Page 1: Eng Ver. ASPAL BUTON PMA - bai.co.id

ASPHALT BUTON

Cost Effective Solutionfor Road Construction

Page 2: Eng Ver. ASPAL BUTON PMA - bai.co.id

LAWELE PENETRATION MACADAM

BRAM = Buton Rock Asphalt MacadamBRAM = Processed Lawele Asbuton and ready to use for penetration macadam or other constructions Low Water Content (Max. 5%)Fine granular size (Max. 1 cm)

Page 3: Eng Ver. ASPAL BUTON PMA - bai.co.id

BRAM Penetration Macadam

Suitable for rural roads (low-med traffic load) 15% cheaper than conventional penetration macadamMeaning that the length of the road built increases 15% than conventional penetration macadamNo additional petroleum asphalt needed (using 100 % Asbuton BRAM)

Page 4: Eng Ver. ASPAL BUTON PMA - bai.co.id

Benefits

Labour intensiveMore economicAvailable budget can be used to lengthen the road built

Page 5: Eng Ver. ASPAL BUTON PMA - bai.co.id

BRAM LAPEN

Page 6: Eng Ver. ASPAL BUTON PMA - bai.co.id

BRAM Penetration Macadam

With the same budget, the cost for developing 1 km conventional penetration macadam can be used for developing 1.2 km BRAM penetration macadamCost savingSolution for making quality roads affordableTarget development can be achieved faster

Page 7: Eng Ver. ASPAL BUTON PMA - bai.co.id

The Implementation of BRAM Penetration Macadam

Page 8: Eng Ver. ASPAL BUTON PMA - bai.co.id

Existing Condition

Page 9: Eng Ver. ASPAL BUTON PMA - bai.co.id

Spreading and compacting Base Aggregates

Page 10: Eng Ver. ASPAL BUTON PMA - bai.co.id

Speading BRAM

Page 11: Eng Ver. ASPAL BUTON PMA - bai.co.id

Spreading key aggregate

Page 12: Eng Ver. ASPAL BUTON PMA - bai.co.id

Spreading BRAM and key aggregate

Page 13: Eng Ver. ASPAL BUTON PMA - bai.co.id

Spreading Fine Aggregate

Page 14: Eng Ver. ASPAL BUTON PMA - bai.co.id

Compacting Fine Aggregate

Page 15: Eng Ver. ASPAL BUTON PMA - bai.co.id

Final Result

Page 16: Eng Ver. ASPAL BUTON PMA - bai.co.id

After 3 months

Page 17: Eng Ver. ASPAL BUTON PMA - bai.co.id

COLD MIX APLICATION

Cold mix Application / Ton MixMaterial : BRAM 120 kg

Cutback/Emulsion Asphalt 35 kgAggregate 0.78 m³

Tool : Pan MixerSpreading : Asphalt Finisher or Manually

Cold mix construction with BRAM is more economical ± 12 % than conventional cold mix construction

Page 18: Eng Ver. ASPAL BUTON PMA - bai.co.id

COLDMIX APLICATION- BRAMCold Mix

BRAM + Cut Back Mixing Material Cold Mix Product

Compating

Page 19: Eng Ver. ASPAL BUTON PMA - bai.co.id

Coldmix Mixture Procedure

BRAM + Cutback are heated at a temperature of 120-135 ° C for ± 15’

Aggregates are mixed within a Pan mixer

BRAM + Cutback are poured onto aggregates in the Pan mixer

The mixture is spreading manually on the road

Asphalt is compacted by Baby Roller

Page 20: Eng Ver. ASPAL BUTON PMA - bai.co.id

Application of Penetration Macadam ( LAPEN )

LAPEN Application/M2

Material : Base Aggregates 110 kgBRAM 15 kgFine Aggregates 2 Kg

Tools : Manual & CompactorSpreading : Manually

Lapen construction with BRAM is cheaper ± 15 % than conventional penetration macadam (using

virgin asphalt/oil asphalt)

Page 21: Eng Ver. ASPAL BUTON PMA - bai.co.id

System COLD MIX / Penetration Macadam System is suitable for making rural roads

Benefits :Cheaper tools’ investment Ideal for light to medium traffic Easy to apply and done manually (labour intensive – social benefit)The mixture result can be stored & re-use for up to 1 month thereafterSaving the budget for rural development roads

Page 22: Eng Ver. ASPAL BUTON PMA - bai.co.id

BRAM’S APPLICATION IN SNAPSHOTS

Page 23: Eng Ver. ASPAL BUTON PMA - bai.co.id

BRAM’S APPLICATION IN SNAPSHOTS

Page 24: Eng Ver. ASPAL BUTON PMA - bai.co.id

Thank you