ENGINEERING SERVICES REPORT

Tinley Manor South January 2016 Ref. DR2012/29 Rev 4

SMEC REPORT

QUALITY ASSURANCE ISSUE DATA

Report Title: Engineering Services Report

Client: Tongaat Hulett Developments (Pty) Ltd

Project Name: Tinley Manor South

Report Number: DR2012/29

Revision Number Rev 4

Revision History:

Date Report

Status Written by Reviewed by

Issued to

Name Institution

2012-11-27 Draft J Ellis R Wilkinson THD

2013-02-05 Draft J Ellis R Wilkinson THD

2013-04-12 Draft J Ellis R Wilkinson THD

2013-05-07 Rev 0 J Ellis M.Koekemoer R Wilkinson THD

2013-10-24 Rev 1 J Ellis N Nkopodi THD

2014-12-03 Rev 2 L Sineke J Ellis T Butterworth RHDHV

2015-03-04 Rev 3 G Cunningham J Ellis H Makwabe THD

2016-01-20 Rev 4 R Moodley J Ellis H Makwabe THD

Approved by:

Signed Date

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/20

(A)

EXECUTIVE SUMMARY

Tongaat Hulett Developments (THD) intends developing a 437 hectare mixed used development

known as Tinley Manor South located within the Ilembe District Municipality. SMEC South Africa has

been appointed to investigate and report on the available municipal services and upgrades required to

service the proposed development.

Bulk water will be supplied to the first phase of the development by the Taffeni Reservoir via an

existing 250mm watermain. The Taffeni Reservoir will require an upgrade after phase 1 in order to

supply the rest of the development. Sembcorp Siza Water has confirmed that there is sufficient land

available to increase the reservoir capacity and designs have been completed to construct two 2.5 Ml

cells at the reservoir. In the future a new reservoir will be constructed within the Seaton Delaval

Development.

Wastewater generated by the development will either gravitate or be pumped to the existing Sheffield

Waste Water Treatment Works (WWTW). The Sheffield WWTW is currently underutilised however the

capacity will be taken up in March 2016 when the Hugh Dent Pump Station is complete. The WWTW

will require an upgrade once construction of the development commences. The WWTW can be

upgraded to an ultimate capacity of 18 Ml/day.

At present, road access to the site is via the N2 freeway; exit 214 (Umhlali), Sheffield Beach road and

an existing gravel road. The gravel access will be upgraded to a surfaced dual carriageway road. This

roadway will be constructed in phases in line with the development phasing. We understand that the

main access may serve as an arterial route in future. To allow for possible future widening, a 30m

road reserve is planned.

Access to the sub-region will be improved by constructing an interchange adjacent to the

development by upgrading the P228 Bridge over the N2 freeway.

A detailed Stormwater Management Plan has been prepared separately.

Duct crossings will be installed to allow for telecommunications infrastructure.

Solid Waste generated from the development will be collected and disposed of at the Kwadukuza

Landfill Site.

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(1)

TABLE OF CONTENTS

Page No

1. INTRODUCTION ..................................................................................................................... 2

2. LOCATION AND EXTENT ...................................................................................................... 2

3. SITE DESCRIPTION ............................................................................................................... 2

4. FRAMEWORK / PROPOSED LAND USE .............................................................................. 2

5. GEOTECHNICAL ASSESSMENT .......................................................................................... 3

6. EXISTING INFRASTRUCTURE .............................................................................................. 4

6.1 Water ....................................................................................................................................... 4

6.2 Sewer ....................................................................................................................................... 4

6.3 Roads....................................................................................................................................... 5

7. PROPOSED BULK INFRASTRUCTURE ............................................................................... 5

7.1 Demand Parameters ................................................................................................................ 5

7.2 Water ....................................................................................................................................... 6

7.3 Sewer ....................................................................................................................................... 7

7.4 Stormwater .............................................................................................................................. 8

7.5 Telecommunications ................................................................................................................ 8

7.6 Proposed Internal Infrastructure .............................................................................................. 8

