Engr. Salis Usman, General Manager, Power System Planning
National Transmission and Despatch Company10th January 2020, WAPDA House, Lahore
![Page 2: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/2.jpg)
Today’s Focus
1. Where it all began?
2. Where do we stand today?
3. Major Challenges for NTDC
4. NEPRA Approves Market Model
5. Layout of Electricity Market
6. Mandate for NTDC
7. Mandate for NPCC
National Transmission and Despatch Company
![Page 3: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/3.jpg)
To set the perspective, particularly for NTDC
professionals and generally for power sector
professionals, with respect to understanding the
envisioned roles and responsibility under the
upcoming competitive wholesale power market
in Pakistan.
Objective of this Presentation
National Transmission and Despatch Company
![Page 4: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/4.jpg)
1. WAPDA, a vertically integrated utility (1958)
2. Major functions of WAPDA Power Wing:
a. Power Generation
b. Power Transmission
c. Power Distribution
Pakistan WAPDA
National Transmission and Despatch Company
![Page 5: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/5.jpg)
Restructuring of Power Sector
National Transmission and Despatch Company
![Page 6: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/6.jpg)
NTDC Mandate
National Transmission and Despatch Company
1. NTDC was granted
license in 2002 under
section 17 of the
NEPRA Act 1997
2. “For the purpose of this
License the minimum
transmission voltage is
declared to be 220 kilo
volts and above”.
![Page 7: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/7.jpg)
NTDC: A Major Stakeholder
National Transmission and Despatch Company
`
Generation Transmission Distribution
WAPDA
NTDCDISCOs
K-Electric
PAEC
IPPs
Public Lightening
AgriculturalConsumer
DomesticConsumer
IndustrialConsumer
CommercialConsumer
Bulk BuyerK-Electric
500 kV220 kV
500 kV220 kV
132 kV11 kV
![Page 8: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/8.jpg)
NTDC Responsibilities
National Transmission and Despatch Company
1. System Planner
2. Transmission Network Operator
3. System Operator
![Page 9: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/9.jpg)
NTDC Core Functions
National Transmission and Despatch Company
The Wire Business
1. Transmission & Generation Planning
2. Project Development and Execution
3. Operation & Maintenance of Transmission Assets
4. Design and Engineering
System Operation and Despatch
1. Economic Generation & Despatch
2. Power System Operation and Control
![Page 10: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/10.jpg)
CategoryGrid Stations Transmission Lines Capacity
Nos. km MVA
Existing System (2020)
500 kV 16 5,970 22,350
220 kV 45 11,322 31,240
Total 61 17,292 53,590
National Transmission and Despatch Company
NTDC Transmission Network
![Page 11: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/11.jpg)
NTDC Transmission Network 2020
![Page 12: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/12.jpg)
NTDC Transmission Network 2025
![Page 13: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/13.jpg)
CategoryGrid Stations Transmission Lines Capacity
Nos. km MVA
Existing System (2020)
500 kV 16 5,970 22,350
220 kV 45 11,322 31,240
Total 61 17,292 53,590
Future System (2025)
500 kV 24 12,633 39,150
220 kV 71 15,894 54,100
765 kV 1 500 3,600
±660 kV 2 (Converter Stations) 886 4,000
±500 kV 1 (Converter Station) 110 1,000
Total 99 30,023 101,850
NTDC Transmission Network 2025
![Page 14: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/14.jpg)
1. Upcoming ARE Policy 2019/2020
2. Upcoming Electricity Policy
3. Unprecedented transmission development plans
4. Effective Regulatory compliance
5. Sind Transmission and Despatch Company secures license from NEPRA
6. Implementation of Performance Culture and Institutional improvements
7. Setting up of R&D Function
8. Revamping of training function at NTDC
9. Development of NTDC Business Plan
10. IT revolution (ERP and many other initiatives)
11. Strengthening the CSR dimension
12. Right of Way issues
13. Revamping the Procurement processes
14. Upcoming competitive power market – more expectations from NTDC
National Transmission and Despatch Company
Major Challenges for NTDC
![Page 15: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/15.jpg)
IGCEP2040
Feb. 2019
Procurement of Modern Software
Sep. 2019
Lahmeyer VRE Study
Nov. 2019
Longterm Forecast (EV+NPHS)
Nov. 2019
Jan. 2019
IGCEP2047
Jan. 2019
Transmission Expansion Plan 2047
Transmission Investment
Plan
Jun. 2020 Sep. 2020
Completed Ongoing To be Started
Pakistan VRE Locational
Study
Feb. 2019
ARE Policy 2019
NTDC Transmission Investment Plan
National Transmission and Despatch Company
![Page 16: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/16.jpg)
NEPRA Approves Market Model
National Transmission and Despatch Company
![Page 17: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/17.jpg)
NTDC in the Competitive Market
Stakeholders
ServiceProviders
System Operator
Market Operator
Metering Service
Providers
Transmission Service Provider
IAAPlanner
MarketParticipants
DISCOsGenerators
SuppliersBPC
National Transmission and Despatch Company
![Page 18: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/18.jpg)
Layout of Electricity Market
National Transmission and Despatch Company
Regulatory
• Grid Code
• Open Access
• Licensing
• Tariff
• Loss Administration
• Payment Security
• Dispute Settlement
Planning
• Medium Term
• Long Term
• Grant of Access
• Protection Coordination
• Standards
• Metering
System Operation
• Security
• Reliability
• Scheduling
• Despatch
• Congestion Management
• SCADA
• Ancillary Services
Stakeholders
• Generators
• IPPs
• Transmission Licensees
• Distribution Licensees
• Traders
• Power Exchanges
![Page 19: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/19.jpg)
Mandate for NTDC
National Transmission and Despatch Company
1. Managing transparency in all the business functions
2. Data institutionalization
3. Metering (Completion, Fine Tuning of SMS at CDPs)
4. Strengthening of demand forecasting function
5. Strengthening of generation & transmission planning
6. Improving processes and structure
7. Amendments in Grid Code and
8. Proposing Connections Agreements
9. Awareness and Capacity building for market readiness
![Page 20: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/20.jpg)
Mandate for NPCC
National Transmission and Despatch Company
1. Managing transparency in all the business
functions
2. Data institutionalization
3. Efficiency in the dispatch of power plants
4. Improving processes and structure
![Page 21: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/21.jpg)
National Transmission and Despatch Company
![Page 22: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/22.jpg)
Motivation
National Transmission and Despatch Company
Effective compliance
with regulatory
requirements
minimizes any risks
involved with non-
compliance events.
