EMu Spring Slice Test. Frank Geurts FNAL. ME4. DT-11. DT-10. ME3. ME2. ME1. Magnet Test / Cosmic Challenge. one 60° trigger sector 36(39) chambers provided electronics available otherwise 24 CSCs Sector 5, overlap with DT sectors 10+11 Trigger: self-trigger or external - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EMu Spring Slice Test

EMu Spring Slice Test

Frank GeurtsFNAL

Page 2: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

2

Magnet Test / Cosmic Challenge one 60° trigger sector

36(39) chambers provided electronics available

otherwise 24 CSCs Sector 5, overlap with DT sectors 10+11

Trigger: self-trigger or external TrackFinder crate in counting house

FED: prototype FED or production FED crate in counting house

1(2) DCC + 3 DDUs

ME1ME2

ME3ME4

DT-10

DT-11

Page 3: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

3

EMu Slice Test

Preparations towards the Magnet Test, and beyond … Starting at YE+2, add chambers when electronics comes

available Add chambers from other stations: ME+1 and ME+4

Integrate with other CMS systems Central DAQ Local Trigger Control for Cosmic Challenge

Develop and test software Local DAQ Timing routines DCS, DQM FAST-site tests dBase Offline/Reconstruction

Page 4: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

4

Spring Test Set-Up

At SX5, on or near YE+2 Peripheral Crate: based on std. VME crate. Using

a rev-1 6U backplane. Fully equipped with 9 production DMBs, 9 (old)

TMBs, pre-production MPC and CCB, and Dynatem Crate Controller

Connected to 6 CSCs, forming a 20° slice on ME+2 and ME+3

Fiber patch panel for DAQ/Trigger/TTC fibers Local control PC for Dynatem/iBoot

Page 5: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

5

Spring Test Chambers on YE+2

ME+2/1/16ME+2/2/31ME+2/2/32

ME+3/1/16ME+3/2/31ME+3/2/32

Page 6: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

6

Spring Test Peripheral Crate

YE+2: ME2 and ME3 CSCs in the same crateSlot assignments done according to Ben Bylsma’s document.

ME2

ME3

Page 7: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

7

Spring Test Set-Up (cont’d)

In the Counting House (a.k.a. Green Barrack) Trigger & Clock

TTC Electronics: TTCvi + TTCvx, external clock patch TrackFinder Electronics Additional NIM electronics Control PC

DAQ pFED and prototype FED crate Local DAQ PC S-Link to Central DAQ’s FRL

DQM Local DQM server

Page 8: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

8

Spring Test Counting House (I)

TTCvi/vx courtesy of OSU CAEN v1718 USB-VME

bridge Fiber patch panel

Counterpart at YE+2 TrackFinder Crate

SP’02, CCB’01

TTC

fibers

TF

Page 9: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

9

Spring Test Counting House (II)

NIM electronics Level conversion Allow for add’l modules

for trigger manipulation pFED crate

Old DDU with small peripheral backplane

S-Link feed to CMS DAQ Spy feed to Local DAQ

Local DAQ, Trigger and DQM control PCs

DAQ

FED

NIM

DQM

TRG

Page 10: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

10

Schematic Layout

Page 11: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

11

Trigger, TTC and DAQ PathsTrigger Path TTC Path

Local DAQ Path Global DAQ Path

Page 12: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

12

Spring Slice Test: Scope & Goals One of the stepping stones towards the Cosmic

Challenge 2nd half of April

Announced at our previous EMu Meeting Infrastructure ready (fibers, counting house, etc.)

except for rack cooling in the Counting House

Experts invited Connect and time-in 6 CSCs Self-trigger on cosmics using TF Provide data to Central DAQ

Page 13: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

13

Spring Slice Test: where are we? TF/SP details, see Dan’s presentation Updated/verified firmware on all CFEBs and DMBs

Jason Updated firmware on all TMBs and ALCTs

Yuri/FG ALCT firmware is now uploaded via the TMB, using the

PeripheralCrate library Documentation available at our website

ALCT “mirrored” firmware on ME3 chambers, specially updated and tested for Slice Test by Alex M.

Fully loaded rev.1 peripheral backplane resulted in communication problems with the ALCTs Temporary removing 6 out of 9 TMB/DMB pairs alleviates the

problem Reintroduce after first CSCs are completely set-up

Page 14: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

14

Spring Slice Test: where are we? (II) TTC electronics

Both TMB and SP timing tests showed intermittent response to B-Go commands

Initially observed single-bit shifts of CCB commands in the TTC B-channel, where double-bit shifts were expected Occasional single and double errors at the TTCrq

Traced back to incorrect A and B-channel timing between TTCvi and TTCvx (thanks to Jan T.)

First stab at internal Slice Test note on TTC configuration for future reference.

