Energy Tutorial:
Electric Grid 101
GLOBAL CHALLENGES – GLOBAL SOLUTIONS – GLOBAL OPPORTUNITIES
GCEP RESEARCH SYMPOSIUM 2011 | STANFORD, CA
Professor Thomas J. Overbye Fox Family Professor of Electrical and Computer Engineering
University of Illinois at Urbana-Champaign
![Page 2: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/2.jpg)
Three Electric System Components
• Generation – source of electric energy
– coal provides over half of the U.S. electric energy
• Load – consumes electric energy
– consumers are in complete control of the switch; utilities must supply enough power to meet load
• Transmission and Distribution – the wires that carry the power from generation to load
– Operating at voltages up to 765 kV (kilovolt), with 500 kV, 345 kV and 230 kV common
2
![Page 3: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/3.jpg)
Major Power Grid Components
3
![Page 4: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/4.jpg)
Power and Energy
• Power is the instantaneous transfer of energy; expressed in watts (W), kW, MW, GW
– US installed generation capacity is about 1000 GW
• Energy is the integration of power over time; expressed in units of joules (J = 1 W-sec), kWh (3.6 x 106 J), or btu (1055 J; 1 MBtu=0.292 MWh)
• U.S. electric energy consumption is about 3600 billion kWh (about 13,333 kWh per person; 1.5 kW continuous per person on average)
4
![Page 5: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/5.jpg)
AC System Analysis
• The power grid is an ac system, operating at close to 60 Hz in North America, 50 Hz in many other places
• Constant frequency ac systems are analyzed using phasor analysis, which expresses a time varying value, such as a voltage or current, as a magnitude and phase angle
– v(t) = Vmax cos( t + v) Vrms v
– Phase angle is always with respect to an arbitrary reference angle
5
![Page 6: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/6.jpg)
The Advantage of Phasor Analysis
6
0
2 2
Resistor ( ) ( )
( )Inductor ( )
1 1Capacitor ( ) (0)
C
Z = Impedance
R = Resistance
X = Reactance
XZ = =arctan( )
t
v t Ri t V RI
di tv t L V j LI
dt
i t dt v V Ij C
R jX Z
R XR
Device Time Analysis Phasor
![Page 7: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/7.jpg)
Instantaneous Electrical Power
7
max
max
max max
( ) ( ) ( )
v(t) = cos( )
(t) = cos( )
1cos cos [cos( ) cos( )]
2
1( ) [cos( )
2
cos(2 )]
V
I
V I
V I
p t v t i t
V t
i I t
p t V I
t
Power
![Page 8: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/8.jpg)
Average Electrical Power
8
max max
0
max max
1( ) [cos( ) cos(2 )]
2
1( )
1cos( )
2
cos( )
= =
V I V I
T
avg
V I
V I
V I
p t V I t
P p t dtT
V I
V I
Power Factor
Average
P
Angle
ower
![Page 9: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/9.jpg)
Complex Power
9
*
cos( ) sin( )
P = Real Power (W, kW, MW)
Q = Reactive Power (var, kvar, Mvar)
S = Complex power (VA, kVA, MVA)
Power Factor (pf) = cos
If current leads voltage then pf is leading
If current
V I V I
V I
S V I j
P jQ
lags voltage then pf is lagging
![Page 10: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/10.jpg)
Power Consumption in Devices
10
2Resistor Resistor
2Inductor Inductor L
2
Capacitor Capacitor C
CapaCapacitor
Resistors only consume real power
P
Inductors only consume reactive power
Q
Capacitors only generate reactive power
1Q
Q
C
I R
I X
I X XC
V2
citorC
C
(Note-some define X negative)X
![Page 11: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/11.jpg)
Capacitors for Power Factor Correction
• Many electric loads are reactive, which means they consume reactive power; i.e., a lagging pf
– Induction motors are a very common example
• Capacitors are commonly used to “correct” the power factor
11
![Page 12: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/12.jpg)
Balanced 3 Phase ( ) Systems
• Bulk power systems are almost exclusively 3
• Single phase is used primarily only in low voltage, low power settings, such as residential and some commercial
• A balanced 3 phase ( ) system has
– three voltage sources with equal magnitude, but with an angle shift of 120
– equal loads on each phase
– equal impedance on the lines connecting the generators to the loads
![Page 13: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/13.jpg)
Advantages of Three Phase
• Can transmit more power for same amount of wire (twice as much as single phase)
• Torque produced by 3 machines is constant
• Three phase machines use less material for the same power rating
• Three phase machines start more easily than single phase machines
13
![Page 14: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/14.jpg)
Three Phase Transmission Lines
14
![Page 15: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/15.jpg)
The North American Electric Grid
• One of the largest and most complex objects ever created
• Consists of four large 60 Hz ac synchronous subsystems
– Eastern Interconnect, Western Interconnect (WSCC), Texas (ERCOT), Quebec
• Small amounts of power can be transferred between subsystems using AC-DC-AC ties
15
![Page 16: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/16.jpg)
North America Interconnections
16
![Page 17: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/17.jpg)
North America Transmission Grid
17
![Page 18: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/18.jpg)
Generation Summary
• Total U.S. Generation consists of more than 10,000 different units with a total capacity of about 800,000 MW
– largest generation “plant” is Grand Coulee (WA) with 7,000 MW of hydro
– next largest are Polo Verde (AZ) with 3,700 MW of nuclear, W.A Parish with 3,600 MW of coal (TX), and Scherer with 3,400 MW of coal in (GA).
