engineering change notice 1. ecu 648256 - …/67531/metadc675818/m2/1/high...interface control...
TRANSCRIPT
r
v)
648256 1. ECU
ENGINEERING CHANGE NOTICE .............................. . . ...___
2. ECN Category (mark one)
Supplemental [I D i r e c t Revision [X I Change ECN [I Temporary [I Standby t1 Supersedure [I Cancel/Void [I
12a. Mod i f i ca t ion Work
[I Yes ( f i l L out Blk. 12b)
12c. 12d) [ X I NO (NA Blks. 12b.
3. O r i g i n a t o r ' s Name, Organization, MSIN, 4. USQ Required? 5. Date
HR WOODWORTH, C1 Yes [ X I NO 7 - 8 - 9 8 1 9 3 3 0 , L 1 - 0 2 . 3 7 3 - 4 4 9 2 6. Pro jec t Title/No./Work Order No.
and Telephone No.
7. BLdg./Sys./Fac. No. 8. Approval Designator
324 F A C I L I T Y B-CELL CLEAN-OUT
(includes sheet no. and rev.)
HNF-2286, REV 2 No. t i o n (Temp. o r Standby ECN only)
N I A N / A I
Design Authority/Cog. Engineer Signature & Date
Design Authority/Cog. Engineer Signature ?. Date
13a. Descr ip t ion o f Change 13b. Design Baseline Document? [I Yes [ X I No
DIRECT REVIS ION OF SUPPORTING DOCUMENT HNF-2286 .
REPLACE DOCUMENT HNF-2286 , REV. 2, PAGES 1 THROUGH 12, WITH ATTACHED DOCUMENT HNF-2286 , REV. 3, PAGES 1 THROUGH 13.
CHANGES INCLUDE:
2 ) . CHANGE PAGE 1, PARA 4, ADD LAST SENTENCE 1). ADDITION OF TABLE 3C, PAGES 12, " S I Z E REDUCE TANK T K - 1 1 4 "
WAS: THE NEXT PHASE . . . . . . ARE DETAILED I N TABLE 3B . IS: THE NEXT PHASE . . . . . . ARE DETAILED I N TABLE 3B , WITH THE EXCEPTION OF TANK
T K - 1 1 4 . THE S I Z E REDUCTION OF TANK T K - 1 1 4 I S ADDRESSED I N TABLE 3C.
14a. J u s t i f i c a t i o n (mark one)
C r i t e r i a Change [ X I Design Improvement [I Envi romenta l [I F a c i l i t y Deact iva t ion [I As-Found [I F a c i l i t a t e Const [I Const. Error/Omission [ ] Design ErrorlOmission [I 14b. J u s t i f i c a t i o n D e t a i l s
AS . - - THE - - - - . , . . QUALITY -. - . PROCESS - - . . - . . - PLAN - . - FOR - -- THE - . 324-BUILDING A C T I V I T I E S DEVELOP, HLJUIIIUNAL IABLtb WILL B t AUDtU 10 HNF-2286
15. D i s t r i b u t i o n ( inc lude name, MSIN, and no. of copies)
WOODWORTH, HR L 1 - 0 2 CARLSON, JL L 1 - 0 2 NORTON, SH L 1 - 0 2 SANDOZ. DH L5-65 ~~ ~~
CENTRAL FILES BI-07
A-7900-013-2 (05/96) GEF095
A-790001bl
16. Design V e r i f i c a t i o n Required
17. Cost Impact 18. Schedule Impact (days) ENGINEERING CONSTRUCTION
SDDlDD
Functional Design Criteria
Operating Specification
Criticality Specification
Conceptual Design Repon
Equipment Spec.
const. spec.
Procurement Spec.