7.7 Solid Waste .............................................................................................................................. 9

8. PHASING ................................................................................................................................ 9

9. APPENDICES ......................................................................................................................... 9

LIST OF FIGURES

Figure 1: Sheffield WWTW ...................................................................................................................... 4

LIST OF TABLES

Table 1: Landuse areas - Based on information supplied by RHDHV dated: December 2015 .............. 3

Table 2: Water demand parameters ....................................................................................................... 5

Table 3: Sewer flow parameters ............................................................................................................. 6

Table 4: Water Demand per phase ......................................................................................................... 7

Table 5: Sewer Flow per Phase .............................................................................................................. 8

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(2)

1. INTRODUCTION

SMEC South Africa has been appointed by Tongaat Hulett Developments (THD) to assess

the extent and capacity of existing municipal services affected by the proposed Tinley Manor

development as well as any upgrades required to service the increased demand created by

the development.

2. LOCATION AND EXTENT

(Refer to Appendix A: DH0002 – LOC – 01)

Tinley Manor South is approximately 473 hectares in size and is located immediately south

of the Umhlali River and east of the N2 freeway.

3. SITE DESCRIPTION

(Refer to Appendix B: DH0002 – AREIAL – 01)

The site is characterized by a series of undulating ridges and steep valleys. The majority of

the site is currently under sugar production and the valleys have been drained to increase

arable land availability.

The Sheffield Waste Water Treatment Works (WWTW) is located within the development

and is owned and operated by Sembcorp Siza Water (SSW) under the authority of Ilembe

District Municipality (IDM).

4. FRAMEWORK / PROPOSED LAND USE

(Refer to Appendix C – DH0002 – FRAME – 01)

Large portions of the project area have been defined as wetlands and will be retained as

open space. The balance of the site will be developed into residential, resorts and a small

component of mixed use. The proposed land use distribution is summarized in the table

below:

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(3)

Table 1: Landuse areas - Based on information supplied by RHDHV dated: December 2015

DESCRIPTION AREA (Ha)

Retail 1 (MU) 19.33

Retail 2 6.17

Special Residential 1500m2 23.43

Special Residential 1000m2 26.45

Special Residential 600/800m2 17.32

Medium Density (MDR) 43.07

High Density (HDR) 18.09

Resort 12.92

Education 12.53

Conservation 240.91

Private Open Space 8.40

Public Open Space 0

Roads 45.05

TOTALS 473.81

5. GEOTECHNICAL ASSESSMENT

The following extracts have been sourced from the geotechnical investigation undertaken by

Drennan Maud and Partners, Report no: 23312 dated December 2012.

“The proposed development of the Tinley Manor - South Bank area is considered feasible

as no catastrophic geological flaws exist that would exclude the entire area from

development, although some areas should be avoided in terms of slope stability and

problem soils. Notwithstanding the above the development of the area should be considered

as challenging due to the geological constraints associated with the prevailing subsoil and

ground water conditions present on site.

As such for planning and construction of the proposed development, the recommendations

given above should be strictly adhered to. These amount to no more than sound building

practices appropriate for the geotechnical constraints associated with the on site subsoils

conditions. Site specific geotechnical investigation will be required at a later date and should

include provisions for regular supervision by a geological engineering professional during

development.”

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(4)

6. EXISTING INFRASTRUCTURE

GIS data sourced from Sembcorp Siza Water (SSW) was used to determine the extent of

the existing water and sanitation infrastructure.

6.1 Water

(Refer to Appendix D – DH0002 – WATER – 01)

The Taffeni Reservoir (2.5 Ml) and Tinley Manor Reservoir (0.25 Ml) are the closest

existing reservoirs to the proposed development. There is an existing 250 mm water

main which terminates near the gravel access road to the project area and a 110 mm

diameter water main which traverses the project area (approximately 200m parallel to

the coastline) crossing the Umhlali River to supply the Tinley Manor reservoir.