18
![Page 19: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/19.jpg)
Electric Load
• The aggregate electric load on the power grid varies continuously, with the customer having almost complete control
– with daily, weekly and seasonal patterns
• Total peak US electric demand is about 710,000 MW, but different areas achieve their peak values at different times
19
![Page 20: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/20.jpg)
Example Yearly Variation in Load
0
5000
10000
15000
20000
250001
518
1035
1552
2069
2586
3103
3620
4137
4654
5171
5688
6205
6722
7239
7756
8273
Hour of Year
MW
Lo
ad
20 Most of the time the load is significantly below its peak value
![Page 21: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/21.jpg)
Daily Load Variation: Very Individual
21
![Page 22: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/22.jpg)
Not All Loads are “Grid Friendly”
• Constant impedance loads are the easiest on the grid; but many loads inject harmonics
22
Switched-Mode Power Supply Current
Source: www.utterpower.com/commercial_grid.htm Source: Fig 2.34 of “Renewable and Efficient
Electric Power Systems” by Masters
Compact fluorescent lamp (CFL)
![Page 23: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/23.jpg)
Transmission and Distribution
• Goal is to move electric power from generation to load with low losses.
• Less losses at high voltages (S=VI* and I2R losses), but more difficult to insulate.
• Typical high voltage transmission voltages are 765, 500, 345, 230, 161, 138 and 69 kV.
• Lower voltage lines are used for distribution (12.4 or 13.8 kV).
• Typical losses are about 3 to 5% in transmission and 10 to 15% in the distribution system. 23
![Page 24: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/24.jpg)
Transmission & Distribution
• Transmission
– networked connections
– power can be supplied from multiple sources
– typically higher voltages, above 100 kV
– mostly overhead, with some underground in urban areas
– Often source of large-scale blackouts
• Distribution
– radial connections
– power moves in one direction only
– typically lower voltages, below 100 kV
– the source of most blackouts, but these are local
– Most new construction is underground, especially in suburban and urban locations 24
![Page 25: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/25.jpg)
Transmission Lines and the Elements
25 Ike in Beaumont, Tx
Quebec Ice Storm
![Page 26: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/26.jpg)
Transmission Lines and Trees
• We like trees, and they grow; but when trees get close to lines bad things can occur.
26
Before “Trimming” After “Trimming”
![Page 27: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/27.jpg)
Power Transfer in Transmission Lines
• Below is the full (and more complicated) power flow derivation for a short transmission line
27
V1 V2 + +
- -
I1 I1 Transmission
Line with
Impedance Z S12 S21
1
** 1 2
12 1 1 1
1 1 2 2 2
21 1 2
12 12
with , Z
Z Z
V VS V I V
Z
V V V V Z Z
V V VS
Z Z
![Page 28: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/28.jpg)
Approximate Power Transfer
• For high voltage lines, the reactance (X term) dominates so Z has an angle of close to 90
28
21 1 2
12 12 12
12 12
1 212 12
If we assume a line is lossless with impedance jX and
are just interested in real power transfer then:
90 90
Since - cos(90 ) sin , we get
sin
Hence the maximu
V V VP jQ
Z Z
V VP
X
1 212
m power transfer is
Max V VP
X
Power Transfer is primarily due to
a phase angle difference!
