SIMOGGA PlannerAdvanced Scheduling & Planning
• OPTIMIZE YOUR GOALS
– Maximize Productivity
– Maximize On Time delivery
– Minimize your ecological footprint
• WITH LIMITED RESOURCES
– Assets: machine, building, vehicle
– Employees
– Time & Budget
• UNDER CONSTRAINTS
– Working hours
– Skills and Affinity
– Logistics conflicts
2
Excel Tables
SIMOGGA PlannerVisualize, Quantify, Optimize the schedule and the planning
3
Magnetic Planning Boards
Various Data Bases
Project management software
SIMOGGAPlanner
SIMOGGA PlannerCase Study
4
Constraints
• Linear line with subparts desassembly
and assembly
• Washing machine combining multiple
products
• 15 days lead time constraint
Questions
• Can the production be sustained with 2
shifts ?
• Can we reduce the lead time ?
• Is there any bottleneck machine ?
• What is the optimal batch size ?
SIMOGGA Planner Configuring the planner - Shifts
5
Setting two shifts for the whole factory
SIMOGGA Planner Configuring the planner - Orders
6
Setting the due date of each order 15 days after the release date
Base the ordering on the due date of each order
SIMOGGA Planner Configuring the planner - Operations
7
SIMOGGA Planner Configuring the planner - Machines
8
Setting the washing machine to handle 4 items simultaneously
SIMOGGA Planner Analyzing initial results
9
Incremental lead time
Most of orders will not be ready within 15 days
SIMOGGA PlannerAnalyzing initial results
10
Production Timeline
WIP
SIMOGGA PlannerFinding the bottleneck machine(s)
11
Machine M26 is the first bottleneck: Cumulated waiting time = 3116 min (52h)
SIMOGGA PlannerFinding the bottleneck machine(s)
12
Machine M26 is also the most used one.
SIMOGGA Planner Resolving the case
13
Set the M26 as the bottleneck machine
Set the M26 on 3 shifts instead of 2
SIMOGGA PlannerComparing solutions – Lead time
14
Schedule1 is the initial schedule
Schedule2 takes into account the bottleneck machine
Each order is now ready within the 15 days time limit
SIMOGGA PlannerComparing solutions – Bottleneck
15
Schedule1 is the initial schedule
Schedule2 takes into account the bottleneck machine
The waiting time in front of M26 has been drastically lowered
SIMOGGA Planner Resolving the case
16
Modifying the batch size for the products
SIMOGGA Planner Resolving the case – Comparing KPIs
17
Schedule for different batch size on the main line
1 : batch size = 2
2 : batch size = 4
3 : batch size = 8
SIMOGGA PlannerIn-depth analysis - Visualize the bottlenecks in details
18
SIMOGGA PlannerIn-depth analysis
19
Number of items waiting in the system (minute by minute)
SIMOGGA PlannerIn-depth analysis - Orders lateness
20
SIMOGGA PlannerIn-depth analysis - Gantt Chart
21
SIMOGGA PlannerIn-depth analysis - Details of each order
22
Op1
Sub-assembly
Op2
Op3
Op4
Op5
Red color when “Planned Start Date” or the “Current Date” > “Critical Start Date”Detailed information when the user drags the mouse over an operation
SIMOGGA PlannerIn-depth analysis - Schedule a new orderline
• The Planner will re-plan the orders
– by stabilizing the previous scheduled orders
– by taking into account the new order or the new priority
• Add the financial aspects in the order panel to help the Order processor to chose the right priority for the orders (= Decision Aid Solution)
23
SIMOGGA PlannerIn-depth analysis – Gantt in function of the priority of orders
24
SIMOGGA PlannerIn-depth analysis - Details of each operation (TODO List)
25
Filters available by machine, product, order
SIMOGGA PlannerIn-depth analysis – Units per day
26
Contact Us!
AMIA Systems,
The “most innovative startup in Brussels” by Innoviris
www.amia-systems.com
linkedin.com/company/amia-systems
twitter.com/amiasystems
Blog amiasystems.wordpress.com
Emmanuelle VIN Martine Houyoux
CEO & Founder Sales & Marketing
+32 479 727 905 +32 483 68 25 34