eng. ahmed abed cv

10
1 CURRICULUM VITAE Dear Sirs, It is a great honor for me to present my C.V. hopping that it meets your appreciation and acceptance. I am highly motivated, pro-active and result oriented individual well experienced in team/project management with extensive exposure in areas of civil, infrastructure and building construction. Objective: Seeking a full-time position in a growing organization focused on continuous development, directing and leading the team in a fast paced, result-oriented environment to achieve overall corporate and business objectives, where my academic background, experience, skills and attention to details may be fully utilized and developed. Personal Data: Name: Ahmed Abd El-Hafez Abd El-Hady Abed Date of Birth: 26 th October 1981 Nationality: Egyptian Marital Status: Married and have three kids Driving license: Egyptian, Kuwaiti & Qatari license. Mobile: (00974) 66005925 \ 66862196 (002) 01124742030 Tel.: (00974) 44984076 E-mail: [email protected], [email protected]

Upload: ahmed-abed

Post on 12-Apr-2017

177 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Eng. Ahmed Abed CV

1

CURRICULUM VITAE

Dear Sirs,

It is a great honor for me to present my C.V. hopping that it meets your appreciation

and acceptance. I am highly motivated, pro-active and result oriented individual well

experienced in team/project management with extensive exposure in areas of civil,

infrastructure and building construction.

Objective:

Seeking a full-time position in a growing organization focused on continuous

development, directing and leading the team in a fast paced, result-oriented

environment to achieve overall corporate and business objectives, where my academic

background, experience, skills and attention to details may be fully utilized and

developed.

Personal Data:

Name: Ahmed Abd El-Hafez Abd El-Hady Abed

Date of Birth: 26th October 1981

Nationality: Egyptian

Marital Status: Married and have three kids

Driving license: Egyptian, Kuwaiti & Qatari license.

Mobile: (00974) 66005925 \ 66862196

(002) 01124742030

Tel.: (00974) 44984076

E-mail: [email protected], [email protected]

Page 2: Eng. Ahmed Abed CV

2

Education:

June 2007

M.Sc. Construction Management (GPa 3.49 out of 4)

Graduation Project: Contractors Prequalification (Grade A)

Civil Engineering Department

College of Graduate Studies

Kuwait University

June 2004

B.Sc. Civil Engineering (GPa 3.05 out of 4)

Graduation Project: Structure (Grade A)

Civil Engineering Department

Faculty of Engineering and Petroleum

Kuwait University

June 1999

High School Diploma

Al Watanaya School, Kuwait

Subject: Science

Languages:

Arabic (Mother Tongue),

English (Fluently speak, read & write)

French: Poor

Computer Qualifications:

Hands-on experience with:

Auto CAD, STAAD Ш, Pca Column

MS. Office suite: Word, Excel, Power Point and Project

Primavera planner

GPS-X

Technical Software: C programming language, Mat lab

Excellent internet research skills.

Page 3: Eng. Ahmed Abed CV

3

Training Courses:

Project Management Professional (PMP)

January 2017 (35 Hours)

Introduction to Hazard Risk Assessment

September 2010

Qatar Design Consortium

C language Programming

February 2001

Society of Engineering and Petroleum

Kuwait University

Achievements:

Grade A Professional Engineer

Jan. 2015

Registration No.10059

Ministry of Municipality & Urban Planning

Qatar

Excellent Student Honor List

2002/2003

Faculty of Engineering and Petroleum

Kuwait University

Exceptional Students Honor List

1999 to 2004

Faculty of Engineering and Petroleum

Kuwait University

Page 4: Eng. Ahmed Abed CV

4

Working Experience:

1) June 2008 up to date

Hamad Bin Khalid Real Estate Company (HBK), Qatar

Development office as client representative engineer (Project Manager) managing all

private prosperities. Tasks including study the best use for each property, supervise

and manage all project phases tender, construction, commission, handover,

maintenance and real estate.

Responsibilities:

Review tenders and quantities, subcontractor contracts, financial invoices and

payments, construction works and finishing stage.

Reviewing planning and setting projects schedules according with project’s

requirements and specifications.

Reviewing Sites mobilization, sites team including Sites Engineers, Projects

Engineer, Foremen and workforce.

Ensure Site safety and Workers safety.

Check the resources, manpower, materials and equipment required for each

site.

Follow up engineering related activities on sites.

Review proposed scope changes for cost and schedule impact for each site.

Follow up and reviewing the monthly report.

Checking subcontractor’s progress of works for each site.

Follow up material procurement schedule and delivery for sites.

Review drawings & specifications, laboratory test results, and method

statements for implementation.

Witnessing along with the consultants and contractor the testing of materials

and structures (e.g. concrete sampling, trial mix, pile tests, materials testing for

building) to ensure conformance to the design / specifications of the

international standards.