Vendor Information
OM Manual
FSARISAR
Safety Equipment List
Radiation Work Permit
Environmental Impact Statement
Environmental RBPOR
Environmental Permit
[I Yes
[XI No
[ I [I [I [I [I [I [ I [I [I [I [I [I [I c'1 [I r i
Add i t iona l [I $ N/A Add i t iona l [I $ N/A Improvement [I N/A Savings [ I $ N/A Savings [I $ N/A Delay [I N/A
SeismiclStress Analysis
StresslOesign Repon
Interface Control Drawing
Calibration Procedure
Installation Procedure
Maintenance Procedure
Engineering Procedure
Operating Instruction
Operating Procedure
Operational Safety Requirement
IEFD Drawing,
Cell Arrangement Drawing
Essential Material Specification
Fac. Proc. Samp. Schedule
Inspection Plan
Inventory Adjustment Request
[I [I [I [I [ I [ I [ I [I [I [I [I [I [I [ I [ I r i
Tank Calibration Manual
Health Physics Procedure
Spares Multiple Unit Listing
Test ProcedureslSpecification
Component Index
ASME Coded Item
Human Factor Consideration
Computer Software
Electric Circuit Schedule
ICRS Procedure
Process Control ManuallPlan
Process Flow Cham
Purchase Requisition
Tickler File
NA
_ _ L J 20. Other Affected D o c m n t s : (NOTE: Documents l i s t e d beLou uiLL not be revised by t h i s ECN.) Signatures be lou
ind ica te t h a t the s ign ing organizat ion has been n o t i f i e d of other af fected documents L is ted below. Document NunberlRevision
N/A Docwent NunberIRevision D o c m n t Nunber Revis ion
N/A N/A
21. Approvals
Design A u t h o r i t y JL CAR
Cog. Eng. HR WWDW Cog. Mgr. JL C
QA DH SANDDZ U Safety
Envi ron.
other
Signature Date Design Agent
PE
QA
Safety
Design
Envi ron.
Other
DEPARTMENT OF ENERGY
Signature o r a Control Nunber t h a t t racks the Approval Signature
ADDITIONAL
A-7900-013-3 (05/96) GEF096
-0 HNF-2286. Rev. 3
324 Facility B-Cell Quality Process Plan
J.L. Carlson BWHC, R i chl and, WA 99352 U. S. Department o f Energy Contract DE-AC06-96RL13200
Org Code: 19330 Charge Code: K4BAA ,+ I-\ lr3 3co B&R Code: EX7050000 Total Pages: 15
EDT/ECN : 648253 UC: UC-506
Key Words : B-Cel 1 , Quality Process Plan, Hot -Work
Abstract: Quality Process Plan for the Restart of Cell Hot-Work. Addition o f Table 3C.
TRADEMARK DISCLAIMER. Reference here in t o any s p e c i f i c c m r c i a l product, process, or serv ice by trade name, trademark, manufacturer, or otherwise, does not necessari ly c o n s t i t u t e o r imply i t s endorsement, recomnendation, o r favoring by the United States Government o r any agency thereof or i t s con t rac tors o r subcontractors.
P r i n t e d i n the United States o f America. To obta in copies of t h i s document, contact: Document Control Services, P.O. Box 950, Mailstop H6-08, Richland WA 99352, Phone (509) 372-2420; Fax (509) 376-4989. ...~.. .- . . __ -. . . . . . . .
I
Release Approval Date Release Stamp
Approved for Public Release
A-6400-073 (01/97) GEF32l
( 1 ) D o c m n t Nunber RECORD OF REVISION
HNF-2286 Page 1 (2) T i t l e
(3) Revision
Rev . 0 R e v . 1
REV. 2
REV. ds
CHANGE CONTROL RECORD
( 4 )
( 7 ) I N I T I A L ISSUE, EDT 6 2 3 0 6 3 , 0 3 - 1 3 - 1 9 9 8
Description of Change - Replace, Add, and Delete Pages
DIRECT REVISION, ADDITION OF TABLE 2, MINOR TEXT CHANGES TABLE 1.