6.2 Sewer

(Refer to Appendix E – DH0002 – SEWER – 01)

The existing Sheffield WWTW (see Figure 1 below) is located within the project

boundary. The WWTW is sized to accommodate 6 Mℓ/day but is operating far below

capacity. Sembcorp Siza Water has a licence and the space available to upgrade the

WWTW (up to 18 Mℓ/day).

Details of the Sheffield WWTW as furnished by Sembcorp Siza Water:

Capacity – 6 Ml /day

Current Usage – 0.5 Ml /day

Figure 1: Sheffield WWTW

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(5)

6.3 Roads

(Refer to Appendix F – DH0002 – ACCESS – 01)

Access to the site is via the N2 freeway, Umhlali interchange (exit 214), Salt Rock

Road, Sheffield Beach Road and an existing gravel road. The gravel road is used to

access the existing farm and by Sembcorp Siza Water to access the WWTW. This

access can also be utilised during the construction phase.

7. PROPOSED BULK INFRASTRUCTURE

7.1 Demand Parameters

Tabulated below are the design parameters used in the calculation of the anticipated Total

Average Daily Demands for water and Average Daily Flows for Sewer for the different land

uses. These were considered as part of the Siza Water Bulk Planning Report prepared by

SMEC South Africa on behalf of Sembcorp Siza Water.

Table 2: Water demand parameters

Residential Type Daily Water Demand Per Unit (ℓ/Unit/Day)

Allowance For Water Loss

Total Average Daily Water

Demand (Mℓ/Unit/Day)

Rural/Low Income 300 15% 0.000345

Middle Income 700 15% 0.000805

Upper Income 1200 15% 0.001380

Golf Course Estate 1500 15% 0.001725

Resort/Tourism (Private)

900 15% 0.001725

Recreational 1000 15% 0.001150

Commercial Daily Water Demand

(ℓ/m²) Allowance For

Water Loss

Total Average Daily Water

Demand (Mℓ/Ha/Day)

Commercial Bulk 6,25 15% 0,072

Industrial Type Daily Water Demand

Per Platform (ℓ/m²/Day)

Allowance For Water Loss

Total Average Daily Water

Demand (Mℓ/Ha/Day)

Light 1,875 15% 0,022

General 3,125 15% 0,036

Heavy 4,375 15% 0,050

Average 0,036

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(6)

Residential Type Daily Sewer

Generation Per Unit (ℓ/Unit/Day)

Allowance For Infiltration

Total Average Daily Flow

(Mℓ/Unit/Day)

Rural/Low Income 210 30% 0.00027

Middle Income 700 30% 0.00091

Upper Income 840 30% 0.00109

Golf Course Estate 1050 30% 0.00137

Resort/Tourism (Private)

630 30% 0.00082

Recreational 700 30% 0.00091

Commercial Daily Water Demand

(ℓ/m²) Allowance For

Infiltration

Total Average Daily Water

Demand (Mℓ/Ha/Day)

Commercial Bulk 4.38 30% 0,057

Industrial Type Daily Water Demand

Per Platform (ℓ/m²/Day)

Allowance For Infiltration

Total Average Daily Water

Demand (Mℓ/Ha/Day)

Light 1.3 30% 0.017

General 2.2 30% 0.028

Heavy 3.1 30% 0.040

Average 0.028

7.2 Water

(Refer to Appendix D – DH0002-WATER-01)

Sembcorp Siza Water has confirmed, that the existing 250mm diameter watermain, from

Taffeni Reservoir, which terminates near the gravel access can be extended to supply the

first phase of the development.

Once further development occurs, the Taffeni Reservoir would need to be upsized. Currently

the reservoir has a capacity of 2.5 Ml. Sembcorp Siza Water has confirmed that there is

sufficient land available to increase the reservoir capacity and designs have been completed

to construct two additional 2.5 Ml cells at the reservoir.

Sembcorp Siza Water has further stated that they plan to abandon the existing 110mm

diameter water supply from Sheffield Reservoir to Tinley Manor Reservoir. A new bulk

supply line, 2.5km long will be constructed from the new Umgeni Bulk Water line from

Avondale to Honolulu.

