engineering and engineering - willkommen ... study on game among government and construction 116...

18
2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management (IE&EM 2010) Xiamen, China 29-31 October 2010 Pages 1-971 Editors: Qi Ershi Shen Jiang Liu Binghui Dou Runliang 4 IEEE IEEE Catalog Number: CFP1016G-PRT ISBN: 978-1-4244-6483-8 1 12

Upload: trankhanh

Post on 21-Mar-2018

224 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

2010 IEEE 17th International

Conference on Industrial

Engineering and EngineeringManagement

(IE&EM 2010)

Xiamen, China

29-31 October 2010

Pages 1-971

Editors:

Qi Ershi

Shen Jiang

Liu BinghuiDou Runliang

4 IEEE IEEE Catalog Number: CFP1016G-PRT

ISBN: 978-1-4244-6483-8

1 12

Page 2: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

TABLE OF CONTENTS

001-2010032 A GLOBAL OPTIMIZATION METHOD FOR FUZZY ANALYTIC I

HIERARCHY PROCESS WITH APPLICATION TO NEW PRODUCT

DEVELOPMENT PROJECTSCREENING

Kuo-Ping Chiao

002-2110059 A HYBRID DUE-DATE FULFILLED FORECASTING BASED ON 6

CLUSTERING AND DECISION TREES

Sheng-Yuan.Hsu

003-1010474 A STUDY OF REPUTATION MEASUREMENT SYSTEM OF 12

CONSTRUCTION AGENCY IN GOVERNMENT INVESTMENT PROJECT

Ling YAN.Li-xia J1A

004- 1010409 ANALYSIS OF COUPLING AND INTERFACING MECHANISM FOR 17

PLATFORM ARCHITECTURE

Yan-ling CAl,Jin-feng WANG

005- 1010344 ANALYSIS ON COAL MINE INVESTMENT DECISION BASED ON 22

BINOMIAL TREE PRICING MODEL

Jin-feng WANG, Yan AN,Li-jie FENQXin WANG

006- 1010433 ANALYSIS ON COASTAL ZONE ECOLOGICAL ECONOMY SYSTEM 25

BASED ON INTEGRATEDREGULATIONS

Yu-xin ZHENQHong-li WANQJia-liang GUO.Rong OUYANG.Jian-feng FENG

007-1010430 APPLICATION OF ANALYTIC HIERARCHY PROCESS IN ENERGY 29

SUSTAINABLE DEVELOPMENTANALYSIS

Guo-ying ZHANG

008- 1010318 APPLICATION OF BACK PROPAGATION NEURAL NETWORK ON 34

PERFORMANCE EVALUATION OF ENTERPRISE INFORMATIZATION

Xiao-qingLI,Ai-bin GUO.MingSUN

009- 1010171 APPLICATION OF GRAY RELATIVE ANALYSIS METHOD IN THE 39

MARKET SEGMENT ALTERNATIVES OF AUTO COMPONENTS

Hong-li YUJanYU

010-1010120 APPLICATION OF THE ANP METHOD BASED ON ENTROPY 43

COEFFICIENTS TO EVALUATION OF RESOURCE-BASED CITY

INNOVATION CAPACITY

Yang CAO,Xue-qing WANQQing-e GUO

011-1010061 COASTAL ZONE URBAN ECOLOGICAL ECONOMY EVALUATION 48

BASED ON SFAAND FACTOR ANALYSIS

Qiang NI,Hong-li WANG,Huai-yu Ll,Zhao-mei LIU,Jian-fengFENG

012-1010193 COMBINATION FORECASTING OFTHE GOLFCOURSES IN CHINA 52

Yong-huan DUAN,Hong-li WANQShuang-mei LI,Di YAO.Fei-peng LI

013- 1010331 COMPLETE OR INCOMPLETE INFORMATION INFRASTRUCTURE, 56

Page 3: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

IMPLICATIONS FOR ATTENTION-FOCUS IN DECISION-MAKING

Xin-ran WANGJiLI,Kev'm C. K. Lam.Xiao-fei WANG

014-3990004 COMPREHENSIVE EVALUATION AND SUGGESTION ABOUT THE REAL 61

ESTATE MACROECONOMIC REGULATIONAND CONTROL POLICY

Shu-hongLl.Ji-dong MA

015-4230014 CUSTOMIZING KNOWLEDGE-BASED RECOMMENDER SYSTEM BY 65

TRACKING ANALYSIS OF USER BEHAVIOR

Xiaohui Li, Tomohiro Mitrata

016-2010103 DEVELOPING GREEN SUPPLIER SELECTION PROCEDURE: A DEA 70

APPROACH

U. P. Wen.J. M. Chi

017- 1010071 ECONOMIC EFFICIENCY EVALUATION OF NATIONAL ECONOMIC 75

DEVELOPMENT ZONES BASED ON DEAAND SFA

Hong-li WANQQiangNljin-feng WEN,Rong OUYANG,Fei-peng LI

018-5230017 EFFICIENCY EVALUATION OF CHINESE TRUST INDUSTRY BASED ON 79

SFA

Jing SUN,Hong-li WANG.Bin BAIJian-guo TAN

019-5230019 ELECTRIC POWER ENGINEERING BIDDING EVALUATION BASED ON 83

C2RMODEL

Yu-weiJJ.Shi-yun ZHANGJiart WANG

020- 1010123 IMPLEMENTATION OF DISCRETE-EVENT SIMULATION (DES) IN 87

ESTIMATING & ANALYZING C02 EMISSION DURING EARTHWORK OF

BUILDING CONSTRUCTION ENGINEERING

Hong-xian Ll.Zhen LEI

021-1010461 RESEARCH IN APPLICATIONMETHODS OF PRODUCTION LINE 90

BALANCING AT AUTOMOBILE PAINT SHOPS

Hong-mai WU.Zhuo LIU,Shou-gong YANG,Chu-mengLV

022-1010248 RESEARCH ON ALLOCATING FIXED COST BASED ON EXTERNALITY 95