DIRECT REVISION, MINOR TEXT CHANGES AND THE ADDITION OF TABLE 3 A AND 3 B . PER ECN 6 4 8 2 5 4 DIRECT REVISION, ADDITION OF TABLE 3C. PER ECN 648256
PER ECN-647560
Author (5) Cog. Engr.
N/A HR WOODWORTH
HR WOODWORTH
WOODWORTH
d for Release (6) Cog. Mgr. Date
N I A
JL CARLSON 3/16/98
JL CARLSON 6/8/98
'JL CARLSON 7 / 8 / 9 8
A-7320-005 (08/91) WEF168
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone.
Size Reduce Tank 119 and Misc. Equipment
This activity is the restart of hotwork in B-Cell to size reduce the remainder of Tank 119 and other misc. pieces of equipment into sizes that can be loaded into a grout container. This activity also includes the process of preparing the containers for shipment from the cell. The specific activities and procedures used are detailed in Table 1.
Load and Ship Low-Level Waste
This activity covers the process of taking a grouted LLW container from B-Cell and loading it into the 3-82B cask in the REC airlock and Cask Handling Area (CHA) for shipment to the LLBG. The detailed activities and procedures for this part of cell cleanout are included in Table 2.
Remove and Size Reduce the 1 B Rack
The next phase of cell cleanout is the removal of the 1B rack from the cell. This includes the remaining activities to remove the rack from the cell wall and the written plan for cutting the rack apart. Specific work instructions detail the steps used to dismantle the rack to ensure that rigging concerns have been addressed satisfactorily. The plan also details how the tanks in the rack structure will be segmented and how heels in the tanks will be handled as mixed waste. The detailed activities and procedures for the removal of the 1 B rack is contained in Table 3a. Rack size reduction plans are detailed in Table 3b, with the exception of tank TK-114. The size reduction of tank TK-114 is addressed in Table 3c.
Collect DisDersible Material from Cell Floor
This part of cell cleanout is the collection of dispersible material from the cell floor. The bulk of the cesium contamination in the cell is expected to be found in the caked material on the floor under the footprints of the racks. Part of this material will be picked up after the 1 B rack size reduction, part after the size reduction of the 2A rack, and a final increment after the 1A rack size reduction is completed. The process will cleanout the drainage trench along the east wall of the cell and the sump in the northeast corner of the floor. The primary methods that will be used are scraping the material into piles,
1
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
picking up the piles with a clamshell or vacuum, then placement of the material in containers for later shipment to the PUREX tunnels as mixed waste. The detailed activities and procedures for this part of cell cleanout will be included in a table added to this document in the future.
Remove and Size Reduce the 2A Rack
This activity will be very similar to the 1B rack size reduction. It will cover the work required to remove the rack from the wall and a specific plan for dismantlement of this rack to account for any possible rigging concerns. The tanks in the 2A rack are expected to have minimum heals as these tanks were condensate receiver vessels. The detailed activities and procedures for this part of cell cleanout will be included in a table added to this document in the future.
Size Reduce the 1A Rack
This phase of the project will size reduce the 1A rack. This rack has already been disconnected and pulled from the wall in to the cell. The specific plan for the reduction of this rack will include the very specific way the tanks in the rack will be dismantled to contain the internal parts of the tanks. This rack contains the process evaporator, tank TK-113, which is expected to contain a potential holdup of 1.5M curies of heel material. The size reduction planning will also address the dismantlement sequence to ensure all rigging concerns are addressed. The detailed activities and procedures for this part of cell cleanout will be included in a table added to this document in the future.
Load and Ship Mixed Waste to PUREX Tunnels
This part of the cleanout process involves the loading of the 22.5 Ton casks with the dispersible material and tank heels collected throughout the cell cleanout project. The casks will be loaded in the REC airlock and shipped to the PUREX plant by truck. The casks will be moved on to flatcars and the fully loaded railcars will be pushed into Tunnel #2. The detailed activities and procedures for this part of cell cleanout will be included in a table added to this document in the future.