Available at our website

Page 15: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

15

CSC Timing

“Synchronization is pretty hard”[from J. Hauser’s summary at the FNAL EMu Meeting]

Conceptual Manual exists Recently updated powerpoint presentation

First step: adjust clock phases between TMB and CFEB Adjust TX and RX clock phases between TMB and ALCT

Requirements: Up-to-date ALCT configuration software tmbtiming.exe: command line package which sets up and

executes automated timing procedures To be replaced by a dedicated TMBtiming class

useable through the XDAQ interface Second Step already requires L1As in the system

Will be provided by TF/SP

Page 16: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

16

CSC Timing (II)

First step is done for all 6 chambers Use DMB/CFEB pulser to find optimal TMB-CFEB clock

phase Use ALCT test strip pulsing to find optimal TMB-ALCT tx/rx

clock phases Second step requires L1As

Generate ghost tracks and have the MPC send two muon candidates to the SP Work in progress: See Dan’s presentation

Last week, we saw the first L1As travel through our systems … Albeit at very low rate. But, this is an important step!

Page 17: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

17

CSC Timing (III)

Next steps L1A timing at CFEBs Adjust various timing windows

See Jay Hauser’s FNAL presentation

Update TMBtiming class will eventually contain all timing methods

Create detailed documentation CMS Internal Note on EMu timing

Page 18: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

18

Calibration & Local DAQ

Calibration See Alex’s presentation

Uses DAQMB/CFEB pulser Triggered by TTC B-Go or CCB

Adjusted DAV windows Part of the FAST site test suite that needs to be ported to the

PeripheralCrate Library New CalibDAQ class available in TriDAS/emu repository

Local DAQ Similar to Beam Tests: DDU spy channel into emuslice02 Used to retrieve Calibration data at the Slice Test

And, is likely to be needed for all other FAST site tests DDUReadout/HardwareDDU classes to retrieve data

HardwareDumper: command-line, for testing purposes EmuRUI (preferred method): XDAQ-based, DQM hooks

Page 19: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

19

EMu & Central DAQ

S-Link cable connectes DDU/DCC to FRL (CMS-DAQ) FRL connects us to a CMS

DAQ column (RUI/RU/BU/FU)

Successful first tests 1309 events recorded by

FRL and local spy channel Important milestone for

EMU and CMS-DAQ: First CMS subsystem to

provide data to DAQ!

FRL crate(counting house)

Myrinet switch(counting house)

Page 20: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

20

EMu & Central DAQ (II)

After the first 1309 events, we ran a 100k single-chamber calibration run Event counts identical CRC checks agree

Next, Very long run (this weekend)

CRC verification Increase event size (this

weekend) Add more chambers

Variable event size Use cosmics data

Pass data on to a simple DAQ column

Fra

nk’s

La

ptop

Rob

erta

’s D

eskt

op

Page 21: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

21

What’s next?

After Spring comes Summer Test: Continue timing efforts

Integrate trigger with Cosmic Challenge Local Trigger Control

Introduce 2nd Peripheral Crate and separate ME2 and ME3 chambers out. Use 2nd MPC feed to SP. Need more (old) TMBs

Introduce OSU Crate Controllers XDAQv3 migration

EMu Slice Test Workshop: July 11 – 15 at CERN Discuss our Summer Plans I sent out to the EMu SliceTest mailing list a personal and

likely incomplete list of tasks relevant to the Slice Test E.g. draft and discuss the CMS Internal Note on CSC timing

Page 22: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

22

Summary

With the Spring Test, the Slice Test is now well under way Many thanks to all who have helped and still do!

6 CSCs are hooked up and have been operational throughout ever since the Spring Test Fiber duct installation

Timing of the chambers partially done Not as fast as we hoped, but … … this is a more complicated procedure than at the TBs Self-trigger: no external trigger source

EMu first CMS sub-detector to provide data to Central DAQ Summer Plans

July Workshop at CERN Integrate with Cosmic Challenge LTC

Webpage – http://cern.ch/EmuSliceTest

Page 23: EMu Spring Slice Test

CERN -- June 18, 2005 Endcap Muon Meeting / CMS Week

23

A Glossary of Acronyms

ALCT - Anode Local Charged Track BU – Builder Unit CCB – Clock & Control Board CFEB – Cathode Front-end Board CMS – Compact Muon Solenoid CRC – Cyclic Redundancy Check CSC – Cathode-Strip Chamber DAQ – Data Acquisition DCC – Data Concentrator Card DCS – Detector Control System DDU – Detector Dependent Unit DMB – DAQ Motherboard DQM – Data Quality Monitoring DT – Drift Tube EMu – End-cap Muon

FAST – Final Assembly & Test FED – Front-end Driver FRL – Front-end Receiver Link FU – Filter Unit LTC – Local Trigger Control ME – Muon End-cap MPC – Muon Port Card RU – Readout Unit RUI – RU Interface SP – Sector Processor TB – Test Beam TF – Track Finder TMB – Trigger Motherboard TTC – Timing, Trigger & Control VME – VERSAmodule Eurocard