highly qualified and experienced consortium of professionals,
comprising of environmentalists, engineers, soil specialists, hydrologist, economists &
architects.
PARTICULARS
C O M P A N Y P R O F I L E
B A C K G R O U N D
CO
MP
AN
Y P
rO
FIL
E
Name of the Firm EMC Pakistan (Pvt) Ltd
Year of Establishment 1997
Address 503 Anum Estate Main Sharah -e-Faisal Karachi
EMAIL [email protected]
WEBSITE www.emc.com.pk
PHONE 92-21-34311466
FAX 92-21-34311467
EMC PAKISTAN PvT. LTd. 2
COMPANY’S VISION
By providing the highest quality of service to our clients and maintaining high levels
of professional ethics and admirable core values, our vision is to be top of the list of
preferred strategic partners in the field of environment and sustainability consulting.
COMPANY’S MISSION
EMC is determined to be the benchmark of quality within our industry by being
the most innovative, diversified environmental consulting firm in Pakistan.
All our consultants share and uphold a common set of admirable codes of
professional conduct and codes of ethics. They operate in selected market segments
focusing on energy, manufacturing and mining industries, drilling Chemical Storage,
LNG terminal and others. Geographically we cover the whole Pakistan and our areas of
specialty ranges from Environmental Impact Assessments to initial Environmental
Examination reporting.
To achieve the position EMC have committed to technical excellence with
significant resources devoted to building an array of new technological solutions and
services.
EMC is committed to embracing modern technology and providing our clients
with state of the art environmental information systems and solutions. We will provide
inspirational leadership in environmental strategy formulation and stakeholder
consultations in solving environmental problems. In order to identify environmental risks
and formulating mitigation measures environmental laws with integrity and fairness in
the process of conducting enviro legal and due diligence has been conducted
COMPANY PROFILE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 3
IMS Policy of EMC
At EMC, protecting the Environment is the foremost responsibility of our employees.
We use energy and resources efficiently and prevent generation of wastes while
providing our activities and services. This encourages our employees to be
environmentally responsible on the job and at home. Health & safety of our employees
are equally important while working & performing duties.
We recognize the contribution we make to the society, and will incorporate
sustainable development thinking into all our activities. We shall propagate this policy
among all our interested parties.
Our recognition and acceptance of these responsibilities will be demonstrated by our
commitment to:
n reducing environmental nuisance and preventing pollution risk related to our
activities;
n Complying with our regulatory, legislative, contractual or other obligations, and
anticipating them whenever possible;
n Continually improve our integrated management systems by reviewing objectives,
conducting audits and management reviews under International standards;
n Seeking to satisfy our customers fully by constantly adapting our services to their
current needs and future requirements;
n Guaranteeing that all employees and subcontractors are trained in accordance
with their roles and the work they undertake;
n Ensuring Prevention of injury & ill health at all workplaces for safety of our
employees and our suncontractors by systematically identifying potential risks and
applying the appropriate prevention measures.
September 22, 2014 Syed Nadeem Arif
Managing Consultant
COMPANY PROFILE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 4
EMC offers a variety of services, at both
Management and Specialist Level, which
includes the following :
I. Environmental Management
n Basic Assessments
n Screening and Scoping Studies
n Environmental Imapct Assessment
n Baseline Environmental Studies
n Environment Health & Safety
Audits
n EMS Audits & Compliance Audits
n Project Management
n Environmental Reviews
n Environmental Management
Program Reports
n Environmental Planning
n Environmental Reviews
n Public Consultation & Facilitation
II. Air Emissions
n Air Dispersion Modeling
n Air Emission Testing
III. Wastewater Testing
n Waste water Treatment Facilities on
Turn Key Basis
n Activated Sludge System
n Dissolve Air Flotation Unit
n Anaerobic and Aerobic Biological
Treatment
IV. Waste Management
n Designing of complete Waste
Management System
n Management of Hazardous & Non
Hazardous Wastes
n Provision of Waste Collection State
of the Art Bins
n Research for Reuse - Recycling of
Waste
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 5
V. Environmental Health &Safety Trainings
n Professional Development Programs-
PDPs:
n Company Specific Programs-CSP
are as follows:
n Employee Training and
Performance Technology
n Management of EHS Training
n EHS Awareness for all site
employees
n Training for Site EHS
Professionals
n Training for Site Personnel on
the Floor
n Training Methodologies
n Best Practices & Advanced
Technologies
I E n v i r o n m e n t a lManagement
Initial Environmental Examination(IEE) & Environmental ImpactAssessment (EIA)
EMC has a core team of expertise and
experience available to undertake full
spectrum of studies required for EIAs
and IEE in accordance with the national
and International guidelines or
requirements of Pakistan. Keeping in
view all the requirements and
guidelines provided within the legal
framework. Related to EIA’s EMC also
has significant experience in compiling,
auditing Environmental Management
plans (EMP). In fact EMC prides itself in
being able to provide a tailor made and
practical approach to EMPs.
Guidance on Compliance with NEQS& Self Monitoring & Reporting bythe Industries
As the limits for air emissions and
industrial liquid effluents have been
revised and set in the Environmental
Quality standards (NEQS), so in order to
ensure the industry do not exceed those
limits, we provide complete services for
carrying out Sampling of critical
parameters, Laboratory testing, Analysis
of test results and Preparation of Self
Monitoring Reports on a standard format
as required by the EPA.
Review of Initial Environmental
Health and Safety
EMC also conduct Health and Safety
review in order to develop and
incorporate Safety Statement a health
and safety policy that recognizes that
health and safety is an integral part of
the organization’s business performance.
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 6
They should ensure that this health and
safety policy is following the points
below:
• It is appropriate to the hazards and
risks of the organization’s work activities
and includes a commitment to protect,
so far as is reasonably practicable, its
employees and others, such as
contractors and members of the public,
from health and safety risks associated
with its activities
• It includes a commitment to comply
with relevant health and safety
legislation, codes of practice and
guidelines as a minimum
• Provides a framework for measuring
performance and ensuring continuous
improvement by setting, auditing and
reviewing health and safety objectives
and targets
• It is documented, understood,
implemented and maintained at all
levels the organization
• Clearly places the management of
health and safety as a prime
responsibility of line management from
the most senior executive level to first-
line supervisory level
• Covers employee health and safety
consultation and representation and
includes a commitment to provide
appropriate resources to implement the
policy
• Provides for employee co-operation
and compliance with safety rules and
procedures
Effective health and safety management
demands comprehensive health and
safety policies that fulfill the spirit and the
letter of the law, are effectively
implemented and are considered in all
business practice and
Environmental Studies / PollutionSurveys and Studies
To assess the degree of environmental
degradation and to set a baseline for future
work. This type of study helps in suggesting
future strategy to comply with the
regulatory requirements and to form a basis
for any management system.
Hazard Response Planning andHealth Risk Assessments
Qualitative Health Risk Assessment
(HRA) are conducted to establish health
risks factors and ranking method will
priorities the products, which present a
high risk during manufacture or
potential health risk during various
phases of manufacturing. High-risk
homogenous exposure groups are
normally identified and samplings of
products are conducted to assess if they
present a high risk.
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd 7
Evaluation of regulatory andlegislative constraints pertaining toEnvironmental Legislation and OtherRequirements.
To maintain legal and other compliance,
the organization must identify and
understand and address the regulatory
and other requirements applicable to
environmental aspects and services
related to Environment. To keep track of
legal requirements, EMC establishes and
maintains a list of all laws and regulations
relevant to the environmental aspects and
impacts of its activities. We have a highly
qualified and experienced Environmental
Lawyer as our associate who can provide
counseling on legal issues, related to
Environment for instance implications of
regulatory compliances and management
of other legal matters.
Guidance on Cleaner Technologies &Treatment Facilities (Area ofExpertise)
It is the need of the day to switch to
newer and cleaner technology, we at
EMC always stress on the cleaner
technologies which are green in nature
and helps in creating less pollution and
are environmental friendly.
Cleaner technology includes recycling,
renewable energy (wind power, solar
power, biomass, hydropower,
biofuels),information technology, green
transportation, electric motors, green
chemistry, lighting, Grey water, and
many other appliances that are now
more energy efficient. It is a means to
create electricity and fuels, with a
smaller environmental footprint and
minimize pollution. To make green
buildings, transport and infrastructure
both more energy efficient and
environmentally benign. Environmental
finance is a method by which new
clean technology projects that has
proven that they are "additional" or
"beyond business as usual" can obtain
financing through the generation of
carbon credits. A project that is
developed with concern for climate
change mitigation (such as a Kyoto
Clean Development Mechanism
project) is also known as a carbon
project.
While there is no standard definition of
"clean technology," it has been
described by Clean Edge, a clean
technology research firm, as "a diverse
range of products, services, and
processes that harness renewable
materials and energy sources,
dramatically reduce the use of natural
resources, and cut or eliminate
emissions and wastes." It notes that
"Clean technologies are competitive
with, if not superior to, their
conventional counterparts. Many also
offer significant additional benefits,
notably their ability to improve the
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd 8
lives of those in both developed and
developing countries.
Virtually all textile and chemical
industries have an impact on the
environment or are impacted by
environmental and related regulation.
The extent of that impact and how
clients navigate regulatory framework
and minimize the risk is a matter of
degree. We have suggested many
textile and chemical industries to
switch to cleaner technologies and
provided them sufficient knowledge
and information database to
implement these technologies
successfully.
Environmental and IndustrialHygiene, Monitoring & Control
We develop a plan for services together
with the client. We listen carefully to our
clients concerns, inform them about
regulatory requirements and our past
experiences with those issues. We have
developed exposure monitoring
strategies, such as chemical air sampling
or noise Monitoring. Our Company also
works with our client to develop effective,
yet workable, exposure control strategies,
including training of workers. Finally we
will report our findings in a professional,
comprehensive, yet understandable
fashion. We will support our clients to
help resolve any regulatory or mitigation
issues related to:
• Industrial Air Emissions and Effluent
Testing
• Indoor Air Quality
• Noise Monitoring and Mapping
illumination Survey
• Air Quality Measurement at work
place to determine occupational
exposure to Toxic substances
• Emissions and Acoustic Pollution
Abatement in Industries.
Environmental, Health & SafetyAudits
To remain competitive in business an
organization needs to be certified by
independent ISO auditors. The scope of
EHS auditing is expanding. In this context
we carry out Internal and Follow up
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 9
Audits before the final certification.
Auditing is no longer simply completing a
checklist to determine regulatory
compliance. To provide information on
the effectiveness of management
systems, opportunities for cost reduction
and continuous improvement
accomplishments auditing programs are
mandatory today. We have Qualified
EARA approved Lead Auditors for EMS
ISO 14001; we also conduct other
Environmental, Health & Safety Audits.
Our EHS auditing includes:
• Compliance Audit
• Site Impact Audit
• EHS Audits (e.g. waste,energy audits)
• Safety Audits
• Health and Safety Auditing and
Program Development
• Environmental Audits
• Due Diligence Regulatory
Compliance Auditing
• Third Party Assessment of Auditing
Programs
• Reporting and Auditing Information
• Management Training
Environmental Site Assessments
Environmental Site Assessment
Phase - I (ASTM E-1527)
The phase I of ESA is based on ASTM E-
1527 and helps in determining potential
environmental liabilities to establish the
basis for further investigation through the
establishment of baseline environmental
condition, comply necessary regulatory
requirements through the identification
of compliance deficiencies and develop
further remediation plans.
Environmental Site Assessment
Phase - II (ASTM E-1903-97 (2002)
Phase II ESA is site-specific and context-
specific. The phase II of ESA determines
the nature and extent of contamination
Phase II environmental site assessment
(ESA) of a parcel of property with
respect to the presence or the likely
presence of substances including but not
limited to those within the scope of the
Comprehensive Environmental
Response, Compensation and Liability
Act (CERCLA) (e.g., hazardous
substances), pollutants, contaminants,
petroleum and petroleum products, and
controlled substances and constituents
thereof. It specifies procedures based on
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 10
the scientific method to characterize
property conditions in an objective,
representative, reproducible, and
defensible manner.
Our team of Experts conduct Phase - I
ESA and based on findings of Phase - I,
recommendations are given for
conducting Phase - II ESA. Soil &
groundwater samples are collected from
identified areas to check for
contamination levels of pullutants
depending on the nature of past
operations at the facility. Mitigation
measures are recommended for
remediation of the soil & groundwater
and removal of the potential
contaminants.
Environmental Management System
(EMS) - ISO 14001
There is currently a monumental effort
by countries throughout the world to
establish a Universal Standard for
Environmental Management which affect
all phases of operation. We have
implemented it in many industrial
sectors. Our work methodology for
implementing this Standard comprises of
following steps:
1. Initial Environmental Review Report
2. Environmental Policy Formulation &
Planning
3. Environmental Policy Formulation &
Planning
4. Implementation, Training &
Documentation
5. Internal Audit
6. Application for the Certification
An Environmental Management System
(EMS) is a stepping stone to knowing
your environmental impact and risks
and being able to manage them
effectively. It also produces a positive
economic impact, delivering real savings
and making systems more robust.
II Air Emission
Air Dispersion Modeling
We have been working on air dispersion
molding and have done number of
project in which we have used
industrial source complex (ISC) model.
Air dispersion modeling is the
mathematical assessment of
contaminant impacts from emissions
sources within a study area. Factors
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 11
that impact the fate and transport of
contaminants in the atmosphere
include meteorogical conditions, site
configuration, emission release
characteristics and surrounding terrain,
amongst others.
Air Emission Testing
Air emission testing remains
necessary while performing any study
related to air pollution and to find out
prevention techniques. Thus EMC
works in close collaboration with
laboratories where these tests be
carried out.
III Wastewater Management
Wastewater Treatment Facilities onTurn Key Basis
We have another expertise of installing
Waste Water Treatment Plants of different
types. We can install WWTP having
different technologies like DAF Technology,
Activated Sludge System etc. We have
some satisfied clients whose WWTP are
running and cleaning the waste water
surpassing the local standards limits.
Wastewater Analysis/ FeasibilityStudy for Treatment Facilities
We conduct wastewater sampling and
analysis to identify the strength of
wastewater in stream. On the basis of
such feasibility studies we submit our
proposals for wastewater treatment
design to the clients. It helps make us
easy to establish real time data and to
consider all aspects in treatment design.
Our main areas of treatment are
industrial units however; we also intend
to work on municipal wastewater
treatment section.
Self Monitoring and Reporting forIndustrial Wastewater
Industries are liable to produce self
monitoring reports to relevant EPAs as
per the schedule given in the Laws &
Regulations. We also assist our clients in
self monitoring procedures and generate
report which includes findings and results
of self monitoring for the submission to
EPAs.
IV Waste Management
Designing of complete Waste
Management System
We analyze and design complete waste
waste management systems of the
company. Our main Emphasize is on
Reuse Recycle of the Product. We design
and supervise the client in implementing
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 12
this management system. We not only
help them in analyzing the problem but
we also prepare procedures and give
training to them on this issue. End to end
can be provided to our customers. Only
one component like making of the
management plan or implementing can
also be done if client requires.
Management of Hazardous & NonHazardous Wastes
We analyze the hazardous waste and
suggest the cost effective way of
disposing it off. We also stress on three
R's i.e. Reduce, Reuse and Recycle while
suggesting any solution related to
hazardous waste management. We also
provide services for collection,
transportation and disposal of waste.
While performing these jobs stress is
always on the laid down procedures of
WMC and the client.
Provision of Waste Collection Stateof the Art Bins
We can provide state of the art, custom
made bins according to the client's
requirements. These Bins can be from
Stainless Steel to Fibre Reinforced Plastic
(Fibre-Glass) material. The sizes can vary
according to requirement and usage. We
provide them and suggest the collection
procedures. These Color-Coded bins itself
provides segregation at source and does
not require any end-user segregation and
saves time and money.
Research for Reuse - Recycling ofWaste
We put emphasize on research and always
conduct tests on the waste to ascertain
their consistency. In the light of results of
the tests we provide cost effective and
simple solutions to our clients. We have
already provided many such solutions to
our clients who are using their hazardous
waste after recycling it at very nominal
charges. e.g. Reusing of 1-1-1- Tri-
choloro-ethlene (TCE) for degreasing after
recycling, reusing the waste oil sludge as
fuel in Cement Industry etc.
EPA Approval and Our Resources
We are working on it at the moment and
have already submitted an IEE (Initial
Environmental Examination) Report for
our Waste Disposal Facility which is
located outside Karachi towards GHARO
(Sindh). We have all the necessary
equipments available with us including
waste collection bins to transportation
Vans and Pneumatic Pumps with
compressors etc for removal and
transportation of waste safely.
Team Of Waste Management
A team of well qualified and experienced
professionals, the core of Waste
Management, provides well thought of
solutions keeping in view the different
dimensions of waste management and
their impacts on each component of the
environment. Masters and PhD's are
there in our team who has not only
technical knowledge of work but has
working capability as well. Detailed
resumes are included in the section of
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 13
Key Personnel's.
V Processing of CDM Projects
The CDM is the only instrument that is
available for developing countries to
assist them in achieving sustainable
development and contributing to the
ultimate objective of the United Nations
Framework Convention on Climate
Change (UNFCCC) to minimize GHG
emission. It aims to assist annex-1
Parties to implement a project activity
that reduces GHG emissions in non-
annex-1 Parties which are mostly the
developed countries, in return for
certified emission reductions (CERs). The
CERs generated by such project activities
can be used by annex-1 Parties to meet
their emissions targets under Kyoto
protocol. Being the signatory of Kyoto
Protocol Pakistan can benefit from CDM.
The processing of CDM projects is
complex task and almost no or very
little expertise is available in the
country. The EMCs professionals, by
attending various training programs,
national and international seminars
have developed ample expertise in
processing the CDM projects. In
addition the EMC has entered into a
long term understanding with an
international consultant based in
Singapore for processing CDM
OUR SERVICES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 14
Trainings on Environment,
Health & Safety
EMC is of the pioneer companies in
Environmental, Health & Safety Training
Providers. EMC Consultants, Team of EHS
Experts can provide you the best possible
trainings in EHS. We can customize the
training courses according to the needs of our
clients.
Catering the Health, Safety and
Environmental needs of industries the
training portfolio of EMC is two fold by
offering:
Customaries Training Programs-PDPs:
n These programs are carefully designed
based on industry feedback:
n Participants expected of senior and
middle management positions
n Shortest possible time 1-3 days to avoid
more time away from job Conducted at
hotel providing congenial learning
environment
Area Specific Programs:
n These programs are tailored as per specific
needs of a company to effectively
communicates message
n Advantages of Site, as personnel &
equipment available to train
n Time flexible as per convenience of the
company or some off season
Following are some of the EHStrainings which can be provided asIn-house courses:
1. General Environmental Awareness
2. Introduction to Environmental Management
Systems ISO 14001
3. Internal Auditing of EMS ISO 14001
4. How to implement effective Environmental
Management Systems ISO 14001
5. Introduction to EHS Auditing
6. Environmental Impact Assessment / Initial
Environmental Examination
7. Hazard Identification at Work place
8. Emergency Preparedness and response
Plan.
9. Env i ronmenta l Legis la t ion and i ts
requi rements
10. Solid and Hazardous Waste Management
11. Waste Water Management
TRAININGS ON EHS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 15
12. Air and Noise Pollution
13. Energy Conservation
14. Introduction to Hazard Analysis and
Critical Control Point (HACCP)
15. Introduction to Occupational Health &
Safety Management System OHSAS 18001
16. Internal Auditing of Occupational Health &
Safety Management System OHSAS 18001.
17. Lockout/Tagout/verify Awareness
18. Machine Guarding
19. Material Safety data Sheets (MSdS),
Spill Clean-Up and Blood Borne
20. Noise Prevention
21. Office Safety Awareness
22. Off the Job Safety - Home, Property, and
Personal Safety
23. Operational risk Management
24. Overhead Crane Safety
25. Personal Protection Equipment
26. Principle Types of Unintentional Fatal
Injuries
27. repetitive Motion Injuries
28. respirator Fit Testing and Training
29. respiratory Protection and Personal
Protective Equipment
30. response to Catastrophic Personal
Injury Loss
31. rigging Techniques
32. risk & risk Management
33. Safe Handling of Flammable and
Combustible Liquids
34. Safe Lifting
35. Safety and Health in the Office
Environment
36. Safety Talks "Your Link to Safety
Awareness Communication!"
37. Safe Work Permits
38. Sling Safety & Safe rigging Practices
39. Stress and Stress Management
40. Supervisor & Managers Safety
responsibilities (r & r)
41. The Control Of Hazardous Energy
(LOCKOUT/TAGOUT)
42. Using Technology In Safety To Work
Smarter, Not Harder
43. vehicle Safety and driving Safety
44. ventilation Systems As Control Measures
45. Warm Weather Injuries
46. Work Permit
47. Workplace Ergonomics
48. Workplace violence: What To Know
What To do
49. You Know You're A Safety Nut When
50. Zero Incidents
TRAININGS ON EHS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 16
Company Resources
Our Consultancy firm consists of a team
of highly skilled environmental consultants
based in Karachi.This company has also a
builtup a strong contact base with a
number of specialist sub-consultants and
draws on this pool of expertise to make up
a specific project team, ensuring a cost
effective and specialized team suited to
each project requirements.
Ownership & EqualOpportunities:
EMC is an equal opportunity employer. It
aims to ensure that it employs the best
applicant for a job and that no job
applicant or employee or project associate
receives less favourable treatment on the
ground of race, nationality, sex, age,
religion, languages or disability. This
applies to recruitment, promotion, training,
the application of grievance, disciplinary
and other procedures, the provision of
employee’s benefits and allterms and
conditions of employement.
CONSULTING CAPABILITIES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 17
1. China PEtrolEum PiPElinE EnginEEring CorPoration ComPany
2. Shanghai ElECtriC
3. Emaar PakiStan
4 attoCk CEmEnt PakiStan limitEd
5. WorkS & SErviCES dEPartmEnt, govErnmEnt of Sindh
6. Sindh tranSmiSSion & diSPatCh ComPany (StdC)
7. frontiEr WorkS organization (fWo)
8. luCky ElECtriC PoWEr ComPany (lEPC)
9. SPECial ProjECt managEmEnt unit, miniStry of CommuniCation, goP
10. PakiStan PEtrolEum ltd
11. CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab
12. SiddiqSonS EnErgy Pvt limitEd
13. fiShEriES dEvEloPmEnt board
14. CrEEk dEvEloPErS Pvt limitEd
15. PakiStan atomiC EnErgy CommiSSion (PaEC)
16. gWadar Port authority
17. aWan trading Co. Pvt limtEd
18. national tranSmiSSion & dESPatCh ComPany limitEd
19.. Sindh Coal authority (SCa)
20. bahria toWn Pvt limitEd
21. dha - brEntWood Pvt limitEd
22. gEtz Pharma Pvt limitEd
23. galaxy ConStruCtionS (Pvt) limitEd
24. un-habitat
25. karaChi mEtroPolitan CorPoration (kmC)
26. landmark EntErPriSES
27. yunuS tExtilE millS limitEd
28. Efu lifE inSuranCE Co. limitEd
29. k- EnErgy Pvt limitEd
SOME PROMINENT CLIENTS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 18
30. ElEngy tErminal PakiStan limitEd (EtPl)
31. n.m. buildErS & dEvEloPErS
32. raniPur Sugar millS (Pvt) limitEd
33. Saima rEal EStatE
34. mEtro tWin toWEr
35. Canon ConStruCtion ComPany
36. Shirazi invEStmEntS (Pvt) limitEd
37. halima buildErS & dEvEloPErS
38. m.S. intErPriSES
39. C.l. buildErS & dEvEloPErS
40. bandhi Sugar millS limitEd
41. atlaS mEtalS (Pvt) limitEd
42. dalda foodS (Pvt) limitEd
43. abbott laboratoriES PakiStan limitEd
44. induS diStillEry & brEWEry (Pvt) limitEd
45. hamza brothErS imPEx (Pvt) limitEd
46. oriEnt WatEr tEChnologiES
47. induS motorS ComPany limitEd
48. king’S food (Pvt) limitEd
49. S.k. EntErPriSES
50. fina EnErji
51. Sarmad Poultry farm
52. agility logiStiCS (Pvt) limitEd
53. niShat millS limitEd
54. induS hoSPital
55. ghani gaSES
56. PaCifiC oil millS (Pvt) limitEd
57. titan EnErgy PakiStan (Pvt) limitEd
58. Pak Can intErnational
SOME PROMINENT CLIENTS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 19
59. PakiStan gEmS & jEWEllEry dEvEloPmEnt ComPany, miniStry of ProduCtion
60. ParthEnon (Pvt) limitEd
61. digri Sugar millS (Pvt) limitEd
62. PakiStan SPaCE & uPPEr atmoSPhErE rESEarCh CommiSSion (SuParCo)
63. Sindh WildlifE dEPartmEnt (govErnmEnt of Sindh)
64. ElEngy tErminal PakiStan limitEd (EtPl)
65. Ea ConSulting Pvt limitEd
66. dSmE Co limitEd
67. faraS fErtilizEr ComPany (Pvt) limitEd
68. agha StEEl induStriES
69. binaPuri PakiStan (Pvt) limitEd
70. dEnim intErnational (Pvt) limitEd
71. d.j. buildErS & dEvEloPErS
72. tEChnova EntErPriSES (Pvt) limitEd
73. Salim yarn millS (Pvt) limitEd
74. Siddiqui buildErS & dEvEloPErS
75. Sumya buildErS & dEvEloPErS
76. S.P. aSSoCiatES buildErS & dEvEloPErS
77. Country ProPErtiES
78. novatEx limitEd
79. futEhally ChEmiCalS (Pvt) limitEd
80. niPPon koEi Co. limitEd, jaPan
81. fauji oil tErminal& diStribution ComPany limitEd (fotCo)
82. Sino Sindh rESourCES (Pvt) limitEd
83. nbt Wind PoWEr PakiStan(Pvt) limitEd
84. zuhair buildErS
85. karaChi intErnational ContainEr tErminal limitEd (kiCtl)
86. iShaq EntErPriSES
87. hiba buildErS & dEvEloPErS
SOME PROMINENT CLIENTS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 20
88. niko rESourCES (PakiStan) limitEd
89. h.m.ilyaS tradErS
90. Euro buildErS & dEvEloPErS
91. fatima vEnturES & amatul ConStruCtionS
92. Sindh inStitutE of urology and tranSPlantation (Siut)
93. oil & gaS dEvEloPmEntComPany limitEd (ogdCl)
94. aSg mEtalS (Pvt) limitEd
95. anoud tExtilE millS limitEd
96. rECkitt bEnCkiSEr PakiStan
97. Sundar gaS (Pvt) limitEd
98. jaWEdan CorPoration limitEd
99. Engro voPak tErminal limitEd
100. kda offiCErS CooPErativE houSing SoCiEty
102. gEnEration SChool
103. noman buildErS (Pvt) limitEd
104. WaltErS PoWEr intErnational
105. glaxoSmithklinE
106. StatE lifE inSuranCECorPoration
107. rEySir EntErPriSES
108. ibadullah WElfarE truSt
109. divinE dEvEloPErS (Pvt) limitEd
110. luCky onE (Pvt) ltd
111. lakSon tobaCCo ComPany
112. a&a aSSoCiatES
113. haSCombE StoragE limitEd
114. mintEx (miniStry of tExtilE induStry)
115. kmC offiCErS CooPErativE houSing SoCiEty
116. karaChi urban tranSPort CorPoration (kutC)
117. PakiStan houSing intErnational limitEd (Phil)
SOME PROMINENT CLIENTS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 21
118. intErnational ComPlEx ProjECtS limitEd (dolmEn grouP of ComPany)
119. amrEli StEElS (Pvt) limitEd
120. karaChi ElECtriC SuPPly CorPoration (kESC)
121. mm PakiStan (Pvt) limitEd
122. al-tuWairqi grouP
123. mi-SWaCo ovErSEaS limitEd
124. China national maChinEry
125. PakiStan gaSPort limitEd
126. im tEChnologiES PakiStan (Pvt) ltd
127. fauji akbEr Portia tErminal (faPt)
128. quality golf PakiStan (Pvt) limitEd
129. national gaSES limitEd
130. Siza food (Pvt) limitEd
131. orix ProPErtiES PakiStan (Pvt) limitEd
132. PakiStan tExtilE City limitEd (PtCl)
133. taavun (Pvt) limitEd
134. aiSha StEEl millS
135. arEva (t&d) Pak Pvt
136. artiStiC millinErS
137. boSiCor PakiStan limitEd
138. b.P. PakiStan ExPloration & ProduCtion inC.
139. Cadbury PakiStan limitEd
140. CrESCEnt ChEmiCalS
141. dEWan Sugar millS
142. Eni PakiStan limitEd
143. fWq EntErPriSES (Pvt) limitEd
144. hinoPak motor limitEd
145. induS rEfinEry limitEd
SOME PROMINENT CLIENTS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 22
146. qaSim intErnational ContainEr tErminal (qiCt)
147. mari gaS ComPany limitEd.