COMPUTATION

Fu-zhou LUO.PengXUE.La-yin WANG,Xiao-ting ZHU

023-5230024 RESEARCH ON EXPLORATION OF CENTRALIZED MANAGEMENT 99

MODE OF GOVERNMENT-INVESTED PROJECTS IN SHENZHEN

MUNICIPALITY

Zheng-hong DING

024- 1990038 RESEARCH ON THE METHOD OF TALENTS SELECTION BASED ON 104

FUZZY PREFERENCE RELATIONS

Bao-lu CHEN

025-4010011 RESEARCH PLAN FORHARNESSING WAVE ENERGY IN EGYPT 108

A. S. Bayoumi,H. A. El-Gama

Page 4: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

026-2120119 STATISTICAL PROCESS MONITORING OF BETWEEN-PART AND 111

WITHIN-PART VARIATIONS USING INDEPENDENT COMPONENT

ANALYSIS

C. S. Cheng,H. P. Cheng,K. K. Huang

027- 1010044 STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116

UNITS ABOUT GREEN ENGINEERING

LiFU,Wen-jie HUANG

028-1010472 TACTICAL GUARANTEE NETWORK SURVIVABILITY CASCADE 120

FAILURES ANALYSIS BASED ON PROBABILITY GENERATING

FUNCTION

YongLI,Zhong-Chi QIN.An-quan ZOU

029-1010153 TECH-KNOWLEDGE CONFORMITY IN INNOVATION OF HIGH-TECH 126

ENTERPRISES

Hua CHEN,Li-qun ZHAN.Su-ping YE

030-1010464 THE DECISION ANALYSIS AND METHODS FOR ENTERPRISES TO 132

RETAIN THE CORE HUMAN RESOURCES

Li-ping WANQNaXU

031- 1010255 THE ESTABLISHMENT AND ANALYSIS OF TIME SERIES MODEL OF 137

PER CAPITA GDP IN YUNNAN, CHINA

Yang LIANQBin HAN

032-1010150 THE HEAT BALANCE STUDY ON REGIONAL SECOND-HAND 140

COMMERCIAL RESIDENTIAL INDUSTRY

Su-ying GAO,Ling-yun WANG.Shu-lian ZHANG,Mei DING

033-5230007 THE MARKETING THEORY BASED ON CUSTOMER KI-DRIVEN 145

MODELAND RESEARCH WAYS TO OPTIMIZE

Jing ZHANG.Bo WANG

034-1010051 THE PRIORITY OF FUZZY COMPLEMENTARY JUDGMENT MATRIX 148

AND ITS APPLICATION IN PROCUREMENT TENDERS FOR

GOVERNMENT PROJECT

Xue-qing WANGQian GUO

035-1010339 THE RELOCATION PLANNING FOR SERVICE CENTERS OF CHENGDU 152

Jing SUN

036- 1010030 THE STUDY ON DECISION-MAKING CRITERION OF PUBLIC 157

PROJECTS

Xi-zhen GAO

037- 1010435 THE STUDY ON EVALUATION SYSTEM OF UNIVERSITY 161

INTERDISCIPLINARY BASED ON PRINCIPAL COMPONENTANALYSIS

Peng LIU,Jin-feng WANG.Li-jie FENQZhi-qiangZHANG

038- 1010288 THE VEHICLE ROUTING PROBLEM OF REVERSE LOGISTICS WITH 166

GREY RECYCLING DEMAND BASED ON HYBRID PSO

Page 5: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

Hong LIU, Qi-shan ZHANG, Wen-ping WANG

039-2010035 TOC PORTFOLIO SELECTION MODEL FOR NPD PROJECTS OF THE 170

BIOTECHNOLOGICAL INDUSTRY

S. H. Chang.C. P. Kan.M. L. Wang

040-2010015 USING GAP ANALYSIS AND IMPLICIT IMPORTANCE TO MODIFY SIPA 175

Y. C. Lee, Y. F. Hsieh,C. W. Huang

041- 1030056 A RESEARCH ON THE PRICING POLICY FOR REMANUFACTURING 180

PRODUCER

Jin-Wang LI,Fang YANG

042-1030422 A STUDY ON THE POSTPONEMENT INVESTMENT DECISION-MAKING 183

OF COAL BED METHANE PROJECT BASED ON THE REAL OPTIONS

Yong-fei ZHU.Sheng-you ZHANQLi-jie FENGJin-feng WANG

043-1030462 COMPANY CHARACTERISTICS, MACROECONOMIC CONDITIONS 186

AND DYNAMIC CAPITAL STRUCTURE ADJUSTMENT IN CHINA

77m; HUANG

044-1030431 COMPARATIVE ANALYSIS BETWEEN THE EPC CONTRACT MODE 191

AND THE TRADITIONAL MODE BASED ON THE TRANSACTION COST

THEORY

Qi GUO,Zhong-pingXU,Guang-fei ZHANG, Ting-ting TU

045- 1030147 DISCRETE-EVENT SIMULATION (DES) OF UNCERTAINTY-BASED 196

TIME-COST TRADE-OFF ANALYSIS

Hong-xian LJ.Zhen LEI

046-1030087 ECONOMIC EFFICIENCY ANALYSIS OF ENERGY EFFICIENCY 200

RETROFIT FOR EXISTING RESIDENTIAL BUILDING IN TANGSHAN,

CHINA

Ying HAN.NengZHU

047- 1030508 EMPIRICAL RESEARCH ON PERFORMANCE EVALUATION OF 204

EFFECTS ON INTEGRATION MANAGEMENT OF ENGINEERING

PROJECTS

Guang-shu XU

)48-1030077 FROM PROFIT TO PROFIT POTENTIAL - REDESIGN THE 208

PERFORMANCE INDICATOR TO SUPPORT TOYOTA PRODUCTION

SYSTEM

Makoto Kawada,Zhan-wen N1U

049- 1030201 INTEGRATION MODEL OF COAL ENTERPRISES ACTIVITY-BASED 217

COST MANAGEMENT INFORMATIONSYSTEM AND ERP

Qing-he YUAN.Yan-hui HOU.Jian YANG

050- 1030104 INVEST PROJECT RISK ASSESSMENT BASED ON JOINT ENTROPY 222

MODEL

Hua WANGLi-ming ZHAO, Yong LI

