engineering consultancy services in malaysia · g&p professionals sdn bhd () engineering...
TRANSCRIPT
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
ENGINEERING CONSULTANCY ENGINEERING CONSULTANCY SERVICES IN MALAYSIA SERVICES IN MALAYSIA ––
CHALLENGES & STRATEGIESCHALLENGES & STRATEGIESBy : Ir. Dr. Gue See Sew
Date: 6 July 2011
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CONTENTS
A. CHALLENGES• Engineering Consultancy Firms
� Stagnant / Decline in size• Brain Drain / Talent Lost• Quality of Graduates• Lack of Support Staff
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CONTENTS
B. STRATEGIES• Grooming of Engineering Consultancy Firms• Talentcorp Malaysia• Overhaul of Higher Education• Harmonisation of Human Resource and
Education
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
The StoryThe Story
• One of the main issues is SUSTAINABILITY frequently affected by retirement or decease of Directors
• Capacity of large Engineering Consultancy Firms (ECF) in Malaysia has been stagnant for the last 25 years
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Large ACEM Panel FirmsLarge ACEM Panel FirmsNo. Name of Firm Total No. of Staff
1990 2000 2010
1 Sepakat Setia Perunding (M) Sdn Bhd 400 373 503
2 Minconsult Sdn Bhd 509 473 450
3 Ranhill Bersekutu Sdn Bhd 290 450 450
4 HSS Integrated Sdn Bhd - 330 370
5 SMHB Sdn Bhd - 304 300
6 G&P Professionals Sdn Bhd - 20 220
7 Kumarasivan Tan & Ariffin Sdn Bhd 193 341 205
8 Jurutera Konsultant (SEA) Sdn Bhd 262 - -
NOTE: Some disappeared from ACEM Directory
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Top Engineering Consultancy Firm in Netherlands
Population of Netherlands: 16.7 Million
Arcadis: 16,000 staff
World Rank: Top 10
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Reasons1. Mismatch
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Reasons2. Brain Drain
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Reasons3. Cyclical Market
19861998
2008
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Lessonslearned
ExperienceKnowledge
Don’t you want to retain these ?
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Engineeringdesigns
………………………….
Methods of constructions
…….………………..
Checklists……………….………………..
Do’s & Don’ts……………….………………..
Planning………………………..
Architecturedesigns
………………………….
Qualitycontrol
………………………….
and many more………..
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Challenging Issues On The Quality Of Graduates
• Attitude
• Command of English
• Adequacy of Fundamentals
• Creativity/Innovations
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
“…it is disappointedabout the quality of Malaysian engineers.”
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Challenging Issues On The Quality Of Graduates
• Poor command of English andcommunication skills
REASONS:• Old Policies on Education• Teachers & Lecturers• Usage
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Challenging Issues On The Quality Of Graduates
• Lack fundamental knowledge
REASONS:• Too much political influence• Compromise on recruitment
– Lecturers lack passion– Support staff
• Lenient in setting exams and giving grades• Accept students below par
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Challenging Issues On Technical Support Staff
• Technologists/TAs
• Technicians
• Draftpersons
SERIOUS SHORTAGE!
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
STRATEGIES
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Do you want to Do you want to groomgroom MalaysianMalaysianEngineering Consultancy Firms to Engineering Consultancy Firms to
deliverdeliver QualityQuality Service and to Service and to doubledoubletheirtheir capacitycapacity or size in 3or size in 3--5 years 5 years
without extra budget to the without extra budget to the Government?Government?
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Potential Growth of ECFPotential Growth of ECF
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
How to do it?How to do it?• Government or government-linked
companies to align the projects to SUSTAINABLE firms with capability and capacity
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Construction Sector OutlookConstruction Sector Outlook• CIDB expects RM70b of construction &
infrastructure projects to be implemented in 2011 with 3.7% annual growth until 2015
Source:YB Dato’ Shaziman Abu Mansor, Minister of Works
Malaysia, The Construction Sector at the Onset of the 10th Malaysia Plan, The 7th MalaysiaConstruction Sector Review and Outlook Seminar, 3 Aug 2010
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
What defines a SUSTAINABLE firm?What defines a SUSTAINABLE firm?
1. Ownership structure that encourage sharing or grooming of engineers to be partners
2. Proper QA/QC system e.g. ISO9001
3. Comprehensive Training and Knowledge Management system
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
What about those smaller What about those smaller companies?companies?