148. PfizEr PakiStan limitEd
149. PharmaCia & uPjohn (Pvt) limitEd
150. PakiStan Pta limitEd
151. ProCtor & gamblE
152. ShEll PakiStan limitEd
153. South aSia StEEl WorkS (Pvt) limitEd
154. Sui SouthErn gaS ComPany
155. thal EnginEEring
156. lilly intErnational (Pvt) limitEd
157. hamSonS induStriES
158. national rEfinEry limitEd (nrl)
SOME PROMINENT CLIENTS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 23
1. baSiC SurvEy on EnvironmEntal and SoCial ConSidEration for ProjECt
imProvEmEnt of national highWay n5 in karaChi City for jiCa
2. baSElinE Study for Solid WaStE managEmEnt in iSlamabad (SECtor 1-9 & 1-10)
for un-habitat
3. WatEr ConSErvation Study at omv kadanWari gaS fiEld for omv (PakiStan)
ExPloration & ProduCtion
4. SuPPlEmEntal fEaSibility Study on rEvival of karaChi CirCular railWay for
jiCa
5. baSElinE Study of kirthar ProtECtEd arEa ComPlEx for Sindh WildlifE
dEPartmEnt, govErnmEnt of Sindh
6. nation-WidE maPPing of induStriES to analyzE thE rEquirEmEnt of CombinEd
EffluEnt trEatmEnt PlantS (CEtPS) for miniStry of tExtilE induStriES,
govErnmEnt of PakiStan
7. Study on SoCial EnvironmEnt (SoSE) karaChi tranSPortation imProvEmEnt
ProjECt for jiCa
8. rESEttlEmEnt aCtion Plan (raP) for rEvival of karaChi CirCular railWay,
karaChi urban tranSPort CorPoration (kutC)
9. SPECial aSSiStanCE for thE ProjECt formulation (SaProf) for imPlEmEntation
of karaChi CirCular railWay (kCr) ProjECt
STUDIES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 24
1. EnvironmEntal & SoCial imPaCt aSSESSmEnt of 132kv tranSmiSSion linE from
nooriabad PoWEr Plant to kda grid Station, Sindh tranSmiSSion & diSPatCh
ComPany (StdC)
2. EnvironmEntal imPaCt aSSESSmEnt of ConStruCtion & rEhabilitation of
national highWay (n-5), jiCa/karaChi mEtroPolitan CorPoraton (kmC)
3. EnvironmEntal imPaCt aSSESSmEnt of karaChi – hydErabad motorWay (m9),
frontiEr WorkS organization
4. EnvironmEntal imPaCt aSSESSmEnt of 660 mW Coal firEd PoWEr Plant, luCky
ElECtriC PoWEr ComPany limitEd
5. EnvironmEntal imPaCt aSSESSmEnt of 500 kv tranSmiSSion linES for lakhra
Coal firEd thErmal PoWEr Plant ConStruCtion ProjECt, national
tranSmiSSion & diSPatCh ComPany (ntdC)
6. EnvironmEntal imPaCt aSSESSmEnt of grEEn linE raPid tranSit SyStEm for
SPECial ProjECt managEmEnt unit, miniStry of CommuniCation, goP
7. EnvironmEntal imPaCt aSSESSmEnt of dualization of faiSalabad byPaSS (ring
road) & faiSalabad to Chiniot road (PaCkagE - i) for CommuniCation &
WorkS dEPartmEnt, govErnmEnt of Punjab
8. EnvironmEntal imPaCt aSSESSmEnt of dualization of bahaWalPur - haSilPur -
bahaWalnagar road (PaCkagE - ii) for CommuniCation & WorkS dEPartmEnt,
govErnmEnt of Punjab
9. EnvironmEntal imPaCt aSSESSmEnt of dualization of ShEikhuPura - gujranWala
road (PaCkagE - ii) for CommuniCation & WorkS dEPartmEnt, govErnmEnt of
Punjab
10. EnvironmEntal imPaCt aSSESSmEnt of 132 kv SuPPly linE for induS hoSPital,
korangi
11. EnvironmEntal imPaCt aSSESSmEnt of 350mW Coal PoWEr Plant ProjECt for
SiddiqSonS EnErgy limitEd
12. EnvironmEntal imPaCt aSSESSmEnt of thE arkadianS for CrEEk dEvEloPErS
Pvt limitEd
13. EnvironmEntal imPaCt aSSESSmEnt of bahria gardEn City for bahria toWn Pvt
limitEd
14. EnvironmEntal imPaCt aSSESSmEnt of k-2/k-3 ProjECt for PakiStan atomiC
EnErgy CommiSSion
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 25
15. EnvironmEntal imPaCt aSSESSmEnt of gWadar Port EaStbay ExPrESSWay for
gWadar Port authority
16. EnvironmEntal imPaCt aSSESSmEnt of kPt Coal yard for aWan trading Co.
Pvt limitEd
17. EnvironmEntal imPaCt aSSESSmEnt of 50 CuSEC drainagE linE – thar Coal
bloCk-ii for Sindh Coal authority
18. EnvironmEntal imPaCt aSSESSmEnt of infraStruCturE dEvEloPmEnt of bahria
toWn karaChi for bahria toWn PrivatE ltd
19. EnvironmEntal imPaCt aSSESSmEnt of ProPoSEd buS raPid tranSit ProjECt
for bahria toWn PrivatE ltd
20. EnvironmEntal imPaCt aSSESSmEnt of “thE ShorE” for dha – brEntWood Pvt.
ltd
21. EnvironmEntal imPaCt aSSESSmEnt of ProPoSEd gEtz Pharma unit ii ProjECt
for gEtz Pharma (Pvt) limitEd
22. EnvironmEntal imPaCt aSSESSmEnt of naShaP dEvEloPmEnt ProjECt: Chanda
mEla & naShPa dEvEloPmEnt & ProduCtion lEaSES (d & PlS) for oil & gaS
dEvEloPmEnt ComPany limitEd
23. EnvironmEntal imPaCt aSSESSmEnt of gradE SEParatEd traffiC imProvEmEnt
Plan from ParktoWEr to a.t.naqvi roundabout for karaChi mEtroPolitan
CorPoration (kmC)
24. EnvironmEntal imPaCt aSSESSmEnt of bin qaSim Coal ConvErSion ProjECt for
k-EnErgy (Pvt) limitEd
25. EnvironmEntal & SoCial imPaCt aSSESSmEnt of ProPoSEd lng imPort tErminal
ProjECt for ElEngy tErminal PakiStan limitEd (EtPl)
26. EnvironmEntal imPaCt aSSESSmEnt of drilling & aSSoCiatEd aCtivitiES for
unitEd EnErgy PakiStan limitEd (uEPl)
27. EnvironmEntal imPaCt aSSESSmEnt of ExPloration aCtivitiES in kohat E.l for
oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)
28. EnvironmEntal imPaCt aSSESSmEnt of Canola oil ExtraCtion unit for dalda
foodS (Pvt) limitEd
29. EnvironmEntal imPaCt aSSESSmEnt of uSEd lEad aCid battEry rECyCling Plant
for atlaS mEtalS (Pvt) limitEd
30. EnvironmEntal & SoCial imPaCt aSSESSmEnt (ESia) of PakiStan floating lng
tErminal ProjECt in offShorE WatErS for dSmE Co. limitEd
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 26
31. EnvironmEntal & SoCial imPaCt aSSESSmEnt (ESia) of floating lng tErminal
ProjECt for fauji oil tErminal & diStribution ComPamy limitEd
32. EnvironmEntal imPaCt aSSESSmEnt of Sugar mill & CogEnEration Plant for
bandhi Sugar millS limitEd
33. EnvironmEntal imPaCt aSSESSmEnt Study of ConStruCtion of flyovErS on
Corridor v (Shahrah-E-PakiStan), karaChi mEtroPolitan CorPoration (kmC)
34. EnvironmEntal imPaCt aSSESSmEnt Study of ProPoSEd EdiblE oil rEfinEry for
PaCifiC oil millS (Pvt) limitEd
35. EnvironmEntal imPaCt aSSESSmEnt of nbt ii - 250mW Wind PoWEr ProjECt
for nbt Wind PoWEr PakiStan ii (Pvt) limitEd
35. EnvironmEntal imPaCt aSSESSmEnt of nbt iii - 250mW Wind PoWEr ProjECt
for nbt Wind PoWEr PakiStan iii (Pvt) limitEd
36. EnvironmEntal imPaCt aSSESSmEnt Study of ConStruCtion of flyovErS on
Corridor v at Sharah-E-PakiStan for karaChi mEtroPolitan CorPoration
(kmC)
37. EnvironmEntal imPaCt aSSESSmEnt of kPd tay intEgratEd dEvEloPmEnt
ProjECt for oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)
38. EnvironmEntal imPaCt aSSESSmEnt of Sumya Silk (rESidEntial Cum CommErCial
ProjECt) for d.j. buildErS & dEvEloPErS
39. EnvironmEntal imPaCt aSSESSmEnt Study of ShahEEd bEnazir bhutto bridgE
ovEr rivEr induS ConnECting ChaChran Sharif to mithankot for Ea
ConSulting (Pvt) limitEd
40 EnvironmEntal imPaCt aSSESSmEnt Study of faraS fErtilizEr’S aCid
manufaCturing Plant for faraS fErtilizEr ComPany (Pvt) limitEd
41. EnvironmEntal imPaCt aSSESSmEnt of agha StEEl millS for agha StEEl
induStriES
42. EnvironmEntal & SoCial imPaCt aSSESSmEnt of karaChi-hydErabad motorWay
(m-9) for binaPuri PakiStan (Pvt) limitEd
43. EnvironmEntal imPaCt aSSESSmEnt Study for karaChi tranSPortation
imProvEmEnt ProjECt (ktiP) for niPPon koEi Co. limitEd, jaPan
44. EnvironmEntal imPaCt aSSESSmEnt Study of 100mW nbt Wind PoWEr ProjECt
at dhabEji for nbt Wind PoWEr PakiStan (Pvt) limitEd
45. EnvironmEntal & SoCial imPaCt aSSESSmEnt of thar Coal mining ProjECt,
Sinhar vikian varvai, bloCk-1 for Sino-Sindh rESourCES
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 27
46. EnvironmEntal imPaCt aSSESSmEnt Study for ProPoSEd ExPloration aCtivitiES
in dakhni mining lEaSE for oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)
47. EnvironmEntal imPaCt aSSESSmEnt Study for SEiSmiC SurvEy in baran bloCk
for oil & gaS invEStmEntS limitEd (ogil)
48. EnvironmEntal imPaCt aSSESSmEnt Study for oil & gaS ExPloration in
fatEhjang bloCk for oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)
49. EnvironmEntal & SoCial imPaCt aSSESSmEnt of Coal ClinkEr & CEmEnt
tErminal for PakiStan intErnational bulk tErminal
50. EnvironmEntal imPaCt aSSESSmEnt of ComPaCt StEEl Plant for aSg mEtalS at
Port qaSim, karaChi
51. EnvironmEntal imPaCt aSSESSmEnt of drilling & aSSoCiatEd ProduCtion
aCtivitiES in hala bloCk for bP PakiStan ExPloration & ProduCtion inC.
52. EnvironmEntal imPaCt aSSESSmEnt of lng tErminal at Port qaSim for Engro
voPak tErminal limitEd
53. EnvironmEntal imPaCt aSSESSmEnt of luCky onE aPartmEntS & mall for
luCky onE (Pvt) limitEd
54. EnvironmEntal imPaCt aSSESSmEnt of StatElifE toWEr at iSlamabad for
StatElifE inSuranCE CorPoration
55. EnvironmEntal imPaCt aSSESSmEnt for 3 dSEiSmiC SurvEy oPErationS at
Sanghar bloCk, bP PakiStan ExPloration & ProduCtion inC.
56. EnvironmEntal imPaCt aSSESSmEnt of noman CaStEllo, noman buildErS (Pvt)
limitEd.
57. EnvironmEntal imPaCt aSSESSmEnt of Corridor-iv at Shahrah-E-faiSal, City
diStriCt govErnmEnt karaChi (Cdgk)
58. EnvironmEntal imPaCt aSSESSmEnt of dolmEn City ProjECt, intErnational
ComPlEx ProjECtS limitEd (iCPl)
59. EnvironmEntal imPaCt aSSESSmEnt of gizri flyovEr at dha, karaChi for
dEfEnCE houSing authority (dha)
60. EnvironmEntal imPaCt aSSESSmEnt of rEvival of karaChi CirCular railWay for
karaChi urban tranSPort CorPoration (kutC)
61. EnvironmEntal imPaCt aSSESSmEnt of kolaChi EnClavE dEvEloPmEnt for mm
PakiStan (Pvt) limitEd
62. EnvironmEntal imPaCt aSSESSmEnt of tuWairqi StEEl millS ProjECt for al-
tuWairqi grouP
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 28
63. EnvironmEntal imPaCt aSSESSmEnt of Sonda-jhErruk Coal minE for China
national maChinEry
64. EnvironmEntal imPaCt aSSESSmEnt of jhErruk PoWEr Plant for China national
maChinEry
65. EnvironmEntal imPaCt aSSESSmEnt of lng tErminal, jEtty & ExtraCtion
faCility for PakiStan gaSPort limitEd.
66. EnvironmEntal imPaCt aSSESSmEnt of oil PiPElinE (SPm-bPl)
67. EnvironmEntal imPaCt aSSESSmEnt of fErtilizEr & grain tErminal for fauji
akbar Portia marinE tErminalS (Pvt) limitEd for Port qaSim karaChi
68. EnvironmEntal imPaCt aSSESSmEnt of PakiStan tExtilE City, Port qaSim
karaChi
69. EnvironmEntal imPaCt aSSESSmEnt of mabarak CEntrE, lahorE for taavun
(Pvt ) limitEd
70. EnvironmEntal imPaCt aSSESSmEnt for aiSha StEEl millS
71. EnvironmEntal imPaCt aSSESSmEnt for boSiCor oil PakiStan limitEd
72. EnvironmEntal imPaCt aSSESSmEnt for boSiCor ChEmiCal PakiStan
73. EnvironmEntal imPaCt aSSESSmEnt of StEEl rE-bar and Cold rolling mill
for South aSia StEEl WorkS PakiStan (Pvt) limitEd
74. EnvironmEntal imPaCt aSSESSmEnt of irl at diStriCt thatta, dhabEji
75. EnvironmEntal imPaCt aSSESSmEnt of bajara-karaChi looP-linE (girEP-ii)
for Sui SouthErn gaS ComPany
76. EnvironmEntal imPaCt aSSESSmEnt of liquid Cargo tErminal for fWq
EntErPriSES (Pvt) ltd
77. EnvironmEntal imPaCt aSSESSmEnt for artiStiC millinErS dEnim ProCESSing unit
78. EnvironmEntal imPaCt aSSESSmEnt of qaSim intErnational ContainEr tErminal
ExtEnSion PhaSE-ii at Port qaSim
79. EnvironmEntal imPaCt aSSESSmEnt of karaChi ElEvatEd ExPrESSWay from
jinnah bridgE to quaidabad for City diStriCt govErnmEnt karaChi
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
29
1. initial EnvironmEntal Examination of ConStruCtion and CommiSSioning of gPf- ii
in gambat South bloCk for PakiStan PEtrolEum ltd
2. initial EnvironmEntal Examination of Clifton viSta for burj buildErS &
dEvEloPErS
3. initial EnvironmEntal Examination of thE addrESS
4. initial EnvironmEntal Examination of ShrimP farming CluStEr dEvEloPmEnt to
EnhanCE SuPPly of raW matErial for SEafood induStry of PakiStan for
fiShEriES dEvEloPmEnt board
5. initial EnvironmEntal Examination of artiStiC millinErS unit 14 ProjECt for
artiStiC millinErS Pvt limitEd
6. initial EnvironmEntal Examination of uEPl Salamat gaS & SalEh oil faCility
ProjECt for unitEd EnErgy PakiStan limitEd (uEPl)
7. initial EnvironmEntal Examination of uP-gradation of road nEtWork from
SujaWal (thatta) to Wango mor via badin (PhaSE-i) for Sindh Coal authority
8. initial EnvironmEntal Examination of bahria gardEn City for bahria toWn
(Pvt) limitEd
9. initial EnvironmEntal Examination of ConStruCtion & oPEration of aErodromE
(airStriP) for unitEd EnErgy PakiStan limitEd (uEPl)
10. initial EnvironmEntal Examination of hoShang PEarl aPartmEntS ProjECt for
galaxy ConStruCtionS (Pvt) limitEd
11. initial EnvironmEntal Examination of oPal 225 mixEd-uSE building ProjECt for
galaxy ConStruCtionS (Pvt) limitEd
12. initial EnvironmEntal Examination of intEgratEd rESourCE rECovEry CEntrE
(irrC), iSlamabad for unitEd nationS human SEttlEmEntS Program
13. initial EnvironmEntal Examination of landmark toWEr for landmark
EntErPriSES.
14. initial EnvironmEntal Examination of 10 faCulty EduCation ComPlExES for
uSaid
15. initial EnvironmEntal Examination of addition of Coal firEd boilEr for yunuS
tExtilE millS limitEd (ytm)
16. initial EnvironmEntal Examination of naimat faCility ExPanSion ProjECt PhaSE-
v inCluding ConStruCtion ofCamP for unitEd EnErgy PakiStan limitEd (uEPl)
17. initial EnvironmEntal Examination of Efu lifE aSSuranCE building for Efu
lifE inSuranCE Co. limitEd
18. initial EnvironmEntal Examination of gradE SEParatEd traffiC imProvEmEnt
Plan from Park toWEr intErSECtion to a.t. naqvi roundabout for Ea
ConSulting Pvt limitEd
19. initial EnvironmEntal Examination of ProduCt uP-gradation ProjECt for
national rEfinEry limitEd (nrl)
20. initial EnvironmEntal Examination of amEEna toWEr for halima buildErS &
dEvEloPErS
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd.
21. initial EnvironmEntal Examination of onE Way rEgimE at khayaban-E-mujahid &
khayaban-E-ShamShEEr for dEfEnCE houSing authority (dha)
22. initial EnvironmEntal Examination of naimat faCility ExPanSion ProjECt PhaSE-
iv for unitEd EnErgy PakiStan limitEd
23. initial EnvironmEntal Examination of 70 riviEra for mr. anjum rEhmat & mr.
nadEEm rEhmat ShEikh
24. initial EnvironmEntal Examination of korangi gaS turbinE PoWErPlant for
karaChi ElECtriC SuPPly CorPoration (kESC)
25. initial EnvironmEntal Examination of S.i.t.E gaS turbinE PoWErPlant for
karaChi ElECtriC SuPPly CorPoration (kESC)
26. initial EnvironmEntal Examination of quEEn’S rESidEnCia – i for n.m. buildErS
& dEvEloPErS
27. initial EnvironmEntal Examination of ProPoSEd 21 mW Co-gEnEration Plant
for raniPur Sugar millS (Pvt) limitEd
28. initial EnvironmEntal Examination of drilling & aSSoCiatEd aCtivitiES in
non-ProtECtEd arEaS of dSS bloCkS for unitEd EnErgy PakiStan limitEd
29. initial EnvironmEntal Examination of ChillEd WatEr Plant EnhanCEmEnt
ProjECt for PfizEr laboratoriES PakiStan (Pvt) limitEd
30. initial EnvironmEntal Examination of naimat - kauSar PiPElinE for unitEd
EnErgy PakiStan limitEd
31. initial EnvironmEntal Examination of Clifton Comfort for mr. muhammad
kaSSim & mrS rubina muhammad huSSain
32. initial EnvironmEntal Examination of Saima luxuria for Saima rEal EStatE
33. initial EnvironmEntal Examination of Euro hi-tECh rESidEnCy for Euro
buildErS & dEvEloPErS
34. initial EnvironmEntal Examination of uEP naimat faCility uPgradation ProjECt
for unitEd EnErgy PakiStan limitEd
35. initial EnvironmEntal Examination of mEtro tWin toWEr
36. initial EnvironmEntal Examination of faizan rESidEnCy for Canon ConStruCtion
ComPany
37. initial EnvironmEntal Examination of Port qaSim WarEhouSE for Shirazi
invEStmEntS Pvt limitEd
38. initial EnvironmEntal Examination of halima toWEr for halima buildErS &
dEvEloPErS
39. initial EnvironmEntal Examination of aziz hEavEn for kgS buildErS &
dEvEloPErS
EMC PAKISTAN PvT. LTd. 30
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 31
40. initial EnvironmEntal Examination for m.S. intErPriSES
41. initial EnvironmEntal Examination of zamzam toWErS for C.l. buildErS &
dEvEloPErS
42. initial EnvironmEntal Examination of 3.2 mW CogEnEration Plant for abbott
laboratoriES PakiStan limitEd
43. initial EnvironmEntal Examination of ProPoSEd additional 7.15 mW PoWEr
Plant for anoud PoWEr gEnEration limitEd
44. initial EnvironmEntal Examination of futurE dEvEloPmEnt in mkk bloCk for
unitEd EnErgy PakiStan limitEd
45. initial EnvironmEntal Examination of garmEntS StitChing (ExPanSion) for
artiStiC dEnim millS limitEd
46. initial EnvironmEntal Examination of ConStruCtion of undErground WatEr
StoragE tankS for glaxoSmithkinE PakiStan limitEd
47. initial EnvironmEntal Examination of ConStruCtion of 800 mEtErS tESt traCk
for induS motorS ComPany limitEd
48. initial EnvironmEntal Examination of maChiyara SPringfiEld for hanif abdani &
muhammad kaSSim
49. initial EnvironmEntal Examination of ProPoSEd makkah toWErS for halima
buildErS & dEvEloPErS
50. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant for king’S
food (Pvt) limitEd
51. initial EnvironmEntal Examination of Sumya ComfortS for hiba buildErS &
dEvEloPErS
52. initial EnvironmEntal Examination of Saima Clifton Park viEW for S.k.
EntErPriSES
53. initial EnvironmEntal Examination of ConStruCtion & oPEration of jama mall
& rESidEnCy for maChiyara & Paragon grouP
54. initial EnvironmEntal Examination of 50 mW Wind PoWEr ProjECt for finErgy
(Pvt) limitEd
55. initial EnvironmEntal Examination of Sarmad Poultry farm
56. initial EnvironmEntal Examination of qaSim logiStiCS CEntrE for agility
logiStiCS (Pvt) limitEd
57. initial EnvironmEntal Examination of mEhran logiStiCS CEntrE for agility
logiStiCS (Pvt) limitEd
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 32
58. initial EnvironmEntal Examination of ProPoSEd 9 mW Wind PoWEr ProjECt
for titan EnErgy PakiStan (Pvt) limitEd
59. initial EnvironmEntal Examination Study of SmElting Plant at SitE for Pak
Can intErnational
60. initial EnvironmEntal Examination of aSSaying and hallmarking CEntrE for
PakiStan gEmS & jEWEllEry dEvEloPmEnt ComPany, miniStry of ProduCtion
61. initial EnvironmEntal Examination of intErnational buSinESS & ShoPPing
CEntrE for ParthEnon (Pvt) limitEd
62. initial EnvironmEntal Examination of Study of SalE of 2 mW SurPluS PoWEr to
hESC from digri Sugar millS for digri Sugar millS (Pvt) limitEd
63. initial EnvironmEntal Examination of SatEllitE data rECEiving ground Station
for agriCulturE ProjECt for PakiStan SPaCE & uPPEr atmoSPhErE rESEarCh
CommiSSion (SuParCo)
64. initial EnvironmEntal Examination of high PrESSurE tranSmiSSion PiPElinE &
nitrogEn blEnding faCility for ElEngy tErminal PakiStan limitEd (EtPl)
65. initial EnvironmEntal Examination of naxon’S marriagE hall
66. initial EnvironmEntal Examination of atlantiC marriagE hall
67. initial EnvironmEntal Examination of maChiyara toWEr
68. initial EnvironmEntal Examination of aviation EnClavE (houSing ProjECt) for
CEntral buildErS & dEvEloPErS
69. initial EnvironmEntal Examination of tayyabi gardEn for hiba buildErS &
dEvEloPErS
70. initial EnvironmEntal Examination of Euro duPlEx City for Euro buildErS
& dEvEloPErS
71. initial EnvironmEntal Examination of kotri unit ExPanSion ProjECt for
PhilliP morriS PakiStan limitEd
72. initial EnvironmEntal Examination of CaPaCity EnhanCEmEnt ProjECt - SahiWal
unit for PhiliP morriS PakiStan limitEd
73. initial EnvironmEntal Examination of ConStruCtion & oPEration of dEnim
intErnational (Pvt) limitEd
74. initial EnvironmEntal Examination Study for EStabliShmEnt of SmElting Plant
at hub induStrial trading EStatE, hub baluChiStan for tEChnova EntErPriSES
(Pvt) limitEd
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 33
75. initial EnvironmEntal Examination Study of ProPoSEd 2.7 mW (ExtEndablE to
12 mW)gaS baSEd PoWEr Plant at kotri-Sindh for Salim yarn millS (Pvt)
limitEd
76. initial EnvironmEntal Examination Study of graCE toWEr for Siddiqui buildErS
& dEvEloPErS
77. initial EnvironmEntal Examination of boPEt unit for novatEx limitEd
78. initial EnvironmEntal Examination of Sumya bridgE viEW - SuPEr luxury
aPartmEntS for Sumya buildErS & dEvEloPErS
79. initial EnvironmEntal Examination of Saima Pari CEntrE for S.P. aSSoCiatES
buildErS and dEvEloPErS
80. initial EnvironmEntal Examination of futEhally ChEmiCalS (Pvt) limitEd
81. initial EnvironmEntal Examination of ProPoSEd SEiSmiC SurvEy at badin bloCk
(non-ProtECtEd arEaS) for unitEd EnErgy PakiStan limitEd (uEP)
82. initial EnvironmEntal Examination of royal homES for CEntral buildErS &
dEvEloPErS
83. initial EnvironmEntal Examination of rESidEntial aPartmEntS for Country
ProPErtiES
84. initial EnvironmEntal Examination of rESidEntial aPartmEntS for Country
ProPErtiES
85. initial EnvironmEntal Examination of Euro ClaSSiC for Euro buildErS &
dEvEloPErS
86. initial EnvironmEntal Examination of al-ghafoor orChid for zuhair buildErS
87. initial EnvironmEntal Examination of ProPoSEd offShorE drilling of nmr-01
and nmr-02 WEllS in induS baSin for nikorESourCES (PakiStan) limitEd
88. initial EnvironmEntal Examination of Euro grand Park for Euro buildErS &
dEvEloPErS
89. initial EnvironmEntal Examination Study for ConStruCtion & oPEration of
al-ghafoor ChalEt for zuhair buildErS
90. initial EnvironmEntal Examination of nEW PoWEr houSE for karaChi
intErnational ContainEr tErminal limitEd (kiCtl)
91. initial EnvironmEntal Examination of SmElting Plant for h.m.ilyaS tradErS
92. initial EnvironmEntal Examination of CEntrEPoint for a&a aSSoCiatES
93. initial EnvironmEntal Examination of Com-3 for iShaq EntErPriSES
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 34
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
94. initial EnvironmEntal Examination of Sumya rESidEnCy for hiba buildErS &
dEvEloPErS
95. initial EnvironmEntal Examination of Euro CloCk toWEr for Euro buildErS
96. initial EnvironmEntal Examination uSE of magiC float modular floating jEtty
SyStEm (hdPE) for fatima vEnturES & amatul ConStruCtionS (South aSian
rESourCES grouP)
97. initial EnvironmEntal Examination of bitriSm bloCk at diStriCt Sanghar-
khairPur-ShahEEd bEnazir abad Sindh for oil & gaS dEvEloPmEnt ComPany
limitEd (ogdCl)
98. initial EnvironmEntal Examination of ProPoSEd tranSPlant toWEr for Sindh
inStitutE of urology & tranSPlantation (Siut)
99. initial EnvironmEntal Examination of maru-rEti gaS PiPElinE for oil & gaS
dEvEloPmEnt ComPany limitEd (ogdCl)
100. initial EnvironmEntal Examination of ProPoSEd 3d SEiSmiiC oPErationS in
tando ghulam ali (tga)& buzdar rEgionS for bP PakiStan ExPloration &
ProduCtion inC.
101. initial EnvironmEntal Examination of ProPoSEd 11.7 mW (ExtEndablE to 16
mW gaS baSEd PoWEr Plant at anoud tExtilE millS limitEd
102. initial EnvironmEntal Examination of CaPaCity EnhanCEmEnt & gmP
ComPlianCE for rECkitt bEnCkiSEr PakiStan
103. initial EnvironmEntal Examination of lPg StoragE & filling Station for
Sundar gaS limitEd
104. initial EnvironmEntal Examination of naya nazimabad houSing SChEmE PhaSE-i
for jaWEdan CorPoration limitEd
105. initial EnvironmEntal Examination of kda offiCErS CooPErativE houSing
SoCiEty
106. initial EnvironmEntal Examination of gEnEration SChool
107. initial EnvironmEntal Examination for ExPanSion of laCtam bloCk for
glaxoSmithklinE korangi Plant
108. initialEnvironmEntal Examination of rEntal PoWEr PlantS, naudEro, Sindh for
WaltErS PoWEr intErnational
109. initial EnvironmEntal Examination of SolvEnt StoragE WarEhouSE for rEySir
EntErPriSES
110. initial EnvironmEntal Examination of dalton Parking Plaza & ShoPPing mall
& uPgradation of zamzama Club & SPortS ComPlEx, dha PhaSE-v, karaChi,
EMC PAKISTAN PvT. LTd. 35
dEfEnCE houSing authority
111. initial EnvironmEntal Examination for dEvEloPmEnt of juma goth for thE
rESEttlEmEnt of ProjECt affECtEd PErSonS (PaPS), karaChi urban
tranSPort CorPoration
112. initial EnvironmEntal Examination of divinE mEga 2 ProjECt, lahorE, divinE
dEvEloPErS (Pvt) limitEd
113. initial EnvironmEntal Examination of City toWEr, SEvEn SEaS ConStruCtion
114. initial EnvironmEntal Examination of Corridor-iv at Shahrah-E-faiSal, City
diStriCt govErnmEnt karaChi (Cdgk)
115. initial EnvironmEntal Examination of houSing SChEmE ProPoSEd ovEr 200
aCrES of land for kmC offiCErS CooPErativE houSing SoCiEty
116. initial EnvironmEntal Examination of PEtro-ChEmiCal, raW matErial & fEEd
StoCk ProjECt, PakiStan houSing intErnational limitEd.
117. initial EnvironmEntal Examination for amrElli StEElS (Pvt) limitEd
118. initial EnvironmEntal Examination of WESt Wharf & haroonabad PoWEr
gEnEration unitS, karaChi ElECtriC SuPPly CorPoration (kESC)
119. initial EnvironmEntal Examination rEPort for drilling ChEmiCal StoragE
WarEhouSE, mi-SWaCo m-i ovErSEaS limitEd
120. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant hub
baloChiStan, ProCtor & gamblE PakiStan (Pvt) limitEd
121. initial EnvironmEntal Examination of karaChi it toWEr ComPlEx CiviC
CEntrE, karaChi
122. initial EnvironmEntal Examination of PoWEr Plant for intErnational
induStriES limitEd, landhi karaChi
123. initial EnvironmEntal Examination of aCaCia Country & golf Club karaChi
for quality golf PakiStan (Pvt) limitEd
124. initial EnvironmEntal Examination of lPg StoragE & bottling Plant for
national gaS limitEd. hub baluChiStan
125. initial EnvironmEntal Examination of mCdonald’S rEStaurant for Siza food
(Pvt) limitEd. f- 9 Park, iSlamabad
126. initial EnvironmEntal Examination of SErviCES aPartmEntS for orix
ProPErtiES PakiStan (Pvt) limitEd. lahorE
127. initial EnvironmEntal Examination of SofitEl rESidEnCE Clifton for triPlE
trEE aSSoCiatES
128. initial EnvironmEntal Examination of 5-StEEl bridgES for City diStriCt
govErnmEnt karaChi (Cdgk)
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 36
129. initial EnvironmEntal Examination for ExtEnSion of boSiCor PakiStan limitEd
130. initial EnvironmEntal Examination of jinnah toWn houSing SChEmE at kda-33
for daWood EntErPriSES
131. initial EnvironmEntal Examination for ExPanSion of lPg StoragE tankS at
Port qaSim for Shv EnErgy PakiStan limitEd.
132. initial EnvironmEntal Examination of SofitEl toWEr Clifton karaChi for
triPlE trEE aSSoCiatES
133. initial EnvironmEntal Examination of maCh-kolPur for Sui SouthErn gaS
ComPany
134. initial EnvironmEntal Examination of mari gaS ComPany ltd. at ziarat bloCk
baloChiStan
135. initial EnvironmEntal Examination of alEEm SonS WEaving, Printing (Pvt)
limitEd
136. initial EnvironmEntal Examination of an outlEt of mC donald’S rEStaurant
at Clifton bEaCh for Siza foodS (Pvt) limitEd.
137. initial EnvironmEntal Examination of CrESCEnt ChEmiCal ComPany at kEPz
138. initial EnvironmEntal Examination of dEWan Sugar millS
139. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant for
hinoPak motorS
140. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant for PfizEr
141. initial EnvironmEntal Examination for hamSonS induStriES
142. initial EnvironmEntal Examination of additional StoragE tankS for national
rEfinEry limitEd.
143. initial EnvironmEntal Examination of dha WatErfront for dEfEnCE houSing
authority
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 37
1. EnvironmEntal audit - mama induStriES, Port qaSim, karaChi
2. buSinESS SoCial rESPonSibility (bSr) audit - niShat millS limitEd, lahorE
3. buSinESS SoCial rESPonSibility (bSr) audit - uS dEnim
4. buSinESS SoCial rESPonSibility (bSr) audit - artiStiC millinErS
5. buSinESS SoCial rESPonSibility audit - navEEna tExtilE millS, lahorE
6. buSinESS SoCial rESPonSibility audit - ahmEd laCE (nExgEn), karaChi
7. EhS audit - rECkitt bEnCkiSEr, karaChi
8. EnvironmEntal ComPlianCE audit - fmC lahorE
9. hSE ComPlianCE audit - monSanto PakiStan limitEd.
