engineering change order - caxapacaxapa.ru/thumbs/489495/pickit3_schematics.pdf · 2020. 2. 17. ·...
TRANSCRIPT
Engineering Change Order
Microchip Technology Incorporated
2355 W. Chandler Blvd.Chandler, AZ 85224-6199
Distribution Location: T10
ECO Number:4950
Originator:Aaron van Duerm
Phone:480-792-7778
Date:1/5/2009
Supplier Notification:No
Description: Old Rev: New Rev:
Affected Documents
Product Document Number:PRODUCT TREE, PICKIT 3 DEBUG EXPRESS 1 2DV164131 14-00842
Reason for Change:Added the 13-00842-2 test procedure documentation to the Product tree.Also revised the ECO page to include the 13-00842R1B document to use for testing the PICKit 3 Programmer.
Description of Change:Test procedure documentation was needed for testing the 44-pin demo board.
Material Disposition:Tempe: You will need to reprogram the first 100 boards from Burnon to correct the previous firmware revison. Please erase the PIC24FJ256GB106 device using a RealICE and reprogram the uniots using the test fixture and the 13-00842R1B test procedure. Please run the 13-00842-2 test procedure for the demo board after the units have been reprogrammed with the correct firmware.
CM: Please rework existing stock by erasing the part, and reprogramming the PICKit 3 using the 13-00842R1B test procedure. We found an issue in the previous revision that we sent and we want to ensure that this is fixed before it becomes a major problem. Implement testing the demo board using test procedure and the 13-00842-2R1 test procedure documentation into process using MPLAB 8.15.11 for the initial build.
Document Control: Please ensure that the test procedure 13-00842 is Rev 1B when it is finalized to avoid confusion for our Tempe test team and our CM.
1/7/20091/7/2009
HW Engineering SW Engineering RMA/TESTMarketing Documentation Quality Production OriginatorBaaN
Revs were updatedDescription of change was implemented
Packlist is correctAll necessary drawings are in PDF file
Page 1 of 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Q.C. Inspection
Date:
Product TreeASSEMBLY NUMBER: 14-00842ASSEMBLY NAME: PRODUCT TREE, PICKIT 3 DEBUG EXPRESS
REV: 2 LAST ECO: 4950 Part No: DV164131MPCode:
Part Number Rev Type Description
12-00842 FINAL ASSY, PICKIT 3 DEBUG EXPRESS1 BQ 10-00424 ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER1 B 10-00424-D ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER1 B 09-00227-D MECH PART DWG, PICkit 2 ENCLOSURE TOP1 D 09-00228-D MECH PART DWG, PICkit 2 ENCLOSURE BOTTOM1 D 02-02038 PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMERC B 02-02038-D PCB ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMERC D 03-02038 SCHEMATIC, PICkit 3 MICROCONTROLLER PROGRAMMERC D 04-02038 PCB FABRICATION, PICkit 3 MICROCONTROLLER PROGRAMMERC D 08-00126 LABEL, NEED HELP WITH ASSY/SERIAL6 LBL 02-01924-03 PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20)1 B 02-01924-D PCB ASSY DWG, PICkit 2 44-PIN DEMO BOARD2.2 D 03-01924 SCHEMATIC, PICkit 2 44-PIN DEMO BOARD2.1 D 04-01924 PCB FABRICATION, PICkit 2 44-PIN DEMO BOARD2.2 D 05-01924 PCB ARTWORK, PICkit 2 44-PIN DEMO BOARD2.2 DISK 08-00126 LABEL, NEED HELP WITH ASSY/SERIAL6 LBL 08-00237 LABEL, PRODUCT, FINAL ASSY, SERIAL NO. OPTIONAL3 LBL 13-00842 TEST PROCEDURE, PICKIT 3 MICROCONTROLLER PROGRAM* TEST 13-00842-2 TEST PROCEDURE, Pickit 3 Debug Express 44-pin Demo Board* TEST