• Solution – to merge
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
G&P PROFESSIONALS (Consulting Group)
WATER(SINGAPORE)
G&P-AA(Hanoi, Vietnam)
STRUCTURES INFRAPROJECTMANAGEMENT
CLAIMS & CONTRACTSMARITIME
SARAWAK
HIGHWAYS & TRANSPORTATION
GEOTECHNICS
G&P R INT. (CAMBODIA)
R&D
MECHANICAL& ELECTRICAL WATER
DAMS & WATER
NGI - G&PZED - G&P
SABAH
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Macro Implementation PlanMacro Implementation Plan
1. Enlist of service providers
2. Grooming3. Export of Services
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Enlisting of ECF with capacity pointsEnlisting of ECF with capacity points
Company Level• SUSTAINABILITY elements
Individual Level• Capacity and capability of professional staffs
in different fields of engineering such as Highway & Transportation, Geotechnical, Drainage, etc.
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Company Level PointsCompany Level Points
3 main SUSTAINABILITY elements are:
• Ownership (60 points)• QA/QC System (15 points)• Training & Knowledge Management (25
points)
Recommended minimum of 60 points
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Ownership StructureOwnership StructurePercentage of Profit Share by
total professional staffPoints
<10% 010% to <15% 1015% to <20% 2020% to <25% 3025% to <30% 4030% to <35% 50
>35% 60Note : Staff strength must be > 20 people.
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
QA/QC SystemQA/QC System
Description Points
ECF without ISO9001:2000 Certification
up to 10
ECF that maintain certification of ISO9001:2000
15
Note : For companies without ISO9001, the points are to be based on the quality of the existing system.
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
TrainingTraining ProgrammeProgrammeNumber of Technical Training Events
Per YearPoints
<12 012 to 24 1025 to 36 1537 to 48 20
>49 25Note: Technical Training includes in-house or external engineering talks, presentation, colloquium, conference, seminar on engineering aspects of works (including KM)
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Individual Level PointsIndividual Level Points
3 main components are:
• Experience of Professional Staff• Professional Qualification• Additional Professional Recognition
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Experience of Professional StaffExperience of Professional Staff
Points (N) 1 point for every full year of relevant work experience up to a maximum of
15 points
Note: The total professional staff shall include all engineering graduates as well as graduates in related specialist skills area such as geologist and hydrologist.
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Professional QualificationProfessional QualificationBasic Professional
RecognitionMultiplying Factor
(M)Engineer without P. Eng. and
other professional staff1.0
Engineer with P. Eng (with “Ir.”)
2.0
Note: Professional staff who are non-engineers but hold a degree in the relevant fields such as geologist, hydrologist, environmental scientist may be considered.
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Additional Professional RecognitionAdditional Professional RecognitionAdditional Professional Recognition &
Bumiputra ParticipationValue Added (V)
to Multiplying Factor
BEM Accredited Checkers 0.2Professionally registered with regional or international engineering organisations
0.1 each up to a maximum of 0.2
Peer Recognition eg presentation, lecture or technical papers�If nos. >5 but 10�If nos. >10 but 15�If nos. >15
0.10.20.3
Bumiputra staff 0.1
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Grooming of Sustainable ECFGrooming of Sustainable ECF
• This is < 3.5% of yearly allocation based on 3% fees on $40b of projects
To groom a firm with 500 to 1,000 staff
• Cost for extra 500 persons per year= 500 x 6,000 x 12 x1.1 = RM40m
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
MatchingMatching• Capability
– Experience– Field of specialisation
• Capacity– Number of key staff required
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
How Sustainability Points System How Sustainability Points System Work?Work?
• Company size to have at least 1.5x numberof staff required
Total Sustainability Points = Company Points x � Individual Points
100
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Example of ProjectExample of ProjectProject
ProponentJabatan Kerja Raya, Cawangan Jalan
Project Brief Construct a 10-km two-lane dual carriageway through hilly terrain
Project Stage Detailed Design
Estimated Man-power Required from Designer
1 no. Project Director with minimum 10 years of experience in Road Construction
Team of Designers (each consists of 1 Senior Engineer with at least 5 years experience and 2 Engineers ):
�2 teams of Road Works and Drainage Designer (6 nos.)
�2 teams of Geotechnical Designer (6 nos.)
�1 team of Bridge Designer (3 nos.)
Hence total number of professional staff required is = 16 nos.