Page 6: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

051- 1030170 OPTIMIZATION OF INSULATION THICKNESS FOR EXTERNAL WALL 227

OF RESIDENTIAL BUILDINGS IN COLD REGIONS OF CHINABASED ON

LIFE CYCLE COST ANALYSIS

Ymg HAN.Neng ZHU

052-1030267 PARAMETER SELECTION OPTIMIZATION FOR PARAMETRIC COST 231

ESTIMATION BASED ON SIMULATED ANNEALING

Xiao-ycm XING, Yi-yongXIAO.Ren-qian ZHANG

053-4010010 REAL OPTIONS FOR ENGINEERING MANAGEMENT DECISION 237

MAKING

Jacob Gargir

054-1030221 RESEARCH ON REFORM AND DEVELOPMENT MODEL FOR RURAL 240

URBANIZATION OF XIAMEN SUBURBS

Li-yun WANG

055- 1030476 RESEARCH ON THE BENEFIT COORDINATION OF THE 245

STAKEHOLDERS IN BT PROJECT

Jun ZHAO

056- 1030477 RESEARCH ON THE OWNER'S TACTICS TO UNBALANCED BID UNDER 249

THE MODE OF CODE OF VALUATION WITH BILL QUANTITY OF

CONSTRUCTIONWORKS

Yi-lin YIN.Lu QIAO.Biao LI

057-5230021 STRATEGIC ALLIANCE FOR ENTERPRISE KNOWLEDGE 253

MANAGEMENT

Shun-lung ZHANG,Dai-qin ZHANG,Li-bo HUANG

058-1030022 STRATEGIC STUDY ON CHINA CONSTRUCTION INDUSTRIAL 258

MARKETBASED ON SSCP: AN EXAMPLE

Yu-ping LIAO, Yi-shengLIU

059-1030475 STUDY OF CLAIM IDENTIFICATION MODEL IN INTERNATIONAL 263

PROJECT BASED ON PROCESS CONTROL IDEOLOGY

Wei-yi HE,Xiao-ming CHEN

060- 1030258 STUDY ON INCENTIVE CONTRACT MECHANISM OF CONSTRUCTION 269

PROJECT UNDER BILATERALMORALHAZARD

Ying-huiJIAN

061- 1030491 SYSTEM ANALYSIS FOR CONTRACTOR PREQUALIFICATION BASED 273

ON P-DEA METHOD

LeiLlChun-lin WU.Yan-qingLI,HengXJA.Yan WANG

062-1030068 THE EXPECTATION DISPARITY OF COST CONTROL AND COST 278

UTILITY OPTIMIZATION IN SUPPLY CHAIN MANAGEMENT CONTEXT

Hong-wei SHl.Zi-rong WANQLi WEI

063-1030033 THE IMPROVEMENT ON THE VALUE OF CONSTRUCTION PRODUCTS 282

Page 7: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

WITHIN THE SCALE OF SOCIAL VALUE

Xian-fang GUO, Yan-fang LI

064- 1030029 THE RESEARCH ON THE METHOD OF DETERMINING BT PROJECT 286

REPURCHASE PRICE

Xi-zhen GAO

065-2030071 TIME-COST TRADE-OFF PROBLEM UNDER UNCERTAINTY 290

INCORPORATING MULTI-OBJECTIVE GENETIC ALGORITHM AND

FUZZY SETS THEORY

C. H. Ding,S. FujimuraX Wei, W. Wei

066- 1030037 URBANIZATION AND ECONOMIC GROWTH: ADYNAMIC PANEL DATA 295

STUDY

Man-gang SHI.Zhe WANG

067-5230033 A NEW AUTHORIZATION MODEL OF A CASE-BASED COMPLEX 299

SYSTEM APPLIED IN ENTERPRISE INFORMATIZATION

Xue-min YUAN, Ttng LI

068-1020047 AN APPLICATION OF LOGISTIC REGRESSION IN CEREBRAL 304

INFRACTION DISEASE DETECTION BASED ON ASSOCIATION RULES

WITH PRE-ROUGH CLASSIFIER

Li YANQDe-sheng XU.Chang-qing LI, Wen-sheng TIAN

069-1070410 AN DATA EXCHANGE METHODOLOGY OF CAD AND VIRTUAL 307

ASSEMBLY SYSTEM

An-sheng LI,Xiao-bin SHEN

070-1020130 BIDDING STRATEGY AND PARTICIPATING THRESHOLD IN ONLINE 311

ENGLISH AUCTION WITH BUY-IT-NOW OPTION

Li DU.Gui-fen HUA

071- 1020152 BUSINESS LOGIC STRUCTURE OF SAAS-BASED E-COMMERCE 316

SYSTEM

Kai-feng Ll,Hao-yu WEN,Zhao-jun YANG

072-1070407 CLUSTERING ALGORITHM OF COLLABORATIVE MANUFACTURING 320

CELLS BASED ON ENTROPY

Yan-qiuXIAO.Zhan-chao WU,Guo-fu LUO

073-1070102 ENERGY-SAVING PRODUCT INNOVATIVE DESIGN PROCESS BASED 325

ON TRIZ/AD

Fu-yingZHANG,Hong-chao ZHANQHui ZHENG.Qing-qing ZHANG

074- 1070204 GREEN RATIONALITY EVALUATION OF DEGRADABLE PACKAGING 329

BASED ON LCA AND FUZZYAHP

Yi KANQJian LI

075-4230012 INFORMATION INTEGRATION IN A DYADIC RELATIONSHIP 333

BETWEEN PRODUCER AND SUPPLIERS CASE STUDY ON HOLTAB

AND ITS SUPPL

Page 8: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

Md. MarufHossan Chowdhuiy.Md. Taynb Chowdhury

076-1050386 INFORMATION MANAGEMENT SYSTEM OF THREE-DIMENSIONAL 344

(3D) ANTHROPOMETRICDATA BASED ON GLSCENE

J.W.NIU.J. TANJ.J. ZHANGX ZHANQL.H. RAN

077-2070028 INVESTIGATION AND DISCOVERY OF CORE ISSUES CONCERNING 349

REQUIREMENTS ELICITATION IN INFORMATION TECHNOLOGY

INDUSTRY AND CORRESPONDING REMEDIAL ACTIONS(AN

INDUCTIVE CASE STUDY OF PAKISTAN'S IT INDUSTRY)

