Page 1: Engineering Perspectives on First Year of New Reactor Construction

Engineering Perspectives on First Year of New Reactor Construction

Mohamed Shams, Ph.D., PEStructural Engineering BC

US NRC, Office of New ReactorsJuly 23, 2013

Page 2: Engineering Perspectives on First Year of New Reactor Construction

Purpose

• Present NRC staff view, from an engineering perspective (civil/structural), on construction inspection efforts and license amendment requests.

Page 3: Engineering Perspectives on First Year of New Reactor Construction

Background

• AP1000 Rev. 19 certification on December 30, 2011– Vogtle Units 3 & 4 license issuance February 10, 2012 – Summer Units 2 & 3 license issuance on March 30, 2012

3

Page 4: Engineering Perspectives on First Year of New Reactor Construction

License Amendment Requests

Modular Construction

• Stud Spacing• Structural Module Details

Nuclear Island RC

Structures, Shield

Building & Basemat

• Nuclear Island Wall Reinforcement Criteria

• Development Length for Basemat Reinforcement

• Basemat Shear Reinforcement Design Details

• Basemat Shear Reinforcement Spacing• Basemat Concrete and Rebar Details

Turbine Building

• Bracing System and UBC vs. IBC• Battery Room and Electrical Equipment

Changes• Layout & Floor Elevation Changes

Containment• Additional Electrical Penetrations• Chemical and Volume Control System• Primary Sampling System

Issued 17 License Amendments

Page 5: Engineering Perspectives on First Year of New Reactor Construction

Basemat Technical IssuesShear Reinforcement (T-heads)

5

• Inspection of basemat rebar identified two issues for the concrete slabs below the elevator and sump pits– Headed shear

reinforcement not demonstrated to comply with ACI 349-01 Appendix B

– Shear reinforcement spacing exceeded d/2

Source: Headed Reinforcement Corporation (HRC) Website

Typical T-head Installation

Page 6: Engineering Perspectives on First Year of New Reactor Construction

Headed Reinforcement

Licensing Basis– Shear stirrups have T-

headed anchors at each end

– T-headed anchors are used where rebar mechanical anchorage is required

– Criteria of ACI 349 Chapter 12 are applied for rebar development

6Source: AP1000 DCD, Rev 19

Page 7: Engineering Perspectives on First Year of New Reactor Construction

Commitments / Guidance

• ACI 349, Section 12.6, Mechanical Anchorage– Appendix B, Anchorage to Concrete

• ASTM A970• Staff open to alternative approaches to demonstrate adequate

anchorage– Manufacturer literature– Research and testing– Alternative models (Strut-and-tie)– Other relevant codes (e.g., ACI 318)

Objective - Ensure adequate anchorage for ductile rebar behavior

7

Page 8: Engineering Perspectives on First Year of New Reactor Construction

ACI 349 Model

8

Page 9: Engineering Perspectives on First Year of New Reactor Construction

Headed Reinforcement

Resolution– Approved License

Amendment Requests• ACI 318-11 provisions

for headed reinforcement

• Increase elevator and sump pits thickness

– Revise shear design of walls

9

Page 10: Engineering Perspectives on First Year of New Reactor Construction

10

Basemat Technical Issues• Basemat Hooked Reinforcement

During a March 2012 inspection, NRC staff identified a deviation in the detailed/installed nuclear island basemat rebar relative to the typical reinforcement depicted from the AP1000 DCD.

Page 11: Engineering Perspectives on First Year of New Reactor Construction

Hooked Reinforcement

Licensing Basis• Design and analysis procedures for seismic Category I

structures are in accordance with ACI 349.• Foundation walls act integrally with the basemat to provide

stiffness and distribute foundation loads.• Basemat designed as a two-way slab.• Basemat considered as a diaphragm, as such is part of the

lateral-force resisting system.

Page 12: Engineering Perspectives on First Year of New Reactor Construction

Commitments / Guidance

• ACI 349-01– Chapter 13 – Negative moment reinforcement must

be developed at support – Chapter 12 – #14 bar splices are prohibited – Chapter 21

• Ductile connections• Cannot invoke excess reinforcement provision (12.5.3.4)

for elements in lateral force-resisting system.

Objective - Ensure ductile behavior of connection of perimeter walls to the basemat

12

Page 13: Engineering Perspectives on First Year of New Reactor Construction

Basemat technical IssuesResolution

– Re-constitution of reinforcement hooks in basemat design.

– Approved License Amendment Requests• Increase in basemat

concrete compressive strength to decrease required development length.

13

MOV
Picture from NEI, NI concrete pour in China link on foot note
Page 14: Engineering Perspectives on First Year of New Reactor Construction

Lessons Learned• Provide quantitative technical justifications for LARs • Adhere to codes and standards in all areas of the design • Detailed design must satisfy both the DCD and code

commitments• Perform detailed engineering analysis sufficiently in

advance of installation• Institute consistency checks• Balance specificity and flexibility in licensing basis