Page 1 of 1* Revision of the Test Procedures are controlled in the Specification Index
12-00842FINAL ASSY, PICKIT 3 DEBUG EXPRESS
REV: 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
10-00424 ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER1 BY1 1
02-01924-03 PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20)1 BY2 1
CAB0019 CABLE, USB, A TO MINI-B, 1.8m/6ft PARTRed cable
Y3 1
RoHS CompliantDELPHI 15431480-030 DIGIKEY 167-1012-ND JUL-06Avail:
RoHS CompliantHIROSE ELECTR UX40-MB-5PA-1000-2003(01) Avail:
DS30030 DOC, WARRANTY/REGISTRATION CARD* DOCY4 1
DS30210 DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION* DOCY5 1
DS51123 SOFTWARE, MPLAB CDROM* DOCY6 1
DS51792 DOC, USING PICKIT 3 POSTER* DOCY7 1
09-00217 PACKAGING, PICkit DEBUG EXPRESS CLAMSHELL PART8 1
DS51782 DOC, PICkit 3 DEBUG EXPRESS PACKAGING FILLER* DOC9 1
08-00237 LABEL, PRODUCT, FINAL ASSY, SERIAL NO. OPTIONAL3 LBL10 1
Page 1 of 16* In Rev Field: Part Rev is controlled in the Specification Index
10-00424ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
10-00424-D ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER1 B1 1
09-00227 MECH PART, PICkit 3 ENCLOSURE TOP1 PART2 1
09-00228 MECH PART, PICkit 3 ENCLOSURE BOTTOM1 PART3 1
02-02038 PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMERC B4 1
08-00126 LABEL, NEED HELP WITH ASSY/SERIAL6 LBL5 1
Page 2 of 16* In Rev Field: Part Rev is controlled in the Specification Index
09-00228MECH PART, PICkit 3 ENCLOSURE BOTTOM
REV: 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
09-00228-D MECH PART DWG, PICkit 2 ENCLOSURE BOTTOM1 D1 1
Page 3 of 16* In Rev Field: Part Rev is controlled in the Specification Index
09-00227MECH PART, PICkit 3 ENCLOSURE TOP
REV: 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
09-00227-D MECH PART DWG, PICkit 2 ENCLOSURE TOP1 D1 1
DS51772 MECH PART ART, PICkit 3 TOP ENCLOSURE DESIGN* DOC2 1
Page 4 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
02-02038-D PCB ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMERC D1 1
03-02038 SCHEMATIC, PICkit 3 MICROCONTROLLER PROGRAMMERC D2 1
04-02038 PCB FABRICATION, PICkit 3 MICROCONTROLLER PROGRAMMERC D3 1
MIC0272 IC SMT, MCP1525T-I/TT, 3L SOT-23 Y PARTU10
4 1
RoHS CompliantMICROCHIP MCP1525T-I/TT A7BQ1TCQXA00 Avail:
RoHS CompliantMICROCHIP MCP1525T-I/TT A7BQ1TC6XA00 Avail:
MIC0430 IC SMT, ANALOG OP-AMP, SNGL SUPPLY R-R, MCP601 SOT-23-5 Y PARTU5
5 1
RoHS CompliantMICROCHIP MCP601T-I/OT AB009TC7XA00 Avail:
MIC0506 IC SMT, MCP1727T-3302E/MF, 1.5A, LOW VOLTAGE, LDO REG 8P DFN Y PARTU7
6 1
RoHS CompliantMICROCHIP MCP1727T-3302E/MF GEAG1YA7XA33 Avail:
MIC0401 IC SMT, 25LC256, 128K/256K-BIT SPI SERIAL EEPROM 8L SOIC Y PARTU3
7 1
RoHS CompliantMICROCHIP 25LC256-I/SN D5AH17C2XA00 Avail:
MIC0526 IC SMT, PIC24FJ256GB106-I/PT MICROCONTROLLER 64L TQFP 10x10 Y PARTU1
8 1
RoHS CompliantMICROCHIP PIC24FJ256GB106-I/PT Avail:
CAP0005 CAP SMT, 0.01uF 0603 CER 50V 20% X7R Y PARTC17