![Page 29: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/29.jpg)
Transformers
• Transformers provide an easily means for changing ac voltage levels
– Power flow through transformers is bi-directional
• Heating is a major concern that can quickly lead to loss of transformer life (and occasionally explosions!)
• High voltage transformers (say 230 kV and up) are large, heavy, and difficult to replace
29
![Page 30: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/30.jpg)
A 230/115 kV Transformer
30
![Page 31: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/31.jpg)
Residential Distribution Transformers
• Residential single phase electric service uses a center tapped transformer to provide 240/120 volt service; a separate ground is used for safety
31
![Page 32: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/32.jpg)
Power System Time Frames
32
Lightning Propagation
Switching Surges
Stator Transients and
Subsynchronous Resonance
Transient Stability
Governor and Load
Frequency Control
Boiler and Long-Term
Dynamics; power flow
10-7 10-5 10-3 0.1 10 103 105
Time (Seconds)
![Page 33: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/33.jpg)
Power System Operations
• The next several slides use a power system simulation package, PowerWorld Simulator, to demonstrate the operation of the electric grid over a time period of minutes to hours (quasi-steady state)
33
![Page 34: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/34.jpg)
One-line Diagram
• Most power systems are balanced three phase systems.
• A balanced three phase system can be modeled as a single (or one) line.
• One-lines show the major power system components, such as generators, loads, transmission lines.
• Components join together at a bus.
34
![Page 35: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/35.jpg)
A Substation “Bus”
35
![Page 36: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/36.jpg)
Metro Chicago Electric Grid
36
![Page 37: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/37.jpg)
Example Three Bus Power System
37
Bus 2 Bus 1
Bus 3Home Area
204 MW
102 MVR
150 MW
150 MW
37 MVR
116 MVR
102 MW
51 MVR
1.00 PU
-20 MW
4 MVR
20 MW
-4 MVR
-34 MW
10 MVR
34 MW
-10 MVR
14 MW
-4 MVR
-14 MW
4 MVR
1.00 PU
1.00 PU
106 MW
0 MVR
100 MWAGC ON
AVR ON
AGC ON
AVR ON
Load with
green
arrows
indicating
amount
of MW
flow
Used
to control
output of
generator Direction of arrow is used to indicate
direction of real power (MW) flow
Note the
power
balance at
each bus
![Page 38: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/38.jpg)
Power Balance Constraints
• Power flow refers to how the power is moving through the system.
• At all times in the simulation the total power flowing into any bus MUST be zero!
• This is know as Kirchhoff’s law. And it can not be repealed or modified.
• Power is lost in the transmission system.
38
![Page 39: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/39.jpg)
Basic Power Control
• Opening a circuit breaker causes the power flow to instantaneously (nearly) change.
• No other way to directly control power flow in a transmission line.
• By changing generation we can indirectly change this flow.
39
![Page 40: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/40.jpg)
Transmission Line Limits
• Power flow in transmission line is limited by heating considerations.
• Losses (I^2 R) can heat up the line, causing it to sag.
• Each line has a limit; Simulator does not allow you to continually exceed this limit. Many utilities use winter/summer limits.
40
![Page 41: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/41.jpg)
Overloaded Transmission Line
41
![Page 42: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/42.jpg)
Interconnected Operation
• Power systems are interconnected across large distances. Most of North America east of the Rockies is one system, with most of Texas and Quebec being major exceptions
• Individual entities (e.g., a utility) only own or operate a small portion of the system, referred to an balancing authority area (previously operating area).
42
![Page 43: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/43.jpg)
Balancing Authority Areas
• Transmission lines that join two areas are known as tie-lines.
• The net power out of an area is the sum of the flow on its tie-lines.
• The flow out of an area is equal to total gen - total load - total losses
= tie-flow
43
![Page 44: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/44.jpg)
Area Control Error (ACE)
• The area control error is the difference between the actual flow out of an area, and the scheduled flow.
• Ideally the ACE should always be zero.
• Because the load is constantly changing, each utility must constantly change its generation to “chase” the ACE.
44
![Page 45: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/45.jpg)
Automatic Generation Control
• Most utilities use automatic generation control (AGC) to automatically change their generation to keep their ACE close to zero.