Table 3: Sewer flow parameters

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(7)

In the future a new reservoir will be constructed within Seaton Delaval. The supply for the

new reservoir will be from the Taffeni reservoir in the form of a 300mm dia. pipeline 700m

long as indicated in Appendix D.

The Siza Water Master Planning report prepared by SMEC on behalf of Sembcorp Siza

Water as well as the anticipated yields provided by RHDHV has been used to calculate the

Average Daily Water Demand (ADD) of the proposed development (6.13 Mℓ/day as

indicated in the Appendix H).

Table 4: Water Demand per phase

NAME TOTAL ADD

(Ml/day)

PHASE 1 0.24

PHASE 2 0.33

PHASE 3 0.20

PHASE 4 0.28

PHASE 5 0.08

PHASE 6 0.32

PHASE 7 0.19

PHASE 8 1.66

PHASE 9 0.45

PHASE 10 2.38

TOTAL 6.13

7.3 Sewer

(Refer to Appendix E – DH0002-SEWER-01)

Sewage generated will be treated at the existing Sheffield WWTW.

Sembcorp Siza Water has stated that the current flow to Sheffield WWTW is 0.5 Ml/day

however they expect the remaining capacity to be taken up by March 2016 once the Hugh

Dent Pump Station is complete. The WWTW would require an upgrade once construction of

the development commences. The WWTW can be upgraded to an ultimate capacity of 18

Ml/day.

Due to the topography of the project area, 4 sewer pump stations will be required to convey

sewer to the Sheffield WWTW.

The Siza Water Master Planning report prepared by SMEC on behalf of Sembcorp Siza

Water as well as the anticipated yields provided by RHDHV has been used to calculate the

Average Daily Flow (ADF) of the proposed development (4.90 Mℓ/day as indicated in the

Appendix I).

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(8)

NAME TOTAL ADF

(Ml/day)

PHASE 1 0.19

PHASE 2 0.26

PHASE 3 0.16

PHASE 4 0.22

PHASE 5 0.06

PHASE 6 0.25

PHASE 7 0.15

PHASE 8 1.32

PHASE 9 0.35

PHASE 10 1.93

TOTAL 4.90

7.4 Stormwater

A Stormwater Management Plan (SWMP) for the Tinley Manor South Development has

been prepared by SMEC, refer to Report No DR2014/48.

The following key aspects will be implemented in doing the detailed design plan:

• All internal storm water reticulation will be designed with in accordance with

municipal guidelines.

• The proposed road network will act as the primary storm water collector with

controlled discharge to attenuation facilities.

• The secondary system (pipe network) will be designed to accommodate the 1:3 and

1:10 year peak flow at critical points.

• Dry attenuation facilities will be used to reduce runoff into the natural drainage

system to the pre-development 1:10 and 1:50 peak flow rates. Attenuation facilities

will be sized to accommodate the difference in volume between 1:50 pre and post

development runoff volumes.

7.5 Telecommunications

Duct crossings will be installed to allow for telecommunication infrastructure.

7.6 Proposed Internal Infrastructure

Internal water and sewer infrastructure will comply with iLembe District Municipality

Sembcorp Siza Water (SSW) standards.

Table 5: Sewer Flow per Phase

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(9)

7.7 Solid Waste

The only available landfill is the Kwadukuza Landfill Site. It is owned and operated by the

Dolphin Coast Waste Management which is responsible for collection and disposal of solid

waste in the Kwadukuza, Empangeni and Richards Bay area.

8. PHASING

(Refer to Appendix G – DH0002-PHASING-01)

The development will be carried out in a phased manner as indicated in Appendix G.

