EMQM5103 MAY SEMESTER 2011 PROJECT QUALITY MANAGEMENT (EMQM5103) ASSIGNMENT LECTURER DR. HARIKRISHNAN KANTHEN STUDENT SYAHRIFENDI LUKMANILHAKIM MASTERS IN PROJECT MANAGEMENT CGS00560517 Syahrifendi Lukmanilhakim Page 1

Upload: syahrifendi

Post on 14-Oct-2014

124 views

Category:

Documents


13 download

TRANSCRIPT

Page 1: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

MAY SEMESTER 2011

PROJECT QUALITY MANAGEMENT (EMQM5103)

ASSIGNMENT

LECTURER

DR. HARIKRISHNAN KANTHEN

STUDENT

SYAHRIFENDI LUKMANILHAKIM

MASTERS IN PROJECT MANAGEMENT

CGS00560517

Syahrifendi Lukmanilhakim Page 1

Page 2: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

TABLE OF CONTENTS PAGE

Introduction 3

Literature Survey 4

Steps & Plans

Phase 1: Foundation & Planning 6

Phase 2: System Design & Documentation 8

Phase 3: Implementation 16

Phase 4: Certification 18

Problem Analysis & Solutions 20

Summary 22

Reference 23

Syahrifendi Lukmanilhakim Page 2

Page 3: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

INTRODUCTION

ISO 9001:2008 is the international standard for Quality Management System (QMS). It

provides the organization with a set of principles that ensure a common sense approach to the

management business activities to consistently achieve customer satisfaction. It can help the

organization business achieve standards of quality that are recognized and respected

throughout the world. By implementing ISO 9001:2008, the organization may benefits many

factors contributing to the growth and success of the business. For example, customer

satisfaction can be achieved when products are delivered consistently in meeting the desired

requirements. The organization can also reduce its operating costs by continually improving

processes that results in operational efficiencies. The ISO certification also will prove the

organization business credentials through independent verification against recognized

standards.

In this report “Maxis Network Engineering Operation (NEO)” is an organization division in

Maxis Communication Berhad which will be acquiring the ISO certification and elaborated in

details the necessary steps and plans to undertake in preparation towards the quality audit

exercise. The report also will highlight and anticipate the problem arises during initial and

implementation of the ISO certification including the solutions for corrective measures.

Syahrifendi Lukmanilhakim Page 3

Page 4: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

LITERATURE SURVEY

This report is prepared by referring to the International Standards Organization’s 9001

Guideline. By referring to the guidelines provided by the ISO official website, it enables

us to write this report and all the steps needed to acquire the certification for Maxis NEO.

Apart from the official website, we also use other web links that provide more in depth

information on how to create quality manual templates and to find the suitable ISO

registrar for this organization to engage. Below is the websites list for reference purposes.

WEBSITES REMARKS

http://www.iso.org/iso/home.htmlGeneral information on what is an ISO standard

http://www.nqa.com/en/atozservices/what-is-iso-9001.asp FAQ on ISO 9001:2008

http://www.iso-quality-manual.com/ ISO Quality Manual Templates

http://www.askartsolutions.com/certificationtips.html FAQ on ISO Registrar

http://www.9001resource.com/iso_9001_iso_9000/iso_9001_registration/ FAQ on Selecting a Registrar

Table 1: List of Websites used for Literature Survey

.

Syahrifendi Lukmanilhakim Page 4

Page 5: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

STEPS AND PLANS

Maxis Network Engineering and Operation (NEO) are responsible to the highest quality

service based on high quality management. Maxis NEO focuses on plan, develop, implement,

operate and maintain the telecommunication network to deliver information, communication

and entertainment services. In order to prepare the company towards achieving the ISO

9001:2008 for Quality Management System (QMS), there are several steps and procedures

that must be followed and implemented before engaging the third party quality audit. In this

report, there will be 5 phases to be performed as shown below:

PHASE 1 – FOUNDATION AND PLANNING

PHASE 2 – SYSTEM DESIGN AND DOCUMENTATION

PHASE 3 – IMPLEMENTATION

PHASE 4 - CERTIFICATION

As the project quality manager for this division, it is his responsibility to drive and prepare

the company for the necessary procedures. Each phases will be explain in detail later in the

report.

