empowering women through adult education cooperation ppsw with dvv international
TRANSCRIPT
EMPOWERING WOMEN EMPOWERING WOMEN THROUGH ADULT THROUGH ADULT
EDUCATION EDUCATION
COOPERATION PPSW WITH COOPERATION PPSW WITH DVV INTERNATIONALDVV INTERNATIONAL
INTRODUCTIONINTRODUCTION
PPSW or Centre for the Development of Women's Resources PPSW or Centre for the Development of Women's Resources as an NGO was founded in 1986. as an NGO was founded in 1986.
The primary objective of PPSW is the empowerment of The primary objective of PPSW is the empowerment of women, in particular those women in the low social-economic women, in particular those women in the low social-economic strata of society in urban and rural areas strata of society in urban and rural areas
PPSW selected as its focus a number of issues that are faced PPSW selected as its focus a number of issues that are faced by these communities, such as social economic, health and by these communities, such as social economic, health and education problems, as the entry point in community education problems, as the entry point in community organizing notably with women’s groups. organizing notably with women’s groups.
Project Location : 6 provinces, consist of 16 district, 56 sub Project Location : 6 provinces, consist of 16 district, 56 sub district.district.
ACTIVITIES WAS CONDUCTEDACTIVITIES WAS CONDUCTED 2006 -20072006 -2007
RESULT 1: PROMOTION OF EDUCATIONAL RESULT 1: PROMOTION OF EDUCATIONAL INSTITUTIONS AND STRUCTURES:INSTITUTIONS AND STRUCTURES: Women group and Co-op meeting regularWomen group and Co-op meeting regular Local cadre meetingLocal cadre meeting Area forum meetingArea forum meeting Cooperative annual general meetingCooperative annual general meeting
Program and Capacity Building for Program and Capacity Building for CBO (women group and women leaders):CBO (women group and women leaders):
Several Trainings : Entrepreunership, micro finance, Several Trainings : Entrepreunership, micro finance, Personality development, transformative leadership, Personality development, transformative leadership, Democracy and politics, good governance, Workshop on Democracy and politics, good governance, Workshop on gender issues for women and men gender issues for women and men
Set up community learning centre : 17 unitsSet up community learning centre : 17 units
Result 2: Capacity Building for CBOResult 2: Capacity Building for CBO
Training/ Training/ WorkshopWorkshop
2006-20072006-2007((participants)participants)
20082008((participants)participants)
TotalTotal((participants)participants)
Entrepreunership Entrepreunership 369369 175175 544544
Micro FinanceMicro Finance 162162 142142 304304
Personality devPersonality dev 442442 5454 496496
Transf LeadershipTransf Leadership 175175 -- 175175
Democracy and Democracy and PoliticsPolitics
155155 2929 184184
Good GovernanceGood Governance 130130 177177 307307
Workshop gender Workshop gender for Women & Menfor Women & Men
4343 236236 279279
TotalTotal 14761476 813813 22892289
Net working :Net working : Local, National : ASPPUK, FORMASI, ANMK, MDG’s, Local, National : ASPPUK, FORMASI, ANMK, MDG’s,
E-Net, KOPBUMIE-Net, KOPBUMI Regional : ASPBAE, SeaPCP, AWCFRegional : ASPBAE, SeaPCP, AWCF
Training & Discussion for staff : Leadership, Audio Training & Discussion for staff : Leadership, Audio Visual, Human right, Personality Development, Visual, Human right, Personality Development, Globalitation impact.Globalitation impact.
Technical assistance and Technical assistance and monitoringmonitoring Developing Learning Media Developing Learning Media for grass root people on for grass root people on community organizing process:community organizing process: video, poster. video, poster.
Capacity Building for CSO Capacity Building for CSO
Promotion of educational instution and Promotion of educational instution and structure:structure: Regular local community meeting for institutional Regular local community meeting for institutional
building of adult education building of adult education Women group and co-op meeting, 232 group, 23 coops, Women group and co-op meeting, 232 group, 23 coops,
5000 participants.5000 participants. Local cadres (CO’s) meeting, Local cadres (CO’s) meeting, ± 400 ± 400 participantsparticipants Cooperative Annual General Meeting : Cooperative Annual General Meeting : ± 3200 ± 3200
participantsparticipants Area forum meeting, Area forum meeting, ± 3± 300 participant00 participant
Research on Evaluation of Community Organizing Strategy : Research on Evaluation of Community Organizing Strategy : 300 respondents300 respondents
Workshop socialization on research Workshop socialization on research 75 75 participantparticipant
ACTIVITIES WAS CONDUCTED ACTIVITIES WAS CONDUCTED AND RESULTAND RESULT
20082008
Result 3 : Lobby and AdvocacyResult 3 : Lobby and AdvocacyActivityActivity 20062006 20072007 20082008
AdvocacyAdvocacy Theme : Ecosoc RightTheme : Ecosoc Right
Partner: Local Parliament in Partner: Local Parliament in Jakarta (DPRD), Human Jakarta (DPRD), Human Right Protector alliance Right Protector alliance (APHP), NGO, Women group (APHP), NGO, Women group (WG)(WG)
Theme: Ecosoc Right.Theme: Ecosoc Right.