Move Spent Fuel to A-Cell
Part of the cell inventory of equipment are seven commercial fuel bundles stored along the west wall of the cell. When the remaining FRG equipment has been removed from A-Cell the bundles will be moved through the REC airlock to A-Cell. The process will place the bundles into new thimbles supported by a new storage rack. The old thimbles and storage racks in B-Cell will be size reduced and disposed of as LLW. The detailed
2
324 Facility 6-Cell Quality Process Plan HNF-2286 (Rev. 3)
activities and procedures for this part of cell cleanout will be included in a table added to this document in the future.
3
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
Activity
Verify 2ombustible loading within limits for cell
3btain Hotwork Permit
'erform size .eduction of Tank 119 and misc. cell jebris
Table 1- Size Reduce Tank 119 and Misc. Equipment
Product
Inventory Nithin limits
4pproved 3ermit
Metal for 3ddition to 3C
Work Control Number (JCS No.)
N/A
NIA
NIA
Applicable Procedure and Instructions
31-SOP-REC-K-22
31-SOP-REC-G-22
31-SOP-REC-K-22
HNF-PRO-356
31-SOP-REC-K-22
31-SOP-REC-A-38
31-SOP-REC-F-2
Responsible [Lead) Individual
BWHC Shift sup.
BWHC Shift sup.
3WHC Shift sup.
Quality Requirements
Procedure approval
BWHC Shift Sup. monthly review
Fire Protection Eng. monthly review
Procedure step
Fire Protection Eng. Approval
Facility mgr. approval
Procedure steps
Procedure steps
Procedure steps
4
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
Table 1- Size Reduce Tank 119 and Misc. Equipment
Activity Product Applicable Procedure and Instructions
Responsible (Lead) Individual
Quality Requirements
Work Control Number (JCS No.)
NIA Rinse metal piece
Metal cleaned for addition to GC
31-SOP-REC-A49 BWHC Shift sup.
Procedure approval
Waste coord. approval
31-SOP-REC-A-38 Procedure steps
Procedure steps
Load GC Filled GC NIA 31-SOP-REC-A49
31-SOP-REC-A-38
BWHC Shift sup.
Neigh GC GC within weight limits
NIA 31-SOP-REC-A49 BWHC Shift sup.
Calibrated load cell
Pre-Grout jose profile
GC within dose limits
31-SOP-REC-A49 BWHC Shift sup.
Calibrated R-07
RCT review
NIA
~
GC ready to grout
GC ready for final dose profile
31-SOP-REC-A49 BWHC Shift sup.
Procedure step 4pproval to grout
3rout :ontainer
NIA
NIA 31-SOP-REC-A49
31-SOP-REC-A-65
BWHC Shift sup.
Calibrated load cell
Procedure steps
'est-Grout jose profile
GC ready for shipment
N/A 31-SOP-REC-A49 BWHC Shift sup.
Calibrated R-07
RCT review
5
324 Facility 6-Cell Quality Process Plan HNF-2286 (Rev. 31
Table 2 - Load and ShiD Low 119 Misc. E uipment
Responsible (Lead) Individual
Quality Requirements
Product Work Control Number (JCS No.)
Applicable Procedure and Instructions
Activity
Receive cask Facility acceptance
NIA 31-SOP-REC-A44 BWHC Shift sup.
Procedure approval by QA and Packaging
Procedure steps
Procedure steps
Unload cask from trailer
Cask ready to load
N/A 31-SOP-REC-A44 BWHC Shift sup.
Inspect cask system
Verify no internal debris
NIA 31-SOP-REC-A-42 BWHC Shift sup.
Procedure approval by QA and Packaging
Procedure hold point
NIA 31-SOP-REC-A42 BWHC Shift sup.
Procedure hold point
Inspect Hittman liner
Place Hittman liner in AIL
Verify no damage
Liner ready for GC
31-SOP-REC-A42 BWHC Shift sup.
Procedure step NIA
BWHC Shift SUD.