9 1
RoHS CompliantKEMET C0603C103M5RAC Avail:
RoHS CompliantNIC COMPONEN NMC0603X7R103K50TRPF Avail:
RoHS CompliantCAL-CHIP GMC10X7R103K5NTLF Avail:
RoHS CompliantPANASONIC ECJ-1VF1H103Z DIGIKEY PCC1801CT-ND Avail:
Page 5 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
CAP0012 CAP SMT, 0.1uF 0603 CER 25V +80/-20% Y5V Y PARTC3, C8, C12, C13, C14, C16, C19, C20, C21, C24, C25, C26, C28, C29, C30, C31, C32, C33, C34
10 19
RoHS CompliantPANASONIC ECJ-1VF1E104Z DIGIKEY PCC1794TR-ND Avail:
RoHS CompliantROHM MCH182FN104ZK Avail:
RoHS CompliantCAL-CHIP GMC10Y5V104Z25NTLF Avail:
RoHS CompliantNIC COMPONEN NMC0603Y5V104Z25TRPF Avail:
CAP0425 CAP SMT, 2.2uF 0805 CER 25V 10% X5R Y PARTC9, C15
11 2
RoHS CompliantPANASONIC ECJ-2FB1E225K DIGIKEY PCC2320TR-ND Avail:
CAP0117 CAP SMT, 47pF 0603 CER 50V 5% NP0 Y PARTC22
12 1
RoHS CompliantKEMET C0603C470J5GACTU DIGIKEY 399-1056-1-ND Avail:
RoHS CompliantPANASONIC ECJ-1VC1H470J DIGIKEY PCC470ACVTR-ND Avail:
CAP0200 CAP SMT, 27pF 0603 CER 50V 5% NP0 Y PARTC4, C5
13 2
RoHS CompliantPANASONIC ECJ-1VC1H270J DIGIKEY PCC270ACVTR-ND Avail:
CAP0265 CAP SMT, 1.0uF 0603 CER 16V 10% X5R Y PARTC2, C6, C7, C27
14 4
RoHS CompliantAVX CORP 0603YD105KAT2A DIGIKEY 478-1249-1-ND Avail:
RoHS CompliantMURATA ELECT GRM185R61C105KE44D DIGIKEY 490-3894-1-ND Avail:
RoHS CompliantMURATA ELECT GRM188R61C105KA93D DIGIKEY 490-1536-1-ND Avail:
RoHS CompliantPANASONIC ECJ-1VB1C105K DIGIKEY PCC2224CT-ND Avail:
RoHS CompliantTAIYO YUDEN EMK107BJ105KA-T DIGIKEY 587-1251-1-ND Avail:
CAP0306 CAP SMT, 10uF 3216 (A) TANT 10V 20% PARTC10, C11, C18
15 3
RoHS CompliantNICHICON F931A106MAA DIGIKEY 493-2351-1-ND Avail:
RoHS CompliantKEMET T491A106M010AG Avail:
RoHS CompliantKEMET T491A106M010AT Avail:
Page 6 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
CAP0311 CAP SMT, 47uF 7343 (D) TANT 20V 10% PARTC23
16 1
RoHS CompliantKEMET T491D476K020AG Avail:
RoHS CompliantKEMET T491D476K020AS DIGIKEY 399-1619-2-ND Avail:
RoHS CompliantKEMET T491D476K020AT Avail:
CAP0372 CAP SMT, 10uF 0805 CER 10V 10% , X5R Y PARTC1
17 1
RoHS CompliantTAIYO YUDEN LMK212BJ106KD-T DIGIKEY 587-1299-1-ND Avail:
CON0170 CONN, RECPT, 1x6 PIN .025 SQ, RA. (0.100") PARTJ4
18 1
RoHS CompliantSAMTEC SSW-106-02-G-S-RA Avail:
RoHS CompliantMILL-MAX 801-13-006-20-001000 Avail:
CON0276 CONN SMT, RECPT, USB 2.0 MINI 5POS PARTJ1
19 1
RoHS CompliantHIROSE ELECTR UX60-MB-5ST DIGIKEY H2959TR-ND Avail:
DIODE0101 DIODE SMT, SCHOTTKY BAT54C 30V 200MA SOT-23 PARTD3
20 1
RoHS CompliantFAIRCHILD BAT54C DIGIKEY BAT54CFSTR-ND Avail:
DIODE0104 DIODE SMT, SCHOTTKY 40V 1A SOT-23 PARTD1
21 1
RoHS CompliantZETEX ZHCS1000TA DIGIKEY ZHCS1000TR-ND Avail:
DIODE0116 DIODE SMT, SCHOTTKY 20V 0.5A SOD-123 PARTD8
22 1
RoHS CompliantFAIRCHILD SEMI MBR0520L DIGIKEY MBR0520LCT-ND Avail:
DIODE0121 DIODE SMT, ZENER 5V 1.5W SMA PARTTR1, TR2, TR3
23 3
RoHS CompliantON SEMI 1SMA5918BT3G DIGIKEY 1SMA5918BT3GOS Avail:
FUSE0019 FUSE SMT, POLYSWITCH 0.05A 30V RESETTABLE (0.135" x 0.110" x 0.025") PARTPTC2, PTC3, PTC4
24 3
RoHS CompliantTYCO/RAYCHEM MICROSMD005 Avail:
RoHS CompliantTYCO/RAYCHEM MICROSMD005F Avail:
Page 7 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