Partner: Co-op local Partner: Co-op local depart (Diskop UKM), depart (Diskop UKM), District head - Rohil, District head - Rohil, NGO, WGNGO, WG
Theme: Women Right Theme: Women Right in Islamicin Islamic
Partner: Islamic Justice, Partner: Islamic Justice, vilage head, vilage head, community, NGO, WGcommunity, NGO, WG
Public Dialogue:Public Dialogue: Theme: Anti Trafficking in Theme: Anti Trafficking in SukabumiSukabumi
Partner: Manpower local Partner: Manpower local depart (Disnaker), Vilage depart (Disnaker), Vilage head, Policeman, Ex migrant head, Policeman, Ex migrant worker, NGO, WG worker, NGO, WG
Theme: General Theme: General Election Governor Election Governor JakartaJakarta
Partner : Pattiro, NGO, Partner : Pattiro, NGO, WGWG
Theme: Local Theme: Local handicraft in handicraft in PandeglangPandeglang
Partner: Industry & Partner: Industry & trade local depart, NGO, trade local depart, NGO, WG,WG,
Theme: Community Theme: Community Health in PandeglangHealth in Pandeglang
Partner: Head of Partner: Head of community health community health centre (Puskesmas), centre (Puskesmas), WG, NGO.WG, NGO.
Theme: proposed local Theme: proposed local regularly draft regularly draft trafficking prevention in trafficking prevention in Sukabumi (continued)Sukabumi (continued)
ActivityActivity 20062006 20072007 20082008AdvocacyAdvocacy -- Theme: Socialize General election Theme: Socialize General election
Governor west KalimantanGovernor west Kalimantan
Partner: WG, NGO, CommunityPartner: WG, NGO, Community
--
Public DialoguePublic Dialogue -- Theme: Trafficking Prevention in Theme: Trafficking Prevention in Sukabumi (continued) and Cianjur.Sukabumi (continued) and Cianjur.
Partner: Manpower local gov (Disnaker), Partner: Manpower local gov (Disnaker), Vilage head, Policeman, Ex migrant Vilage head, Policeman, Ex migrant worker, NGO, WGworker, NGO, WG
--
Theme: Women participation in budget Theme: Women participation in budget planningplanning
Partner: Bappeda, NGO. WG, vilage headPartner: Bappeda, NGO. WG, vilage head
--
Forum multy Forum multy stakeholderstakeholder
Theme: Draft on design local regulating Theme: Draft on design local regulating trafficking prevention in Sukabumitrafficking prevention in Sukabumi
Partner: Manpower , NGO, vilage head, Partner: Manpower , NGO, vilage head, district head, government related, WGdistrict head, government related, WG
--
Lesson LearntLesson Learnt Establish 232 group and 23 coops as places for Establish 232 group and 23 coops as places for
discuss everything problems in community discuss everything problems in community espcecially to find solution about gender espcecially to find solution about gender equality in decision makingequality in decision making
More than 1,000 women meet with policy More than 1,000 women meet with policy maker and proposed input for trafficking maker and proposed input for trafficking prevention, Ecosoc Right, General election prevention, Ecosoc Right, General election governor, Women Right in Islamic, Community governor, Women Right in Islamic, Community Health, Income generating etc.Health, Income generating etc.
More than 100 women involved in decision More than 100 women involved in decision making as head of kampong (ketua RT), vilage making as head of kampong (ketua RT), vilage council (BPD), vilage irrigation system, school council (BPD), vilage irrigation system, school councilcouncil
Increased Staff capacity in facilitate CO activityIncreased Staff capacity in facilitate CO activity Establish net working at vilage, district, national Establish net working at vilage, district, national
and regional leveland regional level
PPSW PLANNING 2009PPSW PLANNING 2009
Project Title:Project Title: Women Empowerment and Advocacy for Women Empowerment and Advocacy for an Adult Edcation Policy.an Adult Edcation Policy.
Goal :Goal : Adult education contributes to the women Adult education contributes to the women empowerment and alleviate poverty.empowerment and alleviate poverty.
Objectives :Objectives : Effective and Effective and efficient change in the efficient change in the structure and mechanism structure and mechanism of adult education for of adult education for women’s empowerment.women’s empowerment.
Planned Results of Project activitiesPlanned Results of Project activities
Partners and networks in the Partners and networks in the region and in the countries are region and in the countries are strengthened in their capacities.strengthened in their capacities.
Policy dialogue and advocacy Policy dialogue and advocacy work on local, national, regional work on local, national, regional or international level to an or international level to an improved recognition of adult improved recognition of adult education in policies and education in policies and budgets. budgets.
Adult education provision is improved and adult Adult education provision is improved and adult educators are trainededucators are trained
Activities to Reach the ResultsActivities to Reach the Results
Activities to reach the Results 1Activities to reach the Results 1 : : To Strengthening CBO and CSO To Strengthening CBO and CSO capacities, Vocational Training, Technical Assistance and monitoringcapacities, Vocational Training, Technical Assistance and monitoring
Activities to reach the Results 2Activities to reach the Results 2: : Forum meeting in group level, Forum meeting in group level, participate in networking participate in networking activity in national and activity in national and regional levelregional level
Activities to reach the Results 3Activities to reach the Results 3: : Seminar and Workshop on draft adult Seminar and Workshop on draft adult education policy in district level education policy in district level