9. APPENDICES

The following maps are attached as appendices to this report:

APPENDIX DRAWING NUMBER DESCRIPTION

APPENDIX A DH0002 – LOC – 01 LOCALITY PLAN

APPENDIX B DH0002 – AERIAL – 01 AERIAL PHOTGRAPHS

APPENDIX C DH0002 – FRAME – 01 FRAMEWORK PLAN

APPENDIX D DH0002 – WATER – 01 BULK WATER

APPENDIX E DH0002 – SEWER – 01 SEWER

APPENDIX F DH0002 – ACCESS – 01 ROAD LAYOUT

APPENDIX G DH0002 – PHASING – 01 PHASING

APPENDIX H WATER DEMAND CALCULATIONS

APPENDIX I SEWER FLOW CALCULATIONS

APPENDIX J CORRESPONDENCE WITH SEMBCORP SIZA WATER

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(10)

APPENDIX A

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(11)

APPENDIX B

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(12)

APPENDIX C

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(13)

APPENDIX D

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(14)

APPENDIX E

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(15)

APPENDIX F

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(16)

APPENDIX G

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(17)

APPENDIX H

NAMEAREA

(Ha)FAR

TOTAL BULK

(m²)

RESIDENTIAL

BULK (m²)

RESIDENTIAL

DENSITY

(units/ha)

RESIDENTIAL

UNITS (No)

COMMERCIAL

BULK (m²)

RESIDENTIAL

ADD (Ml /day)

COMMERCIAL

ADD (Ml /day)

TOTAL ADD

(Ml /day)

Retail 1 (MU) 19.33 0.50 95 257 71 098 1 208 24 159 1.39 0.17 1.56

Retail 2 6.17 0.15 9 255 - - - 9 255 - 0.07 0.07

Special Residential 1500m2

23.43 0.50 116 865 116 865 7 156 - 0.22 - 0.22

Special Residential 1000m2

26.45 0.50 132 650 132 650 10 264 - 0.36 - 0.36

Special Residential 600/800m2

17.32 0.50 92 900 92 900 14 247 - 0.34 - 0.34

Medium Density (MDR) 43.07 0.15 61 920 61 920 25 1 077 - 1.24 - 1.24

High Density (HDR) 18.09 0.375 71 325 64 540 75 1 357 6 785 1.56 0.05 1.61

Resort 12.92 0.25 32 295 tbd tbd tbd tbd tbd tbd 0.42

Education 12.53 0.35 43 868 - - 43 868 - 0.32 0.32

TOTALS 179.31 - 656 334 539 973 - 4 309 84 067 5.11 0.60 6.13

BASE DATA

Retail 1 (MU) Commercial 6.25 l /m2/day

Retail 1 (MU) Residential 1000 l /day/unit

Retail 2 6.25 l /m2/day Low Impact Retail and Entertainment, Mixed Use for Beach Node

Special Residential 1500m2

1200 l /day/unit

Special Residential 1000m2

1200 l /day/unit

Special Residential 600/800m2

1200 l /day/unit

Medium Density (MDR) 1000 l /day/unit

High Density (HDR) Residential 1000 l /day/unit Planned unit development with 10% commercial

High Density Commercail 6.25 l /m2/day

Resort 11.2 l /m2/day

Education 6.25 l /m2/day

Losses (15%) 1.15 -

NB: Based on latest land use schedule 08/12/2015 Drawing No. T01.DUR.000121/01

Base demands from Siza Water's Master Plan

TINLEY MANOR SOUTH TOTAL WATER DEMAND

TABLE 1

Mixed retail, office and residential node

V:\DH0002_TINLEYE1\3_Working\3-5_DivW\Calcs\Spreadsheets\TINLEY MANOR DEMANDS

TINLEY MANOR PHASING - WATER DEMAND

TABLE 2

LAND USE AREA (m2)

BULK

COMMERCIAL

AREA (m2)

NO. OF

UNITS

ADD

(Ml /day)

Cumulative

Total (Ml /day)