Syahrifendi Lukmanilhakim Page 5

Page 6: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

PHASE 1 – FOUNDATION AND PLANNING

Consultant

The first step in planning is to appoint an external consultant to guide and assist during ISO

certification process. Since this is the first time the company is acquiring the ISO standard,

we are suggesting hiring an external consultant who is more knowledgeable and experience.

The objective is, the consultant can provide advice and evaluation on the organization

preparation i.e. documentation, process and training. The consultant also will provide

services such as preparing custom forms or templates for the organization work process. This

evaluation and guidance is essential for the company to amend what needs to be added and

required for the certification process.

Steering Committee

A steering committee must be initiated to monitor the certification process and provide

updates to the whole organization on what is the current status. We are suggesting that each

department to send a representative assigned specifically for this certification process. The

representative must provide all the necessary information in order to identify any gap in their

work process. The objective of this committee is to update and tracked the progress for each

department representative to inform the rest of the organization staff. The committee also

serve as providing awareness to the organization staff on what ISO is all about. By doing so,

each staff will know why the company is acquiring the ISO and what are the benefits that the

staff will gain by participating in the certification process.

Syahrifendi Lukmanilhakim Page 6

Page 7: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

Awareness and Training

Maxis NEO are required to provide awareness campaign to all the personnel. This can be

done by organizing an ISO campaign across the organization by providing general knowledge

of ISO standards. By doing this, each personnel will be notified properly on the objective of

the ISO certification process, why the company needs to have the ISO standards and the

advantages to the staff. Maxis NEO also needs to conduct training to personnel who job

responsibilities are directly related to the ISO standards. By sending the staff for ISO training,

they will attain knowledge to become an internal auditor. The training in return will benefit

the company during and before the real certification audit.

Syahrifendi Lukmanilhakim Page 7

Page 8: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

PHASE 2 – SYSTEM DESIGN AND DOCUMENTATION

DEVELOPMENT OF QUALITY MANAGEMENT SYSTEM HIERARCHY

Quality Management System (QMS) Hierarchy

The Quality Management System structure for Maxis NEO is proposed as shown in Figure 1.

Figure 1: NEO Quality Management System Hierarchy

Quality Manual

The quality manual describes the procedures of the Maxis network Engineering and

Operations Division (Maxis NEO)

Syahrifendi Lukmanilhakim Page 8

Page 9: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

Process Management System (PMS)

These are flow charts which delineate the operations of the Maxis NEO, and which form the

basis for the description of activities set out in the Process Operating Systems (POS).

Process Operating System (POS)

These are written statements defining specific details of who, what, when, where and how

particular operations of the Maxis NEO Procedures are to be carried out.

Work Instructions

A detailed document describing specific activities and tasks within the organization.

Specifications

Document which describe the technical details of the hardware, software, site configuration,

technical reports or design used as document reference.

Guidelines

Document which describe the technical guidelines used by the departments in Maxis NEO.

Equipment supplier’s Manuals

These are documents supplied by the manufacturer containing procedures, instructions and

technical information relating to the operation and maintenance of their equipment. These

documents will be updated by suppliers.

Reference Manuals

These are documents supplied by manufacturers or purchased from a third party. This may

include the statutory or regulatory standards or guidelines from related statutory bodies. This

document will not be updated, but replaced when superseded.

Site Handover Files

Document which describe the technical details of the hardware, software, site configuration,

technical reports or design for the project or site that has completed and handover from

Vendor or/and Engineering to Operations. It can be in a form of hardcopies or softcopies.