FUSE0026 FUSE SMT, POLYSWITCH 0.5A 13.2V RESETTABLE (0.135" x 0.110" x 0.025") PARTPTC1
25 1
RoHS CompliantTYCO/RAYCHEM MICROSMD050F-2 DIGIKEY MICROSMD050FTR Avail:
RoHS CompliantTYCO/RAYCHEM MICROSMD050F-2 DIGIKEY MICROSMD050FCT Avail:
IC00270 IC SMT, 74LVC1T45 1BIT DUAL BUS TXRX SOT23-6 PARTU8, U9, U11
26 3
RoHS CompliantTEXAS INSTRU SN74LVC1T45DBVR DIGIKEY 296-16843-2-ND APR-05Avail:
IC00393 IC SMT, 74AHC1G125, SOT-23-5 Y PARTU12
27 1
RoHS CompliantTexas Instrument SN74AHC1G125DBVR DIGIKEY 296-8744-2-ND Avail:
IC00408 IC SMT, AT25DF041A, 4M-BIT SPI FLASH SERIAL EEPROM 8L SOIC Y PARTU4
28 1
RoHS CompliantATMEL AT25DF041A-SH-B DIGIKEY AT25DF041A-SH-B- Avail:
RoHS CompliantATMEL AT25DF041A-SSH-B DIGIKEY AT25DF041A-SSH- Avail:
IND0024 INDUCTOR SMT, 680uH, 50mA 30-OHM 5% 1812 PARTL1
29 1
RoHS CompliantCOILCRAFT 1812LS-684XJLB Avail:
RoHS CompliantJW MILLER PM1812-681J DIGIKEY M6078TR-ND Avail:
RoHS CompliantJW MILLER PM1812-681J-RC Avail:
LED0034 LED SMT, 0805 GREEN CLEAR 2x1.25mm PARTD2
30 1
RoHS CompliantKINGBRIGHT APT2012QGC-F01 Avail:
RoHS CompliantLITE-ON LTST-C170GKT DIGIKEY 160-1179-2-ND Avail:
RoHS CompliantKINGBRIGHT APT2012QGC Avail:
RoHS CompliantCHICAGO MINAT 7012X5 DIGIKEY L61105TR-ND Avail:
RoHS CompliantLITE-ON LTST-C170GKT DIGIKEY 160-1179-1-ND Avail:
LED0046 LED SMT, 3x2.5mm BI-COLOR RED/GREEN, LOW POWER PARTD4
31 1
RoHS CompliantKINGBRIGHT APB3025ESGC NEUMANN Avail:
RoHS CompliantKINGBRIGHT APB3025ESGC-F01 Avail:
Page 8 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
LED0059 LED SMT, 0805 BLUE CLEAR 2x1.25mm PARTD5
32 1
RoHS CompliantLITE-ON LTST-C170TBKT DIGI-KEY 160-1579-2-ND Avail:
OSC0087 OSC SMT, 12.000MHz CRYSTAL 18PF FUND SMD (HC49) PARTY1
33 1
RoHS CompliantABRACON COR ABLS-12.000MHZ-B2-T DIGIKEY 535-9067-1-ND Avail:
RSMT0001 RES SMT, 0-OHM 0603 PARTR59, R60
34 2
RoHS CompliantPANASONIC ERJ-3GSY0R00V DIGIKEY P0.0GTR-ND Avail:
RoHS CompliantPANASONIC ERJ-3GEY0R00V DIGIKEY P0.0GTR-ND Avail:
RoHS CompliantNIC COMPONEN NRC06Z0TRF Avail:
RoHS CompliantSEI RMCF 1/16 0 5% R Avail:
RSMT0022 RES SMT, 100-OHM 1/10W 5% 0603 Y PARTR16, R26, R42, R43, R45
35 5
RoHS CompliantSEI RMCF1/161005%R Avail:
RoHS CompliantNIC NRC06J101TRF Avail:
RoHS CompliantROHM MCR03FZHJ1000 Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ101V DIGIKEY P100GTR-ND Avail:
RSMT0026 RES SMT, 100K-OHM 1/10W 5% 0603 Y PARTR37
36 1
RoHS CompliantPANASONIC ERJ-3GSYJ104V DIGIKEY P100KGTR-ND Avail:
RoHS CompliantKOA RK73B1JTTD104J Avail:
RoHS CompliantSEI RMCF 1/16 100K 5% R Avail:
RoHS CompliantROHM MCR03EZPJ104 DIGIKEY RHM100KGTR-ND Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ104V DIGIKEY P100KGTR-ND Avail:
Page 9 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0034 RES SMT, 10K-OHM 1/10W 5% 0603 Y PARTR1, R6, R8, R9, R10, R12, R13, R15, R21, R27, R28, R32, R35, R38, R39, R47, R56, R57
37 18
RoHS CompliantROHM MCR03FZHJ1002 Avail:
RoHS CompliantPANASONIC ERJ-3GSYJ103V DIGIKEY P10KGTR-ND Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ103V DIGIKEY P10KGTR-ND Avail:
RoHS CompliantNIC COMPONEN NRC06J103TRF Avail:
RoHS CompliantSEI RMCF 1/16 10K 5% R Avail:
RoHS CompliantYAGEO RC0603JR-0710KL DIGIKEY 311-10KGRTR-ND Avail:
RSMT0052 RES SMT, 2.2K-OHM 1/10W 5% 0603 Y PARTR22, R25, R33, R34, R55
38 5
RoHS CompliantPANASONIC ERJ-3GSYJ222V DIGIKEY P2.2KGTR-ND Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ222V DIGIKEY P2.2KGTR-ND Avail:
RoHS CompliantNIC NRO6J222TRF Avail:
RoHS CompliantSEI RMCF1/162.2K5%R Avail:
RSMT0058 RES SMT, 2.7K-OHM 1/10W 5% 0603 Y PARTR14, R17
39 2
RoHS CompliantPANASONIC ERJ-3GEYJ272V DIGIKEY P2.7KGTR-ND Avail:
RoHS CompliantPANASONIC ERJ-3GSYJ272V DIGIKEY P2.7KGTR-ND Avail:
RoHS CompliantROHM MCR03EZHJ2.7K Avail:
RSMT0092 RES SMT, 4.7K-OHM 1/10W 5% 0603 Y PARTR36, R49, R50
40 3
RoHS CompliantSEI RMCF 1/16 4.7K 5% R Avail:
RoHS CompliantKOA RK73B1JTTD472J Avail:
RoHS CompliantYAGEO/PHYCO 9C06031A4701JLHFT DIGIKEY 311-4.7KGTR-ND Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ472V DIGIKEY P4.7KGTR-ND Avail:
RoHS CompliantROHM MCR03EZHJ4.7K Avail:
RoHS CompliantYAGEO/PHYCO 9C06031A4701JLPFT Avail:
Page 10 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0138 RES SMT, 1.0K-OHM 1/10W 1% 0603 Y PARTR7, R18, R23, R54, R58
41 5
RoHS CompliantVISHAY DALE CRCW06031K00FKEA NEWARK 52K8015 Avail:
RoHS CompliantPANASONIC ERJ-3EKF1001V DIGIKEY P1.00KHTR-ND Avail:
RoHS CompliantROHM MCR03EZPFX1001 DIGIKEY RHM1.00KHCT-ND Avail:
RSMT0166 RES SMT, 330-OHM 1/10W 5% 0603 Y PARTR2, R5, R24, R29, R30, R31, R44, R46, R51, R52
42 10
RoHS CompliantKOA RK73B1JTTD331J Avail:
RoHS CompliantSEI RMCF 1/16 330 5% R Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ331V DIGIKEY P330GTR-ND Avail:
RSMT0189 RES SMT, 33-OHM 1/10W 5% 0603 PARTR48
43 1
RoHS CompliantPANASONIC ERJ-3GEYJ330V DIGIKEY P33GTR-ND Avail:
RoHS CompliantYAGEO/PHYCO RC0603JR-0733RL Avail:
RoHS CompliantYAGEO/PHYCO 9C06031A33R0JLHFT DIGIKEY 311-33GTR-ND Avail:
RoHS CompliantYAGEO/PHYCO 9C06031A33R0JLPFT Avail:
RoHS CompliantKOA RK73B1JTTD330J Avail:
RoHS CompliantSEI RMCF 1/16 33 5%TR Avail:
RSMT0209 RES SMT, 200K-OHM 1/16W 5% 0603 Y PARTR3, R4, R19
44 3
RoHS CompliantPANASONIC ERJ-3GEYJ204V DIGIKEY P200KGTR-ND Avail:
RSMT0382 RES SMT, 2.00K-OHM 1/16W 1% 0603 Y PARTR40, R41
45 2
RoHS CompliantPANASONIC ERJ-3EKF2001V DIGIKEY P2.00KHTR-ND Avail:
RSMT0561 RES SMT, 3.9K OHM 1/10W 5% 0603 Y PARTR20
46 1
RoHS CompliantKOA SPEER RK73B1JTTD392J MOUSER 660-RK73B1JTTD3 Avail:
Page 11 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0098 RES SMT, 470-OHM 1/10W 5% 0603 PARTR53
47 1
RoHS CompliantPANASONIC ERJ-3GEYJ471V DIGIKEY P470GTR-ND Avail:
RoHS CompliantSEI RMCF1/164705%R Avail:
RoHS CompliantNIC NRC06J471TRF Avail:
SWITCH0059 SWITCH, PUSH BUTTON MOM 6mm LIGHT TOUCH, BLACK 7mm 260gF Y PARTS1
48 1
RoHS CompliantPANASONIC EVQ-22707K DIGIKEY P12230SCT-ND Avail:
RoHS CompliantPANASONIC EVQ-11U07K DIGIKEY P8084STB-ND Avail:
TRA0010 TRANS SMT, NPN, 2N2222A, SOT-23 Y PARTQ3
49 1
RoHS CompliantON SEMI MMBT2222ALT1G Avail:
RoHS CompliantFAIRCHILD SEMI MMBT2222A_NL Avail:
RoHS CompliantZETEK UFMMT2222A Avail:
RoHS CompliantZETEK FMMT2222ATA DIGIKEY FMMT2222ATR-ND Avail:
RoHS CompliantFAIRCHILD SEMI MMBT2222A DIGIKEY MMBT2222AFSTR- Avail:
RoHS CompliantON SEMI MMBT2222ALT1 DIGIKEY MMBT2222ALT1OS Avail:
RoHS CompliantDIODES INC MMBT2222A-7-F DIGIKEY MMBT2222A-FDITR Avail:
TRA0035 TRANS SMT, NPN, 2N3904, SOT-23 Y PARTQ2, Q5, Q7
50 3
RoHS CompliantON SEMI MMBT3904 Avail:
RoHS CompliantON SEMI MMBT3904LT1G Avail:
RoHS CompliantFAIRCHILD SEMI MMBT3904_NL Avail:
RoHS CompliantFAIRCHILD SEMI MMBT3904 DIGIKEY MMBT3904FSTR-N Avail:
TRA0048 TRANS SMT, HEX/MOS P-CH -20V -3.7A SOT-23 PARTQ1
51 1
RoHS CompliantINTERNATIONAL IRLML6402TR DIGIKEY IRLML6402TR-ND Avail:
RoHS CompliantINTERNATIONAL IRLML6402TRPBF DIGIKEY IRLML6402PBFTR- Avail:
TRA0049 TRANS SMT, MOSFET N/P-CH 20V, SSOT-6 PARTU6
52 1
RoHS CompliantFAIRCHILD SEMI FDC6420C MOUSER 512-FDC6420C Avail:
Page 12 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-02038PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER
REV: C
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
TRA0066 TRANS, SMT PNP 20V 4A MED PWR SOT-23 PARTQ4
53 1
RoHS CompliantZETEX ZXTP25020CFH DIGIKEY ZXTP25020CFHTR- Avail:
TRA0068 TRANS SMT, PNP, 2N3906, SOT-23 PARTQ6
54 1
RoHS CompliantFAIRCHILD SEMI MMBT3906 DIGIKEY MMBT3906FSTR-N Avail:
RoHS CompliantON SEMI MMBT3906LT1G DIGIKEY MMBT3906LT1GOS Avail:
-JUMPER- -JUMPER- PART(24 AWG BARE WIRE SOLID) @ R11
55 1
RoHS CompliantWIRE-BW-22-1/2 Avail:
-SPARE- -SPARE- LOCATION DO NOT INSTALL PARTDB0, DB1, J2, R61, R62, SCK, SDI, SDO, TB, TP1-TP6, TP9-TP10, TP12-TP15, VBUS
56 22
Page 13 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-01924-03PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20)
REV: 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
02-01924-D PCB ASSY DWG, PICkit 2 44-PIN DEMO BOARD2.2 D1 1
03-01924 SCHEMATIC, PICkit 2 44-PIN DEMO BOARD2.1 D2 1
04-01924 PCB FABRICATION, PICkit 2 44-PIN DEMO BOARD2.2 D3 1
08-00126 LABEL, NEED HELP WITH ASSY/SERIAL6 LBLbottom side of board
4 1
MIC0587 IC SMT, PIC18F45K20 44 TQFP (REV A4 OR LATER) Y PARTU1
6 1
RoHS CompliantMICROCHIP PIC18F45K20-I/PT LEAB17T4XB04 Avail:
CAP0013 CAP SMT, 0.1uF 0805 CER 50V 10% X7R PARTC1, C2, C3
7 3
RoHS CompliantTAIYO UMK212BJ104KG-T DIGIKEY 587-1279-2-ND Avail:
RoHS CompliantKEMET C0805C104K5RACTU DIGIKEY 399-1170-1-ND Avail:
RoHS CompliantCAL-CHIP GMC21X7R104K50NTLF Avail:
RoHS CompliantKEMET C0805C104M5RAC Avail:
RoHS CompliantNIC COMPONEN NMC0805X7R104K50TRPF Avail:
RoHS CompliantKEMET C0805C104M5RACTU DIGIKEY 399-1169-1-ND Avail:
RoHS CompliantXICON CC501B104K MOUSER Avail:
RoHS CompliantPANASONIC ECJ-2YB1H104K DIGIKEY PCC1840TR-ND Avail:
RoHS CompliantKEMET C0805C104M5RAC Avail:
RoHS CompliantYAGEO 08052R104K9B20D DIGIKEY 311-1140-2-ND Avail:
RSMT0444 RES SMT, 750-OHM 1/8W 5% 0805 PARTR5-R12
8 8
RoHS CompliantYAGEO RC0805JR-07750RL DIGIKEY 311-750ARTR-ND Avail:
RoHS CompliantVISHAY/DALE CRCW0805750RJNEA DIGIKEY 541-750ATR-ND Avail:
RoHS CompliantPANASONIC ERJ-6GEYJ751V DIGIKEY P750ATR-ND Avail:
RoHS CompliantROHM MCR10EZPJ751 DIGIKEY RHM750ARTR-ND Avail:
Page 14 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-01924-03PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20)
REV: 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0008 RES SMT, 1.0K-OHM 1/8W 5% 0805 PARTR1, R3
9 2
RoHS CompliantYAGEO/PHYCO 9C08052A1001JLHFT DIGIKEY 311-1.0KACT-ND Avail:
RoHS CompliantKOA RK73B2ATTD102J Avail:
RoHS CompliantSEI RMCF 1/10 1k 5% TR NOWAvail:
RoHS CompliantPANASONIC ERJ-6GEYJ102V DIGIKEY P1.0KATR-ND Avail:
RoHS CompliantYAGEO/PHYCO 9C08052A1001JLPFT Avail:
RSMT0027 RES SMT, 10K-OHM 1/8W 5% 0805 PARTR2
10 1
RoHS CompliantROHM MCR10EZHJW10K Avail:
RoHS CompliantYAGEO/PHYCO 9C08052A1002JLHFT DIGIKEY 311-10KATR-ND Avail:
RoHS CompliantPANASONIC ERJ-6GEYJ103V DIGIKEY P10KACT-ND Avail:
RoHS CompliantSEI RMCF 1/10 10k 5% TR NOWAvail:
RoHS CompliantKOA RK73B2ATTD103J Avail:
RoHS CompliantYAGEO/PHYCO RC0805JR-0710KL DIGIKEY 311-10KARTR-ND Avail:
RoHS CompliantYAGEO/PHYCO 9C08052A1002JLPFT Avail:
RPOT0019 RES POT, 10K-OHM THUMBWH CERM ST PARTRP1
11 1
RoHS CompliantBOURNS 3352E-1-103LF Avail:
RoHS CompliantBOURNS 3352E-1-103 DIGIKEY 3352E-103-ND Avail:
LED0033 LED SMT, 0805 RED CLEAR 2x1.25mm PARTDS1-DS8
12 8
RoHS CompliantLITE-ON LTST-C170CKT DIGIKEY 160-1176-1-ND Avail:
RoHS CompliantLITE-ON LTST-C170EKT DIGIKEY 160-1178-2-ND Avail:
RoHS CompliantCHICAGO MINAT 7012X1 DIGIKEY L61101TR-ND Avail:
Page 15 of 16* In Rev Field: Part Rev is controlled in the Specification Index
02-01924-03PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20)
REV: 1
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
SWITCH0003 SWITCH SMT, PUSH BUTTON SPST MOM 6MM 160GF/230GF PARTSW1
13 1
RoHS CompliantOMRON B3S-1002 DIGIKEY SW416-ND Avail:
RoHS CompliantE-SWITCH TL3301NF260QG/TR DIGIKEY EG1868CT-ND Avail:
RoHS CompliantE-SWITCH TL3301NF260QG DIGIKEY EG1868TR-ND Avail:
RoHS CompliantE-SWITCH TL3301NF160QG/TR DIGIKEY EG1867CT-ND Avail:
RoHS CompliantOMRON B3S-1000 DIGIKEY SW415-ND Avail:
CON0107 CONN, HDR, 1x6 BREAKAWAY, 0.100" PITCH, 0.025 SQ, RA, (0.230/0.090) PARTP1
14 1
RoHS CompliantAMP/TYCO 9-103325-0-06 DIGIKEY A32702-06-ND Avail:
RoHS CompliantMILL-MAX 800-40-006-20-001000 Avail:
RoHS CompliantMILL-MAX 800-10-006-20-001000 Avail:
RoHS CompliantTYCO/AMP 103765-6 Avail:
RoHS CompliantSAMTEC HTSW-106-08-G-S-RA Avail:
RoHS CompliantJAMECO 677548 Avail:
CON0149 CONN, HDR, 1x2 BREAKAWAY, 0.100" PITCH, 0.025 SQ POST (0.100"/0.230") PARTJP1
15 1
RoHS CompliantSAMTEC TSW-102-07-S-S Avail:
RoHS CompliantSAMTEC TSW-102-07-G-S Avail:
CON0084 CONN, SHUNT, 2-PIN SHORTING SHUNT (.100" SPACING) PART@JP1
16 1
RoHS CompliantSAMTEC SNT-100-BK-G Avail:
RoHS CompliantHARWIN M7567-05 FARNELL 150410 Avail:
RoHS CompliantTYCO/AMP 382811-6 DIGIKEY A26227-ND Avail:
RoHS CompliantSULLINS SSC02SYAN DIGIKEY S9002-ND Avail:
MISC0041 MISC, RUBBER FEET, 0.40 SQ x 0.1 THK BLACK PARTplace on bottom side of board
17 4
RoHS Compliant3M SJ-5007 DIGIKEY SJ5007-0-ND Avail:
-SPARE- -SPARE- LOCATION DO NOT INSTALL PARTAUX, C4-C7, Cext, P2, Rext, Rf, X1, X2
18 11
Page 16 of 16* In Rev Field: Part Rev is controlled in the Specification Index
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Pack ListASSEMBLY NUMBER: 14-00842ASSEMBLY NAME: PRODUCT TREE, PICKIT 3 DEBUG EXPRESS
REV: 2 Product No: DV164131
12-00842 FINAL ASSY, PICKIT 3 DEBUG EXPRESSPart Number DescriptionQty
Rev: 1