PHASE 1

Special Residential 600/800m2 38 854 - 56 0.08

Medium Density Residential 57 431 - 144 0.17

TOTAL 96 285 - 199 0.24 0.24

PHASE 2

Special Residential 600/800m2 55 560 - 79 0.11

Medium Density Residential 75 244 - 188 0.22

TOTAL 130 804 - 267 0.33 0.57

PHASE 3

Special Residential 1000m2 82 168 - 82 0.11

Medium Density Residential 31 114 - 78 0.09

TOTAL 113 282 - 160 0.20 0.77

PHASE 4

Special Residential 1000m2 90 204 - 90 0.12

Medium Density Residential 53 759 - 134 0.15

TOTAL 143 963 - 225 0.28 1.05

PHASE 5

Special Residential 1000m2 37 011 - 37 0.05

Medium Density Residential 8 779 - 22 0.03

TOTAL 45 790 - 59 0.08 1.13

PHASE 6

High Density 22 552 2 262 169 0.21

Retail 1 - Mixed Use 7 207 8 053 45 0.11

TOTAL 29 759 10 315 214 0.32 1.45

PHASE 7

Special Residential 600/800m2 78 818 - 113 0.16

Medium Density Residential 12 644 - 32 0.04

TOTAL 91 462 - 144 0.19 1.64

PHASE 8

Medium Density Residential 76 578 - 191 0.22

High Density 144 303 2 262 1 082 1.26

Retail 1 - Mixed Use 17 364 8 053 109 0.18

TOTAL 238 245 10 315 1 382 1.66 3.30

PHASE 9

Single Residential 1500m2

234 289 - 156 0.22

Medium Density Residential 79 906 - 200 0.23

TOTAL 314 195 356 0.45 3.75

PHASE 10

Special Residential 1000m2 55 081 - 55 0.08

Medium Density Residential 35 256 - 88 0.10

High Density Residential 14 066 2 262 105 0.14

Retail 1 - Mixed Use 168 704 8 053 1 054 1.27

Retail 2 61 702 9 255 - 0.07

Education 125 337 43 868 - 0.32

Resort 129 178 32 295 - 0.42

TOTAL 1 217 714 95 732 1 303 2.38 6.13

DEVELOPMENT TOTAL - - 6.13

V:\DH0002_TINLEYE1\3_Working\3-5_DivW\Calcs\Spreadsheets\TINLEY MANOR DEMANDS

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(18)

APPENDIX I

NAMEAREA

(Ha)FAR

TOTAL BULK

(m²)

RESIDENTIAL

BULK (m²)

RESIDENTIAL

DENSITY

(units/ha)

RESIDENTIAL

UNITS (No)

COMMERCIAL

BULK (m²)

RESIDENTIAL

ADF (Ml /day)

COMMERCIAL

ADF (Ml /day)

TOTAL ADF

(Ml /day)

Retail 1 (MU) 19.33 0.50 95 257 71 098 1 208 24 159 1.10 0.14 1.24

Retail 2 6.17 0.15 9 255 - - - 9 255 - 0.05 0.05

Special Residential 1500m2

23.43 0.50 116 865 116 865 7 156 - 0.17 - 0.17

Special Residential 1000m2

26.45 0.50 132 650 132 650 10 264 - 0.29 - 0.29

Special Residential 600/800m2

17.32 0.50 92 900 92 900 14 247 - 0.27 - 0.27

Medium Density (MDR) 43.07 0.15 61 920 61 920 25 1 077 - 0.98 - 0.98

High Density (HDR) 18.09 0.375 71 325 64 540 75 1 357 6 785 1.23 0.04 1.27

Resort 12.92 0.25 32 295 tbd tbd tbd tbd tbd tbd 0.38

Education 12.53 0.35 43 868 - - 43 868 - 0.25 0.25

TOTALS 179.31 - 656 334 539 973 - 4 309 84 067 4.04 0.48 4.90

BASE DATA

Retail 1 (MU) Commercial 4.38 l /m2/day

Retail 1 (MU) Residential 700 l /day/unit

Retail 2 4.38 l /m2/day Low Impact Retail and Entertainment, Mixed Use for Beach Node

