engineering fabricator€¦ · hp flare ko drum (v-6210) 1 13,500 id: 2,300mm tl-tl: 7,200mm 13+3mm...
TRANSCRIPT
-
Engineering Fabricator
-
OVERVIEW
-
Petronas License
-
PRODUCT & SERVICES
-
SCOPE OF SERVICES
• Mechanical Static / Process Equipment
• Pressure Vessels, Heat Exchangers, Tanks
• Skids & Modules
• Engineering,Fabrication, erection, installation & integration
• Pipe Racks Modules
• Plant Fabrication and Erection
• Steel Structures Building, Warehouse
• Site mechanical erection and installation works
• Mechanical Fabrication
• Out fittings for Oil Rigs
• Water Intake Screens/ Stoplog/ Stop Gate
• Offshore Marine Post, Transit Tower, Helideck Structure, Platforms & Ladders, Handrails
• Galvanized Steel Grating (Serrated & non-Serrated)
• Manpower Supply – Technical and Skilled Workers
-
7
Condensate Recovery Unit13.5mL x 5mW x 8mH
Weight : 75MT
Process Skids
Condensate Recovery Unit6.2mL x 7.7mW x12.2mH
Weight: 103 MT
Fuel Gas Treatment UnitWeight: 30MT
-
FR
Add a footer 8
Pressure Vessels
8
ASME U U2 Stamp & PED Vessels, Separators,
Scrubbers, Drums, Reactors, Columns, Towers, Hoppers
Carbon Steel, Stainless Steel, Duplex, High & low Alloy,
Clad Material
-
License and Testimonial
Fabricators of Beaudrey’s products • Screens• Stopgates-Stoplogs• Penstocks• Trash Rakes• Debris Filters• Condenser Tube Cleaning
-
FR
Greasing Unit Fluid Handling Unit
10
Clarifier Mud Handling Seawater filtration
-
FR
Offshore Piling Structure
Marine Structure
Offshore Platforms
SS & CS Gratings
-
WORKSHOP 1 at PASIR GUDANG, JOHOR
10,117m2 (2.5 acres) Fabrication Workshop at Pasir Gudang, Johor3 Fabrication Bays covered area 3,240m2 (54m x 60m) with dedicated bay for Stainless steel material7,000m2 Open assembly and laydown yardFully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting machine, punch/shear hydraulic ironworker machines
-
10,117m2 (2.5 acres) Fabrication Workshop at Pasir Gudang, Johor3 Fabrication Bays covered area 3,240m2 (54m x 60m) with dedicated bay for Stainless steel material7,000m2 Open assembly and laydown yardFully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting machine, punch/shear hydraulic ironworker machines
WORKSHOP 1 at PASIR GUDANG, JOHOR
-
WORKSHOP 1 at PASIR GUDANG, JOHOR
-
FR
New Fabrication Shop Land Size: 107.4m x 72m
7,736m2
Covered Shop: 3,960m2
Bay 1: 18m x 72mBay 2: 22m x 72mBay 3: 18m x 60m
Height under-hook: Bay 2 : 15.7m Bay 1&3 : 9.8m
NEW WORKSHOP at PASIR GUDANG, JOHOR
-
INTEGER EXPERIENCE ON PRESSURE VESSELS, HEAT EXCHANGERS, STORAGE TANKS
Year Project Name & Weight KG Wall Design
Supplied Location Each Thickness Pressure Max Min
1 2019
Sapura Offshore Sdn
Bhd /
Reliance Industries
Limited /Sikka Ports &
Terminals Limited
Sikka Ports and
Terminal, Berth A2
Jamnagar, India
Foam Compound Storage
Tank2 1,070
ID: 1725mm
Ht: 1080mm8mm 2A240 TYPE 316L ATM 65
oC 7.5
oC
Best Engineering
PracticeNo
2 2019
Thermac Engineering
Sdn Bhd /
Afcons-Sapura
Consortium
Oil and Natural Gas
Corporation (ONGC)
ONGC Central
Processing Platform
(CPP) for block KG-
DWN 98/2, India
Hot and Cold Glycol
Exchanger 4 36,000
ID: 406.4mm
HT: 700mm
Plate
Flange/Bl
ind:
40/35
Shell 6
SA516-70 17 FV Barg 230oC ASME Sec VIII Div 1
ASME U StampNo
7 4,180OD: 2,000mm
OL: 4,500mm25mm SS304 6 barg 150oC
ASME Sec VIII Div 1