Attending the site meetings with consultants and contractors.

Review Inspection Requests and other quality related reports/documents of

every activity and monitor accomplishments and status of sub-structures and

superstructures.

Implement all aspect of quality assurance/control system on all materials

Address concerns and issues raised by client and consultants on quality

matters.

Dealing with Government requirements and approvals.

Page 5: Eng. Ahmed Abed CV

5

During this time, these are some of the projects we built:

a) Al Ain Gardens Compound (G+1+PH): 102 Residential Villas with Club

House.

Main contractor : HBK Contracting Co.

Consultant : AEB

Project value : 115,000,000 Qatari Riyals

Plot area : 85,000 m2

b) Al Ain Phase 4 (B+G+M+1): Commercial Shops & Office Building.

Main contractor : Bab Ishtar Contracting Co.

Consultant : AEB

Project value : 61,450,000 Qatari Riyals

Plot area : 15,300 m2

c) Al Ain 2 Compound (G+1): 11 Residential Villas with Club House.

Main contractor : Bukshaisha Contracting Co.

Consultant : MZ & Partners

Project value : 11,000 Qatari Riyals.

Plot area : 4950 m2

d) Al Ain 3 Compound (G+1): 15 Residential Villas with Club House.

Main contractor : Bukshaisha Contracting Co.

Consultant : .AEB

Project value : 13,900,000 Qatari Riyals

Plot area : 6325 m2

e) HBK Masjed extension and Eid prayer.

f) HBK Quran School (G+1+2): Commercial Sops & Office Building.

Main contractor : Al-Rabat Contracting Co.

Consultant : MZ & Partners

Project value : 13,000,000 Qatari Riyals

Plot area : 2300 m2

g) 4 Residential Villas (G+1+PH):

Main contractor : Bukshaisha Contacting Co.

Consultant : DCE

Project value : 3,560,400 Qatari Riyals

Plot area : 2400 m2

Page 6: Eng. Ahmed Abed CV

6

h) Al Rawda Market Extension (B+G+2): Commercial Shops & Office

Building.

Main contractor : Bukshaisha Contacting Co.

Consultant : DCE

Project value : 25,000,000 Qatari Riyals

Plot area : 6100 m2

i) Private Palace (G+1+PH):

Main contractor : Bukshaisha Contacting Co.

Consultant : DCE

Project value : 6,500,000 Qatari Riyals

Plot area : 5900 m2

j) Commercial building at D ring road (B+G+2):

Main contractor : Construction Development Contracting

& Trading Co. (CDCT)

Consultant : TK Engineering & Sketch

Project value : 16,000,000 Qatari Riyals

Plot area : 3500 m2

k) Al Ain 4 Compound (G + 1): 20 Villas Staff Accommodation

Main contractor : Bukshaisha Contacting Co.

Consultant : DCE

Project value : 15,000,000 Qatari Riyals

Plot area : 9450 m2

l) Al Ain 5 Compound (G + 1): 22 Residential VIP Villas

Main contractor : Bukshaisha Contacting Co.

Consultant : AEB

Project value : 35,600,000 Qatari Riyals

Plot area : 12,400 m2

m) Al Ain 6 Compound (G + 1): 20 Duplex Villas with 8 No Part of an

Enclosed Compound.

Main contractor : Bukshaisha Contacting Co.

Consultant : United Consultant

Project value : 18,800,000 Qatari Riyals

Plot area : 9382 m2

Page 7: Eng. Ahmed Abed CV

7

n) New HBK Headquarter Building (5B+G+M+10)

Package 1: Enabling Works:

Main contractor : Swissboring Co.

Consultant : Neo Spectrum Eng. Consultancy

Project value : 19,991,250 Qatari Riyals

Plot area : 4,445 m2

Package 2: Building Package: (Construction Stage)

Main contractor : HBK Contracting Co.

Consultant : Unii Engineering Consultancy

Project value : 160,000,000 Qatari Riyals

Plot area : 4,445 m2

o) New Thursday & Friday Market (Tender Stage)

2) Feb. 2008 up to June 2008

High Slant Contracting & Trading Company, Kuwait

Tendering Department

3) Nov. 2005 up to Feb. 2008

KCC Engineering & Contracting Co. (K.C.C.E.C.), Kuwait

Site engineer then technical office engineer in infrastructure and tunneling projects

department.

Responsibilities:

Preparing the tender documents.

Preparing Site mobilization layout.

Preparing shop drawing and material submittals and obtaining approval from

the consultants.

Preparing material procurement, schedule and delivery.

Check the resources, manpower, materials and equipment required for the site.

Ensuring timely and economical completion of contracts in respect with the

standard quality of the project specification.

Follow up time schedule for project.

Follow up engineering related activities on site.

Ensure Site safety and Workers safety.