/ AshrafA. Ahsan

078- 1070486 KPIS: ANALYZING THE IMPACT OF BUILDING INFORMATION 354

MODELING ON CONSTRUCTION INDUSTRY IN CHINA

Wei-zhuo SUN, Guo-qiang ZHOU

079-5230003 POINTS WORTH RE-CONSIDERATION CONCERNING PRODUCT LIFE 357

CYCLE MANAGEMENT

Jun-yu YANG, Wei ZHAO

080- 1020169 RESEARCH ON DATA LAYER STRUCTURE OF MULTI-TENANT 362

E-COMMERCE SYSTEM

Act DU,Hao-yu WEN.Zhao-jun YANG

081- 1050270 RESEARCH ON INFORMATIZATION MODEL AND PATH OF 366

ENTERPRISE CLUSTER

Jing HUANQJie ZHAO

082-1990073 STUDY ON THE FUNCTION OF SOFT AND HARD EQUIPMENTS IN 371

FUSION BETWEEN INDUSTRIALIZATION AND INFORMATIONIZATION

Xue-gang SHI.Er-shi QI

083-1070381 THE IMPLEMENTATION OF COLLABORATIVE DESIGN AND 376

MANUFACTURE PLATFORM BASED ON WEB SERVICES

Jun RAO, Tai-yong WANG

084-2080121 A RESEARCH OF INTELLIGENT PARAMETERS SEARCHING IN SMALL 379

DATA SETS

Wei-Hua Andrew Wang, Ya-Chun Chang, Wen-Hsin Chen

085-2990112 A STUDY OF COMBINED MANUAL MATERIALS HANDLING TASKS 384

UNDER FOOTWEAR AND LIFTING AND LOWERING HEIGHT

CONDITIONS

Kai Way Li,Shu-Yu Ho,Chi Fung Liu

086- 1040137 AN OPTIMAL TIMING OF MERGER AND ACQUISITION UNDER 388

COOPERATION OPPORTUNISM AND PREMIUM IN REAL OPTIONS

AND GAME-THEORETIC FRAMEWORK: CHINALCO MERGERING RIO

TINTO PLC FOR EXAMPLE

Lu BIAN, Wen-xiu HU,Jiang-peng ZHANG

087-2080106 ANN BASED INTELLIGENT VISION AND SORTING SYSTEM 394

Page 9: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

P. GovendenZ. Li

088- 1080432 APPLICATION OF SOME VALID METHODS IN LOGS COUNTING 400

SYSTEM BASED ON DIGITALIMAGE PROCESSING

Ying XIN.Wei XUE

089-4230009 ASSESSMENT OF COMMUNICATION PROTOCOLS IN THE EPC 404

NETWORK - REPLACING TEXTUAL SOAP AND XML WITH BINARY

GOOGLE PROTOCOLBUFFERS ENCODING

Jiirgen Miiller,Martin Lorenz,Felix Geller,Alexander Zeier.Hasso Plattner

090-2080097 DETECTING AND PREDICTING OF ABNORMAL BEHAVIOR USING 410

HIERARCHICAL MARKOV MODEL IN SMARTHOME NETWORK

Wonjoon Kang,Dongkyoo Shin,Dongil Shin

091 -4040007 EFFECTIVE LANGUAGE POLICY WITHIN GLOBAL COMMUNICATION 415

N. A. Batova

092-2080099 FAULT DIAGNOSIS BASED ON THE ARTIFICIAL IMMUNE ALGORITHM 418

AND NEGATIVE SELECTION

P.Govender,D.A. Kyereahene Mensah

093- 1080273 FORECASTING AND IDENTIFICATION OF STOCK MARKET BASED ON 424

MODIFIED RBF NEURAL NETWORK

Bin SUN,Tie-ke LI

094-2040022 IMPLEMENTATION OF SHRM IA PROCESS MODEL ON CHINESE 428

ASSIGNEES IN PAKISTAN

Syed Zahid Raza Rizvi.Khusro P. Malik GPHR.Farooq Akbar.Aftab H. Malik.Syed

Kazim Raza Naqvi

095-4230020 ON PRIMAL-DUAL COST ALLOCATION SCHEMA IN MULTICAST 433

COMMUNICATION-.COMBINATORIALGAMETHEORYMODEL

Darko Skorin-Kapov

096-2080094 ONLINE FUNCTIONAL PREDICTION FOR SPATIO-TEMPORAL 439

SYSTEMS USING A GENERALIZED TIME-VARYING RADIAL BASIS

FUNCTION NETWORKS FRAMEWORK

Jionglong Su,T.J. Dodd

097-5230002 OPTIMIZATION DESIGN OF SPIRAL BEVELGEARMILLINGMACHINE 444

BASED ON TEST FEM SIMULATION AND SENSITIVITYANALYSIS

Qing LI.Dian-peng LI.Miao HU,Xin-hua XIAO

098-1080445 RESEARCH ON THE INTELLIGENT DECISION-MAKING SUPPORT 449

SYSTEM OF SECURITIES

FeiDING

099- 1040250 ROLE OF EDUCATION FOR SPILLOVER EFFECTS OF FDI ON 454

INNOVATION IN CHINA:—EVIDENCE FROM THE 1998-2008

PROVINCIAL PANELDATA

Jing-fei WU,Dan-zhi HU.Qian WANG

Page 10: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

100-2080070 SCRUM ADOPTION, ACCEPTANCE AND IMPLEMENTATION(A CASE 458

STUDY OF BARRIERS IN PAKISTAN'S IT INDUSTRY AND MANDATORY

IMPROVEMENTS)