PED and CE MarkingNo
3 3,280OD: 1,850mm
OL: 4,063mm25mm SS304 6 barg 150oC
ASME Sec VIII Div 1
PED and CE MarkingNo
4
Reactor Jacketed Cone &
Jacketed Shell and
Collecting Chamber
3 11,250
ID:2974mm
/1200mm
Height: 5400mm
12mm
SUS316L / SA240-316L
Outer Jacket: SS400 /
S275JR
0.3 Barg - - Tanabe No
5 Hopper 15 900~ 1590
ID:1200mm~200
0mm
Height:
500mm~2100m
m
4~6mm SA240 Type 304 ATM 50oC - Tanabe No
6HP Flare KO Drum (V-
6210)1 13,500
ID: 2,300mm
TL-TL: 7,200mm13+3mm
SA516-70N + SS316L
Cladded material10/FV Barg 150oC -50oC
ASME Sec VIII Div 1
2017 ED + PTS
12.20.01
ASME U Stamp
No
7LP Production Separator
(V-1010)1 120,000
ID: 5,800mm,
TL-TL: 19,300mm23+3mm
SA516-70N + SS316L
WOL material10/FV Barg 65oC -0oC
ASME Sec VIII Div 1
2017 ED + PTS
12.20.01
No
PWHT
Filter Leaf Vessels
Bokor Phase 3
Development
BOCPP-A Central
Processing Platform,
Malaysia
Malaysia Marine
Heavy Engineering Sdn
Bhd (MMHE) /
Petronas Carigali Sdn
Bhd
2019
No Client / Owner Equipment Qty Design TemperatureDimension Material Design Code
3 2019 Tapis Teknik Sdn
Bhd
Denka Advantech Pte.
Ltd. Tuas Plant,
Singapore
Tanabe Engineering
Singapore Pte Ltd /
Tanabe Technical
Service Malaysia Sdn
Bhd
2019
-
INTEGER EXPERIENCE ON PRESSURE VESSELS, HEAT EXCHANGERS, STORAGE TANKS
Year Project Name & Weight KG Wall Design
Supplied Location Each Thickness Pressure Max Min
8
1st Stage Gaslift
Compressor Suction
Scrubber (V-2410 A/B)
2 7,000ID: 1,600mm
TL-TL: 2,460mm22+3mm
SA516-70N + SS316L
Cladded material28/FV Barg 65
oC -20
oC
ASME Sec VIII Div 1
2017 ED + PTS
12.20.01
No
9
2nd Stqage Gaslift
Compressor Suction
Scrubber (V-2420 A/B)
2 7,500ID: 1,500mm
TL-TL: 2,450mm28+3mm
SA516-70N + SS316L
Cladded material40 Barg 65
oC -20
oC
ASME Sec VIII Div 1
2017 ED + PTS
12.20.01
No
10
3rd Stage Gaslift
Compressor Suction
Scrubber (V-2430 A/B)
2 7,000ID: 1,200mm
TL-TL: 2,250mm34+3mm
SA516-70N + SS316L
WOL material80 Barg 65oC -20oC
ASME Sec VIII Div 2
2017 ED + PTS
12.20.01
ASME U2 Stamp
Yes
11Gaslift Discharge
Scrubber (V-2440)1 6,900
ID: 1,100mm
TL-TL: 22,50mm38+3mm
SA516-70N + SS316L
Cladded material80 Barg 65oC -20oC
ASME Sec VIII Div 1
2017 ED + PTS
12.20.01
Yes
12 Surge Vessel (V-1020) 1 23,000ID: 3350mm
TL-TL: 6,900mm19+3mm
SA516-70N + SS316L
Cladded material10/FV Barg 65
oC 0
oC
ASME Sec VIII Div 1
2017 ED + PTS
12.20.01
No
13 2012 OVIVO / Singapore LNG Singapore LNG Terminal Seawater Filter Package 4 10,000ID:2,000mm
TL-TL: 3718mm8mm Duplex SS UNS S31803 8 Barg 60
oC - ASME No
Bokor Phase 3
Development
BOCPP-A Central
Processing Platform,
Malaysia
Malaysia Marine
Heavy Engineering Sdn
Bhd (MMHE) /
Petronas Carigali Sdn
Bhd
2019
PWHTNo Client / Owner Equipment Qty Design TemperatureDimension Material Design Code
-
EXPERIENCE LIST / PROJECT REFERENCES 2019
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
1
Engineering design supply procurement fabrication
and delivery of 2 units of Foam Compound Storage
Tanks
Stainless Steel 316L Foam Compound
Storage Tanks
Sikka Ports and Terminal, Berth A2
Jamnagar, India
Reliance Industries Limited /Sikka
Ports & Terminals Limited Sapura Offshore Sdn Bhd Sapura Offshore Sdn Bhd August 2019 October 2019
2Supply and Fabrication of Steel Ladders and
Stainless Steel PlatesSteel Ladders and Plates
MDE5 Melaka Refinery Diesel Euro 5
Project Malaysia Refining Company