Page 8: Eng. Ahmed Abed CV

8

Inspection for construction and finishing work for the project according to the

construction drawing and project specification.

Preparing any variation of claims of the project.

Liaise with client and consultants on matters relevant to quality

assurance/control.

Design, casting and sinking the shafts for the micro tunneling machine.

Cost Control & reporting.

Sites working progress and requirements.

Time schedule programs and follow up progress.

As built drawings & submittals.

Corresponds

Meetings

CCTV camera system works.

Prepares Inspection Requests and other quality related reports/documents of

every activity and monitor accomplishments and status of sub-structure and

superstructure.

During this time, these some of the projects we did:

A) Sewer pipeline for west of Jleeb Al Shuyoukh (SE/74), Kuwait:

Project Value: 2,290,177 K.D.

Construction of 1000 & 1200 mm diameter tunnel for gravity sewage

pipeline 5 km length for west of Jleeb Al Shuyokh. The work including the following:

1) Surveying works.

2) Sinking for 54 shafts from 9 m up to 14 m depth. The shafts were having two

sizes 6 m diameter for the jacking shafts & 4 m diameter for the receiving

shafts.

3) Controlling the underground water by drilling two dewatering wells per each

shaft with total depth of 25 m.

4) Executing the tunnel by jacking the polycrete pipes using the hydraulic micro

tunneling machine (TBM).

5) Executing the polycrete manholes permit structure for the shafts.

6) Inspection works and as built drawings.

7) Recoding the lines using CCTV camera system.

B) Subiya water distribution scheme C2 (stage II), Kuwait:

Project Value: 5,650,492 K.D.

This Contract comprises the final design, procurement, installation, construction,

testing and commissioning of 1200 mm diameter under pressure fresh water ductile

iron pipelines 23.5 km length from the Subiya Desalination Plant to Subiya Water

Distribution Complex. The work process including the following:

1) Excavate, surround and backfill include for disposal of surplus material trench

width 2200 mm. commencing level original ground level up to 6 m.

Page 9: Eng. Ahmed Abed CV

9

2) Supply, transport, lay and joint ductile iron pipes and fittings with spigot and

socket push-in joints in including polyethylene sleeving (double encasement).

3) Supply and transport, lay & joint valves.

4) Provide and install pipe laying ancillaries.

5) Reinforced concrete chambers work.

6) Metals works.

7) Thrust blocks works.

C) Az Zour water distribution scheme (phaseII) ductile iron pipelines north

& south of mina abdullah complex, Kuwait:

Project Value: 12,415,280 K.D.

The construction of a single 1200 mm diameter ductile iron fresh water pipeline 67

km length from outside the boundary of Az Zour water distribution complex to Mina

Abdullah WDC. The work process including the following:

1) Excavate for 1200mm fresh water pipeline up to 5m depth including bedding,

surround and backfill including disposal of surplus materials keeping

excavation free of water by pumping well point dewatering or other approved

means.

2) Bedding and surround.

3) Collect & supply D.I. pipes and bends with lock joints, transport to workshop

at site including polyethylene sleeving. (double encasement)

4) D.I. fittings.

5) Isolation valve chambers.

6) Washout chambers.

7) Air valve chambers.

8) Corrosion protection of D.I. pipes.

9) Pipe laying ancillaries.

10) Reinforced concrete chambers.

11) Metals works.

12) Thrust blocks.

13) Trenchless pipe construction.

14) Fiber Optic Cable and ducts.

D) Contract No. 24-2005/2006 Maintenance of pavers for general

administration of civil flight in Kuwait International Airport:

Project Value: 4,000,000 K.D.

Maintenance works according to working orders from the directorate general of civil

aviation in Kuwait international airport. Such as remove the old concrete layers and

part from the soil and replace it with new concrete and asphalt layers. Make the

electrical manholes with its plastic pipes. Make concrete storm water pipes with

different diameters. Poring 6 * 6 m2 concrete slabs within area 288 * 92 m2 in the

passenger aircraft apron.

Page 10: Eng. Ahmed Abed CV

10

E) Kuwait Controls Company industrial and head office building in

Sabhan, Kuwait:

Project Value: 4,000,000 K.D.

Excavation works, shatter works and concrete Skelton works for two

floors building with a basement within area of 50 * 100 m2 .

4) Sept. 2004 – June 2005

Research Assistant

Civil Engineering Department

Kuwait University

Tasks including: processing and analyzing transportation data

5) Sept. 2003 – June 2004

Structural Design Trainee

Al – Jazeera Consultants

Kuwait

Memberships:

Kuwait Society of Engineers (2004 – present)

American Society of Civil Engineer

Kuwait University student chapter (1999 – present)

Personal Skills:

Establish and improve relationship with customers, hardworking, dedicated,

productive, Enjoy teamwork and basketball college team player for 5 years.

(Further information and certificates can be provided upon request)