10. EnvironmEntal audit - ChEmitEx tExtilE induStry
11. EnvironmEntal ComPlianCE audit - WyEth PakiStan limitEd
12. duE diligEnCE audit - fauji kabirWala PoWEr Plant, Punjab
13. EhS audit - habibullah CoaStal PoWEr ProjECt, quEtta
14. duE diligEnCE audit- habibullah CoaStal PoWEr, quEtta
15. duE diligEnCE audit - Saba PoWEr limitEd, ShEikuPura
16. EhS audit - abbott laboratoriES Pak. limitEd
17. hSE ComPlianCE audit - PfizEr PakiStan limitEd
18. EhS ComPlainCEaudit - PharmaCia & uPjohn
19. duE diligEnCE ComPlainCE audit - Cadbury PakiStan limitEd, hub, baloChiStan
20. EmS audit - bP PakiStan (E & P)
21. EmS audit - PfizEr PakiStan limitEd
22. EmS audit - laSmo oil PakiStan
23. EhS audit - al-karam tExtilES
24. EhS audit - ExidE PakiStan limitEd
25. EhS audit - thal EnginEEring (automotivE)
26 EnvironmEntal audit - huSain Sugar millS
27. EmS audit - iCi PaintS
28. EmS audit - ParkE daviS PharmaCEutiCalS
29. EmS audit - hinoPak motorS
30. EhS audit - univErSal ChEmiCal induStry .
AUDIT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 38
ENVIRONMENTAL SITE ASSESSMENT
CO
MP
AN
Y P
rO
FIL
E
1. EnvironmEntal SitE aSSESSmEnt PhaSE - i, johnSon & johnSon PakiStan (Pvt.)
limitEd
2. EnvironmEntal SitE aSSESSmEnt of ShutdoWn faCility, gSk PakiStan
3. EnvironmEntal SitE aSSESSmEnt of ShutdoWn faCility, PharmaCia and uPjohn
PakiStan (Pvt.) limitEd
4. EnvironmEntal SitE aSSESSmEnt of faCility, WyEth PakiStan limitEd
5. EnvironmEntal SitE aSSESSmEnt of Sakhi - tangri trunk linE oil PilfEragE
SitE at Sakhi - i faCility, bP PakiStan Sakhi - i faCility
EMC PAKISTAN PvT. LTd. 39
1. ConSultanCy SErviCES of iSo-14000-2004 for hinoPak motorS limitEd.
2. in-houSE training on iSo-14000 for hinoPak motorS limitEd.
3. ConSultanCy SErviCES of iSo-14000 for PharmaCia uPjohn (Pvt) limitEd.
4. ConSultanCy SErviCES for iSo-14000 at al-karam tExtilE limitEd. (ProCESSing
mill).
5. intEgratEd managEmEnt SyStEm, baSEd on ohSaS 18001 and iSo-14000 for
PfizEr PakiStan.
6. ConSultanCy SErviCES for thE EStabliShmEnt of intEgratEd managEmEnt
SyStEm, baSEd on ohSaS 18001 for hinoPak motorS limitEd.
7. ConSultanCy SErviCES for thE EStabliShmEnt of intEgratEd managEmEnt
SyStEm, baSEd on ohSaS 18001 and iSo-14001-2004 for bP PakiStan limitEd.
8. iSo 14001-2004 rEviEW for hinoPak motorS limitEd.
9. ConSultanCy SErviCES for thE EStabliShmEnt of iSo 9001- 2000 and iSo
17025 SyStEmS for almEida tExtilE (Pvt) limitEd, EthioPia
10. Study rEPort on food WaStE diSPoSal for Eni-laSmo oil PakiStan limitEd.
(bhit CamP).
11. rECyCling of WaStE oil SludgE for bP badin PakiStan (ConCESSion arEa).
12. diSPoSal of WaStE oil SludgE and diffErEnt tyPES of ChEmiCalS from
laboratory for ShEll PakiStan limitEd.
13. diSPoSal of WaStEWatEr SludgE for mErCk SharPE dohmE
14. diSPoSal of hazardouS and non-hazardouS WaStE for PEtronaS oil
ExPlorationS
15. diSPoSal and inCinEration of ChEmiCalS, dyES and WaStE oil for al-karam
tExtilES
16. diSPoSal of WaStE oil, grEaSE, Paint and ChEmiCalS uSEd in thE ProCESS.
17. diSPoSal of WaStE flavourEd ChEmiCalS for Cadbury PakiStan limitEd.
18. rECyCling of SolvEnt (111-tCE) uSEd for dEgrEaSing for thal EnginEEring.
19. diSPoSal of WaStE ChEmiCalS for univErSal ChEmiCalS induStry
20. Study rEPort on WaStEWatEr diSPoSal/trEatmEnt for Eni- laSmo oil
PakiStan (bhit CamP).
21. daf (diSSolvEd air floatation) unit for WaStEWatEr trEatmEnt at Cadbury
PakiStan limitEd.
22. WaStEWatEr trEatmEnt Plant at thal EnginEEring.
MISCELLANEOUS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 40
23. WaStEWatEr trEatmEnt Plant at hinoPak motorS limitEd.
24. noiSE Study at ProduCtion faCilitiES, badin ConCESSion bloCk for bP PakiStan
ExPloration & ProduCtion inC.
25. EnvironmEntal monitoring of tuWairqi StEEl mill ProjECt for al-tuWairqi
grouP
26. EnvironmEntal managEmEnt & monitoring Plan for lakSon tobaCCo ComPany
limitEd
27. monitoring of WatErfront dEvEloPmEnt ProjECtS for dEfEnCE houSing
authority
24. rEPort on “Study into CauSES and EffECtS of EutroPhiCation in major lakES of
Sindh”
25. Study of Soil ProfilE of farmlandS around SEhWan trEatmEnt faCility for
Eni-laSmo, SEhWan
26. imPaCt of WaStEWatEr irrigation on thE groundWatEr at nagaWall nEar Eni-
laSmo bhit CamP SitE
27. noiSE Study of bP’S faCilitiES at badin ConCESSion arEa
28. ambiEnt air quality monitoring for bEaCon houSE SChool (jubilEE CamPuS)
29. ConSultiing SErviCES for air diSPErSion modEling of raW matErial
tranSPortation for PakiStan Pta limitEd Port qaSim
30. EnvironmEntal monitoring/managEmEnt Plan for lilly intErnational (Pvt)
limitEd.
31. initial EnvironmEntal rEviEW for hamSonS tExtilE millS (Pvt) lmitEd.
MISCELLANEOUS
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 41
Shanghai ElECtriC
ENvIrONMENTAL IMPACT ASSESSMENT OF 2 X 660 MW POWErPLANT AT THAr COAL BLOCK-I
k-ElECtriC limitEd
ENvIrONMENTAL IMPACT ASSESSMENT OF 660 MW COAL FIrEd POWErPLANT IN POrT QASIM, KArACHI
China PEtrolEum PiPElinE EnginEEring CorPoration ComPany
ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) STUdY OF GWAdAr - NAWABSHAH LNG TErMINAL &
PIPELINE PrOJECT
Emaar PakiStan
ENvIrONMENTAL IMPACT ASSESSMENT FOr dEvELOPMENT OF CrESCENT BAY KArACHI (CBK) PrOJECT
frontiEr WorkS organization
ENvIrONMENTAL IMPACT ASSESSMENT OF KArACHI – THATTA dUAL CArrIAGEWAY
attoCk CEmEnt PakiStan limitEd
ENvIrONMENTAL IMPACT ASSESSMENT OF ATTOCK CEMENT LINE-III
WorkS & SErviCES dEPartmEnt, govErnmEnt of Sindh
ENvIrONMENTAL IMPACT ASSESSMENT OF GHOTKI KANdHKOT BrIdGE PrOJECT
invar intErnational holding inC.
ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr dEEP CONvErSION PETrOLEUM rEFINErY IN POrT QASIM,
KArACHI
Sindh Coal authority
WATEr MASTEr PLAN FOr THAr COALFIELd INCLUdING HYdrOGEOLOGICAL, WATEr SUPPLY ANd
WASTEWATEr MANAGEMENT STUdIES
minES & minEralS dEvEloPmEnt dEPartmEnt, govt of Sindh
ENvIrONMENTAL IMPACT ASSESSMENT dUE TO MINING ACTIvITIES IN SINdH
CrEEk dEvEloPErS Pvt limitEd
MONTHLY MONITOrING OF THE ArKAdIANS
bahria toWn Pvt limitEd
MONTHLY MONITOrING OF BAHrIA ICON CLIFTON
galaxy ConStruCtionS (Pvt) limitEd
MONTHLY MONITOrING OF HOSHANG PEArL APArTMENTS
galaxy ConStruCtionS (Pvt) limitEd
MONTHLY MONITOrING OF OPAL 225 MIXEd-USE BUILdING PrOJECT
Engro ElEngy tErminal limitEd (EEtl)
MONTHLY MONITOrING OF FAST TrACK LNG PrOJECT (OPErATIONS)
WORK IN HAND
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 42
gEtz Pharma (Pvt.) limitEd
MONTHLY MONITOrING OF GETZ PHArMA
PakiStan intErnational bulk tErminal limitEd (Pibt)
MONTHLY MONITOrING
afroz tExtilE
MONTHLY MONITOrING
luCky CEmEnt limitEd
MONTHLY MONITOrING
yunuS tExtilE millS
MONTHLY MONITOrING OF UNIT 1, 2 & 3
PhiliP morriS PakiStan limitEd (formErly lakSon tobaCCo ComPany ltd)
MONTHLY ENvIrONMENTAL MONITOrING (SAHIWAL-UNIT)
PhiliP morriS PakiStan limitEd (formErly lakSon tobaCCo ComPany ltd)
MONTHLY ENvIrONMENTAL MONITOrING (KOTrI-UNIT)
atlaS mEtalS Pvt limitEd
MONTHLY ENvIrONMENTAL MONITOrING OF USEd LEAd ACId BATTErY rECYCLING PLANT PrOJECT
(OPErATIONS)
javEdan CorPoration limitEd
MONTHLY ENvIrONMENTAL MONITOrING OF NAYA NAZIMABAd
WORK IN HAND
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 43
CliEnt/loCation: jiCa - karaChi
PrOJECT: BASIC SUrvEY ON ENvIrONMENTAL ANd SOCIAL CONSIdErATION FOr
PrOJECT IMPrOvEMENT OF NATIONAL HIGHWAY N5 IN KArACHI CITY
SCOPE: The survey was undertaken by EMC with an objective to collect
basic information on the important environmental and social aspects
of the project area which comprised 14.5 km section of N5 and its
immediate vicinity along the road length. The information thus
collected will be used for further preparation of EIA/rAP to be done
in Preparatory Survey.
CliEnt/loCation: un-habitat - iSlamabad
PrOJECT: BASELINE STUdY FOr SOLId WASTE MANAGEMENT IN ISLAMABAd
(SECTOr 1-9 & 1-10)
SCOPE: Conducting Baseline Study for Solid Waste Management in
Islamabad (Sector 1-9 & 1-10), Pakistan which will focus on the
waste generated by households, small businesses and vegetable
and fruit markets in the sectors
CliEnt/loCation: omv(PakiStan) ExPloration & ProduCtion g.m.b.h
PrOJECT: WATEr CONSErvATION STUdY AT OMv KAdANWArI GAS FIELd
SCOPE: review and benchmark OMv’s water consumption status. Identify
tangible water reduction (hardware and software issue such as
training and conservation campaign). Identify options for utilization
of ground water (through water treatment options).
develop a 3-5 years rolling plan to achieve the progressive
reduction in water conservation particularly in surface water
resources.
CliEnt/loCation: jiCa - karaChi
PrOJECT: SUPPLEMENTAL FEASIBILITY STUdY ON rEvIvAL OF KArACHI CIrCULAr
rAILWAY
SCOPE: The Supplemental Study on KCr presents the results of various
investigations and development plans along with cost estimations
under the broad categories viz. Socio-economic Survey of the Host
Population, Stakeholders’ Consultations and Information disclosure,
review of Earlier Investigations and related Studies, Environment
and Social Profile of the resettlement Site, results of Engineering
and Physical Surveys, resettlement Site development Plan and
Infrastructure Conceptual design, Cost Estimates, Project
development and Management Plans, and Socio-Economic and
Financial Analysis. Based on all these investigation reports and
plans, a layout for the resettlement Site for PAPs was prepared,
development of the site planned and practicality of the plan and
sustainability of long term functioning and maintenance of the
resettlement examined.
STUDIES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 44
CliEnt/loCation: Sindh WildlifE dEPartmEnt - govErnmEnt of Sindh, jamShoro
diStriCt – Sindh
PrOJECT: BASELINE STUdY OF KIrTHAr PrOTECTEd ArEA COMPLEX
SCOPE: A comprehensive baseline study was carried by Environmental
Management Consultants for Kirthar Protected Area Complex
(KPAC). The KPAC ecosystem comprises a system of mountains
and valleys. The mountains and valleys are largely wasteland.
The mountains still support a rich variety of plants, mammals,
reptiles, amphibians, fishes and invertebrate species. The valleys
have some 40,000 ha as agricultural land, where natural
vegetation has been replaced by cropland and does not support
rare or threatened plant species. Most of the plants species
present on such agricultural land are cultivated.
The habitats that still support the biodiversity of plant and animal
species are nevertheless face to face with threats from each of
the following parameters:
• Climate Change
• Human population
• Land conversion
• Agriculture
• Over harvesting
• Soil erosion
The loss of biodiversity is however, mainly the result of
impoverishment of resources, which has been induced by:
• recurring episodes of drought and an overall scarcity of rainfall
• Scarcity of surface water and hence over excavation of
groundwater. Climate change has been held largely responsible
for aridity of the environment and desiccation of soil. Additionally
drought conditions and excavation of groundwater from deep down
resources has reduced the availability of water in the root zone of
the plants. This has been going on for decades and that may be the
reason for dwarfing of all the tree species, and for coalescing of the
tree rings, which suggests that the root zone has remained deprived
of its share of water for a considerably long time.
Over exploitation of the already meager resources has now become
the way of life in KPAC since the land area is being expanded for
agriculture. This requires land clearing and the subsequent removal
of vegetation which includes some rare species that are considered
as weeds and of no commercial value.
Water being made available in the core habitat of the wildlife in
particular the large mammals, is being shared by the herds of
livestock whose population has been growing to the extent of being
2 livestock heads per capita.
Availability of green agricultural crops in the land area near the
wildlife habitats has induced the small mammals to encroach on
the agricultural fields. descending of the small mammals to lower
STUDIES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 45
levels has in certain cases prompted the large mammals to descend
to lower levels and thus encroach on others habitat.
The process of land degradation and loss of habitat has been
intensified during the last decade. The plant and wildlife species
are being lost due to i) increasing rate of deforestation, ii) expansion
in its agricultural area, and iii) development activities being based on
greed rather than need.
CliEnt/loCation: miniStry of tExtilE induStry, govErnmEnt of PakiStan, iSlamabad
PrOJECT: NATION-WIdE MAPPING OF INdUSTrIES TO ANALYZE THE rEQUIrEMENT
OF COMBINEd EFFLUENT TrEATMENT PLANTS (CETPS)
SCOPE: Ministry of Textile Industry has proposed:
1) Nationwide mapping study of the entire textile sector to identify
current provisions and need to introduce the interventions,
2) Prioritize future interventions,
3) Make a comprehensive policy proposal on environmental
compliance by the industry,
4) Analyze requirement of setting up Combined Effluent
Treatment Plants (CETP) s for environmental compatibility of the
industry and monitoring their performance.
Environmental Management Consultants, Pakistan has been
assigned to undertake a comprehensive study to accomplish these
tasks.
CliEnt/loCation: jiCa, karaChi
PrOJECT: STUdY ON SOCIAL ENvIrONMENT (SOSE) FOr KArACHI TrANSPOrTATION
IMPrOvEMENT PrOJECT
SCOPE: The Study for Karachi Transportation Improvement Project (KTIP)
has proposed 1) the 18 km long radial Corridor 01 to start from
Guru Mandir and to conclude at Surjani, 2) the 14.5 km long
Circular Corridor 2 to start from Singer Chowrangi and end at
NaganChowrangi, 3) the 15.5 km long radial Corridor 3 to begin
from Guru Mandir and end at Saforah Goth, 4) the 14.5 km long
Circular Corridor 4 to start from Cantt Station and terminate at
Singer Chowrangi, while 5) the 16.5 km long radial Corridor 6 to
operate between Tower and New SabziMandi.
The Study has offered the following four systems for public
consideration:
• Bus rapid Transit (BrT),
• Light rail Transit (LrT)
• Mono rail Transit and
• Metro rail Transit (MrT).
The Karachi Transportation Improvement Project is in line with
several national, provincial, and local policy frameworks that
highlight the need for enhancing Karachi’s urban transport network.
STUDIES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 46
CliEnt/loCation: karaChi urban tranSPort CorPoration (kutC), karaChi
PrOJECT: rESETTLEMENT ACTION PLAN (rAP) FOr rEvIvAL OF KArACHI
CIrCULAr rAILWAY
SCOPE: The revival of Karachi Circular railway has been proposed by
Karachi Urban Transport Corporation (KUTC), Pakistan railway
with the Assistance of Japan International Cooperation Agency
(JICA). The land for project is under the ownership of Pakistan
railway (Pr) but has been illegally encroached by large number
of squatter families. As per the National resettlement Policy and
Social Consideration Guidelines of JICA for International Funded
Projects, proper resettlement/relocation of the affected families
is very important
CliEnt/loCation: karaChi urban tranSPort CorPoration (kutC), karaChi
PrOJECT: SPECIAL ASSISTANCE FOr THE PrOJECT FOrMULATION (SAPrOF)
FOr IMPLEMENTATION OF KArACHI CIrCULAr rAILWAY (KCr) PrOJECT
SCOPE: This Framework of resettlement Action Plan is intended to
provide the project proponent of JICA funded project a planning
method of appropriate involuntary action plan for resettlement
arrangement. Thereby KUTC as a project proponent would be able
to develop appropriate resettlement Action Plan, or rAP.
Within the framework of rAP, Project Affected Persons (PAPs)
should be well informed of the result of social environmental
impact study, project proponent’s intention of resettlement
arrangement in advance of project implementation. Thereby
disseminated information to the PAPs will be able to consider over
time an appropriate psychological preparedness among the PAPs
in respect of resettlement activities
STUDIES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 47
CliEnt/loCation: Sindh tranSmiSSion & diSPatCh ComPany (StdC)/nooriabad PoWEr
Plant to k-ElECtriC grid Station at kda SChEmE 33
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF 132Kv
TrANSMISSION LINE FrOM NOOrIABAd POWEr PLANT TO KdA GrId
STATION
SCOPE: Electric Power will be generated and transmitted through newly
build overhead transmission line of about 95 km from 100 MWs
Nooriabad Power Plant to KdA Scheme-33, Karachi. The line route
is planned keeping in mind the less possible right-of-way section for
the line. Total 500 lattice steel towers will be erected to support the
conductor wires. A total of 66 angle towers (out of 500) will be
installed to divert the line according to the proposed route
CliEnt/loCation: jiCa/kmC/from quaidabad bridgE to StEEl mill intErSECtion
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF CONSTrUCTION &
rEHABILITATION OF NATIONAL HIGHWAY (N-5)
SCOPE: The Project intend to utilize Japan’s Grant Aid to widen the
Quaidabad- Pakistan Steel Intersection of N5 from 4 lanes to 6
lanes for approx. 11km, rehabilitate the pavement and construct
service roads and facilities for traffic management and safety
The existing rOW of 150ft (45.7m) is effectively utilized in
determining the road cross section. The cross section is composed
of 6 lane carriageway whose width is 3.65m per lane and the
service road having enough width for dual traffic. Also a green belt
made of planted trees is provided at the road edge so that rOW
can be clearly identified.
CliEnt/loCation: frontiEr WorkS organization/StartS off at km 13+000 (ProjECt
ChainagE 0+000) of thE nha PoSitionEd undEr thE
flyovEr/intErChangE ProvidEd for thE lyari ExPrESSWay on thE
lyari rivEr and EndS at 149+000 (ProjECt ChainagE 136+000) in
thE CloSEnESS of thE ClovEr lEaf intErChangE WhiCh iS PrESEnt on
thE hydErabad byPaSS
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KArACHI – HYdErABAd
MOTOrWAY (M9)
SCOPE: The proposed 136 Km Karachi-Hyderabad M-9 project starts off at
Km 13+000 (Project Chainage 0+000) of the NHA positioned under
the flyover/interchange provided for the Lyari Expressway on the
Lyari river and ends at 149+000 (Project Chainage 136+000) in the
closeness of the clover leaf interchange which is present on the
Hyderabad Bypass.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 48
The objective of the project is to:
• Strengthen the existing road infrastructure
• Construct existing 4-Lane Karachi-Hyderabad Superhighway as 6-
lane, access controlled in order to provide world class Motorway
(M-9) along with its associated facilities
• design and construct bridges, culverts and underpasses where
necessary
• Provide helpline services, services area and other motorway
facilities
CliEnt/loCation: luCky ElECtriC PoWEr ComPany limitEd/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 660 MW COAL FIrEd POWEr
PLANT
SCOPE: The proposed (1x660MW) Lucky Electric Coal Power Project
(LECPP) will be established over an area of 250 acres of land
acquired from Sindh Bor in deh Ghangiaro, Bin Qasim Town,
Karachi.
The main components of the proposed project include:
• Coal Handling System including dust Extraction and Supression
System
• Steam Generator, Turbine Generator and Auxiliary Units
• Cooling Water System
• Water & Effluent Treatment System
• Fire Protection System
• Air Conditioning & ventilation System
• Electrostatic Precipitators, Low NOx Burners, FGd
• A 200 meters high stack
• Ash Handling System with dry Ash Extraction & Temporary
Storage Facilities
• Electrical Systems: Generator Bus duct, Transformers,
Switchgears, Switch Yard etc
CliEnt/loCation: national tranSmiSSion & diSPatCh ComPany/jamShoro diStriCt,
Sindh
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 500 Kv TrANSMISSION LINES
FOr LAKHrA COAL FIrEd THErMAL POWEr PLANT CONSTrUCTION
PrOJECT
SCOPE: The project comprises the following associated facilities including
the main power plant including ash pond, water intake & discharge
pipeline, water pump station and two access roads. The project also
includes 500 kv Transmission Lines (1.2 km x 2 and 4.2 km x2)
connecting to the existing transmission lines.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 49
The main objectives of the Project are:
• respond to the urgent need to close the yawning gap between
power generation and demand
• Provide an economically viable and environmentally acceptable
power generation system to make the coal available for use in
power production, in view of the wide gap between supplies of
fossill fuel and demand.
• Ensure stable power production system for the country
• respond to the need of improvement in quality of life through
sustainable Energy resource development
CliEnt/loCation: SPECial ProjECt managEmEnt unit, miniStry of CommuniCation,
goP/ muniCiPal Park, Saddar to kESC PoWEr houSE ChoWrangi,
Surjani, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF GrEEN LINE rAPId TrANSIT
SYSTEM
SCOPE: The Project start point is at KESC Power House to the traffic study
in Surjani from where it runs southwards through Khwaja
Shamsudin Azeemi road toward Nagan Chowrangi along Shareh-
e-Usman. From Nagan Chowrangi it runs along Sharah-e-Sher
Shah Suri (South westerly) onto Nawab Siddiq Ali Khan road
through Nazimabad Petrol Pump intersection proceeding towards
Lasbella Chowk. At Lasbella Chowk the route turns South
eastwards onto Business recorder road and runs upto Guru
Mandar. On crossing Guru Mandar the Green Line route turns
south westward onto M. A. Jinnah road. The route westwards
crosses Numaish and reaches the Municipal Park.
CliEnt/loCation: CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab/
Punjab
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dUALIZATION OF FAISALABAd
BYPASS (rING rOAd) & FAISALABAd TO CHINIOT rOAd
SCOPE: The major improvements conceived under the road Improvement
Plan are outlined hereunder:
a) The Project targets to dualized and improved the existing road
of both Packages I and II as divided 2-lane road with median and
shoulders
b)Strengthen the road pavement structure to sustain heavy loads
c) Checking and verification of conditions of existing bridges and
culverts
d) Improvement of Geometrics of alignment, where required,
conditions are improved to cope with horizontal & vertical
clearances, improvement of the horizontal curves, stopping and
passing sight distances, steep grades and sharp curves to comply
highway standards
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 50
CliEnt/loCation: CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab/
Punjab
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dUALIZATION OF BAHAWALPUr -
HASILPUr - BAHAWALNAGAr rOAd
SCOPE: In Package II, two roads will be dualized one of which includes the
Hasilpur to Bahawal nagar road with a reported length of 80 km.
the Hasilpur to Bahawalnagar road starts at the outskirts of
Hasilpur city where the existing dual carriageway terminates and
single lane carriageway (both direction) starts. The project road
ends in the built-up area of Bahawalnagar city at Bhawali Chowk.
The major improvements conceived under the road Improvement
Plan are outlined hereunder:
a) The Project targets to dualized and improved the existing road of
Package II as divided 2-lane road with median and shoulders
b) Strengthen the road pavement structure to sustain heavy loads
c) Checking and verification of conditions of existing bridges and
culverts
d) Improvement of Geometrics of alignment, where required,
conditions are improved to cope with horizontal & vertical
clearances, improvement of the horizontal curves, stopping and
passing sight distances, steep grades and sharp curves to comply
highway standards
e) Improvement of traveling conditions to ensure design speed of
100 km/hour for rural areas and 70 km/hour for urban areas
CliEnt/loCation: CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab/
Punjab
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dUALIZATION OF SHEIKHUPUrA -
GUJrANWALA rOAd
SCOPE: Sheikhupura to Gujranwala road is 45 km in length. The project
road starts at end of flyover ramp over Motorway M-2 near
Sheikhupura city ends at flyover crossing (GT road crossing) near
Gujranwala city.
a) To dualize and improve the existing roads included in Packages I
& II as divided 2-lane road with median and shoulders
b) Strengthen the road pavement structure to sustain heavy loads
c) Checking and verification of conditions of existing bridges and
culverts
d) Improvement of Geometrics of alignment, where required,
conditions are improved to cope with horizontal & vertical
clearances, improvement of the horizontal curves, stopping and
passing sight distances, steep grades and sharp curves to comply
highway standards
e) Improvement of traveling conditions to ensure design speed of
100 km/hour for rural areas and 70 km/hour for urban areas
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 51
CliEnt/loCation: induS hoSPital/korangi CroSSing
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 132 Kv SUPPLY LINE
SCOPE: The Indus Hospital Expansion project is in progress which
envisages higher demand for electricity to run its various facilities.
The proposed 132 kv Supply Line for Indus Hospital Korangi has
been planned to meet the demands. The Expansion will require ca
8MW for Phase I which is foreseen to be operational in the year
2018 and around year 2025 ca 16MW will be needed when Phase
III of The Indus Hospital Master Plan will e operational.
The Indus Hospital facilities, which will be supplied from existing
132 kv KE PrL Grid Station, via underground 132 kv cable. The
proposed 132 kv Supply Line for The Indus Hospital includes:
• Addition of a 132 kv HIS Line Bay at KE PrL Grid Station
• Underground Transmission Line between KE PrL Grid Station and
the proposed Indus Hospital’s Grid Station
• Construction of a dedicated 132 kv GIS Grid Station at The Indus
Hospital
CliEnt/loCation: SiddiqSonS EnErgy limitEd/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 350MW COAL POWEr PLANT
PrOJECT
SCOPE: The project includes a completely developed project including the
engineering, design, procurement, construction, commissioning
and operation of the plant, including a pulverized coal (PC)
generating plant, supercritical therma cycle, once through
sea-water cooling, single concrete chimney, air and water quality
controls (fabric filter baghouse and seawater flue gas
desulfurization (FGd) system), coal truck unloading and coal
storage facilities, ash disposal, balance-of-plant equipment
including all buildings and internal roads to provide a complete
power generation facility.
CliEnt/loCation: CrEEk dEvEloPErS Pvt limitEd/zulfiqar StrEEt no.1, oPPoSitE
dha Country & golf Club, PhaSE-viii, dha, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF THE ArKAdIANS
SCOPE: The Arkadians comprises 13 residential towers (32 and 24 storey
high), six office enclaves and a shopping mall in Zone G of the
Waterfront development Area.
This high-end development spanning over an area of 43.24 acres
comprises of high-rise to mid-rise residential towers, office towers
and a retail component supported with high-quality infrastructure,
ample car parking and recreational facilities.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 52
CliEnt/loCation: bahria toWn (Pvt) limitEd/taluka naWabShah, diStriCt ShahEEd
bEnazirabad
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BAHrIA GArdEN CITY
SCOPE: Bahria Garden City Nawabshah Project is a well planned project.
The proposed project has residential and commercial plots catering
for different needs of different classes of people. The residents
would have state of art facilities such as parks, school, hospital,
sports grounds mixed with open spaces, public buildings, roads
and parking etc.
The project is proposed to have 1199 residential and 125
commercial plots and 52 one bedded & 668 two bedded
Apartments of different sizes.
CliEnt/loCation: PakiStan atomiC EnErgy CommiSSion (PaEC)/ParadiSE Point,
karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF OF K-2/K-3 PrOJECT
SCOPE: The Karachi Nuclear Power Project(K-2/K-3) to be installed near
Paradise Point has two Generation-III NPPs of Pressurized Water
reactor (PWr) type each having capacity of 1100MW. The two
NPPs are expected to be connected with the National Grid by
2020/2021.
Some of the important design features of K-2/K-3 NPPs are:
• Seismic design against peak ground acceleration of 0.3g
• Combination of active and passive safety design features
• Integrated feedback of Fukushima accident
• double shell reactor containment building with enlarged free
volume
• defence against large commercial aircraft crash
The main building/civil structures of the plant are given below:
• reactor Building
• Fuel Building
• Electrical Building
• Safeguard Building
• Nuclear Auxiliary Building
• Turbine Building
• Nuclear Waste Building
• diesel Gnerator Building
• Turbine Building
• 500kv and 132kv GIS Building
• Switchyard Control Building
• demineralized Water Building
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 53
CliEnt/loCation: gWadar Port authority/gWadar Port
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF GWAdAr POrT EASTBAY
EXPrESSWAY
SCOPE: The 4.3 km Expressway will be constructed along the castline
having a road of 6 lanes of 45 meter right of Way (roW). The
proposed expressway is dedicated for the operations of heavy
cargo traffic of Gwadar Port. The route of the expressway will be
enclosed and connected with the Free Zone of Gwadar Port.
The proposed project will integrate Gwadar Port with Makran
Coastal Highway and connects the Free Trade Zone with Future
Conatiner Terminal.