Hyundai Engineering
Company Ltd
Tan Bock Kwee & Sons
Sdn BhdAugust 2019 Sept 2019
3Fabrication for Mezzanine Deck and Walkway of the
Offshore Supply Ship “Sapura Jane”Platform Deck and Walkway Sapura Jane Offshore Supply Ship Sapura Sapura
Advantage Marine
Services (Malaysia) Sdn
Bhd
July 2019 Sept 2019
4
Supply and Fabrication of Vertical Filter Leaf
Vessels in accordance to PED with CE Marking, and
FEA on Clutch Door
Vertical Filter Leaf Vessels Tapis Teknik Sdn Bhd July 2019 Sept 2019
5Engineering Design Supply Procurement
Fabrication & Delivery of Heat Exchangers
Hot and Cold Glycol Exchangers shell
All welded heat exchangers
ONGC Central Processing Platform
(CPP) for block KG-DWN 98/2,
Oil and Natural Gas Corporation
(ONGC)
Afcons - Sapura
Consortium
Thermac Engineering
Sdn Bhd July 2019 Nov 2019
6Engineering Design Supply Procurement
Fabrication & Delivery of Pressure Vessels
Production Separator
HP Flare KO Drum
Gaslift Compressor Suction Scrubbers 1st,
2nd & 3rd Stages
Gaslift Discharge Scrubber
Surge Vessel
(details refer to PV Experience list attached)
Bokor Phase 3 Development
BOCPP-A Central Processing
Platform
Petronas Carigali Sdn Bhd Malaysia Marine Heavy
Engineering Sdn Bhd
Malaysia Marine Heavy
Engineering Sdn Bhd May 2019 Sept 2019
7
Supply, Procurement, Fabrication & Delivery of
Jacketed Cone and Jacketed Connection for
Reactors
Reactors RE2301 & RE2401 SUS316L SS400
Jacketed Cone / Connecting Chamber r
Jacketed Connection / Jacketed Shell
Hoppers x 15 units
Fused Silica Filler Plant, Tuas
Singapore
Denka Advantech Pte Ltd,
Singapore
Tanabe Engineering
Singapore Pte Ltd
Tanabe Technical Service
Malaysia Sdn Bhd
May & August
2019July & Nov 2019
8
Supply, Procurement, Fabrication of Flanges,
Nozzles, Pipes, Weir Plates, Gaskets, etc for 8 units
of Pressure Vessels
Supply, Procurement, Fabrication of Flanges,
Nozzles, Pipes, Weir Plates, Gaskets, etc for 8
units of Pressure Vessels
Shell Middle Distillate Synthesis Shell MDS JGC Singapore Shell April 2019 June 2019
9Fabricate and Supply of HDG Heavy Duty Gratings,
Stainless steel trash screensScreens
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
Tan Bock Kwee & Sons
Sdn BhdApril 2019 May 2019
10Fabrication and Supply Hot Dipped Galvanised
GratingGrating, Access Platforms
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
Zhong Huaxing
Development (M) Sdn
Bhd
April 2019 May 2019
11Fabrication and Supply Hot Dipped Galvanised
GratingGrating
Rapid Refinery Package 28B Euro 5
Mogas Isomerization, Tame &
Tankage
PETRONAS CTCI-MIE CN Eleco Engineering
Sdn BhdApril 2019 May 2019
12 Supply and Fabricate Jacking plates and strips Jacking Plates and strips VerwaterVerwater Ind Services
Singapore Pte LtdJanuary 2019 January 2019
-
EXPERIENCE LIST / PROJECT REFERENCES 2018-2012
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
1
Supply and Fabrication of
Piping and Steel Structures,
installation of equipment,
E&I Works, skid integration,
and FAT for the offshore
Condensate Recovery
Unit Skid Package
Condensate Recovery Skid Total Wt: 103.2MT
6.2mL x 7.7mW x12.2mH
LD Cold Seperator: SA 240 316L, Wt: 1991 kg
ID 900mm x T/T 3445, Thickness 8t,
Suction Scrubber: SA 516GR70N, Wt 4074kg
ID 1100mm, T/T 4670mm, Thickness 12.7t,
HP Cold Seperator: SA240 316L, Wt: 2657kg