Special Residential 1500m2 840 l /day/unit

Special Residential 1000m2 840 l /day/unit

Special Residential 600/800m2 840 l /day/unit

Medium Density (MDR) 700 l /day/unit

High Density (HDR) Residential 700 l /day/unit Planned unit development with 10% commercial

High Density Commercail 4.38 l /m2/day

Resort 9 l /m2/day

Education 4.38 l /m2/day

Infiltration 30% 1.3 -

NB: Based on latest land use schedule 08/12/2015 Drawing No. T01.DUR.000121/01

Base demands from Siza Water's Master Plan

TINLEY MANOR SOUTH TOTAL SEWER FLOW

TABLE 3

Mixed retail, office and residential node

V:\DH0002_TINLEYE1\3_Working\3-5_DivW\Calcs\Spreadsheets\TINLEY MANOR DEMANDS

LAND USE AREA (m2)

BULK

COMMERCIAL

AREA (m2)

NO. OF

UNITSADF (Ml /day)

CUMULATIVE

FLOW (Ml /day)

PHASE 1

Special Residential 600/800m2 38 854 - 56 0.06

Medium Density Residential 57 431 - 144 0.13

TOTAL 96 285 - 199 0.19 0.19

PHASE 2

Special Residential 600/800m2 55 560 - 79 0.09

Medium Density Residential 75 244 - 188 0.17

TOTAL 130 804 - 267 0.26 0.45

PHASE 3

Special Residential 1000m2 82 168 - 82 0.09

Medium Density Residential 31 114 - 78 0.07

TOTAL 113 282 - 160 0.16 0.61

PHASE 4

Special Residential 1000m2 90 204 - 90 0.10

Medium Density Residential 53 759 - 134 0.12

TOTAL 143 963 - 225 0.22 0.83

PHASE 5

Special Residential 1000m2 37 011 - 37 0.04

Medium Density Residential 8 779 - 22 0.02

TOTAL 45 790 - 59 0.06 0.89

PHASE 6

High Density 22 552 2 262 169 0.17

Retail 1 - Mixed Use 7 207 8 053 45 0.09

TOTAL 29 759 10 315 214 0.25 1.14

PHASE 7

Special Residential 600/800m2 78 818 - 113 0.12

Medium Density Residential 12 644 - 32 0.03

TOTAL 91 462 - 144 0.15 1.30

PHASE 8

Medium Density Residential 76 578 - 191 0.17

High Density 144 303 2 262 1 082 1.00

Retail 1 - Mixed Use 17 364 8 053 109 0.14

TOTAL 238 245 10 315 1 382 1.32 2.61

PHASE 9

Single Residential 1500m2

234 289 - 156 0.17

Medium Density Residential 79 906 - 200 0.18

TOTAL 314 195 - 356 0.35 2.97

PHASE 10

Special Residential 1000m2 55 081 - 55 0.06

Medium Density Residential 35 256 - 88 0.08

High Density Residential 14 066 2 262 105 0.11

Retail 1 - Mixed Use 168 704 8 053 1 054 1.01

Retail 2 61 702 9 255 - 0.05

Education 125 337 43 868 - 0.25

Resort 129 178 32 295 - 0.38

TOTAL 1 217 714 95 732 1 303 1.93 4.90

DEVELOPMENT TOTAL - - 4.90

TINLEY MANOR PHASING - SEWER FLOW

TABLE 4

V:\DH0002_TINLEYE1\3_Working\3-5_DivW\Calcs\Spreadsheets\TINLEY MANOR DEMANDS

Tongaat Hulett Developments Tinley Manor South Engineering Services Report

v:\dh0002_tinleye1\1_project management\1-5_latest reports\engineering services report\engineering services report tinley manor south - rev 4.docx/mr

2016/01/06

(19)

APPENDIX J

1

Moodley, Radeshni

From: Nikilesh Misra <[email protected]>

Sent: 08 December 2015 03:32 PM

To: Moodley, Radeshni

Cc: Cunningham, Gregg; Ellis, Jonathan; Sheritha Parthab; Roshan Chalithar

Subject: RE: DH0002-1-2-1:TINLEY MANOR SERVICING

Hello Radeshni

Please see below amendments to your summary.