M.J. Akhtar,A. Ahsan,W.Z. Sadiq

101-1040446 STUDY ON CONSTRUCTION ENTERPRISE'S TRANSNATIONAL 462

COOPERATION BASED ON CORE COMPETENCE IN VALUE CHAIN

Fu-zhou LUO.La-yin WANQPengXUE

102-4080012 THE EVALUATION OF BUSINESS INTELLIGENCE MATURITY LEVEL 466

IN IRANIAN BANKING INDUSTRY

ManoochehrNajmi,Mehran Sepehri.Spideh Hashemi

103-1080138 THE PSO-BP-BASED FORECAST OF LOGISTICS COST FOR COAL 471

ENTERPRISES

Yong-kui SHJJian-sheng SHAO

104-2090040 A NEW CELL FORMATION PROBLEM WITH THE CONSIDERATION OF 475

MULTIFUNCTIONAL MACHINES AND IN-ROUTE MACHINES

DISSIMILARITY - ATWO PHASE SOLUTION APPROACH

/. Mahdavi.N. Tahami BahenE. Teymourian

105-5230031 A TWO-PHASE OPTIMIZATION STUDY ON STRATEGIC ALLIANCE 480

PARTNERS SELECTION OF COLLABORATIVE PRODUCT DESIGN

Run-liangDOU.Guang YANG

106- 1090276 AN EMPIRICAL STUDY OF THE RELATIONSHIP BETWEEN THE 484

CAPABILITY OF IT AND BPR IN EQUIPMENT MANUFACTURER IN

GUIZHOU PROVINCE

Ting WANQLin YANG,Jin ZHAO

107-1060306 AN EMPIRICAL STUDY ON THE SUCCESS OF BPR BASED ON BPR 489

SUPPORT SYSTEMS

De-hai YU.Shu-ping YI.Ting WANQJin ZHAO

108-2090082 APPLICATION OF NEGOTIABLE EVOLUTIONARY ALGORITHM IN 496

FLEXIBLE MANUFACTURING PLANNING AND SCHEDULING

X.Hao.H. W.Lin, T.Murata

109- 1090085 APPLICATIONS OF RFID IN A SCOR-MODEL DRIVEN ENTERPRISE 501

PRODUCTION SYSTEM

K.Q. WEI.L. ZHENG,Q. XIANQX. CHEN

110-1090360 CHOOSING RECONFIGURABLE CONFIGURATION FOR AN INFUSION 506

BAG'S PRODUCTION LOGISTIC SYSTEM USING FUZZY AHP

Liang-an ZHANGJiang-ping MEI,Xiao-liu YU,Jm-sha ZHAO

111-4110005 DIMENTIONAL INSPECTION AND FEATURE RECOGNITION 511

THROUGH MACHINE VISION SYSTEM

B. K. Bhattacharyya

Page 11: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

112- 1090487 EVALUATING PERFORMANCE OF CIRCULAR ECONOMY FOR 515

MANUFACTURING ENTERPRISE BASED ON THE THEORIES OF EFA

AND MFA

Li-jie CHENJian LI, Li-ka CHEN

113- 1990372 INNOVATION DESIGN OF SUBMERSIBLE MOTOR PUMP BASED ON 520

TRIZ

Jun DENQLi-jie FENQJin-feng WANG

114- 1090174 INNOVATION EFFICIENCY OF CHINESE MANUFACTURING INDUSTRY 524

FROM 2003 TO 2008—BASED ON SFA METHOD

Qing-xin LAN,Jing HAN,Min-ping LI

115- 1090499 INVERSE DYNAMIC ANALYSIS OF THE 2-DOF PARALLEL PLATFORM 529

WITH ACTUATION REDUNDANCY

F. WANQD. HAN

116- 1090078 LEAN PRODUCTION AND ITS APPLICATION ASSESSMENT USING SET 532

PAIR ANALYSIS

Zhan-wen NlU.Bin ZUO, Wei-hong LI

117-4080009 MODEL-BASED CONTROLOF AN ELASTIC AIRCRAFT ENGINE ROTOR 537

WITH PIEZO STACK ACTUATORS

Filip LEBO.S. Rinderknecht.M. Ozel

118- 1090165 MODELING AND APPLICATION FOR CELLULAR FORMATION UNDER 542

DYNAMIC ENVIRONMENT

Jia-jingFAN.Ding-zhongFENG,Min CAO

119-1090281 MULTI-AGENT MODELING ON SCHEDULING OF MULTI-VARIETY AND 547

MULTI-PROCESS JOB-SHOP

Luo-ke HU,De-hai X1ANG, Yong CHEN

120- 1990197 OPTIMAL DESIGN OF LINKAGE CONTROL PANELS OF THE PORT 553

MACHINERY CAB BASED ON ERGONOMICS

Jing GAO.Xing-scm QIAN,Sliu-yi WANG

121- 1090408 PERMUTATION FLOW SHOP SCHEDULING ALGORITHM BASED ON A 557

HYBRID PARTICLE SWARM OPTIMIZATION

Hai-bo TANG, Chun-ming YE

122- 1060094 RESEARCH AND APPLICATION OF PROCESS INFORMATION 561

INTEGRATED SYSTEM BASED ON WEBTECHNOLOGY

Min LV.Gang WANQNing WU

123-1090114 RESEARCH OF ROBUST DESIGN IN MASS CUSTOMIZATION FOR 566

AUTOMOBILE ENGINE BASED ON ORTHOGONAL EXPERIMENT

XingXU,Ren-wangLI,Xin-li WUJun ZHAO

124-3090014 RESEARCH ON THE APPLICATION OF LEAN PRODUCTION IN THE 571

INDEPENDENT AUTOMOBILE ENTERPRISE

Li-fang WANG.Ze-yongXU, Yu-chun WANG,Min ZHANG, Yu-lin SONG.Xiao LI

Page 12: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

125- 1060452 RESEARCH ON THE ORGANIZATIONAL MODEL AND HUMAN 577

RESOURCE MANAGEMENT BASED ON ADVANCED MANUFACTURING

TECHNOLOGY

Qi-xun GAO,Qian-qian FENG

126-2090084 SIMULATION AND MULTI-AGENT-BASED INTEGRATED SOLUTION 582

FOR MANUFACTURING PLANNING AND CONTROL

C. Y. ChengL.C. Wang.S.L. Hsu

127-2140019 SLIPPING TIME AND VELOCITY OF FOOTWEAR SAMPLES IN 587