ID900mm, T/T 3205mm, Thickness 12t,
MEG Recovery Vessel: SA516Gr70N, Wt 7159kg
ID 1200mm, T/T6405mm, Thickness 12.7t
Erb West Development Low
Pressure Condensate Recovery
System for Petronas Sabah
Operations
PETRONASNGL Tech Services Sdn
Bhd
NGL Tech Services Sdn
Bhd2018 Dec 2019
2
Provision of Project Management, Supervision,
Technical and Skilled workers, Inspection and
Testing
Provision of Project Management, Supervision,
Technical and Skilled workers, Inspection and
Testing
Erb West Development Low
Pressure Condensate Recovery
System for Petronas Sabah
Operations
PETRONAS Vestigo Petroleum Sdn
Bhd.
NGL Tech Services Sdn
Bhd2018 2016
3
Supply and
Fabrication of
Piping and
Steel Structures,
installation of
equipment,
E&I Works,
skid integration
and FAT
Fuel Gas Skid Total Weight 32MT
6.5mL x 4.2mW x 6mH
Fuel Gas Scrubber SS516+316L clad
1.6mID x 3.7mT/T, 32+4mm Thk; Wt:7,539kg
Fuel Gas Filters SA312 TP 316L Wt: 760kg
ID 336.5mm x T/T 3045mm, Thickness 9.53t,
Fuel Gas Superheaters SA312TP 316L
Wt: 441kg
ID 304.84mm x T/T 3540mm, Thickness 9.53t
Bokor Phase 3 Redevelopment -
Central Processing Platform (CPP) PETRONAS
Malaysia Marine and
Heavy Engineering Sdn
Bhd (MMHE)
Innovative Synergy
Solutions Sdn Bhd (ISS)2018 April 2019
4
Supply and Fabrication of
Piping and Steel Structures,
installation of equipment,
E&I Works,integration
and FAT for
Vapour Recovery Skid
Packages
Vapour Recovery Skid 3.4mL x 2.1mW x 1.8mH
Total Weight: 5MT
Piping (ASTM A312 TP316) and Skid Structural
Bokor Phase 3 Redevelopment -
Central Processing Platform (CPP) PETRONAS
Malaysia Marine and
Heavy Engineering Sdn
Bhd (MMHE)
Innovative Synergy
Solutions Sdn Bhd (ISS)2018 April 2019
5Fabricate and Supply of Hot Dip Falvanized
Gratings, Chequered Plates Cover, Grating
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
Gadang Engineering Sdn
Bhd2018 Dec 2018
6Fabricate and Supply of Hot Dip Falvanized
Gratings, Chequered Plates Cover, Grating
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV) Sino TCC (M) Sdn Bhd 2018 Dec 2018
7Fabricate and Supply Hot Dip Galvanized Heavy and
Light Duty Gratings Grating
Rapid Refinery Package P2
RefineryPETRONAS Sinopec
Sinohydro Corporation
(M) Sdn Bhd2018 Nov 2018
-
EXPERIENCE LIST / PROJECT REFERENCES 2018-2012
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
8Fabricate and Supply Hot Dip Galvanized Heavy and
Light Duty Gratings Grating
Rapid Refinery Package 4 Sulphur
Recovery UnitPETRONAS Petrofac Petrofac E & C Sdn Bhd 2018 May 2018
9Fabricate and Supply Hot Dip Galvanized Heavy and
Light Duty Gratings, Light Towers, Steel StructuresGrating
Rapid Refinery Package 12B Solid
Product Jetty and associated
Handling Facilities (SPJ) at Tanjung
Setapa
PETRONASSYS-McConnell Dowell
(SPJ) Joint Venture
SYS-McConnell Dowell
(SPJ) Joint Venture2018 Dec 2018
10Fabricate and Supply of HDG Heavy Duty Gratings,
Stainless steel trash screensScreens
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
Tan Bock Kwee & Sons
Sdn Bhd2018 Dec 2018
11 Fabrication and supply of Piping Works PipingRapid Refinery Package 16A
Effluent Treatment PlantPETRONAS
Wabag Muhibah JV Sdn
Bhd
Wabag Muhibah JV Sdn
Bhd2018 August 2018
12Fabrication and Supply Hot Dipped Galvanised
GratingGrating
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