CliEnt/loCation: aWan trading Co. Pvt limitEd/karaChi Port truSt, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KPT COAL YArd
SCOPE: KPT Coal Yard is mainly a storage and handling facility. Coal
handled at the yard is imported coal. It is imported via vessels
which berthed at Karachi Port Berths. Coal will be transported from
the vessels via trucks and stored in the project site in the form of
heaps which are created via bucket loaders. during storage, coal
will be wetted through seawater to avoid spontaneous combustion
and coal dust emissions. After storage, coal will be dispatched
through trucks covered with Tarpaulin to the customers
CliEnt/loCation: Sindh Coal authority, govErnmEnt of Sindh/thar Coal bloCk-ii
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 50 CUSEC drAINAGE LINE
SCOPE: The project involves construction of an integrated effluent disposal
pipeline; it outlines the laying of a 1.2m diameter pipeline with an
approximate length of 37.5 km from Thar coal block-II. The
proposed facilities would have the capacity of transporting
approximately 50 cusecs of effluent water. This effluent consists of
groundwater extracted during mining and does not contain
impurities due to anthropogenic activities
CliEnt/loCation: bahria toWn PrivatE ltd/9 km from toll Plaza, SuPEr highWay,
mda SECtor 117-118, diStriCt malir, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF INFrASTrUCTUrE dEvELOPMENT
FOr BAHrIA TOWN KArACHI
SCOPE: The project site is situated around 9 km from the Toll Plaza, Super
Highway, MdA Sector 117-118, district Malir Karachi and 40 km
from the city centre. The project site is approximately 6,200 acres
in area and will accommodate around 450,000 residents.
The project constitutes the following major components:
• Master-planned Gated Community
• Advanced Security & rescue Services
• 5-star International Hotel & USGA standard 18 hole Golf Course
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 54
• Commercial Areas
• Gold-Class Cinemas
• State-of-the-art Sports Facilities
• World-class School, College and International University
• International standard Hospital
• International Theme Park, Play-land and Water rides
• Wonders of the world monuments (Eiffel Tower, Taj Mahal and
Statue of Liberty)
• Jamia Mosque
• High-rise Commercials
• Lakes
• Zoo & Botanical Garden
• 400ft Wide Jinnah Avenue
• Landscaped Parks
CliEnt/loCation: karaChi mEtroPolitan CorPoration/bahria toWn to toWEr
(bluE linE), karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd BUS rAPId TrANSIT
PrOJECT
SCOPE: The project comprises construction and operation of BrT (Blue
Line) which will connect Bahria Town to M.W. Tower. The main
route of BrT passes through 27.4 km corridor along existing M-9
from its commencement point in Bahria Town up to Sohrab Goth.
The rest 14.5km is planned within center median along Shahrah-e-
Pakistan, S. M. Toufeeq road, Jahangir road and M.A. Jinnah
road up to M.W. Tower. The total main route length along main
alignment is 41.9 km.
While, the link route of BrT facilitates linkage of Bahria Town with
Quaid-e-Azam International Airport. The link alignment also
intersects with BrT red Line at Malir Cantt. Check post No. 6. The
total link route length is 11.5 km, from its origin at Karachi Airport
to termination point at Super Highway, where it meets Blue Line
main alignment.
CliEnt/loCation: dha – brEntWood Pvt. ltd/Sahil avEnuE, Clifton, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF “THE SHOrE”
SCOPE: The proposed project is located at Sahil Avenue on two plots a
high-rise development comprising five towers. There is 60 feet
wide Khayaban-e-Iqbal between two plots i.e. East Wing and
West Wing. East Wing Plot area measuring 11220.32 Sq.yds
entailing construction of two 24 storey residential and one 20
storey office tower and West Wing Plot area measuring 11426.40
Sq.yds where another 24 storey residential towers will be
constructed, each tower having a mall and recreational area on G,
1st and 2nd Floors
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 55
CliEnt/loCation: gEtz Pharma (Pvt) ltd/korangi induStrial arEa
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFPrOPOSEd GETZ PHArMA UNIT IIPrOJECT
SCOPE: The proposed project comprises of construction of a best-in-class facility for secondary manufacturing of multi dosage forms. The proposed facility will have separate buildings for the manufacturing of:• Solid & Liquid dose Products• Injectables• Metered dose Inhalers• Penicillin Products• Cephalosporin Products
CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/kyhbEr
PakhtunkhWa
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFNASHAP dEvELOPMENT PrOJECT:CHANdA MELA & NASHPA dEvELOPMENT & PrOdUCTION LEASES (d & PLS)
SCOPE: The proroject would span over three functionally distinct phases based on the nature of activities:Phase I: Separation of oil & gas including oil stabilization and dispatch facility at MelaPhase II: Construction of a trunk line for gas transportation from Mela to NashpaPhase III: Gas Processing, LPG recovery/Extraction Plant and Allied Facilities at Nashpa Oil FieldProcessing of raw gas at Nashpa and separator gas at Mela would yield LPG, Sales Gas and Stabilized Condensate as final products. The anticipated production capacity at the Nashpa facility is as under:1. 90MMSCFd (sales gas + fuel gas)2. 16800* Barrel/day of Condensate3. 1120 Barrel/day of NGL4. 373 Ton/day of LPG5. 1 Ton/day of Propane
CliEnt/loCation: karaChi mEtroPolitan CorPoration (kmC)/Clifton, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFGrAdE SEPArATEd TrAFFIC
IMPrOvEMENT PLAN FrOM PArK TOWEr INTErSECTION TO A.T. NAQvI
rOUNdABOUT
SCOPE: The proposed Traffic Improvement Plan Comprises:i) Flyover along 26th Street,/Shahrah-e-Firdausi providing for uninterrupted traffic movements along Sharah-e-Firdausi from dHA/Khayaban-e- Ittehad side towards A.T. Naqvi Chowk (Intersection) and onwards to Bin Qasim Park along with a direct access to the Bahria Town IconTower by means of an exclusive down rampii) Improved traffic management at A.T. Naqvi Chowk under the
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 56
above Flyoveriii) Underpasses for entry/exit movements to/from Bahria Town IconTower and Clifton Funland without any interruption to the through movements on main Shahrah-e-Firdausiiv) Interchange between Shahrah-e-Iran and Shahrah-e-Firdausi near Park Towers Intersection leading to 2-Talwar Intersection.v) Other at-grade improvements for better traffic management in theentire areavi) Provision of a number of grade-separated pedestrian crossings at important locations
CliEnt/loCation: k-EnErgy (Pvt) ltd, bqPS-1/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFBIN QASIM COAL CONvErSION
PrOJECT
SCOPE: The Proposed Project includes conversion of two fuel oil fired
boilers to coal fired boilers and installation of two new generation
units at BQPS-1. In addition to the new boilers, the conversion
project includes the facility for coal handling comprising the
following units:
• An open coal storage area surrounded by wind shield
• Conveyor hopper for delivery to the fuel converted units
• Coal handling covered conveyors
• Coal crusher and local conveyors in the open storage area
• Truck unloading system
• Water treatment facilities
• Condensate polishing equipment
• Ash electrostatic precipitator(s) with ash handling conveyors
• Bottom ash handling conveyors
• Ash storage silo
• Ash Pond
• dust prevention, and fire monitoring and prevention facilities
CliEnt/loCation: ElEngy tErminal PakiStan ltd (EtPl)/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF PrOPOSEd LNG
IMPOrT TErMINAL PrOJECT
SCOPE: The project includes constructing and operating a Liquefied
Natural Gas (LNG) terminal in Port Qasim, inclusive of ship
berthing and import facilities, floating storage tanks and
regasification equipment. The project intends to provide facilities
for receiving supplies of LNG via a conventional LNG carrier,
for offloading, transfer an loading into a Floating Storage and
regasification Arrangement (FSrA) which can be an FSrU, or
FSU+ On Shore regasification, or FSU + on barge regasification.
The FSrA will store and re-gasify the LNG and deliver the
regasified liquefied natural gas (rLNG) via jetty and onshore
associated facilities to the gas network operated by the in country
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 57
transmission pipeline providers.
The ESIA has been prepared to fulfill the regulatory requirements
of Pakistan Environmental Protection Act, 1997and to satisfy the
evaluation criteria of the World Bank and International Finance
Corporation (IFC).
CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEPl)/Sanghar South bloCk
(ProtECtEd arEaS)
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF drILLING & ASSOCIATEd
ACTIvITIES
SCOPE: UEP plans to conduct drilling of exploratory and development wells
in the Protected Areas of dSS Blocks. UEP has been granted
Sanghar Block (2569-3) & digri Block (2568-19) by the
Government of Pakistan for the purpose of oil and gas exploration.
Sanghar Block lies across the Sanghar and Khairpur districts,
while digri Block lies across the Mirpurkhas, Hyderabad, Badin,
Umerkot and Sanghar district of the Sindh Province.
The proposed activities will include the following:
• design and location of the exploratory and development well.
• Mobilization of the civil contractor and the drilling rig.
• design, construction, and operation of access road(s) to the
drilling site and camp.
• Well site preparation.
• Laying of flow lines.
• Establishment and operation of the site camp.
• Well drilling, testing, and all related activities.
• Establishment of Early Production and Testing Facilities.
• Well abandonment or well capping for future production and
site restoration.
• demobilization.
CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/kohat E.l.
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF EXPLOrATION ACTIvITIES
SCOPE: The project comprises of conducting a total of 26 seismic profiles
of varying length measuring 439 km to acquire 2d seismic
reflection data.The project shall be carried out in three phases
which fall in the following areas:
• Phase-I lies in settled area of district Kohat and approximately
8 km of one line (Line # KH 49) intrudes in the tribal area of Kohat
• Phase-II of the project area lies in settled area of district Kohat,
Hangu and some profiles are included in the Orakzai Agency Area
• Phase-III of the project area lies in district Kohat, tribal area of
Kohat, tribal area of district Nowshera and tribal area of Peshawar
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 58
CliEnt/loCation: dalda foodS (Pvt) ltd/ Port qaSim , karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF CANOLA OIL EXTrACTION UNIT
SCOPE: The process of manufacture includes Canola seed cleaning, seed
pre-conditioning and flaking, seed cooking, pressing the flake to
mechanically remove a portion of the oil, solvent extraction of the
press-cake to remove the remainder of the oil, and desolventizing
and toasting of the meal.
The plant will have a capacity to process ~ 300 TPd (Tons Per
day) of canola seeds and to produce ~ 125 TPd of crude canola
oil for subsequent refining. Cost of the project is estimated at PKr
800 million.
CliEnt/loCation: atlaS mEtalS (Pvt) ltd/landhi, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF USEd LEAd ACId BATTErY
rECYCLING PLANT
SCOPE: The project will be constructed on a plot 168,000 sq.ft of land
approximately. The project development will include site formation
works and construction of infrastructure including plant building
structures, drains, sewers and utilities for the proposed Used Lead
Acid Battery recycling and Smelting Plant.
The major units include: Battery Collection Area, Storing Area,
Battery Breaking Unit, Pyrometallurgical Process Units, Furnace
and Bag House Unit, Power House etc.
CliEnt/loCation: dSmE Co. ltd/Sonmiani bay, union CounCil gadani, diStriCt
laSbEla, baluChiStan
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) OF PAKISTAN
FLOATING LNG TErMINAL PrOJECT IN OFFSHOrE WATErS
SCOPE: The project intends to provide facilities for receiving, storing and
regasifying LNG via a conventional LNG carrier by a Floating
Storage and regasification Unit (FSrU). The FSrU will be located
offshore in Sonmiani Bay and will store and re-gasify the LNG and
deliver the re-gasified liquefied natural gas (rLNG) via subsea
pipeline and onshore associated facilities to the gas network
operated by the in-country transmission pipeline providers SSGCL
and SNGPL.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 59
CliEnt/loCation: fauji oil tErminal & diStribution ComPany limitEd (fotCo)/
Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) OF FLOATING
LNG TErMINAL PrOJECT
SCOPE The proposed project aims at providing the necessary infrastructure
facility to bring in LNG into the Natural Gas (NG) network. The
infrastructure for the LNG Terminal will comprise four main elements
(i) FSrU; (ii) Jetty, berth, loading arms and supporting infrastructure
to secure the FSrU and LNG supply vessel and offload LNG
supplies; (iii) dredged berthing basin and approach pockets, and (iv)
high pressure send out pipeline to connect to the appropriate gas
transmission grid in close proximity to Port Qasim
CliEnt/loCation: bandhi Sugar millS ltd/diStriCt ShahEEd bEnazirabad - Sindh
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SUGAr MILL & COGENErATION
PLANT
SCOPE: Construction and operation of sugar mill (capacity 7000 TCd)
and 12MW bagasse fired power generation unit. The objective of
the project is to construct and operate sugar mill at Nawabshah,
Bandhi Sugar Mill has a robust system of managing processes
and controls, which will be applied to the proposed project as well
CliEnt/loCation: PaCifiC oil millS (Pvt) ltd/EaStErn induStrial zonE - Port
qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd EdIBLE OIL rEFINErY
SCOPE: The proposed project will be established to refine crude canola
oil by installing a modern refining plant. The refining unit is designed
for making best usage of raw material in manufacturing of edible oil
to avoid wastage. Another benefit of this refining unit is that the
majority of the units produce hydrogenated product “Banaspati”,
while the same are geared for producing and marketing the cooking
oils as such
CliEnt/loCation: nbt Wind PoWEr ii PakiStan (Pvt) ltd/union CounCil jhangri,
taluka jhimPir – diStriCt thatta
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd 250 MW WINd
POWEr PrOJECT II
SCOPE: The project site has about 30931 acres of Government and Private land in Union Council Jhangri – Taluka Jhimpir - district Thatta. The Project includes designing, testing, manufacturing and operation as well as maintenance of the Wind Farm comprising 166 wind turbines. Total project area of the Wind Farm occupies an area of approximately 2203.6 acres on 5 strips of land. Each strip of land is approximately 150 m wide by 10 km long and the land between the strips is 2 km wide.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 60
CliEnt/loCation: nbt Wind PoWEr iii PakiStan (Pvt) ltd/union CounCil jhangri,
taluka jhimPir – diStriCt thatta
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd 250 MW WINd POWEr
PrOJECT III
SCOPE: The project site has about 30931 acres of Government and Private
land in Union Council Jhangri – Taluka Jhimpir - district Thatta.
The Project includes designing, testing, manufacturing and
operation as well as maintenance of the Wind Farm comprising 166
wind turbines.
Total project area of the Wind Farm occupies an area of approximately
2171.2 acres on 5 strips of land. Each strip of land is approximately 150
m wide by 10 km long and the land between the strips is 2 km wide.
The entire Project Area encompasses 30931 cares for both phases 1
(NBT II) is 15734 acres and for phase 2 (NBT III) is 15197 acres.
CliEnt/loCation: karaChi mEtroPolitan CorPoration (kmC)/Sharah-E-PakiStan,
karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF COrrIdOr v
SCOPE: Construction & Operation of following four flyovers at the intersections:
1. Flyover at Ayesha Manzil
2. Flyover at Water Pump
3. Flyover at dak Khana
4. Flyover at Teen Hatti
CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd/kunnar - diStriCt hydErabad
Sindh
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KPd TAY INTEGrATEd dEvELOPMENT
PrOJECT
SCOPE: Kunnar gas/condensate field is located in Hyderabad district about 26
kilometers from Hyderabad City. The Gas Processing Plant will be
constructed adjacent to Company’s existing LPG plant. Project
comprises of Wellhead facilities, Gas Gathering System and Gas
Processing Plant. The gas processing plant shall treat 312 MMscfd raw
gas and with a design margin of about 10%, the entire facilities shall be
capable of handling and treating 340 MMscfd raw gas and the
associated Sales Gas, Condensate, LPG and Produced Water etc.
design margin for Condensate Storage and Loading System shall be
15% instead of 10%. The 312 MMscfd raw gas shall yield 284 MMscfd
Sales Gas, 4400bb/day condensate and 387 MT/day LPG.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 61
CliEnt/loCation: d.j. buildErS & dEvEloPErS/bahadur yar jung CooPErativE houSing
SoCiEty ltd, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SUMYA SILK
SCOPE: Sumya Silk comprising construction of residential & Commercial Complex on a commercial Block. Sumya Silk is a 15 storey residential cum commercial developement project comprising residential apartments offering3 categories: 1) shops at lower ground, ground 1st & 2nd floors 2) Parking on 3rd to 6th 3) Flats plus recreation area on 7th floor, & 8th to 15 floor for flats only on 1916sq.yd area.
CliEnt/loCation Ea ConSulting Pvt ltd
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY OF SHAHEEd BENAZIr BHUTTO
BrIdGE OvEr rIvEr INdUS CONNECTING CHACHrAN SHArIF TO MITHANKOT
SCOPE: The proposed ‘Shaheed Benazir Bhutto Bridge over river Indus connectingChachran Sharif to Mithankot’ is a part of Government’s approach to uplift the living standards of the local population and to provide ways of inancial growth for the people. The project would essentially be comprised of two major components, (i) Construction of the proposed Shaheed Benazir BhuttoBridge (ii) Construction of approach roads and associated structures
CliEnt/loCation: faraS fErtilizEr ComPany (Pvt) limitEd/Port qaSim authority, karaChi
PrOJECT: ENvIrONMENTAL IMPACT STUdY OF FArAS FErTILIZEr’S ACId MANUFACTUrING
PLANT
SCOPE: The proposed project site is located in Eastern Industrial Zone of Port Qasim
Authority. The proposed acid manufacturing plant will be established over an
area of 2 acres.
The proposed project is an integrated Acid Plant that will produce Sulphuric
Acid, Formic Acid and Sulphonic Acid. The major components of the project
include the following main manufacturing units and associated structures:
• Sulphuric Acid Plant
• Formic Acid Plant
• Sulfonic Acid Plant
• Other Associated Structures
CliEnt/loCation: agha StEEl induStriES/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF AGHA STEEL MILLS
SCOPE: The proposed Agha Steel Mill will be established on a 10 Acres of plot of
land located at Port Qasim, Karachi.. The production capacity of this steel
manufacturing plant will be 2,50,000 Tons per Annum.
The project will comprise the following components:
• Meltshop for production of High/Low carbon, Stainless Steel Products and
cast billets
• rolling Mill for production of hot rolled bar and wire rod
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 62
CliEnt/loCation: binaPuri PakiStan (Pvt) limitEd/ExiSting 136 km karaChi-
hydErabad SECtion of national highWay n-5
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) OF KArACHI-
HYdErABAd MOTOrWAY (M-9)
SCOPE: The project starts off at Km 13+000 (Project Chainage 0+000) of
the NHA reference under the flyover/interchange provided for the
Lyari Expressway on the Lyari river and ends at Km 149+000
(Project Chainage 136+000) in the proximity of the clover leaf
interchange on the Hyderabad Bypass.
The proposed project involves rehabilitation of the existing
134.35 Km (Length reduced by 1.65 Km at Hyderabad end,
terminating before Hyderabad Interchange) of 4-Lane carriageway
both northbound and south-bound and construction of an
additional new lane on the inner side of the Highway wherever
technically feasible. Both rehabilitation and widening bound
carriageways will be divided by a New Jersey Barrier.
Extensions are to be made to all the existing bridge structures
and culverts. Four (4) bridges have an additional extension on
either sode accommodating service roads to allow local traffic to
negotiate land locked areas between canals
CliEnt/loCation: niPPon koEi Co. ltd, jaPan/karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr KArACHI
TrANSPOrTATION IMPrOvEMENT PrOJECT
SCOPE: The project will be implemented on two priority corridors named
as “Green Line Corridor” and “red Line Corridor”
The 22 km long proposed Green Line corridor originates from
Surjani Town and Terminates at regal Chowk Saddar. This route
passes through major roads of Karachi having significant demand
of passengers including Sakhi Hassan round About, Sher Shah
Suri road (Board Office round About), Nazimabad Chowrangi,
Gulbahar/Golimar, Business record road (Lasbela), Gurumandir
to M.A. Jinnah road up to radio Pakistan/Jamia Cloth Market.
There are 28 stations and one depot proposed on this corridor.
The 21 km long proposed red Line Corridor originates from Model
Colony (Tank Chowk) and Passing through Check Post No.6 of
Malir Cantt, Safoora Mazar-e-Quaid/People’s Party Secretariat to
Preedy Street Extension, Empress Market terminating at regal
Chowk. There are 27 stations and two depots proposed on red line
corridor.Both Green and red Lines will operate up to Jama Cloth
Market on M.A. Jinnah road on Green Line and to regal Chowk
along New M. A. Jinnah road on the red Line. This will avoid the
transfer between two lines near the center of the city.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 63
CliEnt/loCation: nbt Wind PoWEr PakiStan (Pvt) limitEd/dhabEji
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY OF 100 MW NBT WINd
POWEr PrOJECT
SCOPE: The project has about 1500 Acres of SZABIST land in dhabeji on
the outskirts of Karachi. The project includes designing, testing,
manufacturing and operation as well as maintenance of wind
turbines.
The project includes installation and operation of 33 wind turbines
in Phase-I for the production of 50 MW. Phase-II comprises
installation of another 33 wind turbines and generation of 50 MW.
The total capacity generation will then be raised to 100 MW.
CliEnt/loCation: Sino-Sindh rESourCES/Sinhar vikian varvai, bloCk-1
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY OF THAr COAL MINING
PrOJECT
SCOPE: The project aims at mining of coal from Thar Coal field Block-1 for
power generation of 900 Mega Watts (MW)s. The main objective
of the Thar Coal Mining Project Block-1 is to develop the coal field
resource for power generation for energy and economic security
of the country.
CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/dakhni m.l
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr OIL & GAS
EXPLOrATION
SCOPE: The seismic data acquisition will be carried out using a
combination of vibroseis and dynamite technologies.
The 2d seismic operation is estimated to span over a period of
4-6 months. The objective of the seismic survey is to explore the
subsurface in the area to identify hydrocarbon laden formations.
CliEnt/loCation: oil & gaS invEStmEntS ltd (ogil)/baran bloCk
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY SEISMIC SUrvEY
SCOPE: The proposed exploration activities include the acquisition of
approximately 400 line km of 2d and 100 sq. km of 3d seismic
survey in the Baran block. The seismic data acquisition will be
carried out using a combination of vibroseis and dynamite
technologies. The 2d and 3d seismic operation is estimated to
span over a period of 4 months for both 2d and 3d seismic
surveys.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 64
CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd/fatEhjang bloCk
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr PrOPOSEd
EXPLOrATION ACTIvITIES
SCOPE: The proposed exploration activities include the acquisition of
approximately 800-1000 line km of 2d seismic survey in the
Fatehjang block. The seismic data acquisition will be carried out
using a combination of vibroseis and dynamite technologies
The 2d seismic operation is estimated to span over a period of 4
months.
CliEnt/loCation: PakiStan intErnational bulk tErminal (Pibt)/Port qaSim,
karaChi
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF COAL CLINKEr &
CEMENT TErMINAL
SCOPE: In a two phase development, PIBT will build capacity for handling
up to 4 million tons per annum of coal, cement and clinker in
Phase I development. Handling capacity at additional 4 million
tons will be developed in Phase II.
At the end of Phase II, the terminal handling capacity will be 8
million tons per annum which can further be enhanced to 12
million tons per annum in future.The total estimated cost of
development in Phase I and II is estimated to be 140 million USd
As the project involves financial support by International Finance
Corporation (IFC) thus the ESIA study gratifies the evaluation
criteria of the funding body. Also all applicable national &
International guidelines and regulations have been used as
reference in preparing this ESIA.
CliEnt/loCation: Engro voPak tErminal ltd/Port qaSim karaChi
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF LNG TErMINAL
SCOPE: The project is intended to provide facilities for receiving supplies
of liquified natural gas (LNG) via conventional LNG carrier
(LNGC), for offloading and dockside transfer to an FSrA.The re-
gasified liquefied natural gas (rLNG) will be delivered via a jetty
and onshore facilities to the gas networks operated by SSGC
(underground/overhead connection to the pipeline proposed by
SSGC for MASHAL Project, off take, approximately 2 to 3 km in
length)
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 65
CliEnt/loCation: aSg mEtalS ltd/Port qaSim , karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF COMPACT STEEL PLANT
SCOPE: The proposed project is of an integrated steel making plant to
produce cast billets by recycling process using induction furnaces
for melting scrap. The process of producing liquid steel is such
that it helps refine the tapped heat from the Induction Furnace.
The secondary refining of liquid steel will be done at ladle furnace
before sending it to Continuous Casting Machine to cast the
billets
CliEnt/loCation: bP PakiStan ExPloration & ProduCtion inC./mirPurkhaS
PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF drILLING &
ASSOCIATEd PrOdUCTION ACTIvITIES IN HALA BLOCK
SCOPE: The proposed project (drilling & Associated Activities) will be
carried out in Hala Game reserve which is located in Mirpurkhas
Block. The project area for which the study has been performed
covers about 9.538 km2.
CliEnt/loCation: luCky onE (Pvt) ltd/raShid minhaS road, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF LUCKY ONE APArTMENTS &
MALL
SCOPE: Lucky One is an Urban development Project comprising a Mall
& Apartments being established over an area of 15 acres at the
present site of Fazal Textile Mills Limited, on rashid Minhas
road in Federal B Industrial Area, Karachi. Lucky One will
include1500 large size apartments, which will attract a permanent
population of approximately 9000-10,000 people.
Conveniently situated on the prime location of Central Karachi, at
Fazal Mill roundabout, the apartments are easily accessible
through major flyovers of Karachi.
CliEnt/loCation: StatElifE inSuranCE CorPoration/iSlamabad
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF STATELIFE TOWEr
SCOPE: Statelife Tower is an Urban development Project comprising of 18
storeys Office Tower estalished over an area of 5,120 square
yard of commercial plot located in Blue Area at Jinnah Avenue,
Islamabad.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 66
CliEnt/loCation: noman buildErS (Pvt) ltd/Clifton karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF NOMAN CASTELLO
SCOPE: The proposed project consists of Highrise Office Towers over
plot of 2000 Sq. Yds area at Boat Basin, Clifton, Karachi
CliEnt/loCation: bP PakiStan ExPloration & ProduCtion inC./Sanghar bloCk
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 3-d SEISMIC OPErATIONS
SCOPE: The project of 3d Seismic Operations by BP Pakistan Exploration
Production Inc. in Sanghar South Block comprises the said
operation as a prelude to oil and gas exploration.The said Block
covers a total area of approximately 2477 sq. km and is located in
the Sanghar, and Khairpur districts of Sindh Province.
CliEnt/loCation: City diStriCt govErnmEnt karaChi (Cdgk)/Shahrah-E-faiSal,
karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF COrrIdOr-Iv
SCOPE: The project comprises construction of eight flyovers at the
intersections. This would develop Shahrah-e-Faisal as a signal
free expressway, presently managed through a series of
signalized intersections throughout the Shahrah.
CliEnt/loCation: intErnational ComPlEx ProjECtS ltd/Clifton, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dOLMEN CITY PrOJECT
SCOPE: The project is located at the sea shore of Arabian Sea and is
being constructed on a plot of land measuring approximately
37,666 sq.yds.
dolmen City is among the most prestigious mixed use
development projects of Pakistan. It is being built to serve
corporate and commercial clients in an ultra modern business
environment.
CliEnt/loCation: dEfEnCE houSing authority/karaChi
PrOJECT: ENvIrONMENTAL ANd SOCIAL IMPACT ASSESSMENT OF GIZrI FLYOvEr
SCOPE: The Study “Transport Planning & Traffic Management Plan for
dHA”, revealed that approximately 44000 vehicles enter/leave
dHA from Submarine Intersection. All these vehicles pass
through Gizri Commercial Area to approach Khayaban-e-Hafiz.
Heavy traffic volume and encroachments in the Gizri commercial
area creates a chaos at this main entry/exit point.
due to the current traffic congestion problems, dHA started the
construction of 1.2 km long flyover in Gizri commercial area, in
order to solve the congestion problems.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 67
CliEnt/loCation: karaChi urban tranSPort CorPoration (kutC)/karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF rEvIvAL OF KArACHI
CIrCULAr rAILWAY
SCOPE: Karachi Circular railway (KCr) will be revived as a Modern
Commuter System to meet the essential transportation need of
the citizens of Karachi. The total route length of the dual tracks
on the Karachi Circular railway project stage-I & stage-II is 43.12
Km (Karachi city to NIPA: 22.86 Km and NIPA to Karachi City
Station & along mainline: 20.26 Km) with 24 stations.
Stage III drigh road to Jinnah Airport (6.1 Km) is itself a viable
project and will be implemented after stabling initial operating
period of 7 years for stage I & II. This stage is neither included
nor under consideration for the funding by JICA. 290 trains/day
will be operated at 6 minutes headway in each direction with
capacity of 942/1391 passengers/train, 18840/30 passengers/hour
and 0.69 million passengers/day (As per SAPrOF Study).
CliEnt/loCation: mm PakiStan (Pvt) ltd/China CrEEk WatErfront along mai
kolaChi ExPrESSWay, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KOLACHI ENCLAvE
dEvELOPMENT
SCOPE: The site for the project is located along China creek waterfront
along Mai Kolachi expressway, Karachi. This is the first in the
series of new urban centres that are being planned in greater
Karachi to help arrest further concentration of offices and
commercial activities in this area. The proposed Kolachi Enclave
development will contain commercial and residential blocks with
facilities such as parking, landscaping and recreational hub for
the local as well as foreign visitors. Project development will
include site formation works and construction of infrastructures,
drains, sewers and utilities and landscape areas.The site selected
for the project is 35.08 acres of land.19.08 acres of land has been
reclaimed while 16.0 acres of water front development has been
allocated for recreational purposes acquired by KPT for the future
development, of which 10 acres will be utilized by the tower
complex. The main tower would be 78 storeys high.
CliEnt/loCation: al-tuWairqi grouP, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF TUWAIrQI STEEL MILLS LTd.
SCOPE: The proposed project is related with the setting up of a steel mill plant to produce direct reduced iron in the first phase and steel and guidelines related to the project as well as appropriate international guidelines. The recommendations wouldbe given onthe basis of project activitiesof Pakistan Environmental Protection Act 1997.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 68
CliEnt/loCation: fauji akbar Portia marinE tErminalS (Pvt) ltd/Port qaSim
karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF FErTILIZEr & GrAIN
TErMINAL
SCOPE: The project is located in Port Qasim and designed for handling
storing and bagging of fertilizers, grains and oil seeds, and
rice with combined tonnage of about four (04) million tons per
annum. The grains and fertilizers are unloaded and conveyed
with the help of bulk unloaders and conveyor offloading belts
CliEnt/loCation: China national maChinEry/thatta diStriCt Sindh
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SONdA-JHErrUK COAL MINE
SCOPE: Sonda-Jherruk minefield is located in Union Council Jherruck
and Sonda, Thatta district, Sindh Province, Pakistan, at the
West of Indus river.The minefield is about 190 km of
transportation distance to Karachi in the southwest and about
38 km of transportation distance to Hyderabad in the north.
The proposed Sonda-Jherruck Coal Mine Project (SJCMP)
comprises sustainable development of coal mine and
minemouth at Sonda-Jherruck for production of 1.8 million
tons coal annually or 5000 tons/day.
The project involves investments of about US$ 315.79 million
Coal mine area has been leased for 30 years and coal
extraction from the mine will be approximately 1.80 million
tons per annum.
It has planned to sink a 180 m shaft to extract Coal. The
proposed project involves the development of mining site,
installation of mining machinery and equipment and
transportation of coal from the mine deep down. The
environmental assessment examined the potential for impacts to
Natural, Biological & Socio-Economic Environment of the
Project Area. The scope of EIA was in line with the World
Bank/IFC guidelines and all relevant National laws, regulations
and guidelines.
CliEnt/loCation: China national maChinEry/thatta diStriCt Sindh
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SONdA-JHErrUK COAL
FIrEd POWErPLANT
SCOPE: The proposed power plant is located in Union Council
Jherruck, in Thatta district, Sindh Province, Pakistan, at the
west of Indus river. JPP Project is adjacent to the proposed
Jherruck/Sonda coal mine and is about 160 km to Karachi, 30
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 69
km (direct line) from Hyderabad City in the north and about 10
km from Sonda Town.