DS51792 DOC, USING PICKIT 3 POSTER1DS51123 SOFTWARE, MPLAB CDROM1DS30210 DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION1DS30030 DOC, WARRANTY/REGISTRATION CARD1CAB0019 CABLE, USB, A TO MINI-B, 1.8m/6ft102-01924-03 PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20)110-00424 ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER1
Page 1 of 1
wM
Label Definition Need Help Label with Serial Number 08-00126 Rev 6
Label Information Label Size: 0.5” x 2.0”
Text Size Need Help? (8pt, Bold)Assembly Number, Serial Number, Revision: (7pt)
GraphicsMicrochip Logo provided as a true type font. (~24pt)
Label Data Need Help? (10pt, Bold, Centered) http://support.microchip.com (7.5pt, centered) Assy# (7-9pt, Left) Serial# (7-9pt, Right)
Part Number Part Number of the assembly that calls out the label
RevisionR1 - Revision of the assembly that calls out the label
Serial Number: JIT- Manufacturer ID 95 - Year (95....) 28 - Work week product shipped (01-52) 1 – Lot number (0-9) 0001 - Sequence Piece Number (0001 - 9999) Starts over with each new lot number.
LocationThe 08-00126 label is to be located on the assembly that calls out the label.
��Need Help?
http://support.microchip.com
Assy# 10-00157-R2 Serial # JIT971217076
Finished Goods Product Label with Barcode 08-00237 Rev 3
MPLAB ICD 2 IN-CIRCUIT DEBUGGER �������� � (1P) DV164005 US � ����������(1T) JIT070120001
Label not to scale Label Information Text (Not Formatted Bold) Label Size: Customize to fit packaging Font: Arial (or other Sans Serif font) Min Label Dimensions: 1” x 3” (ex. Brady: THT-18-423-3) Size: Customize font size to fit label Max Label Dimensions: 1-5/6” x 3-1/6” (ex. Avery: 5199) Min Font Size: 8 pt (Label identifier min 6pt) Color: White Max Font Size: 12 pt Label should, for the most part, contain information in the following order: Product Description: MPLAB ICD 2 IN-CIRCUIT DEBUGGER Part Number Identifier: (1P) – Precedes Part Number. Not included in bar code. Smaller font than Part Number. Part Number: DV164005 Country Code: US Date Code Identifier: (1T) – Precedes Serial Number. Not included in bar code. Smaller font than Serial
Number. Serial Number: JIT070190001 – For non-serialized/bulk product such as cables and accessories, this
field is intentionally left blank. Product Description and Part Number are listed in the Bill of Materials (BOM) provided by Product Engineering. Graphics Country Code: CE Logo (if necessary) US United States
Filename: CE-Logo.jpg CN China China ‘e’ label TH Thailand
Filename: RoHS-China.jpg Serial Number: JIT – Manufacturer ID (designated by Microchip Development Systems) 0701 – Date Code: Last two digits of year and two digits of work week (01-52) (underlined) 2 – Lot number. This digit indicates the lot # (0-9). 0001 – Sequence Piece Number (0001 - 9999) Starts over with each new lot number. Barcode Information: Barcode is Code 39 format (3 of 9) Barcode Height: size to fit label (provided it is still scannable) Min Ratio is 1:1 Max Ratio is 2.5:1 Font: Arial (or other Sans Serif font) Location: This label is attached to the outside of the product case. Vendor to insure that the serial number corresponds to the serial number assigned to the main electro-mechanical assembly contained in this product case.