WCT Construction Sdn
Bhd2018 Dec 2018
13Fabrication and Supply Hot Dipped Galvanised
GratingGrating
Rapid Refinery and Petrochemical
Plant Package 2, 3, 7, 12, 14, 27PETRONAS
Sinopec
Technical Reunidas
Tecnimont-HQC JV
Technip-Fluor JV
Zhong Huaxing
Development (M) Sdn
Bhd
2018 Dec 2018
14
Fabricate and supply of Guides, Jigs, Band Screen,
Bar Screens, BeaTrash Rake, Washing Pipes, Flush
Pipies, Trash Baskets, Beams for Renaissance
Screens, Rakes Steel Structures and PipingJamaica Renaissance 190 MW
power plant U847718
South Jamaica Power Company
(SJPC) TSK Spain Beaudrey Asia Sdn Bhd 2018 August 2018
15
Fabricate and Supply Main Shaft (A29 Filter),
Travelling Bandscreen, Structure, Piping, Supports,
Lifting Lugs
Screen, Steel Structure and Piping
Malaysia Kota Tinggi
WaterTreatment Plant C112317
Munseh Johor River
PUB, Singapore's National Water
Agency
Munseh Engineering Sdn
Bhd Beaudrey Asia Sdn Bhd 2018 June 2018
16
Fabrication and supply of StopLogs Gates, Trash
Rake, Travelling Band Screen and ByPass for
Carem Project
Screens, Rakes, Steel Structures and Piping
Argentina U847117 Carem - Project
Balance of Plant of the Reactor
Carem 25 Nuclear power plant
Argentina’s Comision Nacional de
Energia Atómica (CNEA)
Tecna /
Grupo Isolux Corsan Beaudrey Asia Sdn Bhd 2018 August 2018
17Fabricate and Supply of Travelling Bandscreen and
AccesorriesScreen, Steel Structure and Piping
Malaysia Bukit Shah Project
C112517 Johor water solution
project
BEWG (M) Sdn Bhd BEWG (M) Sdn Bhd E. Beaudrey & C IE 2018 Nov 2018
18 Fabricate and Supply of Structures Steel StructuresSingapore Tengeh Retrofit Water
Treamtnet Plant Project M846116
PUB, Singapore's National Water
Agency
PUB, Singapore's
National Water Agency Beaudrey Asia Sdn Bhd 2018 August 2018
19 Supply and Fabricate of Jacking Timber Gage Supply and Fabricate of Jacking Timber Gage YC Logistics YC Logistics Sdn Bhd 2018 December 2018
20 Fabricate and Supply of Silencor Core Silencor CoreRapid Refinery Package 5 Steam
Creacker ComplexPETRONAS Toyo Engineering Toyo Engineering 2018 January 2019
-
EXPERIENCE LIST / PROJECT REFERENCES 2018-2012
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
21 Fabricate and supply of Travelling Band Screen Screen, Steel Structure and Piping Singapore Tengeh Project PUB, Singapore's National Water
Agency
PUB, Singapore's
National Water Agency Beaudrey Asia Sdn Bhd 2017 2017
22
Fabrication and Supply Hot Dipped Galvanised
Grating and CrMoly SA387 Grade II Class II Plate
Materials
Grating Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2017 2017
23
Fabrication and Supply Hot Dipped Galvanised
Grating and CrMoly SA387 Grade II Class II Plate
Materials
Grating Rapid Refinery P3 PETRONAS Tecnicas Reunidas
Zhonghe Huaxing
Development (M) Sdn
Bhd (China Nuclear)
2017 2017
24Fabrication and Supply Hot Dipped Galvanised
GratingGrating Rapid Refinery P2 PETRONAS Sinopec Engineering
Sinohydro Corporation
(M) Sdn Bhd2017 2017
25
Fabrication and Supply of Offshore Pile Clamp
Platform, Offshore Walkway Structure,
Embedded SUS316L Plates,
GratingRapid Refinery P12B Marine
FacilityPETRONAS
SYS-McConnell Dowell
(SPJ) Joint Venture
SYS-McConnell Dowell
(SPJ) Joint Venture2017 2017
26
Supply and Fabrication of
Piping and Steel Structures,
installation of equipment,