Jherruck Power Plant project (JPPP) is being initiated by a
Chinese firm named as Global Energy development (Private)
Ltd
This proposed power plant comprises sustainable development
of 3 X135 MW – mine – mouth Power Plant.
When completed JPPP will be a milestone to confront the
energy-poverty nexus, and to contribute to economic
development in the region. Total investment in 3x135 MW
super high pressure coal fired power plant is 464.68 Million USd
CliEnt/loCation: PakiStan tExtilE City/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF TEXTILE CITY
SCOPE: The project is located in the Eastern Industrial Zone of Port
Qasim having covered area of about 1,250 acres. It is
developed to provide the domestic textile industry with state-
of the art infrastructure to maximize the production
capabilities to enable it to compete with best in the international
market
CliEnt/loCation: PakiStan gaSPort ltd/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF LNG TErMINAL, JETTY &
EXTrACTION FACILITY
SCOPE: The project is located just North of Qutub Point in Kadiro Creek
linking main Port Qasim navigation channel with Korangi Creek.
It is specifically designed to accommodate LNG Cargo vessels
and re-gasification facility at the point of reception.
CliEnt/loCation: boSiCor oil PakiStan ltd/hub baloChiStan
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BOSICOr OIL
SCOPE Bosicor Oil Pakistan planned to set up an oil refinery in order to
meet not only energy requirement of the country but also to
acquire additional security and desires flexibility in its supply.
CliEnt/loCation: boSiCor ChEmiCal PakiStan ltd/laSbEla baloChiStan
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BOSICOr CHEMICAL
SCOPE Bosicor Chemical Pakistan is setting up an Aromatic Complex
project in district Lasbella, Balochistan. The total covered area of
the project is around 331,573 Square meters. It is an Aromatic
Complex having production capacity of 6,012,000
bbl/annum.Aromatic complex produce chemicals that are feed
stock for production of polyester fibers, plastics, pesticides etc.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 70
CliEnt/loCation: taavun grouP uaE & govErnmEnt of Punjab/gardEn toWn
lahorE
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr HIGH rISE BUILdING
SCOPE: This project is located in Garden Town, Lahore having covered
area of about 62,412m2
Mabarak Centre is a multi-use complex, consisting of four towers
and a horseshoe shaped building. It includes residential and office
towers, as well as conference halls, shopping mall and a five star
hotel. A high rise building with the name has been proposed by
Taa’vun which is a joint venture of Government of Punjab and
UAE Government. EIA study was conducted to assess the
environmental and social impacts of the roject and recommending
mitigation measures
CliEnt/loCation: boSiCor PakiStan ltd/baloChiStan
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF OIL PIPELINE (SPM-BPL)
SCOPE: BPL has planned to acquire oil from international market and
thus establishing a pipeline in association with Coastal refinery
Ltd. This pipeline will partly laid down under water and partly on
land. The concept of this project is establish a Single Point Moor
(SPM) in the sea at Khalifa Point from where it will be connected
to the pipeline and then pipeline will be connected to the storage
tanks of BPL.
CliEnt/loCation: aiSha StEEl mill/bin qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF AISHA STEEL MILLS
SCOPE: Aisha Steel Mill is a cold rolling unit located in the downstream
industrial zone of Pakistan Steel Mills in Bin Qasim The total
covered area of the project is 50 acres. The main components of
the mill are rolling mill, annealing furnace, pickling line and
galvanising unit. For making cold rolled and galvanised coils
raw materials including hot rolled strips/coil are used.
CliEnt/loCation: South aSia StEEl mill/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SOUTH ASIA STEEL MILLS
SCOPE: The project as a new steel mill is located in Port Qasim Area. It
comprises of three main components i.e. Cold rolling Mill, rebar
Mill and Thermal Power Plant.Billets are used as raw material for
rebar, hot rolled strips for cold rolling mill and coal for thermal
power plant.The cold rolling mill and thermal power plant covers
40 acres of total project area.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
CliEnt/loCation: induS rEfinEry ltd/dhabEji
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF INdUS rEFINErY
SCOPE: Indus refinery Ltd is an oil refinery which requires Environmental
Impact Assessment. EMC has successfully prepared and
submitted the Environmental Impact Assessment report in Jan
2006
CliEnt/loCation: Sui SouthErn gaS ComPany ltd
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BAJArA-KArACHI LOOP LINE
(GIrEP-II)
SCOPE: The Bajara Karachi 24ӯ X 200 km loopline project (BKLP) is a
continuation of SSGCL’s transmission line expansion phase
under GIrEP II plan. The proposed gas pipeline will be
established at an estimated total cost of rs. 4437 million and will
follow thesame route on which its 18” Ø I.r.B.P (Indus right Bank
Pipeline), and 20” Ø I.r.B.P-CEP, 16” Ø I.L.B.P (Indus Left
Bank Pipeline) and 20” Ø Kadanwari Pipeline laid in 1975 and
1989 respectively are in operation.
Starting from Bajara in dadu district, the corridor for the Pipeline
would proceed along a 10 metre wide strip to Karchat – Sari –
Khadeji – ACPL, off-take point – Malir Mixing Plant – SMS Malir
and finally terminate at SSGCL’s Karachi Terminal.
Approximately half of the portion of this width will be acquired
while the other half will be leased on temporary basis by SSGCL.
CliEnt/loCation: fWq EntErPriSES (Pvt) ltd/Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr LIQUId CArGO TErMINAL
SCOPE FWQ is a Liquid Cargo Handling Company with Joint venture of
FELdA Malaysia and Westbury Pakistan. They are developing
Liquid Cargo Terminal at Port Qasim which requires
Environmental Impact Assessment. EMC has successfully
prepared the report
CliEnt/loCation: artiStiC millinEr’S ProCESSing unit/landhi induStrial arEa,
karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF ArTISTIC MILLINEr’S
SCOPE Environmental assessments of Artistic Milliner's proposed project
of denim Processing Unit situated in Landhi industrial Area
EMC PAKISTAN PvT. LTd. 71
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 72
CliEnt/loCation: qaSim intErnational ConatinEr tErminal (qiCt)/Port qaSim,
karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr EXTENSION PrOJECT
SCOPE Existing QICT is approaching its capacity. Therefore, an extension
has been planned. IEE for the extension project thoroughly
investigated all impacts and recommended its mitigation alongwith
the management and monitoring plan. The report completed and
got NOC in december 2006.
CliEnt/loCation: City diStriCt govErnmEnt karaChi (Cdgk)/karaChi
PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr KArACHI ELEvATEd
EXPrESSWAY FOrM JINNAH BrIdGE TO QUAIdABAd
SCOPE Karachi Expressway is constructed on the corridor that starts from
Jinnah Bridge near Karachi Port and passing through Saddar
Town, Jamshed Town, Shah Faisal Town and Malir Town, it
reaches Quaidabad in Landhi Town of the City district Government
of Karachi (CdGK). It is a signal free elevated express with a total
length of 25 km. It crosses over an existing railway track at PIdC
House.
EIA EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 73
CliEnt/loCation: PakiStan PEtrolEum ltd/gambat South bloCk
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION ANd
COMMISSIONING OF GPF - II
SCOPE: The propoject involves construction of 50 MMSCFd Gas Facility.
The Plant is to be designed to process up to 50 MMSCFd gas,
approximately 10 TPd LPG and 950 BPd Condensate. Sales Gas
shall be injected in Sui Southern Gas Company Limited (SSGCL)’s
network wheres Condensate and LPG shall be stored for its
onward dispatech to selected refineries and Marketing Companies
respectively. Condensate storage facilities shall comprise four
tanks of 1500 barrel capacity whereas LPG storage shall entail 3
bullets of 20 MT capacity each, summing up to 60 MT capacity.
CliEnt/loCation: burj buildErS & dEvEloPErS/kEhkaShan Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CLIFTON vISTA
SCOPE: The proposed project is being constructed on a total area of
1,605.00 SQ. Yrd (14,45SQ. FT). The project is seventeen (17)
storeys commercial cum residential development consisting of
residential flats from 5th to 16th floors that are spacious and
secure. The project features and design are in accordance with the
requirements of modern day living facilities such as parking area
and recreational facility.
CliEnt/loCation: thE addrESS buildErS & dEvEloPErS/bloCk-8, SChEmE-5,
Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF THE AddrESS
SCOPE: The proposed “The Address” is being constructed on a plot 1001
sq. yds. The project is fifteen (15) storeys commercial cum
residential development consisting of flats from 5th to 13th floors
that are spacious and secure which is conventionally situated
around library, colleges, schools and markets.
CliEnt/loCation: fiShEriES dEvEloPmEnt board/mirPur Sakro
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SHrIMP FArMING CLUSTEr
dEvELOPMENT TO ENHANCE SUPPLY OF rAW MATErIAL FOr SEAFOOd
INdUSTrY OF PAKISTAN
SCOPE: The project site is located in the deltaic region of river Indus, surrounded by a natural creek system in the north, south and the west. The project involves development of Shrimp Farming comprising 16ponds and associated infrastructure for the maintenance of the ponds. Key features of the shrimp ponds include:• Automatic Feeding• Horizontal Aerators andor/ Pedals• Salinity Control • Laboratory for quality and environmental control
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 74
CliEnt/loCation: artiStiC millinErS Pvt limitEd/korangi induStrial arEa, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ArTISTIC MILLINErS UNIT 14
PrOJECT
SCOPE: The proposed AM Unit 14 facility will be located in Sector 25 of
Korangi Industrial Area on an area of 3.94 acres. The proposed
facility will consist of three floors housing the garments cutting,
stitching and finishing sections besides warehouse, utilities and
amenities – canteen, prayer area etc.
CliEnt/loCation: unitEd EnErgy PakiStan limitEd (uEPl)/diStriCtS tando
allahyar and matiari (mkk bloCkS)
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF UEPL SALAMAT GAS & SALEH
OIL FACILITY PrOJECT
SCOPE: United Energy Pakistan intends to construct a new 100 MMscfd
gas production facility at Salamat Gas Field and an Oil Handling
Facility to handle 10,000 BPd oil and 10,000 BPd water at Saleh
Oil Field. The project is needed due to the fact that UEP has
discovered new wells and in order to process the additional raw gas
and oil from these wells, existing production infrastructure would be
unable to cope with the production requirements with addition of
new wells in the MKK concession during 2104 and 2015.
The Salamat Gas facility shall have the following components:
• Production Separator (relocated from other facilities)
• Test Separators
• Amine Unit (relocated from Tangri)
• Gas dehydration Unit (Glycol) (from Mazari)
• Cooling systems (from Kauser)
• Condensate Storage & Loading
• Produced Water System
• Utilities (Hot Oil System, IA Compressors, Nitrogen Storage, rO
Plant, Fire water System)
• draining system
• Flare Stack and K.O. drums
CliEnt/loCation: Sindh Coal authority/naWabShah, SujaWal (thatta) to Wango
mor via badin
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF UP-GrAdATION OF rOAd
NETWOrK
SCOPE The project is located in districts Thatta, Sujawal and Badin. The project is divided into five construction packages for the division of assigning of construction and works along the proposed project route. The 176 km Thatta to Wango Mor road includes constructionof 5 bypasses, bridges and culverts. All the infrastructure facilities will be provided at the site as per the applicable national and international standards and codes
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 75
CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEPl)/mkk ConCESSion arEa
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION
OF AErOdrOME (AIrSTrIP)
SCOPE: United Energy Pakistan intends to construct an airstrip near UderoLal (Tando Adam) for facilitating movement of its employees to andfrom oil and gas fields located around Tando Adam. The site is located mainly in district Sanghar, deh Taluka Tando Adam and partly in district Matiari, deh Mari, Taluka Matiari. Acording to the Master Plan, the facilities planned include Car Parking, Aircraft Parking, Passenger waiting room (Approx. 20 Persons), Shade for ground support equipment (Stairs for access/exit aircraft and barricades), and Power Supply System.
CliEnt/loCation: galaxy ConStruCtionS (Pvt) limitEd, Saddar toWn, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HOSHANG PEArL APArTMENTS
PrOJECT
SCOPE: Hoshang Pearl Apartments Project is located on Hoshang road, adjacent to Karachi Club. The salient features of the proposed project are given below: • 31 Storey Building• 5 Star Fully Serviced Apartments & Penthouses• 24 Hours Concierge Service• designer Interior with Premium Finishing• Modern Exterior & Spacious Interior • Health Club, restaurant & Spa• State of the art IT & Communication Infrastructure• 24/7 real Time CCTv Surveillance• Express Elevators• 11 Floors dedicated for Spacious Parking• Central ventilation & High Performance Air Conditioning
System• International Fire & Safety regulations Assurance• 100% Back-up Power (No Load-Shedding)
CliEnt/loCation: galaxy ConStruCtionS (Pvt) limitEd, karaChi Cantt, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OPAL 225 MIXEd-USE BUILdING
PrOJECT
SCOPE: The Opal 225 Mixed-Use Building Project is situated in Karachi Cantonment, Karachi. The details of the project are given below:• Ultra modern Shopping Mall with the Local & International
brands• Food Court, restaurants, Executive Lounge & Movie Theater• Serviced Apartments operated by International 5 Star Hotel
Brand• SPA, Health Club, restaurant and Swimming Pool• 6 Basement Floors dedicated for spacious Car Parking• 100% Back-up Power• Modern Security and 24/7 real Time CCTv Surveillance• State of the IT and Communication Infrastructure
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 76
CliEnt/loCation: unitEd nationS human SEttlEmEntS Program/iSlamabad
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdIES FOr INTEGrATEd
rESOUrCE rECOvErY CENTrE (IrrC)
SCOPE: Un-Habitat and UNESCAP is going to launch a pilot project for
Solid Waste Management in Islamabad. The pilot project will be
initiated through the establishment of Integrated resource
recovery Centers (IrrC) in the city.The IrrC will process 4 tons
of the waste generated by households and commercial points
located in G-15, and will convert the waste stream into resources.
CliEnt/loCation: landmark EntErPriSES/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdIES OF LANdMArK TOWEr
SCOPE: The Landmark Tower is located in Khakashan, Clifton along the
Khayaban-e-Jami in Karachi. The Tower comprises of a 23-
storeyed commercial building constituting solely its corporate
offices that shall be built over 1,000 sq.yards.
CliEnt/loCation: uSaid/PakiStan
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdIES FOr CONSTrUCTION OF 10
FACULTY EdUCATION COMPLEXES
SCOPE: The purpose of this task order is to provide comprehensive
program management services, including the design, construction
management, equipping, and construction services for ten new
Faculty of Education complexes at ten existing university
campuses.
CliEnt/loCation: yunuS tExtilE millS ltd (ytm)/landhi induStrial arEa (lia),
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AddITION OF COAL FIrEd BOILEr
SCOPE: Yunus Textile Mills Limited has installed the Coal/rice
Husk/Bagasse Fired Water Tube Boiler to meet the energy needs
of the production units. The boiler is equipped with travelling gate
for firing the imported coal as primary fuel and mixing combination
of coal with 30% rice Husk and Bagasse as second option, on
gravity feeding system in the water cooled furnace.
CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEPl)/naimat, taluka tando
adam, diStriCt Sanghar, Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAIMAT FACILITY EXPANSION
PrOJECT PHASE-v INCLUdING CONSTrUCTION OF CAMP
Scope: The site for the proposed project is located in the Tando Adam
Taluka, which lies in the western portion of the Sanghar district in
Sindh. The site lies in the fertile plain area, which has an average
elevation of about 50m. Naimat Phase v project includes the
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 77
following components:
• Production Separator
• Amine Unit
• Gas dehydration Unit (Glycol)
• Gas dehydration Unit (Mol. Sieve)
• LPG recovery Unit (Turbo-Expander)
• LPG Storage (Spheres) and Loading
• Condensate Stabilization Unit
• Condensate Storage & Loading
• Produced Water System
• Utilities (Hot Oil System, IA Compressors, Nitrogen Storage, rO
Plant, Fire Water System)
• draining System
• Flare Stack and K.O. drums
• Establishment and Operation of the site camp
CliEnt/loCation: Efu lifE inSuranCE Co. ltd/dha, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EFU LIFE ASSUrANCE BUILdING
SCOPE: The proposed project comprises of construction of a 17-storeyed
commercial building comprising of offices built over 1821 sq.
yards. The total covered area of the project is 83674.40 sq. ft
providing vehicle parking from 2nd to 9th floor and occupancy
from 10th to 17th floor. It will be providing other facilities and
amenities for its occupants such as lifts, gymnasium, board room,
recreational area, male prayer area etc.
CliEnt/loCation: karaChi mEtroPolitan CorPoration/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF GrAdE SEPArATEd TrAFFIC
IMPrOvEMENT PLAN FrOM PArK TOWEr INTErSECTION TO A.T. NAQvI
rOUNdABOUT
SCOPE: The proposed Traffic Improvement Plan comprises:
i. Flyover along 26th Street/Shahrah-e-Firdausi
ii. Improved Traffic Management at A.T. Naqvi Chowk under
the above Flyover
iii. Underpasses for entry/exit movements to/from Bahria Town
Icon Tower and Clifton Funland
iv. Interchange between Shahrah-e-Iran and Shahrah-e-
Firdausi near Park Towers Intersection leading to 2-Talwar
Intersection
v. Other at-grade improvements for better traffic management
in the entire area
vi. Provision of a number of grade-separated pedestrian crossings
at important locations.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 78
CliEnt/loCation: national rEfinEry ltd (nrl)/korangi induStrial arEa, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOdUCT UP-GrAdATION
PrOJECT
SCOPE: The project involves value addition characteristics to the refinery products through improvement of product quality In terms of reduced Sulphur content thereby launching environment friendly petroleum products particularly diesel, gasoline and lube base oil. This objective will be achieved via two phase implementation of the project cumulatively referred as the Product Up-Gradation Project.The project will be executed in two distinct phases to undertake installation of Units according to the following layout.1. Naptha Block• Naptha Splitter Unit (NS)• Naptha Hydrotreator Unit (NHT)• ISOM Unit (PENEX/dIH)2. Heavy Oil Complex• Slurry Hydro cracking Unit (UOP Uniflex)• diesel Hydro-desulfurization Unit (UOP Unionfining)• vacuum distillation Unit (vdU)• vacuum Gas Oil Hydrocracking Unit (UOP Uncracking)• Mobil Selective dewaxing Unit (MSdW) Unit (Group-II Base
Oil)
CliEnt/loCation: halima buildErS & dEvEloPErS/Sindhi muSlim CooPErativE
houSing SoCiEty, jamShEd toWn, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AMEENA TOWEr
SCOPE: Proposed project will be Basement + Ground + 1st Floor (Shops & Service Area) + 2nd to 8th Floors (Flats & Service Area) that features a Wastewater Treatment Plant at Ground Floor and Basement (Car & Motor Cycle Parking). The apartment features bedrooms that include a spacious drawing room, a well-ventilated kitchen with modern facilities and imported sanitary ware and fixtures.
CliEnt/loCation: dEfEnCE houSing authority (dha)/dEfEnCE houSing authority
(dha)
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ONE WAY rEGIME AT KHAYABAN-E-MUJAHId & KHAYABAN-E-SHAMSHEEr
SCOPE: The project involves conversion of traffic regime on Khayaban-e-Shamsheer and Khayaban-e-Mujahid from previous two way trafficplan to one way. The conversion of two roads from dual way to one way was implemented by dHA after assessing the feasibility of the decision through the traffic studies (NESPAK Transport Planning & Traffic Management Plan (2005) and analysis of problems faced by the residents from the dual carriageway plan onthese roads. Keeping in view the recommendations of NESPAK, Khayabane Shamsheer and Khayabane Mujahid were converted from dual carriage way to one way regime in order to ease traffic
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 79
jams and to reduce the mid-block accidents at and around KhaddaMarket area. After the conversion, Khayabane Shamsheer, one ofthe widest roads in dHA, has been dedicated to the traffic incoming from Saudi Consulate towards Mcdonald’s on Sea viewwhile Khayabane Mujahid has been converted for outgoing traffic.
CliEnt/loCation: unitEd EnErgy PakiStan ltd/taluka khiPro – diStriCt Sanghar –
Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAIMAT FACILITY EXPANSION
PrOJECT PHASE-Iv
SCOPE: The project is located in Taluka Khipro district Sanghar, Sindh. The project is needed due to the fact that UEP has discovered new wells around the Naimat Facility and in order to process the additional raw gas from these wells, the existing facility requires expansion. The primary objectives of the project are: • To enhance production capacity of Naimat Facility by 50MMscfd.The new developments at the Naimat Facility include the following activities:• Installation of two 400GPM Amine Plants• Installation of one 50 MMscfd dehydration Plant• Installation of a new HP Separator Unit
CliEnt/loCation: mr. anjum rEhmat & mr. nadEEm rEhmat ShEikh/Clifton,
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 70 rIvIErA
SCOPE: The project site is located in Clifton on the main Sharah-e-
Firdousi. The project is a Twenty Nine (29) stories residential
cum commercial development consisting of residential apartments
offered & showrooms at ground and First Floor.
The project features and design are in accordance with the
requirements of modern day living facilities such as parking area
and recreation hall.
CliEnt/loCation: karaChi ElECtriC SuPPly CorPoration (kESC)/korangi, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KOrANGI GAS TUrBINE POWEr
STATION UPGrAdATION
SCOPE: Power plant upgradation component involves; installation of 32
Heat recovery Steam Generators on all 32 Gas powered
Generator Sets and installation of one Steam Turbine Generator
with associated components. On completion, the project shall be
able to add 10 MW to the national grid by utilizing the waste heat
of flue gasses, in addition to existing 88 MW capacity. revamping
of grid component involves conversion of existing Air Insulated
Switchgear system to Gas Insulated Switchgear system. After the
completion of power plant component, the power station shall be
classified as a combined cycle power plant.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 80
CliEnt/loCation: karaChi ElECtriC SuPPly CorPoration (kESC)/SitE, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SITE GAS TUrBINE POWEr
STATION UPGrAdATION
SCOPE: Power plant upgradation component involves; installation of 32
Heat recovery Steam Generators on all 32 Gas powered
Generator Sets and installation of one Steam Turbine Generator
with associated components. On completion, the project shall be
able to add 10 MW to the national grid by utilizing the waste heat
of flue gasses, in addition to existing 88 MW capacities.
revamping of grid component involves conversion of existing Air
Insulated Switchgear system to Gas Insulated Switchgear
system. After the completion of power plant component, the
power station shall be classified as a combined cycle power
plant.
CliEnt/loCation: n. m. buildErS & dEvEloPErS/guliStan-E-Sajjad, haPPy homES
road, hydErabad
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF QUEEN’S rESIdENCIA – I
SCOPE: Queen’s residencia-I is residential cum commercial project
involves construction and operation of six floors building on an
area of 2800 Sq. Yards. Proposed project will be six (06) story
complex with 37 shops on ground floor and total 84 apartments.
The project shall provide parking capacity on basement and
ground floor for almost 111 cars. On each floor, there will be total
14 apartments. The project is aimed at providing modern day
residential facilities to the residents of Hyderabad.
CliEnt/loCation: raniPur Sugar millS (Pvt) ltd/taluka gambhat, diStriCt
khairPur
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF OF PrOPOSEd 21 MW CO-
GENErATION PLANT
SCOPE: The project comprises of construction, up gradation and
installation of power transfer components that includes power
cables, transformer, switch gears and other connectivity
equipments. The power plant through 01 No. of 6 MW alternator
and 01 No. of 15 MW alternator, is able to generate 21 MW
electricity out of which up to 6 MW is utilized by the ranipur
Sugar Mill, whereas up to 12MW surplus power will be supplied
to SEPCO during cane crushing season and 16 MW electricity
during off season.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 81
CliEnt/loCation: unitEd EnErgy PakiStan ltd/digri & Sanghar South bloCkS
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF drILLING & ASSOCIATEd
ACTIvITIES IN NON - PrOTECTEd ArEAS
SCOPE: The activities associated with the proposed development
program will comprise drilling of exploratory/development well,
associated activities and field development. If exploratory drilling
proves fruitful, and the petroleum reservoir is to be commecially
exploited, the field has to be developed for oil/gas production.
Field development activities may include:
• drilling of additional wells (Appraisal and Production Wells)
• Laying of Pipelines
• Construction of a Processing Plant
• Establishment of a residential Camp and Access road
CliEnt/loCation: PfizEr laboratoriES PakiStan (Pvt) ltd/SitE, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CHILLEd WATEr PLANT
ENHANCEMENT PrOJECT
SCOPE: The project involves installation of two new Absorption Chillers
having capacity of 350 tons each. The chillers are direct fired
dual fueled absorption chillers. Natural Gas will be used to fire
the system and diesel will be used when Natural Gas is
unavailable. The Gas Fired Chillers will replace the 480 tons of
electrically operated conventional chillers currently being used
in the facility
CliEnt/loCation: unitEd EnErgy PakiStan ltd/taluka khiPro, diStriCt Sanghar &
taluka matiari, diStriCt matiari – Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAIMAT – KAUSAr PIPELINE
SCOPE: Project invovles construction of a pipeline connecting Naimat Gas
Facility to Kausar Facility. Both the facilities will be connected
through 10 inches diameter pipeline having length of 31.7
kilometer approximately.
The study was specific to the laying/operation of the proposed
NAKA pipeline. Significant aspects covered included land use,
obstruction of infrastructure courses, disturbance of natural
habitats of fauna and flora species, relocation and compensation
for the effected (if any) and socio-economic factors.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 82
CliEnt/loCation: mr. muhammad kaSSim & mrS rubina muhammad huSSain/Clifton,
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CLIFTON COMFOrT
SCOPE: The proposed project is development project covering a total plot area 1052.00 SQ.Yrd of a commercial plot located at main Gizri road. It is sixteen stories residential cum commercial development consisiting of residential apartments offered & number of showrooms at ground floor
CliEnt/loCation: Saima rEal EStatE/khalid bin WalEEd road, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SAIMA LUXUrIA
SCOPE: Proposed Project Invovles construction and operation of a 15 storybuilding in PECHS Block-2. There will be total 36 apartments in thebuilding with parking provided from first till third floor. recreational facilities will be provided on fourth floor which includeladies and gents gymnasium.
CliEnt/loCation: Euro buildErS & dEvEloPErS/north nazimabad, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO HI-TECH rESIdENCY
SCOPE: Proposed project will be fourteen (14) story apartment complex that features a recreation area, prayer hall, 1st to 3rd floor car andmotor cycles parking. The apartment features 3, 4 and 5 bedrooms that include a spacious drawing room, a well-ventilated kitchen with modern facilities and imported sanitary ware and fixtures.
CliEnt/loCation: unitEd EnErgy PakiStan/taluka khiPro – diStriCt Sanghar –
Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF UEP NAIMAT FACILITY
UPGrAdATION PrOJECT
SCOPE: The project is needed due to the fact that UEP has discovered new wells around the Naimat Facility and in order to process the additional raw gas from these wells, the existing facility is requiredto be upgraded
CliEnt/loCation: mEtro tWin toWEr/frErE toWn quartEr, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF METrO TWIN TOWEr
SCOPE: Proposed project will be thirty (30) story apartment complex that features a reception and waiting area, community shop, prayer hall, funeral parlor, community halls, library, board games, day care centre, billiard, male and female gymnasium and snooker, basement-1 and 2 as well as 1st – 5th floor car and motor cycles parking. Both the towers feature 4 bedrooms at each floor from 7th– 30th floors that include a spcious drawing room, a well-ventilatedkitchen with modern facilities and imported sanitary ware and fixtures
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 83
CliEnt/loCation: Canon ConStruCtion ComPany/jamShEd toWn karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF FAIZAN rESIdENCY
SCOPE: Proposed project will be a twelve (12) story apartment complex
that features a gymnasium, children play area, 1st – 4th floor car
and motor cycles parking. The apartment features 3 bedrooms
that include a spacious drawing room, a well-ventilated kitchen
with modern facilities and imported sanitary ware and fixtures
CliEnt/loCation: Shirazi invEStmEntS Pvt ltd/north WESt induStrial zonE Port
qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF POrT QASIM WArEHOUSE
SCOPE: The site is located at W3/II & III, North West Industrial Zone, Port
Qasim, Karachi. The proponent (SIPL) intends to establish a
warehouse in Port Qasim for temporary storage of containers
which are used by the proponent for shipment of different
materials.
Scope of project involves;
• Construction of warehouse
• Construction of offices
• Construction of guard room
• Transportation of containers to the site
• Firefighting arrangements
CliEnt/loCation: halima buildErS & dEvEloPErS/gulShan-E-iqbal, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HALIMA TOWEr
SCOPE: The project involves construction and operation of a thirteen (13)
story building. There will be total 9 residential floors, with parking
provided from 1st till 3rd floor. Fourth floor will be used for
recreational as well as residential purpose
CliEnt/loCation: kgS buildErS & dEvEloPErS/fEdEral b arEa, bloCk-17,
SChEmE no. 16, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AZIZ HEAvEN
SCOPE: Proposed project will be eighth story apartment complex that
features a recreation area, prayer hall, basement floor car and
motor cycles parking. the apartment features 3, 4and 5 bedrooms
that include a spacious drawing room, a well-ventilated kitchen
with modern facilities and imported sanitary ware and fixtures.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 84
CliEnt/loCation: m.S. intErPriSES/Clifton karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF M.S. INTErPrISES
SCOPE: The proposed project is development project covering a total
area of plot i.e. 972.00 Sq.Yrd. (8748.00 Sq.Ft.). The proposed
project will be fourteen storey apartment complex that features a
community hall, basement, ground floor and 1st – 4th car and
motor cycles parking. The apartment features 3 bedrooms at each
floor from 5th – 14th floor that includes a spacious drawing room,
a well ventilated kitchen with modern facilities and imported
sanitary ware and fixtures.
CliEnt/loCation: C.l. buildErS & dEvEloPErS/fatima jinnah road, Civil linE
quartErS, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ZAMZAMA TOWErS
SCOPE: The proposed project is a development project covering a total
plot area i.e. 6051.00 Sq.Yrd. (54459.00 Sq.Ft.) of a residential
cum commercial plot located at the main Fatima Jinnah road. The
project development will comprises of site development works and
construction of infrastructure including building structures, drains,
sewers, and other utilities.
CliEnt/loCation: abbott laboratoriES PakiStan ltd/landhi, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 3.2MW COGENErATION PLANT
SCOPE: Abbott Laboratories Pakistan Ltd plans to install a 3.2 MW gas
turbine to replace twp of its current inefficient gas turbine.
Proposed project 3.2 MW Cogeneration Plant at Landhi will result
in increase in power generation capacity from 4MW to 5.2 MW
and reduction of natural gas consumption and reduce CO2
emissions which are part of Abbott’s environmental commitment
to reduce GHG emissions
CliEnt/loCation: anoud PoWEr gEnEration ltd/korangi induStrial arEa, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd AddITIONAL 7.15
MW POWEr PLANT
SCOPE: The proposed plant comprises of three Caterpillar (Model Cat
3520-C) gas power internal combustion engines, each coupled
with two MW generators. Each engine is capable to produce 975
KW. Natural Gas will be the main fuel for the plants. The plant is
technically designed to operate on gas generating units with 90%
power availability.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 85
CliEnt/loCation: artiStC millS ltd/korangi induStrial arEa, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF GArMENTS STITCHING
(EXPANSION) PrOJECT
SCOPE: The proposal involves construction and operation of an additional
Garments & Stitching section at the Artistic denim Mills in Korangi
Industrial Area on 1.14 acres area. The project shall contribute in
raising the share of denim fabric exports from Pakistan to the
international market.