Syahrifendi Lukmanilhakim Page 9

Page 10: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

DEVELOPMENY OF ACTION PLAN

Responsibility, Authority and Communication

The Maxis NEO Management must defined and communicated the responsibilities and

authorities in the following documents:

a) Organisation Chart

b) Job Profile

c) Performance Evaluation

d) Limit of Authority (LOA)

Job Profile and Performance Evaluation are developed and maintained in accordance to the

Human Resource Department policies and procedures. The Job Profile defines the specific

area of responsibilities and authorities for the position. Within each position, there is further

definition of responsibilities for each of the given staff. This is either accounted for in the

objectives or specific process documentation. Staffs shall update their Job Profile as and

when there is a change. The Performance Evaluation lays-out short term responsibilities for

achieving specified results. Performance Evaluation is conducted and reviewed formally at

least once a year and may be amended at other times, if needed. Performance of staff against

their Objectives is used as criteria in the Performance Evaluation process. Authority for the

operations of the telecommunications network is delegated throughoutNEO and is described

and documented in Maxis Limit of Authority (LOA).

Quality Policy

Maxis NEO must ensure that this policy is transmitted to and understood at all levels within

the division. The quality policy shall be reviewed when necessary to ensure its suitability to

the business environment, requirements defined and management direction when necessary.

Maxis NEO is committed to comply with the requirements established and defined, Maxis

Quality is the way we do business.

Syahrifendi Lukmanilhakim Page 10

Page 11: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

We are committed to creating an environment of total quality by employing five simple

principles:

Manage based on facts.

Anticipate customer needs.

eXceed customer expectations.

Improve our processes continuously.

Succeed through the creative contribution of our people.

Quality Objective

Maxis NEO operates towards the following general objectives, to:

a) Provide a competitive mobile network for customers.

b) Improve the response to customer needs.

c) Develop employee’s skills and abilities through formal and informal learning and

broadening experiences.

d) Measure key quality indicators and demonstrate continual improvement.

e) Incorporate the latest standards and directions for Quality Management.

DEVELOPMENT OF QUALITY MANUAL AND MANDATORY DOCUMENTED

PROCEDURES

Quality Manual

The quality manual describes the Quality Management System (QMS) in Maxis NEO and is

permanent reference in implementing and maintaining the system. Its sets out the principles

and processes by which the Maxis NEO division establishes, implements, continually reviews

the processes and procedures to ensure that the Maxis NEO fulfils all its responsibilities with

consistent high quality results.

Syahrifendi Lukmanilhakim Page 11

Page 12: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

Maxis NEO shall established and maintain a quality manual that includes:

a) The scope of the QMS, including details of and justification for any exclusions.

b) Documented procedures established as per NEO QMS Hierarchy.

c) Description of the interaction between the processes of the QMS.

MANDATORY DOCUMENTED PROCEDURES

1. Control Of Documents

Maxis NEO shall established and maintain documented procedure to define the controls

needed. All documents as stated in the NEO QMS Hierarchy (Figure 1) will be part of the

control of documents.

1. Control of Records

Maxis NEO shall establish and control the quality records as evidence of conformity to the

requirements of NEO QMS Hierarchy (Figure 1). The process owners shall define, maintain

and control related records in a form of hardcopies, softcopies or systems as defined by them.

2. Control of Nonconforming Product

Maxis NEO shall ensure that product which does not conform to product requirements is

identified and controlled to prevent its unintended use or delivery. Maxis NEO shall deal with

nonconforming product by one or more of the following ways:

a) By taking action to eliminate the detected nonconformity

b) By authorising its use, release or acceptance under concession by a relevant authority in

accordance to the procedures or the Limit of Authority

c) By taking action to preclude its original intended use or application

d) When nonconforming product is detected after delivery or use has started, Maxis

NEO shall take action appropriate to the effects, or potential effects, of the nonconformity

Nonconforming products in Maxis NEO shall be defined as follows:

Syahrifendi Lukmanilhakim Page 12

Page 13: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

a) For Projects: Equipments or sites rejected due to deficiencies or nonconformities to

requirements.

b) For Operations & Maintenance: Equipments or sites being faulty or having reliability

issues.