E&I Works, skid integration,
and FAT
for the Condensate
Recovery Skid Package
Condensate Recovery Skid
13.5mL x 5mW x 8mH
Total Weight: 75MT
LD Cold Seperator: SA 240 316L, ID 900mm x
T/T 3445, Thickness 8t, Wt 1991kg
Suction Scrubber: SA 516 GR 70N, ID 1100mm,
T/T 4670mm, Thickness 12.7t, Wt 4074kg
HP Cold Seperator: SA 240 316L, ID900mm,
T/T 3205mm, Thickness 12t, Wt 2657kg
MEG Recovery Vessel: SA516 Gr 70N, ID
1200mm, T/T6405mm, Thickness 12.7t, Wt
7159kg
Petronas FPSO Mampu-1 Vestigo Petroleum Sdn Bhd. MISC BerhadNGL Tech Services Sdn
Bhd2016 2016
27
Provision of Project Management, Supervision,
Technical and Skilled workers, Inspection and
Testing
Provision of Project Management, Supervision,
Technical and Skilled workers, Inspection and
Testing
Petronas FPSO Mampu-1 Vestigo Petroleum Sdn Bhd. MISC Berhad NGL Tech Services Sdn
Bhd 2016 2016
28Fabricate and Supply of Continuous Tube
Cleanig Equipment
Continuous Tube Cleaning Equipment
Wt: 15000kg
Material (components): Mixture of ASTM A570
Gr50 / UNS S 31803 / ASTM Gr.65 SS400 /
Mexico Centro Morelos Combined
Cycle 724 MW Power Plant Mexico state utility CFE Comisioin Federal Beaudrey Asia Sdn Bhd 2016 2016
-
EXPERIENCE LIST / PROJECT REFERENCES 2018-2012
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
29
Civil, M&E, Steel Structures Fabrication, Erection
and Construction of a Workshop and Warehouse
Building at Rapid Refinery Project site at
Pengerang
Steel Structures Fabrication, Erection, Civil
and M&E WorksRapid Refinery P2 PETRONAS Sinopec Engineering Sinopec Engineering 2016 2016
30 Fabrication and Supply of Steel Structures Steel Structures Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2016 2016
31Fabrication and Supply of Heavy Lift and
Transportation BeamsBeams ` PETRONAS Siemens ALE 2016 2016
32 Fabrication of Out Fitting for Jack Up Rig B378 Outfitting Jack up Rig B378 Japan’s BOTL Frigstad Offshore Keppel FEL 2015 2015
33Supply and Fabrication of Steel Structures for
Heavy LiftSteel Structures - ALE - ALE 2015 2015
34Supply, Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Thailand Khanom 977MW Gas
turbine combined cycle (GTCC)
power generation plant
Khanom Electricity Generating
Co., Ltd. (KEGCO)
Mitsubishi Heavy
Industries, Ltd. (MHI) Beaudrey 2014 2015
35Civil, M&E, Steel Structures Fabrication, Erection
and Construction of a Warehouse Building
Steel Structures Fabrication, Erection, Civil
and M&E WorksMalaysia Senai Idaman Park SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. 2015 2015
36Supply, Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Philippines Pagbilao 735MW coal-
fired power station
Team Energy, JVTokyo Electric
Power Company and Marubeni
Corporation
Mitsubishi Hitachi
Power Systems and
Korea's Daelim
Industrial
Beaudrey 2015 2015
37Supply, Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Mexico Iberdrola Dulces Nombres
II, 300-MW combined cycle power
plant (CCGT)
Iberdrola Iberdrola ingeniería y
construcción. Beaudrey 2015 2015
38Supply, Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
India Mundra LNG Regasification
Plant Project GSPC LNG Limited(GLL) Toyo Engineering Beaudrey 2015 2015
39Supply, Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Indonesia Banggai Ammonia
Plant
PT Surya Esa Perkasa (SEP), PT
Panca Amara Utama (PAU).