Regards

Nicky Misra

Project Manager

[email protected]

Suite 1-4,Reypark House, Rey’s Place, Avondale, Ballito PO Box 1635, Ballito, 4420

+2732 946 7202

+2783 3099467

+2732 946 2188

���� Save a tree. Don't print this e-mail unless it's really necessary

This e-mail is confidential and may also be privileged. If you are not the intended recipient, please delete it and notify us immediately. You should not copy or use it for any purpose, nor disclose its contents to any other person. Thank you.

From: Moodley, Radeshni [mailto:[email protected]]

Sent: 08 December 2015 09:00 AM

To: Nikilesh Misra Cc: Cunningham, Gregg; Ellis, Jonathan

Subject: DH0002-1-2-1:TINLEY MANOR SERVICING

Hi Nicky,

Thanks for meeting with us. As per our discussion yesterday, the following is noted with regard to the Tinley Manor

South Banks Development:

Water:

• Water for the first phase of the development can be made available by the extension of the existing 250mm

diameter from Taffeni Reservoir. We will need confirmation of the demand for the 1ST

Phase before

committing to this.

• Thereafter the Taffeni reservoir will require upsizing to supply the following phases. There is sufficient space

available to upsize the reservoir to a ultimate capacity of 7.5ML. Existing Reservoir is 2.5ML.

Design has been completed to construct in 2 x 2.5ML Modules

2

• The construction of the new Seaton Delaval Reservoir is uncertain at present due to the uncertainty of the

development. Sembcorp will have to probably redraft a new Services Agreement as there will be new

owners and the usage of the Seaton Delaval Development may change.

• The existing 110mm diameter watermain that supplies Tinley Manor Reservoir can be abandoned however a

new supply line from the Umgeni Bulk line to Tinley Manor Reservoir would need to be constructed. Umgeni

has given approval for a connection of their feeder line. The length of main required to the Tinley Manor

Reservoir is approximately 2.5km.

Sewer

• Sewer can be pumped or gravitate to the existing Sheffield WWTW

• Current flow at the treatment works is approx. 0.5ML

• Once Hugh Dent P/Station is complete flow at the WWTW will increase.

• The inlet is designed to accommodate 18 Ml/day and treatment capacity is 6Ml/day but can be increased to

the ultimate of 18Ml/day.

• An option is also available to gravitate sewer to the Christmas Bay P/station however this may require

demolishing and upsizing the existing pumphouse. Furthermore the route of the rising main to Christmas

Bay will be quite complicated. The sump may need to be upsized however there is not much space available

and the site is within the 100m high water mark which will pose additional problems in getting approvals.

The rising main from Christmas Bay has not been installed as yet

I trust the above is in order, please feel free to add on anything I’ve omitted.

Kind Regards,

Radeshni Moodley | Engineer, Urban Development SMEC South Africa 2 The Crescent, Westway Office Park, Westville, Durban, South Africa, 3629 T +27 (31) 277 6637 | F +27 (31) 277 6700 | M +27 (84) 941 2809 [email protected] | www.smec.com | LinkedIn ____________________________________________________ SMEC SNOWY MOUNTAINS ENGINEERING CORPORATION Local People. Global Experience. Disclaimer: The information contained in this e-mail and any attachment file is confidential. It is intended for the addressee, and may not be used, reproduced, disclosed or distributed without SMEC's permission. SMEC accepts no liability for loss or damage (whether caused by negligence or not) resulting from the use of any attached files. Please consider the environment before printing this email.

This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual

or entity to whom they are addressed. If you have received this e-mail in error please notify the originator of

the message. This footer also confirms that this e-mail message has been scanned for the presence of

computer viruses. Any views expressed in this message are those of the individual sender, except where the

sender specifies and with authority, states them to be the views of Siza Water Company (Pty) Ltd.

_____________________________________________________________________

This e-mail has been scanned for viruses by Symantec.Cloud.