4. Internal Quality Audit

Maxis NEO shall conduct internal audits at least once a year to determine whether the QMS :

a) Conforms to the planned arrangements, to the requirements of this International Standard

and to the QMS requirements established by Maxis NEO.

b) Is effectively implemented and maintained.

An Internal Quality Schedule shall be planned and prepared, taking into consideration the

status and importance of the processes and NEO department to be audited. The audit criteria,

scope, frequency and methods shall be defined. Selection of auditors and conduct of audits

shall ensure objectivity and impartiality of the audit process. Auditors shall not audit their

own work. Documented procedure established to define the responsibilities and requirements

for planning and conducting audits, establishing records and reporting results (Control of

Records).

The Head of Department responsible for the area being audited shall ensure that actions are

taken without undue delay to eliminate detected nonconformities and their causes. Follow-up

activities shall include the verification of the actions taken and the reporting of verification

results (Corrective Action).

5. Corrective Action

Maxis NEO shall take action to eliminate the causes of nonconformities in order to prevent

recurrence. Corrective actions shall be appropriate to the effects of the nonconformities

encountered. Documented procedures shall be established to define requirements for:

a) Reviewing nonconformities (including customer complaints)

Syahrifendi Lukmanilhakim Page 13

Page 14: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

b) Determining the causes of nonconformities

c) Evaluating the need for action to ensure that nonconformities do not recur

d) Determining and implementing action needed

e) Records of the results of action taken (Control of Records)

f) Reviewing the effectiveness of the corrective action taken

6. Preventive Action

Maxis NEO shall determine action to eliminate the causes of potential nonconformities in

order to prevent their occurrence. Preventive actions shall be appropriate to the effects of the

potential problems.

A documented procedure shall be established to define requirements for:

a) Determining potential nonconformities and their causes

b) Evaluating the need for action to prevent occurrence of nonconformities

c) Determining and implementing action needed

d) Recording of results of action taken (Control of Records)

e) Reviewing the effectiveness of the preventive action taken

DEVELOPMENT OF WORK PROCESS

Maxis NEO must establish and maintains a set of processes to ensure that products and

services are defined, planned, verified, launched and delivered consistently with customer

expectation, quality objectives and any relevant statutory and regulatory standard. Below list

are the identified processes for Maxis NEO to develop and documented for the certification

process.

QMS 1 : END-TO-END 2G/3G NEW SITES ROLLOUT PROCESS

QMS 2 : PRODUCT SERVICE AND ENGINEERING (CORPORATE

CUSTOMER) END TO END PROCESS

QMS 3 : END TO END INTERCONNECT PROCESS

Syahrifendi Lukmanilhakim Page 14

Page 15: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

QMS 4 : END TO END PROCESS FOR TRANSMISSION NETWORK

QMS 5 : END TO END CORE NETWORK ENGINEERING

QMS 6 : END TO END NEW BSC/PCU/XCDR ROLLOUT PROCESS

QMS 7 : BRINGING INTO SERVICE PROCESS

QMS 8 : CIRCUIT PROVISIONING

QMS 9 : NETWORK DATABASE CONFIGURATION MANAGEMENT

QMS 10 : PERFORMANCE OPTIMIZATION

QMS 11 : EXPANSION/MIGRATION/REPARENTING PROCEDURE

QMS 12 : END TO END FAULT & PERFORMANCE MANAGEMENT

QMS 13 ; PREVENTIVE MAINTENANCE

QMS 14 : PROVISIONING

QMS 15 : FIXED NETWORK PROVISIONING

QMS 16 : PLANNED EVENT MANAGEMENT

QMS 17 : USER CHANGE REQUEST

QMS 18 : END TO END 2G / 3G NEW SITE ROLLOUT PLANNING PROCESS

QMS 19 : SYSTEM SECURITY AND BUSINESS CONTINUITY

QMS 20 : GSM LAB AND TECHNICAL TEST LAB

QMS 21 : PROCUREMENT AND PAYMENT PROCEDURES

QMS22 : DECOMMISSIONING PROCEDURE

QMS23 : STORAGE AND CALIBRATION

QMS24 : TEST TOOL MANAGEMENT

QMS25 : APPARATUS ASSIGNMENT (AA)