Procedure step Move cask into AIL
Cask ready for liner
NIA 31-SOP-REC-A42
BWHC Shift sup.
Procedure hold point
Record GC ID number
Verify waste package
NIA 31-SOP-REC-A42
6
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
Table 2 - Load and Ship Low 119 Misc. E uipment
Responsible (Lead) Individual
Activity Product Work Control Number (JCS No.)
Applicable Procedure and Instructions
Quality Requirements
Load Hittman liner
Liner ready for lid
NIA 31-SOP-REC-A42 Procedure step
Procedure step
BWHC Shift sup.
Load liner into cask
Cask ready for removal from AIL
31-SOP-REC-A42 BWHC Shift sup.
Remove cask from AIL
NIA 31-SOP-REC-A42 Procedure step Cask ready for lid
Cask lid secured
BWHC Shift sup.
sup. BWHC Shift Torque cask
lid nuts NIA 31-SOP-REC-A-42 Procedure hold
point Calibrated torque wrenches
Perform cask leak test
Verify cask sealed
NIA 31-SOP-REC-A42 BWHC Shift sup.
Procedure hold point
Calibrated test device
Load cask onto trailer
Cask ready to ship
NIA 31-SOP-REC-A44 BWHC Shift sup.
Procedure steps
Review loading and shipping records
Verify shipping documents
31-SOP-REC-A44 QC inspector QC lnpection Plan
NIA
QC hold point
Ship cask LLW shipment
NIA 31-SOP-REC-A44 BWHC Shift sup.
Procedure step
7
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
Work Control Number (JCS No.)
(Step 1-16) 31-98-001 50 Prepare Facilitate
Equip, Cell & Removal of Attach Winch 1 B Rack
Applicable Procedure and Instructions
31-SOP-REC-K-30**
Table 3a - Remove the 1 B Rack
Responsible (Lead) Individual
BWHC Shift sup.
BWHC Shift sup.
BWHC Shift sup.
Quality Requirements
Work Package Steps
Procedure and Work Package step
Work Package Steps
Remove MSMs at South Window
Restor B-Cell Capability
~
Facilitate Removal of 1B Rack
31-98-00150 (Step 28)
31-98-00150 (Step 18)
BWHC Shift sup.
31-SOP-REC-K-02 **
Procedure and Work Package steps
Remove 1B Rack From Wall
1B Rack Ready for Reduction
31-98-001 50 (Step 25)
N/A
Install MSMs at South Window
Install Wall Shield Plugs
Provide Shielding for Airlock and B-Cell
31-98-001 50 (Step 32-35)
31-SOP-REC-K-02**
3I-SOP-REC-A-O4** 31-SOP-REC-A-12** 31-SOP-REC-F-11** 31-SOP-REC-F-11 A**
Work Package steps
8
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
Activity
Remove Misc. Piping and Agitator
Reduce Connector Face
Reduce Lower Rack Structure and Plugs
Remove
Reflux Condenser
E-I12
Product
Metal for Addition to GC
Metal for Addition to GC
Metal for Addition to GC
Metal for Addition to GC
Table 3b - Size Reduce the 1 B Rack
Work Control Number (JCS No.)
31-98-001 51 (Step 3)
31-98-00151 (Step 7)
31-98-00151 (Step 9)
31-98-001 51 (Step 11)
Applicable Procedure and instructions
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 3I-SOP-REC-F-O2* 31-SOP-REC-K-05*
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 3I-SOP-REC-F-O2* 31-SOP-REC-K-05*
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 31-SOP-REC-F-O2* 31-SOP-REC-K-05*
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 3I-SOP-REC-F-O2* 31-SOP-REC-K-05*
Responsible (Lead) Individual
BWHC Shift sup.
BWHC Shift sup.
BWHC Shift sup.
BWHC Shift sup.