CliEnt/loCation: glaxoSmithklinE PakiStan ltd/SitE, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION OF
UNdErGrOUNd WATEr STOrAGE TANKS
SCOPE: The proposed underground water tanks shall have the capacity
to store 100,000 gallons of water per tank ie.e total of 200,000
gallons. The proposed project shall be completed in two phases.
Construction of Tank No.1 shall be completed in four months and
Tank No. 2 in 6 months.
CliEnt/loCation: induS motorS ComPany ltd - north WEStErn induStrial zonE –
Port qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION OF 800
METErS TEST TrACK
SCOPE: The project involves construction of 800 meters long test track
within the Indus Motors facility in Port Qasim. The track will be
used for road testing of vehicles manufactured by Indus Motors
Company Ltd
CliEnt/loCation: mr. hanif abdani & mr. muhammad kaSSim, Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MACHIArA SPrINGFIELd
SCOPE: Proposed project will be fourteen storey apartment complex that
features a community hall, basement floor car & motor cycles
parking. The apartment features 3 bedrooms that include a
spacious drawing room, a well-ventilated kitchen with modern
facilities and imported sanitary ware & fixtures.
CliEnt/loCation: halima buildErS & dEvEloPErS, dEhli mErChantilE SoCiEty,
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MAKKAH TOWEr
SCOPE: The project involves erection of a fifteen floor building (Ground +
14) for residential purpose in dehli Mercantile Society, Gulshan
Town, Karachi. The building shall include for parking floors, one
floor for recreational purpose and ten residential floors.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 86
CliEnt/loCation: king’S food (Pvt) ltd/korangi induStrial arEa, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF WASTEWATEr TrEATMENT
PLANT
SCOPE: The project will be implemented on 0.12 acres area of land which
is already acquired by the proponent.The Project includes
designing, construction and operation as well as maintenance of
the WWTP. The plant will be designed to treat an aggregate
270,000 GPd of industrial wastewater at its facility.
Sources of Waste Water Treatment Plant. The plant will be
designed to:
• Process wastewater
• rO rejection water
• domestic sewage from kitchen and washrooms
The wastewater treatment at the proposed WWTP will focus on
key water quality parameters e.g. TSS, TdS, pH, BOd and
COd.The treatment will be designed keeping in view (i) the
quality of effluent being received for treatment and (ii) NEQS
discharge limits for industrial effluents.
CliEnt/loCation: hiba buildErS & dEvEloPErS/bihar muSlim CooPErativE houSing
SoCiEty union ltd., karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUMYA COMFOrTS
SCOPE: The project is thirteen (13) storeys residential development
consisting of flats from 5th to 13th floors that are spacious and
secure which is conventionally situated around library, colleges,
schools and markets thus providing an accessible distance from
all amenities of life. The project features and design are in
accordance with the requirements of modern day living facilities
such as parking area and recreational facility.
CliEnt/loCation: S.k. EntErPriSES/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SAIMA CLIFTON PArK vIEW
SCOPE: The Proposed Project is being constructed on a total area of plot
1016.66SQ.Yd. (9150.00 SQ.FT.). The project is fourtee (14)
stories commercial cum residential development consisting of flats
from 5th to 14th floor and a number of showrooms at ground floor.
The project development will comprises of site development
works and construction of infrastructure including building
structures, drains, sewers, and other utilities.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 87
CliEnt/loCation: maChiyara grouP & Paragon grouP)/runChorE quartErS
nEar jama Cloth markEt, m.a. jinnah road, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION
OF JAMA MALL & rESIdENCY
SCOPE: The proposed project comprises construction of Basement, Ground Floor and 1st & 2nd Floors for Shops, 3rd to 7th Floors for Car Parking and 8th to 11th Floors for Flats only. The residential apartments are spacious, secure and are 13 Storey high which is conventionally situated around shopping malls, restaurants and a hospital.
CliEnt/loCation: finErgy (Pvt) ltd/jhimPir arEa of diStriCt thatta Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 50 MW WINd POWEr
PrOJECT
SCOPE: The project includes designing, tesing, manufacturing and operation as well as maintenance of wind turbines.The proposed Finergy Wind Farm includes installation and operation of 33 sets of wind turbines for the production of 50 MW. The hub height is 80m and the runner diameter is 82m.
CliEnt/loCation: Sarmad Poultry farm/EaStErn induStrial zonE, Port qaSim,
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SArMAd POULTrY FArM
SCOPE: Project involves construction, operation and maintenance of a Broiler Poultry Farm in Eastern Industrial Zone of Port Qasim. The Poultry farm is planned to keep and rear around 25,000 birds in its facility. dOC will be brought to the facility and will be reared under conditions satisfying local hygienic and OHS standards. regular inspection of bird health in the PF will be conducted.
CliEnt/loCation: agility logiStiCS (Pvt) ltd/Port qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF QASIM LOGISTICS CENTrE
SCOPE: The proposed Qasim Logistics Centre is located in NWI Zone, PQA, Karachi. The proposed Centre shall have facilities for specialised storage, logistics and dry and cold supply chain operations.Following facilities will be provided at the proposed Qasim Logistics Centre;• Bulk Storage• Fully operational Cross dock facility• Configurable racked pallet positions• Total Inventory Management• Bar Code Scanning• Multi user EdI capabilities• Temperature controlled facility• value Added Services – fulfillment, labeling, documentation compliance etc.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 88
CliEnt/loCation: agility logiStiCS (Pvt) ltd/Port qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MEHrAN LOGISTICS CENTrE
SCOPE: The proposed Mehran Logistics Centre is located in GadapTown, Super Highway, Karachi. The proposed Centre shall have facilities for specialised storage, logistics and dry and cold supply chain operations.Following facilities will be provided at the proposed Qasim Logistics Centre;• Fully operational Cross dock facility• Configurable racked pallet positions• Total Inventory Management• Bar Code Scanning• Multi user EdI capabilities• Temperature controlled facility• value Added Services – fulfillment, labeling, documentation
compliance etc.• Maintenance Workshop for Transportvehicles / Trucks
CliEnt/loCation: titan EnErgy PakiStan (Pvt) ltd/taluka & diStriCt thatta -
Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd 9 MW WINd
POWEr PrOJECT
SCOPE: Project site is located in Jhimpir Wind Corridor 13 km off Thatta-Thano Bulla Khan road, Taluka & district Thatta in Sindh. The Wind Power Project will be estalished over 68 -02 acres of land. The project includes designing, testing, manufacturing and operation as well as maintenance of wind turbines. The proposed project includes installation and operation of 06 sets of wind turbines in Phase-I for the prodction of 9.0 MW (1500 KW x 6). The hub height is 80 m and the runner diameter is 82 m. The civil works of the wind farm includes the foundation of WTGS, foundation of box type transformers, erection patform, power collection route and access roads construction (expansion in the wind farm).
CliEnt/loCation: Pak Can intErnational/SitE, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY OF SMELTING PLANT
SCOPE: The site for the Proposed Project Coal Based Smelting Plant is
located in SITE Karachi. The area of the plot is about 2,000 Sq.
Yard.
The raw material used are :
• Used Lead Acid Batteries and other scrap material
(40M.T/day)
• reducing Agents (anthracite or the metallurgical coke
(charcoal) and the iron chips)
• Fixing Agent (Fluorspar along with soda ashor sodium
carbonate)
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 89
CliEnt/loCation: PakiStan gEmS & jEWEllEry dEvEloPmEnt ComPany, miniStry of
ProduCtion/bliSS ShoPPing CEntrE, zaib-un-niSa
StrEEt,Saddar, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ASSAYING ANd HALLMArKING
CENTrE
SCOPE: The project comprises establishment of Lab/Centre for the
metallurgical analysis of alloys containing precious metals used in
jewellery making. The project includes installation and operation
of equipment used in the processes of assaying and hallmarking
during metallurgical analysis.
The centre will be used for metallurgical analysis of alloys
containing precious metals. Assaying determines the
fineness/composition of the precious metals (Gold, Silver,
Palladium and Platimun) in the alloy used in jewellery whereas
Hallmarking refers to the physically marking a piece of jewellery
according to specific laws to certify the purity of metal. Assaying
is carried out by a number of techniques which includes
destructive and non-destructive testing.
CliEnt/loCation: ParthEnon (Pvt) ltd/abdullah haroon road, Saddar, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF INTErNATIONAL BUSINESS &
SHOPPING CENTrE
SCOPE: The proposed project comprises construction of a (15) Floor
Building. The proposed project covering total area of 3,62088
Sq.ft. The project development will include site development
works and construction of infrastructure including building
structures, drains, sewers and other utilities. Elevators, Fire
Alarm and Protection System, Intercom System, Wi-Fi Internet
System, CCTv Surveillance System, Generators and amenities
areas have been allocated to make the project more attractive
CliEnt/loCation: digri Sugar millS (Pvt) ltd/taluka digri, diStriCt mirPurkhaS
Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY OF SALE OF 2 MW
SUrPLUS POWEr TO HESC FrOM dIGrI SUGAr MILLS
SCOPE: The project comprises of construction, up gradation and
installation of power transfer components that includes power
cables, transformer, switch gears and other connectivity
equipments.The power plant is provided with two Shinko 3
megawatt turbo generators to generate 6 MW electricity, out of
which upto 4 MW is utilized by the digri Sugar Mills, whereas,
upto 2 MW surplus power will be supplied to HESCO during cane
crushing season.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 90
CliEnt/loCation: PakiStan SPaCE & uPPEr atmoSPhErE rESEarCh CommiSSion
(SuParCo)/induStrial trianglE at iSlamabad highWay nEar
toll Plaza, iSlamabad
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SATELLITE dATA rECEIvING
GrOUNd STATION FOr AGrICULTUrE PrOJECT
SCOPE: The building locates in Industrial Triangle at Islamabad Highway
near Toll Plaza. The project requires the establishment and
operation of ground receiving station that will perform the
following operations:
• receiving signals from remote satellite
• Acquisition of Satellite remote Sensing (SrS) data for
agriculture crops in Pakistan
• Acquisition of SrS data will also be used for earth resources
surveying, mapping and environmental monitoring studies
• Acquisition of data for atmospheric/meteorological studies
CliEnt/loCation: ElEngy tErminal PakiStan ltd (EtPl)/Port qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HIGH PrESSUrE TrANSMISSION
PIPELINE & NITrOGEN BLENdING FACILITY
SCOPE: The proposed ETPL site for rLNG at Port Qasim is at
Khiprianwala Island i.e. at the junction of Phitti and Kadiro Creek
System. The project will thus be integrated into the infrastructure
of Oil & Gas dedicated area at Port Qasim.
The proposed project involves construction/laying of a High
PressureTransmission Pipepline that will connect proposed Engro-
rLNG facility to the SSGC distribution network. The pipeline will
be primarily used to transfer regasified LNG (rLNG) and may
however be also used for transport of LPG.
CliEnt/loCation: mr. junaid & mr. umEr naqi/bahadur yar jang CooPErativE
houSing SoCiEty, bloCk 3, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAXON’S MArrIAGE HALL
SCOPE: The Marriage Hall is ground floor + Boundary wall, it comprising
bridal room, stage, toilet, store room, kitchen, reception, booking
office, open lawn, underground water tank, drive way and
proponent are also providing motor cycle parking area. The total
plot area of the project 1023.00 Sq. yrd or 9208.68 Sq. ft. The
project is surrounded by open spaces and serenity, Marriage Hall
is basically the latest addition to the accessible modern wedding
halls present in the area of Bahadurabad that promises optimum
space utilization, comfort and stylish making merry.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 91
CliEnt/loCation: PEChS bloCk 3, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ATLANTIC MArrIAGE HALL
SCOPE: The proposed project is situated on Plot 1, 2, 3 PECHS Block-3.
The site is located Maqbool CO-OP Housing Society Ltd. (KCHS
Union) Karachi located on main Shaheed-e-Millat road.
The “Atlantic Marriage Hall” consists of ground floor for marriage
hall and car parking purpose only and the features of project are
dressing room, stage, toilet, kitchen, booking office, underground
water tank + OverHead water tank, driveway, lobby and proponent
is also providing motor cycle + car parking area in marriage hall.
The total plot area of the project is 4425 Sq.Yrd.
CliEnt/loCation: baShir maChiyara/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MACHIYArA TOWEr
SCOPE: The proposed project is a development project covering a total
area of plot i.e. 1220.75 Sq.Yrd, (10986.75 Sq.Ft). The project
development will comprises of site development works and
construction of infrastructure including building structures, drains,
sewers and other utilities. The project is surrounded by open
spaces and serenity.
CliEnt/loCation: CEntral buildErS & dEvEloPErS/gadaP toWn, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AvIATION ENCLAvE(HOUSING
PrOJECT)
SCOPE: Aviation Enclave is proposed to have single and one unit
Bunglows measuring 120-400 sq. yds and open plots both in
residential and commercial category measuring 120-400 sq.yds
residential plots and 750-5295 sq.yds commercial plots.
CliEnt/loCation: hiba buildErS & dEvEloPErS/north nazimabad, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF TAYYABI GArdEN
SCOPE: Tayyabi Garden apartments are ground+ 15 floors car parking,
children play area, 12 floor residential project comprising 2 & 3
bedrooms super luxury apartments. The total area of the project
is 1000.00 Sq.Yrd. The project development will comprises of
site development works & construction of infrastructure including
building structures, drains, sewers and other utilities.
The project accommodates to all necessities which a family
desires from the residential areas and apartment buildings to the
schools, religious and business districts.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 92
CliEnt/loCation: Euro buildErS & dEvEloPErS/north nazimabad, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO dUPLEX CITY
SCOPE: The proposed project comprises construction of thirteen (13) floor apartments with 04, 05 & 06 rooms super executive apartments in three categories, Executive, Super Executive and duplex. The project also houses exquisitely designed ultramodern showrooms fit for multinational companies, chain stores, banks and other prestigious business establishments. The project is ideally locatedfor family living with easy access to schools, hospitals, parks, shopping centers and restaurants for a modern lifestyle.
CliEnt/loCation: PhiliP morriS PakiStan ltd/kotri, Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KOTrI UNIT EXPANSION
PrOJECT
SCOPE: The site located in SITE Area Kotri district Jamshoro. The site area is spread over 1875 Acres of land.The proposed project will compose of the following units:• New primary processing including FTd area• renovation of existing primary building• Modification in secondary production area• Additional secondary area• Modification in utility building• Installation of gas fired power plant• Installation of Wastewater Treatment Plant• Generator house extension• Medical Centre• Modification of fire protection system in all buildings• Improvement in site equipment and services• Prayer Area• Workers Canteen
CliEnt/loCation: PhiliP morriS PakiStan ltd/SahiWal
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CAPACITY ENHANCEMENT
PrOJECT - SAHIWAL UNIT
SCOPE: The site located in Qadirabad, 20 km from Sahiwal. The site area is spread over 69635 m2 of land..The proposed project will compose of the following units:• New primary processing area• Modification in secondary production area • Additional secondary area• Modification in utility building• Installation of Wastewater Treatment Plant• Generator house extension• Medical Centre (Future Plan)• Modification of fire protection system in all buildings• Improvement in site equipment and services• Prayer Area• Workers Canteen
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 93
CliEnt/loCation: dEnim intErnational (Pvt) ltd/Port qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION
OF dENIM INTErNATIONAL (PvT) LTd
SCOPE: The proposed facility (dIPL) will be located in the Northwesternindustrial zone of Port Qasim Area over an area of 7 acres.The proposed denim processing unit will be established at Port Qasim to produce the finest quality of real indigo denim, and its variants, to suit the needs of discerning customers worldwide. With a current proposed capacityof 1 million meters per month, it can supply any variant of denim; basic, premium and high qualityoe/oe, ring/oe, ring/ring in 100% cotton as well as polyester and streach denim.
CliEnt/loCation: tEChnova EntErPriSES (Pvt) ltd/hub baluChiStan
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY FOr ESTABLISHMENT OF
SMELTING PLANT
SCOPE: The primary project is designed for the reclamation of the lead in the scrap automotive or industrial batteries on an environmentally sustainable basis & selling the same for further use in the production of lead oxides or in the casting of grids, which will be used again in the production of lead acid batteries.
CliEnt/loCation: Salim yarn millS (Pvt) ltd/kotri-Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY OF PrOPOSEd 2.7 MW (EXTENdABLE TO 12 MW) GAS BASEd POWEr PLANT)
SCOPE: The project comprises construction, installation and operation of 2.7 MW (extendable to 12 MW) Gas Based Power Plant being installed at Salim Yarn Mills.The proposed plant comprises of six Caterpillar (Model Cat 3520-C) gas power internal combustion engines, each coupled with two MW generators. Each Engine is capable to produce 1900 KW. Natural Gas will be the main fuel for the plants. The plant is technically designed to operate on gas generating units with 90% power availability.
CliEnt/loCation: Siddiqui buildErS & dEvEloPErS/nazimabad
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION
OF GrACE TOWEr
SCOPE: The proposed project is a Mixed Use development Project covering an area of 1153 square yards & located in Nazimabad. The project is fifteen stories residential and commercial development consisting of residential apartments offered in 06 categories. The project development will include site development works and construction of infrastructure including building structures, drains, sewers and other utilities. Elevators, fire alarm and protection system, intercom system, generators, and amenities areas have been allocated to make the project more attractive.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 94
CliEnt/loCation: novatEx limitEd/Shah latif toWn, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF BOPET UNIT
SCOPE: The project will comprise of a single production line of BOPET
film with an average production of approximately 25,000
tons/year. The BOPET line will be fully equipped with state-of-the
art technology for the production of a wide variety of polyester
films with thicknesses ranging from 12 um to about 100 um and
will be able to utilize not only for the packaging of products such
as confectionary, biscuits, potato snacks but also in textiles, tea,
soaps, shampoos, and many other applications.
CliEnt/loCation: Sumya buildErS & dEvEloPErS/PEChS bloCk-3, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUMYA BrIdGE vIEW SUPEr
LUXUrY APArTMENTS
SCOPE: The proposed project comprises construction of seventeen (17)
stories of 03, 04 & 05-room executive suites and spacious,
modern showrooms ideal for prestigious national and international
companies.
CliEnt/loCation: S.P. aSSoCiatES buildErS and dEvEloPErS/north nazimabad,
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SAIMA PArI CENTrE
SCOPE: The proposed Saima Paari Centre is being constructed on a
commercial plot of land measuring 18000.00 sq.ft (2000.00 sq.yd)
and is located in North Nazimabad, Karachi. The project
comprised of fourteen storeys residential and commercial
development consisting of 91 limited edition apartments of 4-5
rooms & showrooms at ground floor.
The project is ideally located for family living with easy access to
schools, hospitals, parks, shopping centers and restaurants for a
modern lifestyle
CliEnt/loCation: futEhally ChEmiCalS (Pvt) ltd/manghoPir road, SitE, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF FUTEHALLY CHEMICALS
SCOPE Futehally Chemicals is located at Site on an area of 6.75 Acres.
The project has been undertaken as part of increase in production
capacity of detergent manufacturing plant to 400 TPd (tons per
day) and also to increase procurement of generic raw, packaging
and finished product by construction of new warehouse.
Another expansion to diversify its toll manufacturing business
through the construction of a dedicated sate of the art facility to
cater to home care products and provision of wastewater
treatment plant.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 95
CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEP)/badin bloCk (non-ProtECtEd
arEaS)
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd SEISMIC SUrvEY
SCOPE: The project of seismic operations by UEPL in non-protected area
of Badin Concession Block comprises the said operation as a
prelude to oil and gas explorations
The said Block covers a total area of approximately 6,600 sq.km
and located in the four districts of Sindh Province, which Badin
Thatta, Hyderabad and Mirpurkhas.
CliEnt/loCation: CEntral buildErS & dEvEloPErS/fatima jinnah road, Civil
linES, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF rOYAL HOMES
SCOPE: “royal Homes” is an Urban development Project comprising the
Twelve (12) Storey residential Towers to be constructed on a
plot of area measuring about 3,600 square yards located on
Fatima Jinnah road, Civil Lines.
CliEnt/loCation: Euro buildErS & dEvEloPErS/north nazimabad,karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO CLASSIC
SCOPE: The proposed project is a development project covering an area
of 26996.06 sq.ft. Euro Classic is basically the latest addition to
the accessible modern homes present in the area of North
Nazimabad that promises optimum space utilization, comfort and
stylish living. The project comprises of fire protection system,
earthquake proof structure, wide internal roads, underground
parking, modern elevators, a home automation system for energy
saving and easy living, Wi-Fi internet, water purification (reverse
osmosis system), imported sanitary ware and fixtures,
underground parking, modern elevators, porcelain floor tiles,
security and extreme privacy,sewerage treatment line, concealed
cabling (Tel, Cable and Intercom) and amenity areas have been
allocated to make the project more attractive
CliEnt/loCation: zuhair buildErS & dEvEloPErS/gulShan-E-iqbal bloCk-3
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AL-GHAFOOr OrCHId
SCOPE: The Project comprises of a sixteen (16) storey tower over
1066.67yd2 area of commercial land. The project development
consists of 85 apartments offered in four (04) categories with 03,
04 and 05 room executive apartments.according to the proposed
building plan the basement is reserved for Air raid Shelter, the
Ground floor comprises Shops & Amenities area, 1st to 3rd floor
reserved for parking, 4th floor consist of parking & recreational
Area while 5th to 16th floor residential apartments
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 96
CliEnt/loCation: nikorESourCES (PakiStan) ltd/induS baSin bloCk-y
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd OFFSHOrE
drILLING OF NMr-01 & NMr-02 WELLS
SCOPE: The drilling will be conducted with an area of approximately 80
km to 100 km Southwest of Karachi and at least 60 km offshore
from the nearest landfall.The proposed well locations are located
within two 10 km radius polygons. The IEE Study has identified
the environmental aspects likely to arise from the drilling and
associatedactivities in Indus Basin Y and has made assessment
of the impact and recommended mitigation measures to ensure
environmental impacts are minimized and kept to acceptable
limits.
CliEnt/loCation: Euro buildErS & dEvEloPErS/nazimabad bloCk-1, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO GrANd PArK
SCOPE: The proposed project is located in Block-1, Nazimabad and is
Mixed Use development Project covering an area of 2502 sq.yds.
The project development will include site development works
construction of infrastructure including building structures, drains,
sewers, and other utilities. Elevators, fire alarm and protection
system, intercom system, generators, and amenities have been
allocated to make the project more attractive.
CliEnt/loCation: zuhair buildErS/PEChS, bloCk-2, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY FOr CONSTrUCTION &
OPErATION OF AL GHAFOOr CHALET
SCOPE: The proposed project is located in PECHS Block-2 comprising of
an eight storey tower with a 04 & 05 room super executive
apartment accentuated by its gorgeous elevation and evitable
location.The project covers an area of 438 sq. yds. The project
development will include site development works and construction
intercom system, Wi-fi Internet System, CCTv surveillanc
system, generators and amenities areas have been allocated to
make the project more attractive.
CliEnt/loCation: karaChi intErnational ContainEr tErminal limitEd (kiCtl)/
WESt Wharf, karaChi Port, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NEW POWEr HOUSE
SCOPE: The proposed project comprises of construction of a new power
house at Karachi International Container Terminal (KICT).This will
include installation of eight diesel Engine driven generators after
removal from the Container Quay Cranes. All the generating sets
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 97
will run in parallel supported by a control/ synchronizing system.
requisite equipment like switch gears/step up/down transformers
will also be installed. Power supply cables will be laid up to each
Quay Crane (QC). A total of 8 nos. of Caterpillar engines which
shall be removed from the cranes and relocated in the power
house, will have a power generation capacity of 11.8 MW. The
area of the proposed powerhouse is 60m x 10.2m (612 sq. m)
which will be located inside the Terminal near the Engineer
Building. The estimated capita cost of the project is US$ 2.7m.
CliEnt/loCation: ilyaS tradErS/Port qaSim, karaChi, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SMELTING PLANT
SCOPE: The project includes setting up a smelting plant in PQ Karachi.
The smelting cycle in the rotary furnace includes following
sequence:
● Preheating of the rotary furnace to 1100oC to 1200oC.
● Feed of the charge mix into the furnace with Furnace
charging machine in 25-30min.
● rotation of the furnace at speed of 1 to 1.5 rPM
● Burning of organic materials at 60-90oC.
● drying of charge at 120oC to 150oC.
● Melting of metallic lead at 327oC.
● reduction of lead oxides and lead sulphate with reducing
agents at 650 oC to 1200oC.
● Formation of liquid Lead Bullion.
● Formation of a liquid slag.
● discharge of liquid lead through discharge port at periphery
of furnace.
● discharge of slag.
CliEnt/loCation: a&a aSSoCiatES/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr CONSTrUCTION OF
CENTrEPOINT
SCOPE: The Centrepoint Building comprises 3, 57,720 sq.ft. of
commercial space standing at a height of 492 feet including the
communication tower. It will comprise of office spaces, swimming
area and parking garage. The project development will include
site development works and construction of infrastructure
including building structures, drains, sewers, wastewater
treatment facility, landscaping of the area and other utilities.
International standards of design in commercial building have
been adopted. High speed elevators, security system, swimming
pools and amenities areas have been allocated to make the
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 98
project more attractive.
The project will be funded by Overseas Private Investment
Corporation (OPIC). The IEE study covers all national and
international requirements to meet the evaluation criteria of the
OPIC.
CliEnt/loCation: iShaq EntErPriSES/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd rESIdENTIAL &
COMMErCIAL BUILdING PrOJECT “COM-3”
SCOPE: “COM-3” is an Urban development Project comprising two 32
Storeys residential cum Commercial Towers being established
over an area of 9689 square yards of a commercial plot located
at the edge of Khayaban-e- Saadi and Khayaban-e-Ghalib
adjoining at Bilawal Chowrangi in Block-6 KdA Scheme No. 05
of Clifton Karachi. Administratively the area falls in Saddar Town
of defunct CdGK.
CliEnt/loCation: hiba buildErS & dEvEloPErS/ShahEEd-E-millat road, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUMYA rESIdENCY
SCOPE: The Sumya residency is a 14 storey residential development
consisting of 52 apartments offered in 6 categories. It offers 2,
& 4 Bedrooms Super Luxury Apartments. The features and
design are in accordance with the requirements of modern day
living and creative use of technology such as home automation
and internet facility. The project is ideally located for family living
with easy access to schools, hospitals, parks, shopping centres
and restaurants for a modern lifestyle. The unique modern
design with provision of large LCd screens for product
advertisement makes this building a landmark location in the
area which will be easily identifiable to guests of the residents
CliEnt/loCation: Euro buildErS/north nazimabad, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO CLOCK TOWEr
SCOPE: The proposed Euro Clock Tower (ECT) project comprises of
shops and residential flats shall be loacted in North Nazimabad,
Karachi.The project aims at providing a landmarkto the skyline in
the commercial and residential sector of North Nazimabad.
Euro Clock Tower is a 9 storey residential development
consisting of 63 apartments offered in 5 categories. building
height is 146 ft above ground level. The project is ideally located
for family living with nearby access to schools, hospitals, parks,
shopping malls and restaurants for an ideal family lifestyle.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 99
CliEnt/loCation: fatima vEnturES & amatul ConStruCtionS/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION USE OF MAGIC FLOAT MOdULAr
FLOATING JETTY SYSTEM (HdPE)
SCOPE: Magic Float comprises of HdPE Material designed into
interlocking blocks for use above water.The HdPE material is
100% recyclable, resistant to oils, acids, frost, seawater corrosion,
chemicals and Uv rays.its high buoyancy, low maintenance and
ease of assembling and its environmental friendly composition
make it very viable product.
CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/diStriCt
Sanghar-khairPur-ShahEEd bEnazirabad Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF BITrISM BLOCK
SCOPE: The project area is located in South East of Sindh Province and
is about 26 km from Sanghar City. The project area is divided in
three districts i.e Sanghar, Khairpur and Shaheed Benazir Abad
The scope of work covers both acquisition of 2d/3d seismic
activity and drilling of wells. On the basis of seismic survey
results, three exploration wells will be drilled in the project area.
CliEnt/loCation: Sindh inStitutE of urology and tranSPlantation (Siut)/
Saddar, karaCh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd SIUT TrANSPLANT
TOWEr
SCOPE: This public health project will be located on Yaqub Khan road.
The proposed SIUT Transplant Tower will be treating all
transplant patients under one roof and comprises of transplant
surgery ward, laboratory, radiology and will also accommodate
patients suffering from other diseases. The proposed tower would
be connected with the existing dewan Farooq Medical Centre
(dFMC).
CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/gotki, Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MArU-rETI GAS PIPELINE
PrOJECT
SCOPE: This Maru-reti Gas Field is located in the Northern Sindh
Province, 7 km South of Ubaro. OGdCL intends to lay a gas
pipeline between Maru-reti gas wells to existing Guddu Power
Plant gas supply line for onward supply to Guddu Pipeline.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 100
CliEnt/loCation: bP PakiStan ExPloration & ProduCtion inC/badin ConCESSion
arEa
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd 3-dSEISMIC
OPErATIONS IN TANdO GHULAM ALI (TGA) & BUZdAr rEGIONS
SCOPE: Proposed seismic survey is use to produce a three-dimensional
(3d) map of the subsurface geological structures so potential
locations for oil and gas production wells can be identified with
greater accuracy.
CliEnt/loCation: anoud tExtilE millS ltd/nooriabad, Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd 11.7MW
(EXTENdABLE TO 16 MW) GAS BASEd POWEr PLANT.
SCOPE: The project comprises of construction, installation and operational
stages of 11.7 MW (extendable to 16 MW) gas based power plant
with waste heat recovery boilers (WHrB) and installation of
steam turbine to produce additional electricity
CliEnt/loCation: rECkitt bEnkiSEr/SitE karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CAPACITY ENHANCEMENT &
GMP COMPLIANCE
SCOPE: The project has been undertaken as a part of reckitt Benckiser’s
Capacity Enhancement and GMP Compliance Project, comprising
of addition of in-house production and packing of Harpic and
MPC (Multi Purpose Cleaner), capacity enhancement of veet
Cream and upgrade of disprin area to meet GMP compliance
requirements
CliEnt/loCation: Sundar gaS (Pvt) ltd/Port qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUNdAr GAS LPG STOrAGE
& FILLING STATION
SCOPE: The proposed site for the Sundar Gas LPG storage and filling
facility is located in the LPG designated area at Plot F-01, North
West Industrial Zone of Port Qasim. The total area of the plant is
8090 sq.m.
Keeping in view the present scenario and demand, Sundar Gas
has planned to develop a storage facility of 120metric tons which
will be increased to 170metric tons.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 101
CliEnt/loCation: City diStriCt govErnmEnt karaChi (Cdgk)/Shahrah-E-faiSal,
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF COrrIdOr-Iv
SCOPE: The project comprises of construction of flyovers to develop
Shahrah-e-Faisal as a signal free corridor, presently managed
through a series of signalized intersections throughout the
Shahrah.
This Initial Environmental Examination (IEE) report presents the
assessment of environmental impacts of construction &
operation of proposed signal free corridor at Shahrah-e-Faisal
Karachi.