FRICTION MEASUREMENTS

K. W.Li.L. Liu,C-Y Chen.Y. T. Chen,H. F. Tsai

128- 1090252 STUDY ON ECO-EFFICIENCY EVALUATION OF MANUFACTURING 591

SYSTEMBASED ON CIRCULAR ECONOMY

Xiao-huiAN,Yuan-min CUIEr-shi QI

129- 1060209 THE CAPABILITY EVALUATION OF IE COORDINATED 594

IMPLEMENTATION BASED ON THE UNASCERTAINED

MEASUREMENT MODEL

Er-shi QI, Cui-na LI.Licmg LIU

130- 1060450 THE CONSTRUCTION TECHNOLOGY OF COLLABORATIVE 599

MANUFACTURING SERVICE CHAIN BASED ON ADAPTIVE

MULTI-AGENT PRODUCT STRUCTURE

Guo-fu LUO.Ming-ming FU, Yan-qiu X1AOJun MA

131-2060104 THE EFFECTS OF CORPORATE ENVIRONMENTAL PRACTICES ON 604

FINANCIAL PERFORMANCE OF GLOBAL COMPANIES

J. D. van Iwaarden.I. Angelova.A. Mladenov.A. Dobreva

132- 1090455 THE IMPROVED GENETIC ALGORITHM FOR THE COMPLIEX 609

JOB-SHOP SCHEDULING

Yong CHEN,Tmg-ting HU,Guo-xian WU.Zhong-ming ZHAO

133-5230028 A DEVELOPMENT OF MANUFACTURER-SUPPLIER GAME MODEL 615

FOR HAZARDOUS SUBSTANCES RISK CONTROL IN ELECTRONICS

INDUSTRY

Wei-ge WANQDan YE,Ming-bo SUN

134-2100096 A HYBRID LOCAL SEARCH APPROACH IN SOLVING THE MIRRORED 620

TRAVELINGTOURNAMENT PROBLEM

W.Wei,S.Fujimura,X.Wei,C.H.Ding

135-2100030 A NEW RANKING METHOD FOR EFFICIENT UNITS IN DATA 625

ENVELOPMENTANALYSIS WITH EXPANDED FEASIBLE REGION

C. P. Bao.K. C. Lee

136-4100001 A NONLINEAR PROGRAMMING MODEL FOR A MULTI-FACILITY 630

LOCATION PROBLEM WITH A PROBABILISTIC LINE BARRIER

S. ShiripourJ. Mahdavil,M- Amiri-Aref,M. Mohammadnia-Otaghsara

Page 13: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

137-5230030 A PROBLEMON CLAW-FREE HOMOGENEOUSLY TRACEABLE 635

Zu Ll.Ke-Wen ZHAO, Yue LIN,De-Qin CHEN

138-2100010 AN EVOLUTIONARY APPROACH USING FUZZY GREEDY 638

INITIALIZATION TO PERMUTATION FLOW-SHOP SCHEDULING WITH

THE MAKESPAN CRITERION

K. Sheibani

139-4180013 ANALYSIS OF EDUCATION SERVICE PROVIDERS' DEMAND FOR 642

ENTREPRENEURIAL ABILITY:THE EMPLOYMENT DILEMMA AND

OPPORTUNITY FOR TECHNICAL AND VOCATIONAL SCHOOL

STUDENTTEACHERS IN TAIWAN

C. M. Chou.C, H. Shen.H. C. Hsiao.S. C. Chen

140-4230006 APPLYING FUZZY SIMPLE ADDITIVE WEIGHTING SYSTEM TO 646

HEALTH EXAMINATION INSTITUTION LOCATION SELECTION

H. Y. Lin.C. J. Liao.Y. H. Chang

141-5230032 DISCIPLINARY COMPETITION EVALUATION BASIS ON THE DEA 651

CROSS-EFFICIENCY ANALYSIS

Hua-ling LIU

142-2100054 IMPROVEMENTS IN SOLVING RESOURCE CONSTRAINED SHORTEST 655

PATH PROBLEMS IN COLUMN GENERATION CONTEXT

Isik Bicery, Taner Bilgic

143- 1100187 MEASURING AIRPORT PRODUCTION EFFICIENCY BASED ON 660

TWO-STAGE CORRELATIVE DEA

Yan-chang CHUJian YU,Yan-bin HUANG

144-2100113 OPTIMAL QUERIES PROCESSING IN A HETEROGENEOUS SENSOR 665

NETWORK USING MULTICOMMODITYNETWORK FLOW METHOD

Nurjahan Begum,Samia Tasmm.Mahmuda Naznin

145-4230002 OPTIMIZATION BY LINEARNETWORKCODING 671

Shu Qin Li,Shuo-Yen Robert Li

146-2120122 OPTIMIZATION OF MIMO PLASTIC INJECTION MOLDING USING 676

DOE, BPNN, AND GA

W. C. Chen.H. C. TsaiJ. T. Lai

147- 1100058 RESEARCH ON THE OPERATIONS STRATEGY OF CHINESE 681

MANUFACTURING ENTERPRISES UNDER THE BACKGROUND OF

INTERNATIONAL SUBCONTRACTING

QiFAN

148- 1100109 SINGLE-MACHINE SCHEDULING WITH GENERAL DETERIORATING 685

JOBS AND LEARNING EFFECT

Xin-gongZHANG,Guang-le YAN

149-1100199 THE OPTIMIZATION OF A MULTIPLIER ALGORITHM WITH NCP 689

Page 14: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

FUNCTION

Ytie LIFeng-wen HUANQAi-ping JIANG

150- 1100343 THE STUDY OF MULTI-OBJECTIVE DECISION METHOD BASED ON 694

BAYESIAN NETWORK

Hong-yan DUl,Li-li ZHANG,Shu-dong SUN,Shu-bin SI

151-2100007 USING REGRESSION MODEL FOR ELIMINATING THE PUZZLEMENT 699

OF NON-ARCHIMEDEAN NUMBER IN DATA ENVELOPMENTANALYSIS

C. P. Bao.K. C. Lee.H. L. Pu

152- 1100148 WEIGHT CHANGEABLE COMBINATION FORECAST METHOD BASED 704

ONACA

Chao ZHANG, Qun ZHANG

153-5230036 A DECISION-MAKING METHOD FOR CUSTOMIZED 709

PERFORMANCE-ENHANCEMENT PLAN BASED ON GREY

