emc3 casestudy-icecave1

11
LinkedIn Talent Connect 2013 London Hilton Metropole Hotel www.emc3.eu CONFERENCE DESIGN AND BUILD CASE STUDY

Upload: emc3london

Post on 09-Aug-2015

25 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Emc3 casestudy-icecave1

LinkedIn Talent Connect 2013

London Hilton Metropole Hotel

www.emc3.euCONFERENCE

DESIGN AND BUILD CASE STUDY

Page 2: Emc3 casestudy-icecave1

AN ICE CAVE SCENE

emc3

Page 3: Emc3 casestudy-icecave1

This is how we start the process...

Our artist sketches

up some visuals to

show how the room

could look

Page 4: Emc3 casestudy-icecave1

Next we work on the layout...

Once the artwork was

approved, our team

created to-scale CAD

plans of the room

with the décor in it to

show a more accurate

representation of space

Page 5: Emc3 casestudy-icecave1

Scale 3D Visuals...

Page 6: Emc3 casestudy-icecave1

The Final Floorplan

Page 7: Emc3 casestudy-icecave1

The Build 30 hours up, 10 hours down

The build took around 30

hours, then the derig after the

event took just under 10!

See below link for our time

lapse video of the whole thing:

http://vimeo.com/78522842

Page 8: Emc3 casestudy-icecave1

The Finished Article

Page 9: Emc3 casestudy-icecave1

The Finished Article

Page 10: Emc3 casestudy-icecave1

The Animation

Page 11: Emc3 casestudy-icecave1

CONTACT

www.emc3.eu

Call Alistair

or Daniel

020 3468 3907

Email:

[email protected]

emc3

www.emc3.eu

THANK YOU!