CliEnt/loCation: haSCombE StoragE ltd/ShikarPur
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF BULK OIL STOrAGE FACILITY
SCOPE: Hascombe Storage Limited plans to launch the project of setting
up a Bulk Oil Storage Facility at district Shikarpur to facilitate the
increasing demand of petroleum products in the country by
speedily supplying the products in the target markets within reach
through accessible roads using fast transport services
CliEnt/loCation: kmC offiCErS CooPErativEhouSing SoCiEty/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HOUSING SCHEME PrOPOSEd
OvEr 200 ACrES OF LANd
SCOPE: The proposed project covers an an area of 200 acres and has
the potential to contribute towards revitalization of the housing
sector and towards the economic development of the country
CliEnt/loCation: amrElli StEElS (Pvt) ltd/dhabEji
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION AMrELLI STEEL MILLS
SCOPE: The proposed project is concerned with the establishment of
a melt shop and a hot rolling mill to reduce the import of steel and
iron, so an Initial Environmental Examination (IEE) has been
carried out to provide all necessary information on potential
environmental and social impacts at the different stages of the
project.
CliEnt/loCation: karaChi ElECtriC SuPPly CorPoration (kESC)/karaChi
PrOJECT INITIAL ENvIrONMENTAL EXAMINATION OF WEST WHArF & HArOONABAd
POWEr GENErATION UNIT
Scope: The proposed project is concerned with the establishment of power generation units to manage the acute power shortage in Karachi.An Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of the project.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 102
CliEnt/loCation: intErnational induStriES ltd/landhi karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF POWEr PLANT
SCOPE: The project will be situated at Landhi area on Survey Nos. 399
to 405, deh Sharabi, Landhi Town, Karachi. Land requirement
for the complete project is 40 acres.
International Industries is intending to establish Cold rolling
Mill and Gas Fired power plant to manufacture high quality of
Cold rolled Coils
CliEnt/loCation: ProCtor & gamblE PakiStan (Pvt) ltd/hub baloChiStan
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF WASTEWATEr TrEATMENT
Scope: The proposed project is concerned with the construction,
establishment and operation of Wastewater Treatment Plant.
An Initial Environmental Examination (IEE) has been carried out
to provide all necessary information on potential environmental
and social impacts at the different stages of the project.
CliEnt/loCation: jaWEdan CorPoration ltd/gadaP toWn, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAYA NAZIMABAd HOUSING
SCHEME PHASE-I
SCOPE: The proposed Naya Nazimabad HousingScheme is a multi use
project will be build on 1,238 acres and its major portion is located
in Gadap Town and minor is in Orangi Town. The project includes
residential plots for houses, large plots for flats, commercial
areas and other amenities including health facility, praying areas,
grave yard, schools, colleges, university and some green areas.
CliEnt/loCation: kda offiCErS CooPErativE houSing SoCiEty/gulShan-E-iqbal,
karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KdA OFFICErS COOPErATIvE
HOUSING SOCIETY
SCOPE: The K.M.C O.C.H.S. is planned to be built on a total of 200 acres
out of which 60% shall be reserved for residential purposes
whereas 3.81% and 11.10% area shall be used as commercial
and amenities area respectively.
These amenities include mosque, parks and parking space,
public buildings and school/ colleges built on a total of 18 plots
altogether. As such, the project shall provide the residents easy
access to all facilities such as educational, health, recreation etc
Guidelines of Pak- EPA laws as well as other relevant
environmental legislations. It is essential that the project design,
construction and operations are such so as to pose no threat to
surrounding physical and biological environment, the work force
and the residents of the housing colony
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 103
CliEnt/loCation: gEnEration’S SChool/SitE arEa, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF GENErATION’S SCHOOL
SCOPE: The proposed South Campus of Generation’s School shall
be constructed in South Avenue SITE, Industrial Area, Karachi
having an area of 5.81 acres.
The project comprises of Standard Classrooms. Libraries, Labs,
Office Block, Playground and Inside Car Parking
CliEnt/loCation: glaxoSmithklinE/korangi karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr EXPANSION OF LACTAM
BLOCK
SCOPE: Construction of facility for manufacturing of Lactam Products
(Cephalosporins) - tablets, capsules and suspension
CliEnt/loCation: WaltErS PoWEr intErnational (WPi)/ naudEro Sindh
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF rENTAL POWEr PLANTS
SCOPE: The project comprises construction, installation and operation
of two rental Thermal Power Plants. The rental Thermal
Power Plant being installed at Naudero, Sindh comprises two
gas turbines of 50MW and 51MW capacities on a 5-acre land
area near the Naudero Sugar Mills. Natural Gas will be the
main fuel for the plants. Associated with the Project are
provisions for connections to the electricity and gas grids
CliEnt/loCation: dEfEnCE houSing authority/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dALTON PArKING PLAZA &
SHOPPING MALL & UPGrAdATION OF ZAMZAMA CLUB & SPOrTS COMPLEX
SCOPE: The project comprises of a Parking Plaza, Shopping Mall, Club
& Sports Complex built over 100,000 m2.
CliEnt/loCation: rEySir EntErPriSES/SitE SuPErhighWay, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SOLvENTS STOrAGE
WArEHOUSE
SCOPE: The project comprises of the construction of Warehouse on a
plot of Industrial land having an area of about 1210 sq.yds.
Organic solvents (i) denatured Spirit (ii) N Butyl Acetate (iii) be
stored in drums & Underground Tanks.
The Proponent of this project M/s reysir Enterprises, supplies
organic solvents to customers with a wide range of performance
products designed to solve chemical problems associated with
the production, processing and transportation of Chemicals for
the manufacturing of paints.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 104
CliEnt/loCation: karaChi urban tranSPort CorPoration/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr dEvELOPMENT OF JUMA
GOTH FOr THE rESETTLEMENT OF PrOJECT AFFECTEd PErSONS
(PAPS)
SCOPE: This IEE report responds to the requirement of Pakistan
Environmental Protection Act, 1997 & the resettlement Action
Plan (rAP) prepared for the resettlement of Project Affected
Persons (PAPs) of the Project: revival of Karachi Circular
railway.The rAP was prepared in response to the EIA conducted
and approved earlier. The rAP required identification of site for
relocation of the Project Affected Persons (PAPs).The proponent,
KUTC, has identified 283 acres land opposite Juma Goth railway
Station & adjacent to urban area Shah Latif Township in Bin
Qasim Town.
CliEnt/loCation: divinE dEvEloPErS (Pvt) ltd/lahorE
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dIvINE MEGA 2
SCOPE: divine Mega 2 has been proposed by the divine developers
(Pvt) Ltd.and is located in the newly developed area of Main
defence road Lahore Cantt. The project would have retail
Outlets, Anchor Stores, restaurants, Cafes, Executive Offices
with fully fitted kitchens andwashrooms, Shops, Banks,
prestigious showrooms at the ground floor and basement for
parking.
CliEnt/loCation: SEvEn SEa ConStruCtion/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CITY TOWEr
SCOPE: The project initiated by the Seven Seas Construction Builders
and develops a residential cum commercial building on a plot
measuring 1023 sq. yds. The building comprises of 13 floors.
various steps undertaken in the IEE preparation included
understanding of the proposed operation; review of legislation
and guidelines; IEE scope and methodology includes collection of
secondary data; field data collection; impact identification;
recommendations for mitigation and monitoring measures;
development of Environmental Management Plan (EMP) and
reporting
CliEnt/loCation: mi-SWaCo m-i ovErSEaS ltd/karaChi
PrOJECT INITIAL ENvIrONMENTAL EXAMINATION rEPOrT FOr drILLING CHEMICAL
STOrAGE WArEHOUSE
Scope: An Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of drilling project. An IEE document has been prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 105
CliEnt/loCation: quality golf PakiStan (Pvt) ltd/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ACACIA COUNTrY & GOLF CLUB KArACHI
SCOPE: Quality Golf Pakistan (Private) Limited – QGPL to set-up a country and golf club in Pakistan at a prime location of Karachi. This upcoming project has been named as ACACIA Country & Golf Club (ACGC) which is being established near Quaid-e-Azam International Airport, Malir Cantonment, Karachi.
CliEnt/loCation: triPlE trEE aSSoCiatES/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SOFITEL rESIdENCE
SCOPE: Triple Tree Holding being a local partner of ACCOr Group has proposed the serviced apartments in the Clifton, Karachi, which is named as Sofitel residence. The project proposed in the posh locality of the city.Sofitel residence will comprise of 33 floors and a basement. It will cover an area of 7655.67 yd2. Site is approximately 23 feet high from mean sea level. First three floors and ground floor will have shops, play area and health club.A dedicated 4 storeys car park has been proposed above the shopping area. Services area has been proposed further above in 2 floors. Serviced apartments will occupy 21 storeys just after the Services area. Last 2 floors will have mechanical and electrical installations.
CliEnt/loCation: national gaS ltd/hub baloChiStan
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF LPG STOrAGE BOTTLING
PLANT
SCOPE:: National Gases Limited has planned to set up LPG storage and filling facility in Hub, Balochistan. This proposed plant will be set up at 04 acres area with storage capacity 100 Metric Tons and filling capacity 25 Metric Tons per single shift. The annual throughput of LPG will be received by road tankers from source to filling plant and transfer to consumers by filling them into cylinders or decanting into the transport tanks for bulk supply through LPG Pumps.
CliEnt/loCation: Siza food (Pvt) ltd/f-9 Park, iSlamabad
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr MCdONALd’S rESTAUrANT
SCOPE: Siza Food Pvt Ltd, who is Mcdonalds’s franchise owner in Pakistan, decided to open their first branch in F-9 Park, Islamabad.The assessment of this IEE study has been focused on the operation of restaurant. The major areas covered in the impact analysis include solid waste, waste water, noise, emissions, occupational safety and socioeconomic factors. Facilities which are included to manage restaurant operations include HvAC, water, natural gas, electricity, communication, illumination, water treatment and solid waste management. All these systems are installed as per international standards and calibrated at higher degree.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 106
CliEnt/loCation: orix ProPErtiES PakiStan (Pvt) ltd/gulbErg, lahorE
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr SErvICES APArTMENTS
SCOPE: Orix Properties Pakistan (Private) Limited (OPPL) has proposed
the serviced apartments in the Gulberg town, Lahore, which is
posh locality of the city.
The site is located in the semi commercial area of Gulberg,
Lahore, which is a peaceful place and surrounded by the
residential bungalows. The infra structure around site is excellent
with spacious roads and proper sewerage system. There is no
significant flora and fauna found on site, except some wild bushes,
shrubs, herbs and some pet animals.
CliEnt/loCation: City diStriCt govErnmEnt karaChi/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 5-STEEL BrIdGES
SCOPE CdGK Is intended to construct 5-Steel bridges at different
locations of Karachi for which IEE study has been conducted to
assess the environmental and social impacts of the project in the
project vicinity and providing recommendations to mitigate those
impacts.
CliEnt/loCation: PakiStan houSing intErnational ltd/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr PETrO-CHEMICAL, rAW
MATErIAL & FEEd STOCK PrOJECT
SCOPE: The proposed project is concerned with the setting up of Tank
Terminal which will be used for storage of petrochemical raw
material and feedstock, so an Initial Environmental Examination
(IEE) has been carried out to provide all necessary information on
potential environmental and social impacts at the different stages
of the project; an IEE document has been prepared to meet the
legislative requirement of Pakistan Environmental Protection Act
1997.
CliEnt/loCation: im tEChnologiES PakiStan (Pvt) ltd/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KArACHI IT TOWEr COMPLEX
SCOPE: IT Tower Complex is a project of such nature that will provide
10,000 seats call centres, a three basement car parking area to
facilitate 2,500 cars at a time, food courts, high class shopping
arcade, Cineplex for entertainment purposes, a hotel and other
office spaces. Tower will have 47 stories. A total covered area of
2.8 million ft2 will be occupied by the tower. It is a project of IM
Technologies.This project is a multi-use complex and will fulfil
office needs as well as providing accommodation and
entertainment facilities. It will have world class support facilities
and services to manage the whole building through a centralised
building management system.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 107
CliEnt/loCation: boSiCor PakiStan ltd/hub, baloChiStan
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OFAddITIONAL STOrAGE TANKS
& ISOMErIZATION UNIT
SCOPE: The project is located at Khalifa Point on the coastline of the
Arabian Sea. Bosicor refinery is producing 600 bbls LPG, 32,610
bbls export naphtha, 42,090 bbls premier motor gasoline, 6000
bbls Bosicor light oil, 165,840 bbls high speed diesel and 24,740
bbls fuel furnace oil. BPL has planned to extend its operation by
adding up a new process unit (the Isomerisation Unit) which will
process light naphtha through isomerisation process to form high
octane products.
BPL also planning to increase its storage capacities for future
needs and for this purpose constructing11additional storage
tanks near existing storage tanks area with the capacity of
126,000 tons.Two additional new tanks are for crude oil and the
rest the product storage tanks.
CliEnt/loCation: daWood EntErPriSES, kda SChEmE-33, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OFJINNAH HOUSING SCHEME
SCOPE: dawood Enterprises has planned to launch advance housing
scheme in the area of Karachi development Authority Scheme-
33 Sector-29. The study was followed by site visits, details of
construction activities, post-construction activities such as
occupying of houses.
Environmental and social baseline has been taken from published
literature available specifically relevant to the Scheme-33 which
was further confirmed during ground visits conducted.
The assessment was focused on construction activities, existing
infrastructure of area, post construction activities and
transportation.The major areas covered in the impact analysis
include air emissions, wastewater, solid waste, community
development, adjacent landuse and traffic management.
CliEnt/loCation: Shv EnErgy (PakiStan) ltd, Port qaSim, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr EXPANSION OF LPG STOrAGE TANKS
SCOPE: SHv Energy is one of the largest LPG production industries in Pakistan. SHv Energy has planned to extend its operations in Port Qasim area by its new expansion project of five above the ground LPG storage tanks adjacent to existing facility. At present SHv Energy has total land area of 5 acres out of which half of that area is being utilised by existing facility. The proposed extension project will start its operations on the remaining half portion of 5 acre land. The assessment was focused on construction activities i.e. foundation works, etc. and operations i.e. LPG storage, filling and transportation.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 108
CliEnt/loCation: triPlE trEE intErnational/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr CONSTrUCTION & OPErATION
OF SOFITEL TOWEr
SCOPE: Triple Tree International Hotel intends to establish Sofitel Tower
at Clifton, Karachi which will be comprises of 25 floors hotel,
shopping mall on ground floor and 5 floor basement parking.
The total area acquired for this development is about 7337.52
yd2 and at 28 ft height of sea level. The assessment was
primarily focused on the construction activities and later
operations of hotel procedures and relevant mechanics. The
major areas covered in the impact analysis include wastewater,
solid waste, occupational safety and socio-economic factors as
well as traffic management.
CliEnt/loCation: mari gaS/ziarat bloCk, baloChiStani
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr SEISMIC SUrvEY &
EXPLOrATOrY WELL
SCOPE: Mari Gas intends to undertake seismic and drilling operations in
the southern part of Ziarat Block which lies in district Bolan. The
southern part of Ziarat Block occupies 95 km area in total.
A well organized team established to conduct field visits for
various locations that fall within the boundary of project area such
as Pir Ghaib, Bibi Nani, Khajuri, Barari, dranjan and Kirta. It is
expected that the well will be drilled to the nearby area of Bibi
Nani.
CliEnt/loCation: Sui SouthErn gaS ComPany ltd
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MACH-KOLPUr ON QPL
(GIrEP-II)
SCOPE: The Mach Kolpur 18ӯ X 15 km loopline project (BKLP) is a
continuation of SSGCL’s transmission line expansion phase
under GIrEP II Plan.
The proposed gas pipeline will be estalished at an estimated total
cost of rs. 348 million. The loopline traverse along the existing
12ӯ Quetta Pipeline from Mach valve Assembly at Khobash to
Kolpur Main valve Assembly.
The total width of the corridor of impact of the proposed Mach-
Kolpur loopline would be 30’. Almost 90% of the loopline route
is traversing in the bed of Bolan river and the remaining 10%
barren rocky soil near Kolpur valve Assembly. This land having
width of around 20’ is to be leased for construction.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 109
CliEnt/loCation: alEEm SonS WEaving, dyEing, Printing (Pvt) ltd/SitE, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ALEEM SONS
SCOPE Screening of the potential impacts during construction and
operation phase has been made, mitigation has been suggested
and finally monitoring plan was developed
CliEnt/loCation: Siza food (Pvt) ltd, SEa viEW/Clifton, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION
SCOPE IEE for a new Mcdonald's outlet at the Clifton Beach Karachi
along with a proposed park was carried out in which
environmental screening was made to assess the environmental,
ecological and social impacts of the project.
Finally mitigation were conducted. Screening was made for
environmental, social and ecological impacts of the project.
CliEnt/loCation: CrESCEnt ChEmiCalS/EPza, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CrESCENT CHEMICALS
SCOPE An Initial Environmental Examination (IEE) has been carried out
to provide all necessary information on potential environmental
and social impacts at the different stages of establishment of
Crescent Chemical's project an IEE document has been prepared
to meet the legislative requirement of Pakistan Environmental
Protection Act 1997.
CliEnt/loCation: hinoPak motorS ltd/SitE, karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF WASTEWATEr TrEATMENT
PLANT
SCOPE Screening of the possible environmental impacts due construction
and operation of wastewater treatment plant
CliEnt/loCation: dEWan Sugar millS ltd,
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dEWAN SUGAr MILLS
SCOPE dewan Sugar Mills Limited is installing distillery Plant in their
premises for which EMC has successfully prepared the Initial
Environmental Examination report in Sep 2004
CliEnt/loCation: Eni-laSmo/bhit, SEhWan
PrOJECT: IMPACT ASSESSMENT ON QUArrIES AT HALLEL SITE
SCOPE Study has been conducted for the environmental and ecological
impacts of quarries taken from the different sides along Hallel
road side.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 110
CliEnt/loCation: dEfEnCE houSing authority/karaChi
PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dHA WATErFrONT
SCOPE dHA has launched some futuristic landmark projects Water Front
development is one of such projects. The project is located on
the Southern portion of Karachi about 14kms long stretching from
Sindbad to the Golf Course.The project has multi-spectral land
use patterns in which residential, commercial and recreational
sites are developed.
IEE EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 111
EMC provides following industrial hygiene services for implantation of Industrial Hygiene Programs
for Organizations.
• noiSE SurvEyS and noiSE abatEmEnt SolutionS
detailed noise surveys are noise maps developed for the designated area. Noise reduction
measures are recommended to reduce noise at source.Selection of appropriate hearing
protection is carried out after determination of Octave band frequency and noise levels.
• aSSESSmEnt of PotEntial ExPoSurE of EmPloyEES to hazardouS SubStanCES
Survey of facility is carried out and risk assessment conducted to determine potential exposure
of employees to substances hazardous to health. This includes gas, vapours and particulate
matter. High exposure areas are highlighted for further determination of actual exposure levels
through industrial hygiene measurements
• dEtErmination of ExPoSurE lEvElS and mitigation mEaSurES to rEduCE ExPoSurES
Exposure levels are determined to assess the exposure of employees to hazardous substances
over an 8 hr. period to check against the Permissible Exposure Limits of the substances.
Measures to reduce exposure levels using the hierarchy of controls are outlined and
recommended. This includes selection of appropriate rPE as well.
• ErgonomiC aSSESSmEntS and SolutionS to imProvE dESign of job and Work StationS
Survey of manual handling activities and workstations is conducted to identify potential
ergonomic issues which could lead to Work related Musculoskeletal disorder (WrMSd).
Lighting levels are also determined in respect to the nature of work. determination of Heat and
Cold Stress during outdoor work and measures to reduce heat and Cold stress are
recommended.
We also provide customized trainings on the following:
• hEaring ConSErvation and noiSE ExPoSurES
Hearing Conservation and Noise Exposure training programs are provided to employees to
increase awareness on hearing conservation and the potential risks of hearing loss due to high
noise exposure. Training includes videos and case studies
• oCCuPational hEalth and ExPoSurE to hazardouS SubStanCES
Training on basics of Occupational Health highlighting the hazards of exposure to hazardous
substances is provided using videos and case studies
• ErgonomiCS
Basic training on Ergonomics is provided to employees using videos, and case studies
• SElECtion and uSE of PErSonal ProtECtivE EquiPmEnt
Selection and use of Personal Protective Equipment especially Hearing Protection and
respiratory Protective Equipment plays an important role in implementation of an industrial
hygiene management. Training on selection, handling, use and storage of PPE is provided to
both the users and management so that both are on the same level when ordering and using
the right PPE for the task in hand to provide maximum protection.
INDUSTRIAL HYGIENE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 112
CliEnt/loCation: mama induStriES (Pvt) ltd, Port qaSim, karaChi
PrOJECT: ENvIrONMENTAL AUdIT (PHASE-1)
SCOPE: Performed detailed environmental audit in order to observe and
record the environmental , health and safety compliance issues at
the terminal during operation and maintenance stages.
CliEnt/loCation: niShat millS ltd, lahorE
PrOJECT: BUSINESS SOCIAL rESPONSIBILITY (BSr) AUdIT
SCOPE: Conducted BSr Audit of dyeing and Finishing Units (review of
2011 audit)
A review of the progress against the last BSr audit
recommendations was carried out and gaps identified with
recommendations for improvement.
CliEnt/loCation: navEEna tExtilE mill (dEnim) lahorE
PrOJECT: BUSINESS SOCIAL rESPONSIBILITY (BSr) AUdIT
SCOPE: Audited the textile mill producing denim with the team of auditors
by covering local legislative requirements
CliEnt/loCation: ahmEd laCE (nExgEn) karaChi,
PrOJECT: BUSINESS SOCIAL rESPONSIBILITY (BSr) AUdIT
SCOPE: Conducted an audit at Ahmed Lace (Nexgen) and covered local
legislative requirements. Ahmed Lace manufactures Stickers, Tags,
and Printed ribbons.
CliEnt/loCation: rECkitt bEnkiSEr, karaChi & lahorE
PrOJECT: EHS COMPLIANCE AUdIT
SCOPE: Conducted EHS audit at three locations of rB Pakistan. rB
Pakistan is producing consumer as well as pharmaceutical
products.
CliEnt/loCation: fmC, lahorE
PrOJECT: ENvIrONMENTAL COMPLIANCE AUdIT
SCOPE: Conducted the audit for assessing the compliance at FMC. Local
environmental legislative and corporate requirements were
assessed.
AUDIT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 113
CliEnt/loCation: monSanto PakiStan ltd, lahorE
PrOJECT: EHS COMPLIANCE AUdIT
SCOPE: Audited two locations of Monsanto Pakistan with the team of
auditors and covered the local legislative requirements and its
compliance at Monsanto Pakistan
CliEnt/loCation: ChEmitEx tExtilE induStry, karaChi, PakiStan
PrOJECT: ENvIrONMENTAL AUdIT
SCOPE: Conducted an environmental audit to check compliance with
national regulatory requirements. The audit was conducted and
completed in the year 1998.
CliEnt/loCation: WyEth PakiStan ltd
PrOJECT: ENvIrONMENTAL COMPLIANCE AUdIT
SCOPE: Conducted an environmental compliance audit for the Wyeth Pakistan
Limited in the year 2006 which specially focused the compliance of
operations of all industrial units with respect to the national regulatory
requirements as well as corporate requirements.
CliEnt/loCation: fauji kabirWala PoWEr Plant, Punjab
PrOJECT: dUE dILIGENCE AUdIT
SCOPE: Conducted an audit for the due diligence of power plant which
involved the performance check of power plant with respect to the
certain standards of care and corporate requirement.
CliEnt/loCation: habibullah CoaStal PoWEr Plant
PrOJECT: EHS AUdIT
SCOPE: Conducted an EHS audit in compliance with ISO-14001-2004
standards. All the units of power plant were being investigated as
well as office areas.
CliEnt/loCation: Saba PoWEr Plant, Punjab, PakiStan
PrOJECT: dUE dILIGENCE AUdIT
SCOPE: Conducted an audit for the due diligence of power plant which
involved the performance check of power plant with respect to the
certain standards of care and corporate requirement.
AUDIT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 114
CliEnt/loCation: abbott PharmaCEutiCalS Pak (Pvt) ltd, karaChi, PakiStan
PrOJECT: EHS AUdIT
SCOPE: Conducted an EHS audit in compliance with ISO-14001-2004
standards. All the process units/areas of pharmaceutical industry
were being investigated as well as office areas.
CliEnt/loCation: uCi, S.i.t.E karaChi, PakiStan
PrOJECT: INITIAL ENvIrONMENTAL rEvIEW (IEr) rEPOrT FOr UNIvErSAL
CHEMICAL INdUSTrIES.
SCOPE: This study was carried out to assess the existing EMS
(Environmental Management System) in the company.
CliEnt/loCation: PfizEr PakiStan ltd, karaChi
PrOJECT: EHS COMPLIANCE AUdIT
SCOPE: Conducted this as the lead auditor and assessed the compliance
against the local regulatory and corporate requirements
CliEnt/loCation: PharmaCia & uPjohn, iSlamabad
PrOJECT: EHS COMPLIANCE AUdIT
SCOPE: Assessed this site and audited against corporate EHS legislative
and local regulatory requirements. This pharmaceutical company
is situated in the federal capital i.e. Islamabad, Pakistan
CliEnt/loCation: Cadbury PakiStan ltd, hub, baloChiStan
PrOJECT: dUE dILIGENCE COMPLIANCE AUdIT
SCOPE: Performed this and assessed the chocolate manufacturing industry.
CliEnt/loCation: bP PakiStan (E&P)
PrOJECT: EMS AUdIT
SCOPE: Assessed the BP sites in Badin Concession Area against ISO
14001 EMS systems and local legal requirements.This concession
area is in South East of Pakistan.
CliEnt/loCation: PfizEr PakiStan ltd, karaChi
PrOJECT: EMS AUdIT
SCOPE: As a Team Leader, performed ISO 14001 compliance audit for a
pharmaceutical plant located in Karachi, Pakistan.
AUDIT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 115
CliEnt/loCation: laSmo oil
PrOJECT: EMS AUdIT
SCOPE: Performed ISO 14001 compliance audit for a Oil & Gas plant
located in Sindh Province of Pakistan
CliEnt/loCation: al -karam tExtilES, karaChi
PrOJECT: EHS AUdIT
SCOPE: Performed Environment, Health & Safety compliance audit for a
Textile Mill located in Karachi, Pakistan.
CliEnt/loCation: ExidE PakiStan ltd
PrOJECT: EHS AUdIT
SCOPE: Performed Environment, Health & Safety compliance audit.
CliEnt/loCation: thal EnginEEring (automotivE), karaChi
PrOJECT: EHS AUdIT
SCOPE: Performed Environment, Health & Safety compliance audit for an
Automotive Manufacturing Plant, located in Karachi, Pakistan
CliEnt/loCation: huSSain Sugar millS
PrOJECT: ENvIrONMENTAL AUdIT
SCOPE: Performed Environmental compliance audit for a Sugar Mill,
located in Sindh Province of Pakistan
CliEnt/loCation: iCi PaintS, karaChi
PrOJECT: EMS AUdIT
SCOPE: Performed ISO 14000 compliance audit for a Paint manufacturing
plant, located in Karachi, Pakistan
CliEnt/loCation: ParkE daviS PharmaCEutiCalS, karaChi
PrOJECT: EMS AUdIT
SCOPE: Performed ISO 14000 compliance audit for a Pharmaceutical
company, located in Karachi, Pakistan
CliEnt/loCation: hinoPak motorS , karaChi
PrOJECT: EMS AUdIT
SCOPE: Performed ISO 14000 compliance audit for vehicle manufacturing
company, located in Karachi, Pakistan.
CliEnt/loCation: univErSal ChEmiCal induStry, karaChi
PrOJECT: EHS AUdIT
SCOPE: Performed Environment, Health & Safety compliance audit for
Textile auxiliaries manufacturing located in Karachi, Pakistan
AUDIT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 116
ENVIRONMENTAL SITE ASSESSMENT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
CliEnt/loCation: Eni laSmo, SEhWan, PakiStan
PrOJECT: STUdY OF SOIL PrOFILE OF FArMLANdS
SCOPE: Soil study to prepare current soil profile of farmlands at Sehwan
to form basis for reutilization of treated water from Sehwan
Treatment Facility in the Farmlands. Soil tests indicated presence
of oil & grease in farmland soils, which affected the normal soil
mechanisms and disturbed the soil’s natural environment.
CliEnt/loCation: gSk PakiStan, lahorE
PrOJECT: ENvIrONMENTAL SITE ASSESSMENT OF SHUTdOWN FACILITY
SCOPE: The total area of facility was 25 acres and a total of 32 sites were
drilled for soil and groundwater sampling during Phase II
assessment.
CliEnt/loCation: PharmaCia and uPjohn PakiStan (Pvt.) limitEd
PrOJECT: ENvIrONMENTAL SITE ASSESSMENT OF SHUTdOWN FACILITY
SCOPE: The Total area of facility was 7 acres and a total of 8-10 sites
were drilled for soil and groundwater sampling during Phase II
assessment
CliEnt/loCation: WyEth PakiStan limitEd
PrOJECT: ENvIrONMENTAL SITE ASSESSMENT OF FACILITY
SCOPE: A total of 6-7 sites were drilled for soil and groundwater sampling
CliEnt/loCation: bP PakiStan limitEd, naimat baSal faCility
PrOJECT: BIOrEMEdIATION OF OIL CONTAMINATEd LANd
SCOPE: Oil leaked into subsoil of the Naimat Basal Facility area of
around 100 acres A total of 18-20 sites were drilled for soil
contamination and bioremediation of the soil was carried out
CliEnt/loCation: bP PakiStan Sakhi i faCility
PrOJECT: ESA OF SAKHI-TANGrI TrUNK LINE OIL PILFErAGE SITE AT SAKHI–I
FACILITY
SCOPE: Oil leakage was detected in the Trunk line from Sakhi remote
facility to Tangri processing facility. Leakage of oil over land area
of Manzoor Laghari and Makhan Laghari field. A total of 16 sites
were drilled and soil samples collected to check for oil
contamination.
EMC PAKISTAN PvT. LTd. 117
CliEnt/loCation: karaChi urban tranSPort CorPoration
PrOJECT: GEOLOGICAL SUrvEY FOr PrEPArATOrY SUrvEY (II) ON KArACHI
CIrCULAr rAILWAY rEvIvAL PrOJECT
SCOPE: The work was carried out in accordance with the Project
Specifications and under the supervision of representatives of
JICA (EMC). The Program of investigation included drilling of
boreholes at specified locations along the rout of Karachi
Circular railway, revival Project, Karachi. during drilling of
boreholes subsoil samples were collected and necessary
laboratory tests were conducted on selected samples. This
report is based on drilling of 90 (ninety) nos of boreholes (24
boreholes of 15m depth each, 44 nos of boreholes of 20m) with
field and lab test results and their analysis of the test data.
CliEnt/loCation: johnSon & johnSon PakiStan (Pvt.) limitEd
PrOJECT: PHASE I ESA ASSESSMENT
SCOPE: Phase I ESA assessment as per ASTM E 1527 Standard was
carried out of the facility to identify any potential risks /liabilities
at site due to past practices.
ENVIRONMENTAL SITE ASSESSMENT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 118
CliEnt/loCation: S.i.t.E karaChi, PakiStan
PrOJECT: report on Environmental Audit of a Textile Processing Unit
SCOPE: The Environmental Audit of a Textile Unit was done for the Sindh
Environmental Protection Agency under a World Bank assisted
project. It was a joint venture of SEPA and EMC team and its
objectives were to examine environmental status of an industry
and to formulate its Environmental Management Plan (EMP).
CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan
PrOJECT: Consultancy Services of ISO-14000 - 2004.