Company to have at least 24
staff for capacity
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Companies bidding for projectCompanies bidding for projectCompany A• large multi-disciplinary design consultant with 100 professional staff• Profit shared by 15% to <20% of total professional staff strength• ISO 9001 certified• Company arranged more than 49 events of technical training a year
Company B• medium-sized specialist firm dealing with road works with 30 professional
staff• Profit shared by 25% to <30% of total professional staff strength• ISO 9001 certified• Company arranged 25 to 36 events of technical training a year
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Companies bidding for projectCompanies bidding for projectCompany C• large multi-disciplinary design consultant with 100 professional staff• Profit shared by <10% of total professional staff strength• ISO 9001 certified• Company arranged more than 49 events of technical training a year
Company D • small to medium-sized specialist firm dealing with road works with
20 professional staff• Profit shared by 30% to <35% of total professional staff strength• ISO 9001 certified• Company arranged 12 to 24 events of technical training a year
Company not qualified as its capacity is < 24 staff
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Company Level AssessmentCompany Level AssessmentCriteria Company Points Allocated
Company A Company B Company C
SustainableOwnershipProgramme
20 40 0
QA/QC System 15 15 15Training and Knowledge
Management
25 15 25
Total 60 70 40
Company to have at least 60 Company
Level Points
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Individual Level AssessmentIndividual Level Assessment
Staff Detail Individual Points AllocatedYears of
ExperienceMultiplyingFactor, M
Value added to Multiplying Factor, V M+V Sub-totalAccredited
CheckerRecog-nition
Papers Bumiputra
ProjectDirector
15 2 - 0.1 0.1 0.1 2.3 34.5
Road Works 1
SeniorEngineer
Engineer
13
6
1
2
2
1
-
-
-
0.2
-
-
0.2
0.1
-
0.1
-
-
2.5
2.1
1.0
32.5
12.6
1.0
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Total Sustainability PointsTotal Sustainability PointsCriteria Company Points Allocated
Company A Company B
Company Level Points 60 70
Individual Level Points 271.5 254
Final Sustainability Points 60 x 271.5 = 162.9100
70 x 254 = 177.8100
Company B will be awarded the
contract
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Key BenefitsKey Benefits
• Building up expertise, capabilities and quality of local Engineering Consultancy Firms
• Improve earning potential through increased capacity, productivity and export of services
• Better positioned to navigate through regional economic cycles
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
• It is possible to groom Malaysian ECF to deliver quality service and to double their capacity in 3-5 years
• This can be done without extra budget to the Government by aligning <3.5% of yearly allocation
• Grooming of SUSTAINABLE firms can bring great benefits to the country
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Brain Drain vs. Brain Gain
• Pluge Brain Drain
• Brain Gain : Talentcorp Malaysia
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Success Attributes On Brain Gain
• Improve Working Environment– Chief/Leadership
• Remuneration Package– Part 1 – Basic – Similar to IEM’s Survey– Park 2 – 45% Net Profit e.g. G&P
• Reward the Chief and Team
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))G&P Professionals Sdn Bhd
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))G&P Professionals Sdn Bhd
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
PART 2
e.g. In G&P Geotechnics Sdn Bhd
• 45% of net profit for directors/partners
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
StrategiesImprove English and communication skills
• Teachers – recruit good retired teachers (template)
• Lecturers– Improve recruitment strategies– Structured training to existing lecturers– Improved usage
• Drama, debating clubs, toastmaster club– Raise the entry bar
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
StrategiesImprove Fundamentals
• Recruit lecturers with passion– Template– Recruit practitioners as lecturers
• Raise entry qualifications– Increase Diploma/certificate courses
• Review LAN subjects• Develop lecture modules
– IEM input
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
UNDERGRADUATE UNDERGRADUATE TRAININGTRAINING
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
UNDERGRADUATE TRAININGUNDERGRADUATE TRAINING
Review and update the undergraduatesyllabus to meet industry needs
Assisted by active & experienced practitionersPooling resources from universities & practitioners
Knowledge sharing between lecturers and practitioners through workshops and forums
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
UNDERGRADUATE EDUCATIONUNDERGRADUATE EDUCATION
StructuredModules/Lectures(Uni/IEM/ACEM)
Lecturers
P.Eng With Practice Exposure
Improvement toImprovement toUndergraduateUndergraduate
EducationEducation
StrengthenFundamentals
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Strategies
Creative / Innovation
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CURRENT STATUS OF R&D• Malaysia lagging far behind countries
such as US, Japan, China, India, Singapore and Brazil.
3.6 times>M’sia(After MASTIC, 2006)
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CURRENT STATUS OF R&D
• GERD/GDP Ratio
1996
0.22%
2004
0.63%
2010
???0.7%
More needs to be DONE!!!