QMS26 : SUPPLY CHAIN MANAGEMENT

QMS27 : VENDOR/CONTRACTOR PERFORMANCE PROCESS

QMS28 : VENDOR JOB APPROVALS AND VERIFICATION PROCESS

QMS29 : IP SECURITY PROCESS

Syahrifendi Lukmanilhakim Page 15

Page 16: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

PHASE 3 - IMPLEMENTATION

Training

During the implementation process, Maxis-NEO must provide training to all the organization

staff. The training can be categorized into 3 stages:

General

Documentation

Certification readiness

General Training

In the earlier steps and plans explanation under Phase 1(pg 8), it is stated that Maxis NEO

must provide awareness campaign to all the staff. These training are required to support the

campaign and provide more detail information regarding the ISO certification. The objective

of this training is to give full knowledge and understanding of the basic document control and

its importance.

Documentation Training

Staff personnel who are directly involved in using and maintaining control documents must

undergo training for them to acquire the skills in order to use the new documents standards.

The involved staff must be inform clearly on the consequences if disregarding the control

documents standards.

Certification Readiness

There are also ISO certification training provided by external parties, these training is also

important and must be considered also. By sending the staff to this training, it will prepare

them with the necessary knowledge on the correct certification process. It will also benefit

Syahrifendi Lukmanilhakim Page 16

Page 17: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

the organization since the trained staff can organize a simulation ISO audit process prior to

the real ones. This can prepare the organization on any mistakes and process it might oversee

and find the solutions.

Syahrifendi Lukmanilhakim Page 17

Page 18: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

PHASE 4 – CERTIFICATION

In this phase, the organization must be ready for the ISO certification audit. In preparation for

that there are several steps that need to be taken first. Below are the steps:

Simulation Run

Selection of Registrar

ISO Certification Audit

Simulation Run

Maxis NEO must implement the new quality management system in its daily process to at

least minimum 3 months. By doing so will prepare the staff and the organization for the real

certification process. This trial will highlight any corrections and enhancement that the

organization needs to amends according to the ISO recommendations. In phase 1, we have

highlighted that an external consultant must be hired to oversee the whole certification

process for the organization. This external consultant jobs is to review the ISO documents

and provide advice on any additional or removal process to prepare the readiness for the

organization certification process.

Selection of Registrar

The most important factor in choosing a ISO 9001:2008 Registrar is how well they can work

with the organization. This includes how well they know your industry, how much

experience they have with similar companies, and how well they communicate with the

organization and its employees.

Syahrifendi Lukmanilhakim Page 18

Page 19: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

Interview 3 or more ISO 9001:2008 Registrars to get a good idea of the options available and

differences between ISO 9001:2008 Registrars. Currently there are many companies which

are base locally and international that can help the organization to be certified. In Malaysia

the most known body for ISO certification process is SIRIM and internationally there are

others such as UKAS (United Kingdom Accreditation Service) and Lloyd’s.

ISO Certification Audit

This is the final step for the organization to be certified for the quality management system

standard 9001:2008. This step determines if the organization has successfully documented

and implemented all of the requirements of the specified standard. This is accomplished via

an in-depth review of the quality manual and procedures and the confirmation of their

implementation. The audit also verifies conformance to the identified standard. The audit is

performed in accordance with the requirements of ISO 9001:2008. This audit will involve on-

site interviews, examinations of documents and records and observations to thoroughly

determine the implementation of the standard. Any nonconformity will be documented and

identified as major or minor nonconformities. A major nonconformity is the absence or total

breakdown of a system to meet a clause or sub-clause of a standard. A minor nonconformity

might be a procedure that is not comprehensive enough, a staff who did not follow the

procedure, or a lack of a required record. A major nonconformity requires a separate

successful re-audit of the applicable clause or sub clause before the organization can be

certified. A minor nonconformity will generally be addressed by submitting a response to the

ISO auditor before the organization can be certified.

