energetics with elvac. elvac development for energy sector year 1998 – mcs system for power...

28
Energetics with ELVAC Energetics with ELVAC

Upload: lorin-parks

Post on 24-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVACEnergetics with ELVAC

Page 2: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

ELVAC development for energy sector

Year 1998 – MCS system for power distribution control in substations

From 1998 until now – more than 130 substations with MCS system installed

Page 3: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

ELVAC development for energy sector

Year 2000 – beginning of RTU series development as a logical next step after MCS system. The goal was to fulfil new demands in energy sector and enlange possibilities for other market segments.

Page 4: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

wide range of configurations – from cheap small systemsup to sophisticated powerful systems

enhanced communication abilities – GPRS, serial, LAN,many standard communication protocols

protective functions – for grid protection

battery backup support – charging, testing

RTU features (comparing to MCS system)

MCS system1998

ELVAC RTU2013

ELVAC development for energy sector

Page 5: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

ELVAC development for energy sector

From Y2000 until now – RTU series extended the application abilities for the following fields:remote control of distribution substationsremote control and measurement of distributional transforming stations (DTS)overhead power distribution – remote control and measurement of section circuit breakers and reclosersunderground power distribution – cable grid measurement and evaluationrenewable energy control and measurement – solar and windwater, gas and thermal managementenergy efficiency management (energy consumption audits in industry)

Page 6: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

ELVAC product range for energy sector

RTU7.4 - control and communication unit, 4x IFC

RTU7K (KL) - control and communication unit, 3U+3I

RTU7M - modular system for larger or tailor made systems

RTU M3Z - module for measurement and evaluation of 3-phase currents

Page 7: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

ELVAC product range for energy sector

RPSII – redundant power supply for ctitical applications

Boxes RY – tailor made boxes with RTU units and all necessary wiring and accessories for direct customer implementation

Tailor made RTU units – for customers with specific demands

Page 8: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

ELVAC product range for energy sector

EPG73-channel current generator3-channel voltage generatorDIO for protection testingUSB interfacewide range of user FW

Used as:current, voltage generatorfunction generatorrecord player – for errors records from protectionstester of indicators for failure currentsprotection testerDI datalogger

Page 9: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

ELVAC product range for energy sector

EPG7 HPGenerator and tester with high power

outputs for full range testing of protections

Energetics with ELVAC

Page 10: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

Related ELVAC products for energy sector

SCADA SW Mikrodispecink for dispatching control

RTU user software

LCD display for RTU units

Communication converters for RTU units

Other RTU accessories – power supplies, batteries, antennas, measuring transformers

Operator LCD multipanels and big screens (rear projection)

Time synchronization GPS card for PCs

Page 11: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Energetics with ELVAC

Energetics with ELVAC

Wide product range

Flexibility for different applications

Many years experience

References in energy sector

Page 12: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: ČEZ, a.s., Czech Republic

Name of project: 150x substations control

Project description: Remote control of substations in 150 places

Used device: MCS and RTU systems

Number of devices: 2500 pcs

Term: 1997 – 2008

Page 13: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: Energetika Vítkovice, a.s., Czech Republic

Name of project: Substations control

Project description: Remote control of substations in factory energetics

Used device: RTU7M/MS

Number of devices: 500 pcs

Term: 2006-2008

Page 14: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: ČEZ, a.s., Czech Republic

Name of project: Distribution switching elements control

Project description: Remote control of disconnectors and reclosers

in distribution grid for dispatching control and

automatic grid control

Used device: RTU7M/MS, RTU7K, RTU7KL

Number of devices: 2000 pcs

Term: 2002 – still going

Page 15: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: Owners of wind power plants in Czech Republic

Name of project: Wind power plant control

Project description: Remote control and measurement

of wind power plant

Used device: RTU7M or RTU7K/KL

Number of devices: 25 pcs

Term: 2005 – still going

Page 16: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: Owners of solar power plants in Czech Republic

Name of project: Solar boom in Czech Republic

Project description: Connection of solar power plants to the

distribution grid of ČEZ Inc. for performance control

in SCADA

Used device: RTU7M or RTU7K/KL

Number of devices: 1500 pcs

Term: 2009 - 2013

Page 17: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: E.ON Česká republika, s.r.o., Czech Republic

Name of project: Solar boom in Czech Republic

Project description: Connection of solar power plants to the

distribution grid of E.ON

Used device: RTU7M or RTU7K/KL

Number of devices: 200 pcs

Term: 2011 – still going

Page 18: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: Západoslovenská energetika, a.s, Slowakia

(group E.ON)

Name of project: Fault currents indicators in Bratislava

Project description: Control of cable lines in distribution grid

Used device: RTU7.4

Number of devices: 700 pcs

Term: 2009 - 2012

Page 19: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: Západoslovenská energetika, a.s., Slowakia

(group E.ON)

Name of project: Distribution switching elements control

Project description: Remote control of disconnectors and reclosers

in distribution grid for dispatching control and

automatic grid control

Used device: RTU7M, RTU7K/KL

Number of devices: 150 pcs

Term: 2010 – still going

Page 20: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: Stredoslovenská energetika, a.s., Slowakia

(group Electricité de France (EDF))

Name of project: Distribution switching elements control

Project description: Remote control of disconnectors and reclosers

in distribution grid for dispatching control and

automatic grid control

Used device: RTU7M, RTU7K, RTU7KL

Number of devices: 80 pcs

Term: 2010 – still going

Page 21: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: Východoslovenská energetika, a.s., Slowakia

(group RWE)

Name of project: Distribution switching elements control

Project description: Remote control of disconnectors and reclosers

in distribution grid for dispatching control and

automatic grid control

Used device: RTU7M, RTU7K, RTU7KL

Number of devices: 70 pcs

Term: 2010 – still going

Page 22: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: CEZ BULGARIA EAD

Name of project: 13x substations control

Project description: Remote control of substations in 13 places

Used device: Large RTU7M systems

Number of devices: 31 pcs

Term: 2012 – still going

Page 23: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: CEZ BULGARIA EAD

Name of project: Overhead and underground lines control

Project description: Pilot project for measuring and remote control

of distribution elements in overhead lines and

underground lines

Used device: Whole systems of RTU7 installed in cabinets,

with measuring transformers, capacitive deviders

and transformers for power supplying

Number of devices: 20 pcs

Term: 2013

Page 24: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: CEZ BULGARIA EAD

Name of project: SCADA Mikrodispečink

Project description: Instalation and maintenance of SCADA SW

Used device: Software

Number of devices: 1 pc

Term: 2009 – still going

Page 25: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: CEZ ROMANIA, S.A.

Name of project: Distribution switching elements control

Project description: Remote DTS and Recloser control

Used device: RTU7M

Number of devices: 300 pcs

Term: 2013 – 2015

Page 26: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: CEZ ROMANIA, S.A.

Name of project: SCADA Mikrodispečink

Project description: Instalation and maintenance of SCADA SW

Used device: Software

Number of devices: 1 pc

Term: 2009 – still going

Page 27: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Referencies

Energetics with ELVAC

Company: EVN Macedonia

Name of project: Distribution switching elements control

Project description: Pilot project for remote control of reclosers

in distribution grid

Used device: RTU7M

Number of devices: 10 pcs

Term: 2012 – still going

Page 28: Energetics with ELVAC. ELVAC development for energy sector Year 1998 – MCS system for power distribution control in substations From 1998 until now –

Contacts

ELVAC Inc.Hasičská 53

700 30 Ostrava-HrabůvkaCzech Republic

Tel.: +420 597 407 100Fax: +420 597 407 102E-mail: [email protected]

Web: www.elvac.eu