Behind the country’s target of 1.5% by 2010
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
BENEFITS OF R&D
• Reduction in delivery time & construction costs � IncreasedProfit
• Increased competitiveness without compromising HSE
• Improve safety • Better quality of life
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))Courtesy of Judin Abdul Karim (2006)
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
• American Inventor
American Inventor
OCCUPIED
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Challenge The Norm Thru Innovation To Excel
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
THE WAY FORWARD
Roles of Stakeholders
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
R&D RELEVANT TO INDUSTRY NEEDS
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Current Issues• No significant licensing revenues for the
universities (after Hii HH, 2003)
• No R&D output from universities has been commercialized yet on a national scale (after Hii HH, 2003)
Example of Successful R&D:�University of Strathclyde, UK - £42 million in
royalty income (www.strath.ac.uk/research)
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
PUBLIC-PRIVATE SECTOR LINKAGES
• Private companies should form strategic alliances with research institutions
• Research institutions should actively seek partners from the industry
• Strong relationship between universities and industry – alumni, adjunct professors from industry
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CULTURE OF EXCELLENCE• System for sharing of information
• Environment which encourages creativity and innovation
• Allocation of time for R&D
• R&D incentives and reward scheme
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
R&D BY CONSULTANT
Case History
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
R&D CULTURE• R&D Wish List / Suggestion Box
• Policy of minimum 1 hour/day for R&D
• Internal colloquium
• Yearly R&D Achievement Award
• R&D Committee to monitor wish list and output
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
R&D Wish ListResearch & Development (R&D)Subsurface Investigation
Wish-lists / Issues R&D Topics
1.Could percussion method of advancing casing be used for normal SI for SPT test and collect undisturbed samples for consolidation and triaxial tests?
1.The effect of percussion method of advancing boreholes the results of SI?
1.Is foam drilling a must for failure investigation on landslide sites?
2. The effects of foam or new stabilising method for drilling.
1.What is the correlation between Su and results of JabatanKerja Raya (JKR) probe for marine deposits of different composition?
3. Correlation between Su and results of Jabatan Kerja Raya (JKR) probe for marine deposits of different composition.
1.Do we have DOs and DON’Ts on subsurface investigation (SI) - Borehole- Piezocone- Consolidation test- CIU test
4. DOs and DON’Ts and Checklists on SI- Borehole- Piezocone- Consolidation test- CIU test
1.What are the new developments on SI? 5. Review on the development of SI.
1.Does Malaysia have calcareous sand? 6. Properties of calcareous sand in Malaysia.
1.How to de-air porous stone for piezocone and maintain the saturation of porous stone for piezocone?
1.Method to ensure full saturation of porous stone for piezocone.
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
2500 Ton Siloon Very Soft Marine Deposits
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
OUTCOME• Development of Software
• Original PIGLET software– Limited pile numbers and pile of
equal length
• Development of PIGEON software– Unlimited pile numbers and pile of
unequal length
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
KNOWLEDGE MANAGEMENT SYSTEM
• Transfer of knowledge
Directors
Partners
Engineers
Geologists
Support Staff
On the job training
Coaching
R&D
Sharing of knowledge through colloquium
Spreadsheet,software, operating procedures, etc.
Structured Training
Leadership / Commitment
Shareholders
Value to Shareholders
Industry
Value to Industry
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
STRUCTUREDSTRUCTUREDTRAINING FOR TRAINING FOR
PRACTITIONERSPRACTITIONERS
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
STRUCTURED TRAINING FOR STRUCTURED TRAINING FOR PRACTITIONERSPRACTITIONERS
Adopt Continuing Professional Development(CPD) Scheme (by BEM)
Collaborate with IEM, technical agencies, academia, local governments, private industry, NGOs, etc
Implement certification and accreditationsystem to update competency of stakeholders
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
STRUCTURED TRAINING FOR STRUCTURED TRAINING FOR PRACTITIONERSPRACTITIONERS
Approval of Training
Projects by Steering
Committee
TargetStakeholders
Implementation (Internal & External)
Certification & Accreditation
Knowledge Transfer
Training Topic
Available Expertise
Available Facilities
Budget
PanelReviewer
CKC/SEA
Government Agencies
Universities / Institutions
Consultants/ Specialist Contractors
Workshops
Conferences
Seminars
KPIs
Interviews
Drills
To Local Authority
ToGovernment Agencies
To Consultants / Specialist Contractor
To Universities / Institutions
To Property Owner
PolicyImplementation
PolicyImplementation
ImprovePractice
Capacity Building
PublicAwareness
Review Training Direction
InsuranceInstitution
To Insurance Institution
ImproveConfidence
PropertyOwner
Emergency Service Agency
LocalAuthority
To Emergency Service Agency
ImproveRescue Operation
Exam
Courses
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
MAJOR OVERHAUL IS NEEDED ON HIGHER EDUCATION
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Harmonisation Of HR/Education
• HR Need– Study of need of Technologists, TAs and
Technicians– Direct 30% STPM/SPM students to Diploma and
Certificate Courses
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))