RELATING-FUZZY APPRAISAL MODULE—AN EMPIRICAL STDUY ON

TECHNICALCENTEROF TIANJIN PIPE GROUPCORPORATION

Xiao-jie LIANG, Chun-fengNIE.Jing XV, Yuan-ying MA O

154- 1200367 A DISTRIBUTED WORKFLOW MANAGEMENT SYSTEM FOR 714

COLLABORATIVE PRODUCTDEVELOPMENT

Ping JIANG,Yui-kvi DING.Liang GAO.Xin-yu SHAO, Ym-dong SHEN

155- 1110349 A HYBRID GREEDY ALGORITHM FOR THE CAR SEQUENCING 719

PROBLEM

Long LIN

156-1110185 A PRODUCTION PLANNING METHOD BASED ON FUZZY 723

CHANCE-CONSTRAINED PROGRAMMING

Jian ZHANQHai-ping ZHU,Fei-fei HUA

157-4110002 AN INTEGRATED DUAL RESOURCE MANAGEMENT AND 728

PRODUCTION PLANNING SYSTEM

J. Xu,X, Xu,S. Q. Xie

158-1200419 APPLICATION RESEARCH OF SHORTENING DELIVERY TIME 733

THROUGHVALUE STREAM MAPPINGANALYSIS

Guo-qiangPAN.Ding-zhong FENQMei-xian JIANG

159-2110036 ARRIVING TIME CONTROL ALGORITHM FOR DYNAMIC FLEXIBLE 737

FLOW SHOP PROBLEM

C. Liu.S. Fujimura.L. Y. Kang

160- 1110392 CYCLE TIME ESTIMATION APPROACH BASED ON MATHEMATICAL 742

PROGRAMMINGAND STATISTICAL REGRESSION

FengLIANG

161-1200230 DESIGN OF MINING DRAWING MANAGEMENT SYSTEM BASED ON 746

WORKFLOWMODEL

Xiao-wei MI.Nai-liang LI,Zhen-hua Liu,Xiao-cheng Fan,Bai-yu Zhang

Page 15: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

162-2100091 FUZZY SETS FOR PURCHASE PLANNING IN UNCERTAIN CONDITIONS 750

O. Panchenko, Y. Kupriyanov, V. Taratoukhine.A. Zeier

163-1110269 GENETIC ALGORITHM FOR JOB SHOP SCHEDULING WITH 754

EARLINESSAND TARDINESS PENALTIES

Hong-an YANG.Qi-fengSUNJie GUO

164-3060009 IE IS THE ACCELERATOR OF ECONOMIC GROWTH MODE 759

TRANSFORMATION OF AUTONOMOUSVEHICLE

Yu-chun WANG, Li-fang WANG, Ze-yongXU, Guang YANG

165-1110160 IMPROVEMENT FORTRADITIONALPERT BASED ON RATIONAL RISK 766

AVERSION

Ying-hui MAN, Yong ZHANG

166- 1110194 LEAD-TIME, CAPACITY AND PRICING DECISIONS FOR THE 770

PRODUCTION SEAT BOOKINGSYSTEM

Li Ll.Zhi-xiang CHEN

167-2110123 MACHINE-PROCESS GROUPING ALGORITHM USING PARTICLE 773

SWARM OPTIMIZATION

Dedy Suryadi,D. Daniel Sheu

168-2110068 MEDIUM-TERM MULTI-PLANT CAPACITY PLANNING PROBLEMS 779

FOR SEMICONDUCTOR FOUNDRY

James T. Lin.Tzu-Li Chen,Ym-Yann Chen

169- 1110048 ON INTEGRATED PRODUCTION MODELBASED ON TOC 784

Hong-bo ZHANG

170-1110226 OPTIMIZATION OF BI-DIRECTIONAL PRESS LINE SCHEDULING 788

BASED ON HYBRID GENETICALGORITHM

Hai-pingZHU.Zhi-chao GUO,Guo-jun ZHANG

171-1110427 REMOTE PRODUCTION DASHBOARD: A REAL-TIME AND ONLINE 793

CONTROL TECHNOLOGY FOR DISCRETE MANUFACTURING

PROCESS BASED ON KNOWLEDGE SERVICE

Ao BAI.Ren-zhong TANQJing-xiangLV,Yu-xuan ZHU

172-1110338 RESEARCH ON SIMULATION-BASED PERFORMANCE ANALYSIS OF 799

AERO-ENGINE CASING PRODUCTION LINE

Bing CHEN, Ting YANQShan LI,Gang WANG

173- 1110088 RESEARCH THE FEASIBILITY BASED ON HUMAN FACTORS IN AUTO 804

PARTS PRODUCTION LINE TO IMPROVE THE EFFICIENCY

Ting SHI

174-1110393 SPATIAL-BASED DECOMPOSITION APPROACH FOR THE CRUDE 808

SCHEDULING PROBLEM OF A REFINERY WITH MULTIPLE PORTS

AND LONG-DISTANCE PIPELINES

Xuan CHEN,Zhi-hai ZHANQSi-min HUANG.Lt ZHENG

Page 16: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

175-1110457 THE STUDY ON BALANCE OF PRODUCTION SCHEDULE AND 813

CAPABILITY OF DELI MOLDED PRODUCTS CO. LTD

Yan XU,Qiao XIE,Qun LIU

176- 1120220 A STATISTICAL CONTROL CHARTBASED ON ARMA (N, N-l) MODEL 817

Xun-bo LIU,Xiao-ming SUN, Yi-ying ZHU

177-3020001 A STUDY ON THE LEANING TOWARD KANSEI QUALITY 821

MANAGEMENT SYSTEM OF FOODS WITH KNOWLEDGE

INTEGRATION

Da-qing LI,Da-peng WEI

178-1120368 AN ANALYSIS METHOD FOR ROBUSTNESS OF MECHANICAL 827

PROCESS SCHEME BASED ON VMEAAND TRIZ

Zhao MA, Yi-hai HE, Wen-bing CHANG, Mei-hui WANG

179-5230023 AN INNOVATIVE DESIGN OF ENERGY-SAVING PRODUCTS BASED ON 831

QFD/TRIZ/DEA INTEGRATION

Hui ZHENG.Hong-chao ZHANG, Fu-ying ZHANG

180-1120239 AN SVR AND SINGLE RESPONSE MODELING STRATEGY BASED RPD 835

APPROACH FOR MULTIEXTREME PROCESSES

Qing-an QUI

181- 1120010 ANALYZING QUALITY MANAGEMENT STATUS QUO AND 840