SCOPE: Consultancy services were provided for the implementation of
EMS with the company in a stipulated time period.
CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan
PrOJECT: In-House Training on ISO-14000
SCOPE: Training program on environment related topics viz, Hazardous
and Non hazardous Waste Management, Waste Water
Management, Air & Noise Pollution and Energy Conservation at
Hino Pak Motors Ltd.
CliEnt/loCation: PharmaCia uP jhon, iSlamabad, PakiStan
PrOJECT: Consultancy Services of ISO-14000
SCOPE: Consultancy services for EMS ISO 14001 implementation and
certification.
CliEnt/loCation: thal Engg, korangi, karaChi, PakiStan
PrOJECT: Consultancy Services of ISO-14000
SCOPE: Provided consultancy services for implementation of EMS and
ISO 14001 certification.
CliEnt/loCation: al-karam tExtilE ltd, landhi, karaChi, PakiStan
PrOJECT: Consultancy Services for ISO-14000
SCOPE: Consultancy for the implementation of EMS and ISO 14001
Certification of various department viz. processing, weaving,
spinning and garments, has been provided
CliEnt/loCation: PfizEr, PakiStan, S.i.t.E karaChi
PrOJECT: Integrated Management System, based on OHSAS 18001 and
ISO 14001.
SCOPE: Practical implication of compulsory clausal requirements of ISO
14001 and OHSAS 18001 upon completion of necessary
documentation and following result oriented monitoring and
inspection techniques.
ISO SPECIFIC EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 119
CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan
PrOJECT: Consultancy Services for the establishment of Integrated
Management System, based on OHSAS 18001.
SCOPE: Practical implication of compulsory clausal requirements of Safety
& Security Management Systems OHSAS 18001 upon completion
of necessary documentation and following result oriented
monitoring and inspection techniques.
CliEnt/loCation: bP (PakiStan) ltd, karaChi, PakiStan
PrOJECT: Consultancy Services for the establishment of Integrated Management
System, based on OHSAS 18001 and ISO 14001 - 2004.
SCOPE: Practical implication of compulsory clausal requirements of Safety
& Security Management Systems OHSAS 18001 and
Environmental Management System ISO 14001 - 2004 upon
completion of necessary documentation and following result
oriented monitoring and inspection techniques.
CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan
PrOJECT: ISO 14001 - 2004 review
SCOPE: ISO 14001 - 2004 review was carried out for the implementation of
Environmental Management System accordingly to ISO
14001 - 2004 certification and its compliance.
CliEnt/loCation: almEida tExtilES (PrivatE) ltd, EthioPia
PrOJECT: Consultancy Services for the establishment of ISO 9001 - 2000
and ISO 17025 systems.
SCOPE: Establishment, Implementation and Compliance of Quality
Management Systems includes ISO 9001 - 2000 and Laboratory
Management System i.e. ISO 17025 certification.
ISO SPECIFIC EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 120
CliEnt/loCation: Eni-laSmo bhit - SEhWan, PakiStan
PrOJECT: STUdY rEPOrT ON FOOd WASTE dISPOSAL
SCOPE: detailed report was prepared for providing environmental friendly
solutions to manage their food waste at Bhit Camp Site Kirthar
Concession Area and methodologies has been drawn out for the
management of food waste.
CliEnt/loCation: bP badin PakiStan, ConCESSion arEa
PrOJECT: rECYCLING OF WASTE OIL SLUdGE
SCOPE: The British petroleum is engaged in the exploration and production
of oil and gas from the Badin Concession Area, required the
services of EMC for the disposal of its oil sludge in environmental
friendly manner. After being studied the characteristics of oil sludge
solution in the use of cement kiln was recommended and the oil
sludge has been utilized and recycled into cement kiln as
alternative fuel.
CliEnt/loCation: ShEll PakiStan limitEd, karaChi
PrOJECT: dISPOSAL OF WASTE OIL SLUdGE ANd dIFFErENT TYPES OF CHEMICALS
FrOM LABOrATOrY
SCOPE: Shell Pakistan is dealing in blending oils, petrol, hi-octane, diesel
and Furnace oil. The for the disposal of the waste oil, we once
again suggested the solution employing oil as substitute fuel for
cement kiln, EMC awarded one year contract of utilizing the oil
waste with same process with SPL. The waste chemicals were
incinerated in the cement kiln and exhaust emissions were tested
to monitor any air contamination. Some chemicals were recycled
as well for reuse
CliEnt/loCation: mSd (mErCk SharPE dohmE), SitE, karaChi PakiStan
PrOJECT: dISPOSAL OF WASTEWATEr SLUdGE.
SCOPE: Merck Sharpe dohme is a pharmaceutical company producing
varied range of products in the field of medicine. They generate
hazardous wastewater sludge produced during the treatment of
wastewater. The wastewater sludge was incinerated into the
cement kiln and the remainders were used as raw material for
cement manufacturing. The exhaust emissions were tested as per
the practice of monitoring air during incineration. The EMC has
signed of incinerating its sludge for one year.
WASTE MANAGEMENT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 121
CliEnt/loCation: PEtronaS oil ExPlorationS, Sukkur , PakiStan
PrOJECT: dISPOSAL OF HAZArdOUS ANd NON HAZArdOUS WASTE
SCOPE: The Petronas Oil Exploration is engaged in exploration and
production of gas in Sindh was looking for the disposal of
hazardous and non hazardous waste for which EMC was
contacted. After analyzing the status of waste, it has been found
out that this waste can be recycled and reused. different venders
were contacted for the reuse of solid waste. EMC monitored the
whole activity to ensure its ultimate usage and disposal in a
environmental friendly manner
CliEnt/loCation: al-karam tExtilES ltd, landhi, karaChi
PrOJECT: dISPOSAL ANd INCINErATION OF CHEMICALS, dYES, ANd WASTE OIL.
SCOPE: Al-Karam Textile is one the leading textile industries in Pakistan
producing different types of cloths, mainly exporting its product
to European market.The use of chemicals and dyes are inevitable
for the production of cloths. After analyzing their waste, incineration
was sorted out as the best suitable option for disposal of waste
chemicals and dyes. This waste was incinerated into the cement
kiln and exhaust emissions were tested to monitor air
contamination.
CliEnt/loCation: hinoPak motorS ltd, SitE karaChi, PakiStan
PrOJECT: dISPOSAL OF WASTE OIL, GrEASE, PAINT ANd CHEMICALS USEd IN THE
PrOCESS.
SCOPE: The Hinopak Motors is mainly manufacturing heavy duty trucks,
dumpers and buses. The use of oil, grease and paint is quite
common in the process which generates the waste which should
be incinerated due to its toxicity, incineration was proceeded into
the cement kiln and hazardous waste was incinerated successfully.
The emissions were tested during the process.
CliEnt/loCation: Cadbury PakiStan ltd , hub, baluChiStan
PrOJECT: dISPOSAL OF WASTE FLAvOrEd CHEMICALS
SCOPE: The Cadbury Pakistan is a food industry producing various ranges
of chocolates uses flavored chemicals to enhance the taste and
smell of its product. The flavored chemical was expired and we
suggested incineration at cement kiln and performed this activity
according to the norms and procedures of EMC.The emissions
were tested for any possible air contamination
WASTE MANAGEMENT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 122
CliEnt/loCation: thal EnginEEring, korangi, karaChi, PakiStan
PrOJECT: rECYCLING OF SOLvENT (111-TCE) USEd FOr dEGrEASING.
SCOPE: The Thal Engineering is Car Air-condition manufacturing industry,
were keen to dispose off its solvent named Tri Chloro Ethylene
(TCE) used for degreasing of equipments. EMC with the help of
PCSIr laboratory recycled the solvent which later utilized by Thal
Engg: again in their process. This saved them millions of rupees
and also good name as an environmental friendly company.
CliEnt/loCation: uCi, SitE, karaChi, PakiStan
PrOJECT: dISPOSAL OF WASTE CHEMICALS
SCOPE: The Universal chemicals Industry is renowned textile chemicals
making industry the disposal of waste chemicals which in being
incinerated in cement kiln. The exhaust emissions were tested
for monitoring of air produced during the incineration of chemicals.
They generate lot of hazardous chemical residue which is
hazardous in nature. Their waste was first neutralized and then
disposed off to a land fill site as benign material. Their waste oil
was also disposed off in lubricating industry and reused as
lubricating oil.
WASTE MANAGEMENT EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 123
CliEnt/loCation: Eni-laSmo, bhit - SEhWan, PakiStan
PrOJECT: STUdY rEPOrT ON WASTE WATEr dISPOSAL /TrEATMENT
SCOPE: detailed study on management of waste water generated from
their camp sites has been reported. Suggestions and
recommended for the environmental friendly solutions has been
provided.
CliEnt/loCation: Cadbury PakiStan ltd. hub, baluChiStan, PakiStan
PrOJECT: WASTE WATEr TrEATMENT PLANT
SCOPE: design, fabrication, installation, operation and maintenance of
wastewater treatment plant for food industry.
CliEnt/loCation: thal Engg
PrOJECT: WASTE WATEr TrEATMENT PLANT
SCOPE: design, fabrication, installation, operation and maintenance of
wastewater treatment plant.
CliEnt/loCation: hinoPak motorS ltd S.i.t.E karaChi, PakiStan
PrOJECT: WASTE WATEr TrEATMENT PLANT
SCOPE: design, fabrication, installation, operation and maintenance of
wastewater treatment plant. for the Automobile industry.
CliEnt/loCation: ShEllPakiStan ltd, karaChi
PrOJECT: WASTE WATEr TrEATMENT PLANT
SCOPE: design, fabrication, installation, operation and maintenance of
wastewater treatment plant
CliEnt/loCation: ProCtor & gamblE (Pvt) ltd
PrOJECT: WASTE WATEr TrEATMENT PLAN
SCOPE: Construction, establishment and operation of Wastewater
Treatment Plant
CliEnt/loCation: miniStry of tExtilE induStry, govErnmEnt of PakiStan, iSlamabad
PrOJECT: NATION-WIdE MAPPING OF INdUSTrIES TO ANALYZE THE rEQUIrEMENT
OF COMBINEd EFFLUENT TrEATMENT PLANTS (CETPS)
SCOPE: Feasibility Studies and preliminary design for Combined Effluent
Treatment Plants (CETPs) for Industrial Estate in Karachi, Lahore,
Faisalabad, Sialkot, Multan & Hub.
WWTP SPECIFIC EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 124
CliEnt/loCation: bP PakiStan ExPloration & ProduCtion, badin ConCESSion
PrOJECT: NOISE STUdY AT PrOdUCTION FACILITIES
SCOPE: The study has been carried out to determine the existing noise
levels of BP Pakistan sites at Badin Concession Area. The aims
and objectives of the study are to identify the causes of noise and
to highlight noisy areas to prevent health hazards caused due to
nuisance of noise.
CliEnt/loCation: al-tuWairqi grouP
PrOJECT: ENvIrONMENTAL MONITOrING OF TUWAIrQI STEEL MILL PrOJECT
SCOPE: The report contains the Environmental Monitoring results at the
site for construction of proposed Tuwairqi Steel Mills. This
monitoring is being performed by Environmental Management
Consultants in compliance to the condition of approval of IEE
issued from Sindh EPA in favour of Tuwairqi Steel Mills.
CliEnt/loCation: lakSon tobaCCo ComPany ltd
PrOJECT: ENvIrONMENTAL MANAGEMENT & MONITOrING PLAN
SCOPE: This Environmental Management & Monitoring Plan (EMMP)
has been prepared by Environmental Management Consultants
(EMC).This report provides an approach for managing monitoring
environment related issues and describes the institutional
framework for environmental management and resource
allocations to be carried out by Lakson Tobacco Company Limited
(LTC) for mitigating the negative impacts which may cause
degradation to the Environment.
CliEnt/loCation: dEfEnCE houSing authority (dha), karaChi
PrOJECT: MONITOrING OF WATErFrONT dEvELOPMENT PrOJECTS
SCOPE: dHA has launched some futuristic landmark projects. WaterFront
development is one of such projects. The project is located on the
Southern portion of Karachi about 14 kms longstretching from
Sindbad to the Golf Course. The project has multi-spectral land
use patterns in which residential, commercial and recreational
sites are developed.
The monitoring of three projects is being performed by EMC and
they are:
(1) Crescent Bay
(2) Creek Side Mall
(3) Creek Marina
MONITORING EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 125
CliEnt/loCation: britiSh PEtrolEum PakiStan (bPP), badin
PrOJECT: MONITOrING OF PErSONAL EXPOSUrE TO BTEX (BENZENE, TOLUENE,
XYLENE, ETHYL BENZENE)
SCOPE: On request of BP Pakistan Exploration and Production Inc., EMC
performed monitoring of BTEX exposure at Mazari Facility, district
Badin Sindh.
CliEnt/loCation: lilly intErnational (Pvt) ltd
PrOJECT: ENvIrONMENTAL MONITOrING/MANAGEMENT PLAN.
SCOPE: Lilly International (Pvt) Limited is an engineering firm for which
EMC has successfully preparing Environmental Monitoring /
Management Plan for Ubauro-Shaikh Wahan and Turnol-Chablat
Section since Jan 2006.
CliEnt/loCation: thatta, Sindh, PakiStan
PrOJECT: rEPOrT ON "STUdY INTO CAUSES ANd EFFECTS OF EUTrOPHICATION IN
MAJOr LAKES OF SINdH".
SCOPE: Out of the selected lakes of Sindh, Haleji and Kinjhar lakes were
studied in detail so as to determine the nature and extent of
eutrophy and overgrowth of aquatic weeds, and suggest strategy
for their control.
CliEnt/loCation: Eni-laSmo, SEhWan, PakiStan
PrOJECT: STUdY OF SOIL PrOFILE OF FArMLANdS ArOUNd SEHWAN TrEATMENT
FACILITY
SCOPE: The purpose of the soil study was to prepare the current soil
profile of farmlands at Sehwan. various parameters that may
affect soil quality were tested and the results documented for
specific ion toxicity of sodium, chloride, boron and microbiological
contamination of faecal origin etc
CliEnt/loCation: Eni-laSmo, naganWal, PakiStan
PrOJECT: IMPACT OF WASTEWATEr IrrIGATION ON THE GrOUNdWATEr
SCOPE: Possible soil and groundwater contamination has been envisaged
due to the wastewater irrigation on farm lands.
CliEnt/loCation: bP, badin, PakSitan, badin ConCESSion
PrOJECT: NOISE STUdY OF BP'S FACILITIES
SCOPE: The aim of study was to carry baseline survey of noise levels
within facilities vis-à-vis establish noise maps of BP facilities at
Badin Concession Area
MONITORING EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 126
CliEnt/loCation: bEaCoN houSE, korangi, karaChi, PakiStan
PrOJECT: AMBIENT AIr QUALITY MONITOrING
SCOPE: Ambient air quality in and around Beacon House School Jubilee
Campus located in Korangi Industrial Area Karachi was analyzed.
Sampling was carried out at four different stations on a 24 hour
basis for Oxides of Sulphur and nitrogen, carbon monoxide,
particulate matter and ozone.
CliEnt/loCation: PakiStan Pta ltd Port qaSim, karaChi
PrOJECT: CONSULTING SErvICES FOr AIr dISPErSION MOdELING OF rAW
MATErIAL TrANSPOrTATION
SCOPE: Pakistan PTA is a Chemical manufacturing company which
requires Consulting Services for Air dispersion of raw Material
Transportation at their premises in Port Qasim in October 2005
CliEnt/loCation: hamSonS tExtilE millS ltd, korangi, karaChi, PakiStan
PrOJECT: INITIAL ENvIrONMENTAL rEvIEW
SCOPE: Screening has been made for the environmental impacts of
towel manufacturer industry, solution were sorted out and finally
recommended has been made.
MONITORING EXPERIENCE
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 127
Soil and groundwater assessment / management for designing /
installation of telecommunication tower
EMC geotechnical staff has conducted soil and ground water assessment /management prior to the
designing & installation of Telecommunication Towers all over the country for the following clients.
1. ufonE: PaCkagE 1; datE : SEP 2007 - aug 2013 no. of SitES: 536
2. zong : PaCkagE ii; datE fEb 2012 – aug 2013 no of SitES: 94
3. PtCl: PaCkagE vii; datE: fEb 2009-aPr 2010 no of SitES:25
4. Cm Pak: PaCkagE iii; datE :SEP-oCt 2009 no of SitES: 2
5. Warid: PaCkagE vi; datE: oCt 2007- jan 2009 no of SitES: 294
6. EriCSon : PaCkagE v ; datE: oCt 2007 no of SitES: 2
7. Pak tElECom : PaCkagE iv ; datE july – aug 2007 no of SitES: 3
SOIL & GROUNDWATER ASSESSMENT
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 128
Socio-economic survey is based on the statistical approach such as housing, existing
population, rate of population growth, population forecasting & modeling. Health,
education, provision of infrastructures in the communities & the overall social improve
mental/development plan is designed. In the section of Economic survey, incomes of the
people, income sources & cost & benefit analysis of the said projects.
Census of households and individuals located within the project has to be undertaken to
register and document the status of potentially affected population within the project impact
area. It will provide a demographic overview of the population served by the resettlement
Plan (rP) and profiles of household assets and main sources of livelihood. It will cover
100% of the potentially affected population within the project impact area.
n rESOUrCE bASE. The resource base including land, water, and forest, etc., with
an assessment of its development and ecological potential in the pre-project
conditions. during the conduct of the census, legal boundaries of affected
properties and the right of way (rOW) are to be verified. Structures, trees and
other assets are to be recorded.
n ECONOMY bASE. The economy base of the affected people including the modes
and magnitude of production, consumption pattern, related economic institutions.
n hOUSEHOLd CENSUS. Household census covering immovable property owned by
the APs and other resources in their possession/use. These surveys would be
carried out in association with local and host communities as well as with the
local representatives.
n SOCIAL STrUCTUrES. The social structure, norms, customs, cultural centers,
traditions, patterns of leadership and institutions of social network.
n aFFECTEd PErSONS. The census will prima-facie identify Tenants, Sharecroppers,
Encroachers and a gricultural day labourers. during such census, those Affected
Persons are dependant on the existing infrastructure link for their livelihood, shall
also be identified and listed along with their identified income.
dATABASE mANAGEMENT
n dATA SOUrCES. As a pre-requisite for conducting the primary household surveys,
relevant information is to be collected from secondary sources. These include:
revenue records maintained, with regard to land particulars for facilitating
acquisition of properties and resettlement of oustees; Census records for
demographic information; - development agencies to get information on various
development programs for special sections of population like those living below
poverty line, Scheduled Tribes, Schedule Castes, etc.; and - Local organizations
including NGOs in order to involve them and integrate their activities in the
economic development programs of the displaced population.
n dATA COLLECTION. Household level contacts and interviews with each affected
family for completing the household socio-economic profile. Each of the
SOCIO-ECONOMIC IMPACT ASSESSMENT
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 129
households surveyed and the structure/land likely to be affected by the project
has to be numbered, documented and photographed. Public consultation
exercises in different project areas to be conducted with the involvement of
Affected Persons. In these exercises, women among the Affected Persons are
to be involved to elicit their views and options on the overall planning of
resettlement activities. discussions with a cross-section of affected population
will help towards understanding the problems and preference of the APs.
n dATA aNALYSIS. The analysis would cover the following: population, population
density, age, sex ratio, literacy rates/education, gender issues, tribal issues,
religious groups, income, occupation and poverty line.
n dATA uPdATE. Since there is generally a time gap between the census and land
acquisition procedure, which will take at least one year, it implies that actual
physical relocation of APs may be delayed by a year. Therefore, it is suggested
that NGOs responsible for implementation of rP along with IPMU, should conduct
a rapid appraisal to continuously update information.
SOCIO-ECONOMIC IMPACT ASSESSMENT
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 130
EMC conducts hydrological studies and assess the impact assessment. We conduct the
evaluation of the potential hydrological impacts on ground & groundwater. The following
provides an overview of existing work done and planned analyses.We have collected a big
amount of data that serves as the foundation for current water resource investigations in
Pakistan. We have some major studies undertaken to characterize groundwater movement
in Sindh and around.
Below is a brief description of activities currently under way:
n aSSEMBLE dATABASES
Assemble and maintain map, relational and other databases. These include
engineering, hydrologic and environmental components and include digital map
library, hydrologic database, physical/document library and image repository.
n CUrrENT grOUNdWATEr CONdITIONS
Currently developing maps, graphs and supporting databases to document
groundwater levels and chemistry within the study area and characterize
hydrogeologic conditions. depths to groundwater will be further characterized in
phreatophyte and irrigated areas. Water rights also will be described.
n CHArACTErIZE CUrrENT SPrING hYdrOLOGIC CONdITIONS
document and analyze current conditions of select springs within the project area,
including physical setting, local hydrogeology and spring flow sources
and dynamics.
n CHArACTErIZE bIOLOGICAL CONdITIONS aT SPrING-dEPENdENT aQUATIC, rIPArIAN
aNd WETLANd hABITATS
document current conditions of the spring-dependent habitats, including spring
pools and brooks, and riparian, wetland and open-water habitats.
n CHArACTErIZE CUrrENT PHrEATOPHYTE CONdITIONS
This includes distribution of phreatophytes and irrigated vegetation estimated
consumptive use and vegetation dynamics.
n CHArACTErIZE hYdrOGEOLOGIC SETTING
This includes a regional-scale hydrogeologic map, regional-scale hydrogeologic
sections, local-scale hydrogeologic maps of spring areas and structural maps.
nn dEvELOP grOUNdWATEr fLOW mOdEL
develop a groundwater flow model to simulate the groundwater effects of the
project. The model will be based upon some reputable and renowned software
for flow modeling.
n idENTIFY aNd EvALUATE hYdrOLOGIC mANAGEMENT aNd monitoring aLTErNATIvES
Identify and evaluate alternative hydrologic management and monitoring
programs for the project
HYDROLOGICAL STUDIES
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 131
namE: SyEd nadEEm arif
PoSition: MANAGING dIrECTOr
qualifiCation: n Masters in Business Administration
n Bachelors of Civil Engineering
ExPEriEnCE: Mr. Arif is basically an Engineer having done his post graduation
in Business Management. He is an experienced trainer and has
conducted numerous courses and trainings on Environmental
Management, Environmental Auditing etc. He is a qualified auditor
for ISO 14000 Environmental Management Systems, ISO 9000
Quality Management Systems and OHSAS 18001 Occupational
Health & Safety Assessment Scheme. He has vast experience in
defining strategic planning, monetary and Technical matters,
scheduling of the projects, preparation of contractual claim
documents, report generation, computer based time scheduling
and planning, Coordination with the clients, negotiations etc. He
was a speaker at different seminars and workshops and has
delivered lectures on several topics related to Environment, Health
& Safety.
namE: dr mirza arShad ali baig
PoSition: PrINCIPAL ENvIrONMENTAL EXPErT
qualifiCation: n Phd. Chemistry, University of British Columbia (USA), 1961.
n Master of Chemistry, University of Karachi; 1953
ExPEriEnCE: dr. Baig is Ph.d. in Chemistry; University of British Colombia,
USA (1961) and M.Sc. in Chemistry; University of Karachi (1953).
He has professional experience of over 50 years, which includes
research, teaching, administration, consultancy and report writing.
Expertise and interests include natural resource management,
environmental audit, environmental impact assessment, development
of pollution control technologies, occupational health & safety,
hazardous material handling, technology transfer, agro-based
industry, rural industry, and small industry establishment. Worked in
Pakistan, Sultanate of Oman and Canada.
Generated most of the Baseline data for environmental parameters
for Karachi viz. Water Pollution, Air Pollution, Noise Pollution, Soil
Pollution, Industrial Pollution, and Marine Pollution, "Environmental
Audit of development Projects in Badin district" and most recently
"Environmental Profile of Karachi City district and vision 2020"
Chapter for Karachi Master Plan 2020".
K E Y P E R S O N N E L
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 132
namE: dr. iqbal ali
PoSition: PrINCIPAL ENv. ENGINEEr & EXPErT ON WATEr
qualifiCation: n Ph. d.Civil Engineering University of Leeds, U.K. (1969)
n M. Tech. Water Power Engineering; Indian Institute of
Technology, Kharaghpur, India (1960)
n B.E. (Hon's) Civil Engineering: University of Jabalpur, India
(1958)
n P.G.C Airport Planning: SEATO Graduate School of Engineering
(Now AIT) Bangkok (1962)
ExPEriEnCE: He has a rich experience in the field of Environmental Engineering &
Management. The former director of Institute of Environmental
Engineering and research at N.E.d University developed the institute in
to a full-fledged teaching, research and consulting organization.
Carried out a large number of studies e.g. hazardous & solid waste,
air pollution, EIA, water treatment and coastal water pollution as
research supervisor, advisor, and consultant of the WHO
n EIA including Air and Water dispersion studies for the Keloil
LPG, Plant Bin Qasim, Karachi
n Analysis/Measurements of Flue Gas Emissions of KESC, Bin
Qasim Thermal Power Station.
n Environmental Pollution Assessment within Pakistan Steels.
n Environmental Assessment of the proposed Barge Mounted
Power Plant, Bin Qasim, Karachi-M/S. Pak. Engineering
Service (Pvt) Ltd., Karachi.
n Environmental Audit of Tapal Energy Ltd, Hub river road,
Karachi.
n Air Quality Assessment at Islamabad/rawalpindi - Federal
Environmental Protection Agency, Islamabad.
n Greenhouse Gas Inventory and National Least-Cost GHGs
Abatement Strategies Project, and Climate Change and Industrial
Emissions in Pakistan.
n Situational and Strategical analysis for Solid Waste Management
in Azad Jamu and Kashmir.
n Ambient Air Quality Assessment in the Northern Area, Pakistan
namE: Saquib Ejaz huSSain
PoSition: ENvIrONMENTAL & SOCIAL CONSIdErATION EXPErT
qualifiCation: n Masters in Applied Chemistry & Chemical Technology from
Karachi University
ExPEriEnCE: Mr. Saquib is working as an Environmentalist at EMC and has a
good command on conducting Environmental Assessment Studies.
He possess good knowledge on National and International
Legislations pertaining to the Protection of Environment and
Natural resources. He also has an experience of working at Sindh
K E Y P E R S O N N E L
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 133
Ministry of Environment as an Assistant director, where he was
directly involved in the process of reviewing environmental
assessment reports and decision making in light of Pakistan
Environmental Protection Act 1997 and rules and regulations
framed there under.
namE: zulEkha Soorma
PoSition: HSE AdvISOr
qualifiCation: n Masters in Business Administration (Marketing) from IBA
ExPEriEnCE: Ms. Soorma is a Lead Auditor and has attended and passed the
IrCA certified courses for OHSAS 18001 and ISO 14001 and
Certificate Course in Industrial Environmental Management.
She is also a Green Belt in Lean and Six Sigma and has attended
Leading Edge and Leadership Edge Workshops organized by Senn
delany. She has an experience of 15 years in HSE and has also
worked in other disciplines like Quality Assurance and Production
during the course of her career in Pharmaceutical Industry. She has
successfully implemented EHS Management Systems at GSK
Pakistan Ltd and Wyeth Pakistan Ltd.
She is working as HSE Advisor at EMC since March 2010 and has
prepared Occupational Health and Industrial Hygiene procedures
for BP Pakistan besides imparting customised training on ISO
14001 to clients.
namE: taSnEEm bhatti
PoSition: SOCIO-ECONOMIC EXPErT
qualifiCation: n Masters in Business Administration from Institute of Business
& Administration, Pakistan
n Masters in Economics from University of Sindh, Jamshoro,
Pakistan
ExPEriEnCE: Ms. Bhatti has more than 20 years of experience in the field of
Sociology. She prepared social profiles of coastal communities of
Sindh and Baluchistan as well as rural areas of Sindh and
Baluchistan where companies like BP Pakistan, OMv, Eni and
Petronas have conducted oil and gas exploration. She also works
as a monitoring and evaluation officer on behalf of funding agencies
like JICA, AdB for social sector projects.
namE: ijaz huSSain
PoSition: CHEMIST
qualifiCation: n B.Sc. from Karachi University with major in Chemistry,
Biochemistry, & Microbiology.
K E Y P E R S O N N E L
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 134
ExPEriEnCE: Mr. Ijaz Hussain has experience as a chemical analyst and
laboratory technician. In past he has been working with the
following organizations:
n defence research Organisation
n Zliten Gas Power & desalination Plant, Libya
n rehmat Hospital
due to his capabilities of handling administrative, logistic and
procurement work, he has also been partly associated with
procurement, logistics and administration department. Mr. Ijaz
Hussain is a core employee of EMC and working since 1997 and
have vast experience in managing office environment as well as
laboratory and sampling work. He is a well coordinating person and
has good knowledge of understanding of various aspects.
namE: muhammad haSEEb
PoSition: ENvIrONMENTAL SPECIALIST
qualifiCation: n Masters in Environmental Studies from University of Karachi, Pakistann Masters in Applied Chemistry & Chemical Technology from University of Karachi, Pakistan
ExPEriEnCE: Mr. Haseeb, Masters in Environmental Sciences & Applied Chemistry and Chemical Technology has experience as an environmentalist with special reference to data analysis and has good command on conducting Environmental Assessment Studies in the field of Oil & Gas, Construction, Mining, Chemicals and Pharma, Transportation, Urban development etc. Conduct Environmental Baseline Surveys and Environmental Monitoring, conduct environmental audits and prepare Environmental Management Plans for industries. Having experience of working with International donor Agencies like JICA, AdB, USAId He possesses good knowledge on National & International Laws, regulations and Guidelines pertaining to Environment & Social Issues.
namE: khurram ShamS khan
PoSition: SOCIAL dEvELOPMENT SPECIALIST
qualifiCation: n Master in Water Management from Institute of Water and Environment, Cranfield University, England n Bachelor in Economics and Environmental Studies from Bates College, Maine, USA
ExPEriEnCE: Mr. Khurram has an interdisciplinary knowledge base for framing and problems of socio-economic development and poverty reduction, Strong foundations in project design and planning, development of implementation and impact frameworks, policy review and monitoring & evaluation.Extensive experience in the development of various communication materials including strategy documents, grants, policy reviews, progress reports, donor updates, MOUs, and socio-
K E Y P E R S O N N E L
CO
MP
AN
Y P
rO
FIL
E
EMC PAKISTAN PvT. LTd. 135
economic reports.Exposed to the process of partnership-building and relationship management with donor agencies, corporate entities, government departments, civil society organizations, and local community groups.
namE: ahmEd zohair Siddiqui
PoSition: ENvIrONMENTAL ENGINEEr
qualifiCation: n Master of Environmental Engineering from University of Melbourne Australia
ExPEriEnCE: Civil/Environmental Engineer possessing 5+ years of diversified experience in the engineering and development sector with particular expertise in Environmental Management, Sustainable Infrastructure, Water quality/Treatment and Project Management. Postgraduate recipient of Master of Environmental Engineering degree from the department of Infrastructure Engineering at the University of Melbourne, Australia. Graduate Civil Engineer from the NEd University of Engineering & Technology. Presently employed as an Environmental Professional on a range of extensive infrastructure and energy projects across Pakistan. responsibilities include providing Environmental Investigation & Management expertise, liaising with and assisting clientele in acquisition of environmental permits, conducting comprehensive Environmental Impact Assessment (EIA) studies, performing Environmental Site Assessments and Environmental Compliance Monitoring (ECM).
K E Y P E R S O N N E L
CO
MP
AN
Y P
rO
FIL
E