• Usually the utility control center calculates ACE based upon tie-line flows; then the AGC module sends control signals out to the generators every couple seconds.
45
![Page 46: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/46.jpg)
Three Bus Case on AGC
Bus 2 Bus 1
Bus 3Home Area
266 MW
133 MVR
150 MW
250 MW
34 MVR
166 MVR
133 MW
67 MVR
1.00 PU
-40 MW
8 MVR
40 MW
-8 MVR
-77 MW
25 MVR
78 MW
-21 MVR
39 MW
-11 MVR
-39 MW
12 MVR
1.00 PU
1.00 PU
101 MW
5 MVR
100 MWAGC ON
AVR ON
AGC ON
AVR ON
46
Net tie flow is
close to zero
Generation
is automatically changed
to match change in load
![Page 47: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/47.jpg)
Power Transactions
• Power transactions are contracts between areas to do power transactions.
• Contracts can be for any amount of time at any price for any amount of power.
• Scheduled power transactions are implemented by modifying the area ACE: ACE = Pactual,tie-flow - Psched
47
![Page 48: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/48.jpg)
100 MW Transaction
Bus 2 Bus 1
Bus 3Home Area
Scheduled Transactions
225 MW
113 MVR
150 MW
291 MW
8 MVR
138 MVR
113 MW
56 MVR
1.00 PU
8 MW
-2 MVR
-8 MW
2 MVR
-84 MW
27 MVR
85 MW
-23 MVR
93 MW
-25 MVR
-92 MW
30 MVR
1.00 PU
1.00 PU
0 MW
32 MVR
100 MWAGC ON
AVR ON
AGC ON
AVR ON
100.0 MW
48
Scheduled
100 MW
Transaction from Left to Right
Net tie-line
flow is now
100 MW
![Page 49: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/49.jpg)
Multi-Area Operation
• If Areas have direct interconnections, then they may directly transact up to the capacity of their tie-lines.
• Actual power flows through the entire network according to the impedance of the transmission lines.
• Flow through other areas is known as “parallel path” or “loop flows.”
49
![Page 50: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/50.jpg)
Seven Bus Case: One-line
50
Top Area Cost
Left Area Cost Right Area Cost
1
2
3 4
5
6 7
106 MW
168 MW
200 MW 201 MW
110 MW
40 MVR
80 MW 30 MVR
130 MW
40 MVR
40 MW
20 MVR
1.00 PU
1.01 PU
1.04 PU1.04 PU
1.04 PU
0.99 PU1.05 PU
62 MW
-61 MW
44 MW -42 MW -31 MW 31 MW
38 MW
-37 MW
79 MW -77 MW
-32 MW
32 MW
-14 MW
-39 MW
40 MW-20 MW 20 MW
40 MW
-40 MW
94 MW
200 MW
0 MVR200 MW
0 MVR
20 MW -20 MW
AGC ON
AGC ON
AGC ON
AGC ON
AGC ON
8029 $/MWH
4715 $/MWH 4189 $/MWH
Case Hourly Cost
16933 $/MWH
System Has Three “Areas”
![Page 51: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/51.jpg)
Seven Bus Case: Area View
Area Losses
Area Losses Area Losses
Top
Left Right
-40.1 MW
0.0 MW
0.0 MW
0.0 MW
40.1 MW
40.1 MW
7.09 MW
0.33 MW 0.65 MW
51
System has
40 MW of
“Loop Flow”
Actual
flow
between
areas
Scheduled
flow
Loop flow can result in higher losses
![Page 52: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/52.jpg)
Loop Flow in Eastern Interconnect
52
Contours
show lines
that would
carry at
least 2%
of a power
transfer
from
Wisconsin
to TVA
![Page 53: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/53.jpg)
Reactive Power
• Reactive power is supplied by
– generators, capacitors, transmission lines
• Reactive power is consumed by
– loads
– transmission lines/transformers (high losses)
• Reactive power must be supplied locally.
• Reactive must satisfy Kirchhoff’s law - total reactive power into a bus MUST be zero.
53
![Page 54: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/54.jpg)
Voltage Magnitude
• Power systems must supply electric power within a narrow voltage range, typically with 5% of a nominal value.
• For example, wall outlet should supply 120 volts, with an acceptable range from 114 to 126 volts.
• Voltage regulation performed mostly by generators, LTC transformers and capacitors.