RELATIONSHIP OF FOOD INDUSTRY IN CHINA

Yi-zhong MA,Jie BI

182-2120055 APPLIED TECHNOLOGY FORECASTING MODEL ON EVALUATION OF 845

QUALITYGROWTH

Pei-HsiLee.Chih-Ping Chiang

183-3120002 APPLYING QUALITY FUNCTION DEPLOYMENT TO QUALITY 849

MANAGEMENT OF PRODUCT SERVICE SYSTEM

Zhi-sheng HONG.Jia-zhen HUO

184-4120014 DEVELOPMENT OF THE QUALITY MANAGEMENT OF EDUCATIONAL 854

ESTABLISHMENTS IN THE REPUBLIC OF BELARUS

Krum Elena Vitalievna

185-2120116 ESTIMATION OF REPEATABILITY AND BETWEEN-METHOD 857

REPRODUCIBILITY USING ANOVEL STATISTICAL MODEL

MingNan Chen

186-2120114 LEAN SIX SIGMAFRAMEWORKTO IMPROVE THROUGHPUT RATE 862

M.G. KanakanaJ.H.C. Pretorius,B. van Wyk

187- 1120493 ON THE FORMATION OF MATHEMATICAL MODEL IN THE 867

DEFECTIVE DESIGN IN MECHANICALPRODUCTS

Wei-dongLIU,Gui-hai YANG

188-2120048 PRIORITIZATION OF PRODUCT DESIGN TASKS USING QFD, TRIZ AND 871

Page 17: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

DSM

C. C. Tseng.C. C. Torng.S. C. Lin

189-3120012 QCC IN LUMBER INDUSTRY TIMBER PRODUCTION QUALITY 876

IMPROVEMENT APPLICATION

Yu-jieZHU,YangLJ

190-1120093 QUALITY GAPS IN NEW PRODUCT DEVELOPMENT 881

Ning-ningJINGChen YANG

191-1120162 RESEARCH ON CUSTOMER REQUIREMENTS MODEL BASED ON 884

A-CUTS FUZZY WEIGHTED AVERAGE METHOD

Jin-tong GUO,Jie HU, You ZHAO

192-1120052 STATISTICAL PROCESS CONTROL OF OVER-DISPERSED 888

MULTIVARIATE COUNT DATA

Yan-ting LI.Li-fengXI

193-2120005 STATISTICAL THINKING FORENGINEERS-WHAT, WHY, AND HOW? 893

K.S. Krishnamoorthi

194-2070118 SYSTEMATIC STRATEGIES IN DESIGN PROCESS FOR INNOVATIVE 898

PRODUCT DEVELOPMENT

Chimg-Shing Wang, Teng-Ruey Chang

195-2120014 THE RISE AND FALL OF R&D CENTER'S 'QUALITY MANAGEMENT 903

DEPARTMENT' OF AMAJOR ICT BASED CHINESE ORGANIZATION IN

PAKISTAN: AN EXPLORATORY,EXPLANATORY AND ANALYTICAL

CASE STUDY OF CORE REASON OF RISE AND FALL AND

CORRESPONDING SOFT BENEFITS AND DIS-BENEFITS

A. Ahsan

196- 1130297 A HASS PROFILE RESEARCH METHOD BASED ON COMPUTER 911

SIMULATION TECHNOLOGY

Li-zhi WANG, Tong-min JJANG.Xiao-yang LI.Fu-qiang SUN

197- 1130229 A MIXED EXPERT SYSTEM FOR FAULT DIAGNOSIS 916

Yuan-hang WANQChao DENQYaoXJONQJun WU

198- 1130322 AN INFORMATION FUSION METHOD FOR RELIABILITY BASED ON 920

D-S EVIDENTIAL THEORY

Jun-ba WAN, Tong-min JlANQXiao-yangLI, Yu FAN

199- 1130377 AVAILABILITY OF MARKOV REPAIRABLE SYSTEMS WITH 924

CHANGEABLE OPERATINGREGIMES

Li-ying WANQLi-rong CUI, Wei CHEN.Xian ZHAO

200- 1130298 CONDITION-BASED EARLY STAGE DIAGNOSIS USING ROBUST ANT 927

COLONY CLUSTERINGALGORITHM AND FEATURE MAPPING

Ji-hong YAN,De-bin ZHAO

201- 1130133 INTEGRATED IMPORTANCE MEASURE OF BINARY COHERENT 932

Page 18: Engineering and Engineering - Willkommen ... STUDY ON GAME AMONG GOVERNMENT AND CONSTRUCTION 116 UNITSABOUTGREENENGINEERING LiFU,Wen-jieHUANG 028-1010472 TACTICAL GUARANTEE NETWORK

SYSTEMS

Shu-bin SI,Li-H ZHANG.Zhi-qiang CAl.Ning WANG

202- 1130132 MODELLING OF FAILURE PREDICTION BAYESIAN NETWORK BASED 937

ON FAULT TREE ANALYSIS

Zhi-qiang CAl.Shu-dong SUN,Shu-bin SI.Ning WANG

203- 1130404 MODELING AND OPTIMIZATION OF DETERIORATING EQUIPMENT 942

WITH PREDICTIVE MAINTENANCE AND INSPECTION

Ning WANG.Slm-dong SUN,Shu-min LI,Shu-bin SI

204-U30268 OPTIMIZATION OF STEP STRESS ACCELERATED DEGRADATION 947

TEST PLANS

Jing-Rui ZHANG,Tong-Min JIANQXiao-Yang LI,Li-Zhi WANG

205- 1130405 PROBABILITY ANALYSIS OF CONCRETE SLAB CRACKING DURING 952

CONSTRUCTION

Jia-chun WANQJin-gu XU

206- 1130416 RELIABILITY ANALYSIS OF A NOVELSTRUCTURE IN AN AUTOMATIC 955

SORTING SYSTEM

Xiu-fang SUNLi ZHENG

207-1130333 RELIABILITY ASSESSMENT BASED ON PROPORTIONAL 958

DEGRADATION HAZARDS MODEL

He-tao CHEN,Hong-jie YUAN

208- 1130494 RELIABILITY EVALUATION BASED ON FUZZY FAULT TREE 963

Guo-zhu MAO,Jia-wei TU,Hui-bin DU

209- 1130501 RESEARCH ON MAINTENANCE MANAGEMENT OBJECT STRUCTURE 967

MODE BASED ON ROM

Zao-jie KONG, Ymg-xin MENG