Toyo Engineering - PT
Inti Karya Persada
Tehnik (IKPT)
Beaudrey 2015 2015
40
Fabrication of Out Fitting for Jack Up Rig B360,
363, 369, 370, 371, 372, 373, Semi Submesible
M1235, M1222
Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2014 2014
41Civil, M&E, Steel Structures Fabrication, Erection
and Construction of a Warehouse Building
Steel Structures Fabrication, Erection, Civil
and M&E WorksMalaysia Seelong, Senai Excel Metal Industries (Malaysia)
Excel Metal Industries
(Malaysia)
Excel Metal Industries
(Malaysia)2014 2014
-
EXPERIENCE LIST / PROJECT REFERENCES 2018-2012
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
42Supply, Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Saudi Arabia 2,640MW Jeddah
South power plant Saudi Electricity Co (SEC)
Hyundai Heavy
Industries (HHI) Beaudrey 2014 2014
43Supply and Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Saudi Arabia Shuqaiq 2.64GW oil-
fired power plant Saudi Electricity Co (SEC)
Hyundai Heavy
Industries (HHI) Beaudrey 2014 2014
44
Supply, Fabrication and Erection of Steel
Structure Building and Installation and Erection
of Plant Equipment
Steel Structure Fabrication and Erection,
Installation of Plant Equipment
Malaysia Tanjung Langsat
Biomass Steam PlantTPM Technopark Sdn Bhd
TPM Technopark Sdn
BhdAKK Engineering 2013 2013
45Supply and Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Malaysia Tanjung BinPower Plant
Phase 2 1,000 MW supercritical
coal-fired power plant
Tanjung Bin Energy Issuer Bhd /
Malakoff Corporation Alstom Power Beaudrey 2013 2013
46Supply and Fabricate and supply of Raw Water
Intake EquipmentScreen, Steel Structure and Piping
Mexico Centro Morelos Combined
Cycle 724 MW Power Plant Mexico state utility CFE Comisioin Federal Beaudrey 2013 2013
47Supply and Fabricate and supply of Raw Water
Intake EquipmentFilter Vessels - Super Duplex Material
Chile Guacolda 54 MW coal-fired
power generation plant Empresa Eléctrica Guacolda
Mitsubishi Heavy
Industries, Ltd. (MHI) Beaudrey 2013 2013
48
Fabrication of Out Fitting for Jack Up Rig B342,
345, 346, 349, 350, 351, 352, 353, 354, 355, 356,
357, 358
Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013
49Design Supply Fabrication and Installation of 4
units Duplex Filter Vessels and Oil Water
Separator
Oil Seperator:
Material: Mixture of SS304 / Carbon Steel ,
Fabrication Weight: 12,270kg
4400mm x 1435mm x 3450mm
Filter Vessel
Material Duplex UNS S31803, ID 2000mm,
TL/TL 3718mm, Thickness 8mm, Weight
10,000kg
Singapore LNG Terminal Singapore LNG Corporation
(SLNG)
Samsung C&T
Corporation Ovivo Water 2012 2012
50Fabrication of Out Fitting for Jack Up Rig B322,
B323, b326, 327, 329, 330, 333, 335, 336, 341Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013
51Fabrication Erection Paining. Overturning and
Seafasterning of 600 ton Helideck Structures 600 ton Helideck Structures Jack up Rig Helideck Mencase Offshore Mencase Offshore Keppel FEL 2012 2012
-
THANK YOU
Integer Engineering Sdn Bhd (979727-P)Sales Office: Head Office & Fabrication 2A-2 Jalan Puteri 4/2 PLO 685 Jalan Platinum Utama Bandar Puteri, 47100 Puchong Pasir Gudang Industrial Estate Zone 12BSelangor, Malaysia 81700 Pasir Gudang, Johor, MalaysiaPhone: +6010-6612380 +603-80527003E: [email protected] www.integergroup.com.my
mailto:[email protected]://www.integergroup.com.my/