Syahrifendi Lukmanilhakim Page 19

Page 20: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

PROBLEM ANALYSIS AND SOLUTIONS

As the project quality manager, it is my duty and responsibility to anticipate and identify the

problems that the company may face during the implementation of this ISO certification

process. By using a problem analysis, we can categorize it into 2 stages:

Planning

Implementation

Planning

During the planning stage for ISO certification process, overall we can forecast the

organization staff may face difficulties in gripping the company idea to implement the

standards. Many may don’t understand the objective and goals for acquiring the ISO

9001:2008 standards. This problem can be resolve by providing the adequate awareness

campaign and training to all the organization staff. By doing so, the organization

management can make sure all their personnel is fully understand the objective and

importance of the standards. Time factor can also be a restrain during the planning stage, the

company must have enough time allocated to perform the certification process. When

initiating the planning stage, the management must acknowledge and allocate sufficient time

to the involved staff apart from their daily work time. Cost is another factor the organization

needs to attend. The organization must have sufficient budget allocation in order implement

the ISO certification process. This budget is needed to hire experienced consultant to carry

out awareness campaign, training and development of work process. Without enough budget,

this certification process may not be successful and a waste of resources.

Syahrifendi Lukmanilhakim Page 20

Page 21: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

Implementation

Throughout the implementation stage, the company may find many of its work process are

not properly documented and some does not have any records at all. This problem can delay

and affect the efficiency of the certification process. Cooperation and commitment from each

department’s representative is also important. Apart from their daily work, they also need to

devote their full time in assisting the company to achieve the ISO standards. In preparation

for the quality audit, the auditor may randomly interview the staff regarding the company

process, vision, policy and etc. During this interview, auditors will write up problems as

“non-conformances” which divided into “major” and “minor”. A major non-conformance

will cause the company not to get certified for the ISO standard. Minor conformances may or

may not prevent your certification, it all depends on the number and severity of your non-

conformances. In order to overcome this problem, proper training and briefing must be done

timely and also prior to the real certification audit. Management must assign an internal

auditor to organize a mock up or a trial ISO audit. This will help the staff to get used of the

audit process and to be prepare with the answers in the event they are to be called for

interview by the auditors.

Syahrifendi Lukmanilhakim Page 21

Page 22: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

SUMMARY

The purpose of this report is to provide the steps and plans on how to get and an organization

to be certified for ISO 9001:2008. The document also lays out the problems that the

organization may face during planning and implementation stage and also provide the

solutions on how to overcome it. This document is prepared for Maxis Network Engineering

and Operations (NEO) solely to acquire the certification standard in accordance with the ISO

9001:2008 guidelines.

Syahrifendi Lukmanilhakim Page 22

Page 23: EMQM5103 (PROJECT QUALITY MANAGEMENT)

EMQM5103

REFERENCE

Rose, K.H. (2005). Project Quality Management: Why, What and How. J. Rose Publishing

Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling,

and Controlling. Wiley Publishing

Maxis Network Engineering and Operations (2010).Quality Manual: Revision number 5

ISO Quality Manual Templates. http://www.iso-quality-manual.com/

International Organisation for Standardization. http://www.iso.org/iso/home.html

Reliable Tools to Build Your Own Effective ISO 9001 Quality Management System.

http://www.9001resource.com/iso_9001_iso_9000/iso_9001_registration/

Definition and Details on Details on ISO 9001 QMS Certification.

http://www.nqa.com/en/atozservices/what-is-iso-9001.asp

Syahrifendi Lukmanilhakim Page 23