475-31 Bangbae-Dong, Seocho-Gu Seoul, 137-819 Republic of Korea Tel : 82-2-523-054Fax : 82-2-523-0544 http://www.enesystem.co.kr/english2 OFFER SHEET Page : of PROJECT : Saadiyat DCP3 / ADC - Carbon Steel (Rev3) Date : To : Al Jaber Precision Engineering Offer No : EnE/AJPE-11059 Attn : Mr. Michel Khoury PIC : Sunggun Kwon / Project Manager Dear Messrs, In compliance with your esteemed inquiry, we are pleased to offer the under-mentione d article(s) as per terms and conditions described in detail as follows; Validity Period : One (1) Months from issue date. Payment : T/T in 30 days from invoice date. Delivery : To be discussed later TES Tank Information Storage Capacity : 18,600 RT.Hr Peak Rate : 3,100 RT Internal Diameter : 21.1 m Shell Height : 22.5 m Water Level : 22.0 m (Normal) Diffuser Pipe Line : 18" (450 mm) Temperature : 4.44 o C Supply & 13.33 o C Return Unit :AED SN Item Number / Description Unit 1 1 July 12, 2011 Quantity Unit Price Amount Internal Flow Distributor for Chilled Water TES Design and Engineering of Diff user Supply of Diffuser and Internal Piping Material Site Supervision for Diff users Installation Site Supervision for Insulation Works Test & Commissioning Note : Material Delivery Condition - CIF condition to UAE port exclud ing any import duty, loca l tax, and local transportatio n cost Supervision Service & Duration - Two (2) calendar mo nths' supervision services shall be pro vided for site supervision of installation w ork for diffuser and test & commissioning including performance test with field instruments - After two (2) calendar mo nths from requested date or actual disp atch date which ever come s later, AED 2,000 / MANDAY for normal working day and AED 3,000 / MANDAY f or Public Holiday shall be charged to AJPE - Additional overtime charge ( 1.5 times of normal rate) shall be a pplied for more than 8 hou rs work in a same day - Non-working da y due to access problem etc which cannot be attributed to EnE's responsibility shall be counted as wor king day and accumulated to supervision period Only the sum of UAE Dirham Total Amount : Five Hundred Seventeen Thousand Only ********************************************************************* Note : - Any design calculation and detail drawings shall not be submitted. - Pipe material is "Electric Arc-Welded Steel Pipe" (ASTM A53 Gr. A ERW sch XS or equivalent JIS STPG370 ERW sch 40) Kwon Sunggun AED 517,000 1 Lot 1  1  387,000  Lot 40,000 40,000  50,000 50,000  Lot 1 387,000  - Lot 40,000  1 40,000  Lot Out of Scop - Project Manager

Upload: jsn179

Post on 04-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

7/29/2019 Eneajpe Sdy Dcp3-Cs (18.6k 8.9d)Rev3 110712

http://slidepdf.com/reader/full/eneajpe-sdy-dcp3-cs-186k-89drev3-110712 1/1

475-31 Bangbae-Dong, Seocho-Gu

Seoul, 137-819 Republic of Korea

Tel : 82-2-523-054Fax : 82-2-523-0544

http://www.enesystem.co.kr/english2

OFFER SHEET Page : of

PROJECT : Saadiyat DCP3 / ADC - Carbon Steel (Rev3) Date :

To : Al Jaber Precision Engineering Offer No : EnE/AJPE-11059

Attn : Mr. Michel Khoury PIC : Sunggun Kwon / Project Manager

Dear Messrs,

In compliance with your esteemed inquiry, we are pleased to offer the under-mentioned article(s) as per terms

and conditions described in detail as follows;

Validity Period : One (1) Months from issue date.

Payment : T/T in 30 days from invoice date.

Delivery : To be discussed later

TES Tank Information

Storage Capacity : 18,600 RT.Hr Peak Rate : 3,100 RT

Internal Diameter : 21.1 m Shell Height : 22.5 m Water Level : 22.0 m (Normal)

Diffuser Pipe Line : 18" (450 mm) Temperature : 4.44oC Supply & 13.33

oC Return

Unit :AED 

SN Item Number / Description Unit

1 1

July 12, 2011

Quantity Unit Price Amount

Internal Flow Distributor for Chilled Water TES

Design and Engineering of Diffuser

Supply of Diffuser and Internal Piping Material

Site Supervision for Diffusers Installation

Site Supervision for Insulation Works

Test & Commissioning

Note : Material Delivery Condition

- CIF condition to UAE port excluding any import duty, local tax, and local transportation cost

Supervision Service & Duration

- Two (2) calendar months' supervision services shall be provided for site supervision of installation work for diffuser and

test & commissioning including performance test with field instruments

- After two (2) calendar months from requested date or actual dispatch date which ever comes later, AED 2,000 / MANDAY for

normal working day and AED 3,000 / MANDAY for Public Holiday shall be charged to AJPE

- Additional overtime charge (1.5 times of normal rate) shall be applied for more than 8 hours work in a same day

- Non-working day due to access problem etc which cannot be attributed to EnE's responsibility shall be counted as working

day and accumulated to supervision period

Only the sum of UAE Dirham Total Amount :

Five Hundred Seventeen Thousand Only *********************************************************************

Note :

- Any design calculation and detail drawings shall not be submitted.

- Pipe material is "Electric Arc-Welded Steel Pipe"

(ASTM A53 Gr. A ERW sch XS or equivalent JIS STPG370 ERW sch 40)

Kwon Sunggun

AED 517,000

1

Lot 1 

387,000 

Lot 40,000 40,000 

50,000 50,000 

Lot 1 387,000 

-

Lot 40,000 1 40,000 

Lot Out of Scop -

Project Manager