Quality Requirements
Procedure and Work package Steps
Peer review CG calculations
Procedure and Work package Steps
Peer review CG calculations
Procedure and Work package Steps
Peer review CG calculations
Procedure and Work package Steps
Peer review CG calculations
9
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
Activity
Reduce Tank TK-112
Remove Tank TK-114
Reduce Upper Rack Structure
Product
Metal for Addition to GC
Tank
set aside for later Disposal
TK-114
Metal for Addition to GC
Table 3b - Size Reduce the 1 B Rack (cont.)
Work Control Number (JCS No.)
31-98-00151 (Step 12)
31-98-00151 (Step 15)
31-98-00151 (Step 16)
Applicable Procedure and Instructions
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 3I-SOP-REC-F-O2* 31-SOP-REC-K-05*
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 31-SOP-REC-F-02* 31-SOP-REC-K-05*
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 31-SOP-REC-F-02* 31-SOP-REC-K-05*
Responsible (Lead) Individual
BWHC Shift sup.
BWHC Shift sup.
BWHC Shift sup.
Quality Requirements
Procedure and Work package Steps
Peer review CG calculations
Procedure and Work package Steps
Peer review CG calculations
Procedure and Work package Steps
Peer review CG calculations
10
324 Facil i t y B-Cel 1 Qual i t y Process P1 an HNF-2286 (Rev. 3)
Activity
Reduce Upper Plugs
Product
Metal for Addition to GC
Table 3b - Size Reduce the 18 Rack (cont.)
Responsibl e (Lead) Individual
Work Control Number (JCS No.)
Quality Requirements
31-98-001 51 (Step 18-19)
Applicable Procedure and Instructions
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 31-SOP-REC-F-02* 31-SOP-REC-K-05*
I
Work package Steps
Peer review CG calculations
11
324 Faci 1 i t y B-Cel 1 Qual i t y Process P1 an HNF-2286 (Rev. 3)
Responsible (Lead) Individual
BWHC Shift sup.
Table 3c - Size Reduce the 1B Rack (tank TK-114)
Quality Requirements
Procedure and Work package Steps
Peer review CG calculations
Activity Product
Reduce Tank TK- 114
Metal for Addition to GC
I
Work Control Number (JCS No.)
(Step 15.1 31-98-00151
WCN-03)
Applicable Procedure and Instructions
31-SOP-REC-A-49* 31-SOP-REC-K-22* 31-SOP-REC-A-38* 3I-SOP-REC-F-O2* 31-SOP-REC-K-05*
** Common Facility Procedures, not provided for Review 31-SOP-REC-K-30. InstallationlRemoval of services Via Split Plugs and Operating Transfer Ports 31-SOP-REC-K-02. Maniuplator Removal and Installation 31-SOP-REC-A-04, AirlockiCell Access 31-SOP-REC-A-12, Hot Cell Shielding Door Controls 31-SOP-REC-F-11, DressIUndress Procedure for Fresh Air Hood 31-SOP-REC-F-1 IA, DresdUndress Procedure for Full Face Air Purifying Respirator and Two Pair of PCs
*Procedures Previously Reviewed Reviewed for Table 1 31-SOP-REC-A-49, Preparing/Loading Low Level Waste (LLW) Grout Containers 31-SOP-REC-K-22, In Cell Operation of thermal Arc Plasma Cutting System 31-SOP-REC-A-38, Medium Pressure Spray Decontamination 3CSOP-REC-F-02. Fire Safety Guidelines for Radiochemical Hot Cells 31-SOP-REC-K-OB, Radiochemical Engineering Cells (REC) Cranes 3CSOP-REC-G-22. Hot Cell Combustible Materials Inventory
12
324 Facility B-Cell Quality Process Plan HNF-2286 (Rev. 3)
Tables to be Added by Document Revision
Table 4 - Collect Dispersible Material from Cell Floor
Table 5 - Remove and Size Reduce the 2A Rack
Table 6 - Size Reduce the 1A Rack
Table 7 - Load and Ship Mixed Waste to PUREX Tunnels
Table 8 - Move Spent Fuel to A-Cell
13