54
![Page 55: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/55.jpg)
How the Grid can Fail August 14th, 2003
55
![Page 56: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/56.jpg)
Pricing Electricity and LMPs
• Cost to supply electricity to bus is called the locational marginal price (LMP)
• Presently some electric markets post LMPs on the web
• In an ideal electricity market with no transmission limitations the LMPs are equal
• Transmission constraints can segment a market, resulting in differing LMP
• Determination of LMPs requires the solution on an Optimal Power Flow (OPF)
56
![Page 57: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/57.jpg)
Three Bus LMP Example: Constraint Ignored
57
Line from Bus 1 to Bus 3 is over-loaded; all
buses have same marginal cost
Gen 1’s
cost
is $10
per
MWh
Gen 2’s
cost
is $12
per
MWh
Bus 2 Bus 1
Bus 3
Total Cost
0 MW
0 MW
180 MWMW
10.00 $/MWh
60 MW 60 MW
60 MW
60 MW
120 MW
120 MW
10.00 $/MWh
10.00 $/MWh
180 MW120%
120%
0 MWMW
1800 $/hr
![Page 58: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/58.jpg)
58
Three Bus LMP Example: Constraint Considered
Bus 2 Bus 1
Bus 3
Total Cost
60 MW
0 MW
180 MWMW
12.00 $/MWh
20 MW 20 MW
80 MW
80 MW
100 MW
100 MW
10.00 $/MWh
14.01 $/MWh
120 MW 80% 100%
80% 100%
0 MWMW
1921 $/hr
Line from 1 to 3 is no longer overloaded, but now
the marginal cost of electricity at 3 is $14 / MWh
![Page 59: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/59.jpg)
MISO LMPS from 9/30/11 at 10:55am
59
Source:https://www.midwestiso.org/MarketsOperations/RealTimeMarketData/Page
s/LMPContourMap.aspx
![Page 60: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/60.jpg)
Power Grid Reliability
• Practically all blackouts are due to localized problems in the distribution system
– distribution system has a radial design, so any break in the circuit will blackout those downstream
– such blackouts have no impact on the reliability of the interconnected transmission system
• Of course large blackouts, like 8/14/03, can occur
60
![Page 61: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/61.jpg)
Power Grid Reliability
• Reliable operations requires
– no transmission lines/transformers are overloaded
– bus voltages are within limits
– must be able to withstand loss of any single device
– must not lose stability during a short-circuit
– system frequency must be very close to 60 Hz (usually about 0.02 Hz)
61
![Page 62: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/62.jpg)
Frequency Control
• Steady-state operation only occurs when the total generation exactly matches the total load plus the total losses
– too much generation causes the system frequency to increase
– too little generation causes the system frequency to decrease (e.g., loss of a generator)
• AGC is used to control system frequency
62
![Page 63: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/63.jpg)
Freq. Response to 2600 MW Loss
63
![Page 64: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/64.jpg)
Power System Protection
• A number of different automatic devices are used to protect the power grid
– several different types of relays sense short-circuits, opening the associated lines or transformers
– under/over voltage relays protect against voltage problems
– under/over frequency relays protect against frequency excursions (59.7 Hz or 60.3 Hz)
64
![Page 65: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/65.jpg)
Power Systems are Adaptable
• The power grid can sustain a loss of several lines/generators without a major system-wide collapse (probably)
– Northridge 1994 earthquake removed several major lines, splitting the Western Grid in half, and causing under-frequency load-shedding. But the grid remained intact
• Most vulnerable when the loads are highest
65
![Page 66: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/66.jpg)
Power System Vulnerabilities
• Power system operations have evolved to deal with a number of different problems
– weather including lightning, wind, tornados, hurricanes and icing
– earthquakes
– equipment failures
– random acts of violence
66
![Page 67: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/67.jpg)
Utility Control Centers
• The power grid is controlled by local control centers, using a SCADA (supervisory control and data acquisition) system and usually a more advanced EMS (energy management system)
• The grid can operate open-loop, and in an emergency can be manually controlled
• Cyber-security is an important issue as more controls are network accessible
67
![Page 68: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/68.jpg)
ISO New England Control Center
68
![Page 69: Energy Tutorial: Electric Grid 101 - Stanford University - The](https://reader035.vdocument.in/reader035/viewer/2022070222/613d3eac736caf36b75b0a02/html5/thumbnails/69.jpg)
Questions?
69