![Page 23: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/23.jpg)
Critical Strategies
1. Identify regulatory requirements as laid down
in the Licence and assess the risks associated
with each non-compliance event;
2. Ensure that NTDC staff is aware of these
requirements and their own roles and
responsibilities in this context; and
3. Provide a program, guidelines, and procedures
to facilitate efficient and effective compliance.
National Transmission and Despatch Company
![Page 24: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/24.jpg)
Regulatory Compliance Framework
National Transmission and Despatch Company
![Page 25: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/25.jpg)
How We Reached Here?
National Transmission and Despatch Company
1958
Provisional Electricity Departments
were transferred to WAPDA and
accordingly Area Electricity Boards
(AEBs) were established in 1982
199419821947-58
Localized generation
and distribution of
power
Independent Power Producers (IPPs)
![Page 26: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/26.jpg)
How We Reached Here?
National Transmission and Despatch Company
1997 20191998 2002 2005
IGCEP
NEPRA Grid Code
Power Policy 2002
![Page 27: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/27.jpg)
Power Sector Hierarchy
National Transmission and Despatch Company
NTDC
1. System Operation
2. Transmission Network Operator
1994 IPPs
2002 &
onward IPPs
GENCOs
PPAs
WAPDA
(Hydel)
CPPA-G
Market Rules
1. Market Operator
2. Market Operations
Commercial Code
1. Meter Reading Verification
2. Billing
3. Settlements4. Payments
Grid Code
EPP & CPP
(EPP & CPP)
+UoSC
(EPP & CPP) +UoSC+ MOF
DISCOs
IESCO
FESCO
LESCO
SEPCO
MEPCO
GEPCO
HESCO
QESCO
PESCO
TESCO
(EPP & CPP) +UoSC+ MOF+ DM
Generation
Portfolio
Renewables Power Flow
Financial Flows
![Page 28: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/28.jpg)
Ownership Structure
National Transmission and Despatch Company
Ownership Structure
GenerationTransmission and
DespatchDistribution
IPPs+K
Electric
GENCOs+
WAPDA+
PAEC
National Transmission and Despatch Company
10DISCOs
K Electric
State Owned Privately Owned
Privately Owned
![Page 29: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/29.jpg)
NTDC Mission Statement
National Transmission and Despatch Company
Contribute in the development of a prosperous
Pakistan by managing a stable, reliable and
economical transmission and despatch system
through professional excellence in terms of team
efforts and delivery
![Page 30: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/30.jpg)
NTDC of Tomorrow
National Transmission and Despatch Company
NTDC aims to be the best Transmission Company while
adopting best utility practices, ensuring Transmission
System Reliability and Safety and committed to become the
best service provider to the power producers, distribution
companies and bulk power consumers connected to its
Network.
Working to acquire new technologies including 765 kV AC
and ± 660 kV DC for better dispersal and transmission of
power.
![Page 31: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/31.jpg)
Performance at NTDC
National Transmission and Despatch Company
• Understand and communicate clarity on the purpose
• Follow rules yourself and then expect from others
• Ensure regulatory compliance proactively
• Have total faith in Allah Almighty & trust on team’s abilities
• Be brave to own your mistakes and failures
• Assess and review thoughts before shaping in ideas
• Manage your resources well – humans come first
• Acknowledge others’ performance specially of juniors
• Say No to tentativeness, comprising and pessimism
• Exhibit highest level of commitment with organizational goals
• Keep excelling and aim to stay at top – nothing short
![Page 32: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/32.jpg)
NTDC: Existing Network
National Transmission and Despatch Company
![Page 33: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/33.jpg)
NTDC: Future Network
National Transmission and Despatch Company
![Page 34: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/34.jpg)
Financial Perspective
National Transmission and Despatch Company
Tariff
1. Source of earning is Use of System Charge through
NEPRA tariff
2. Applicable tariff 2017-18 is Rs. 148.33 /kWh/month
3. KE and other few adjustments not allowed by NEPRA
4. Allowed losses @ 2.8% against demanded @ 3%
![Page 35: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/35.jpg)
Financial Perspective
National Transmission and Despatch Company
Financial Performance
1. 2016: Net after tax profit of Rs. 9,227 million
2. 2017: Net after tax profit of Rs. 10,585 million
3. 2018: Net after tax profit of Rs. 14,736 million
4. 2018: Current Ratio (Current Asset/Current Liability) = 1.48
5. 2018: Debt Equity ratio for 2018 = 86%
![Page 36: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/36.jpg)
Factors for Electricity Market
National Transmission and Despatch Company
Robust Transmission System Control Area Demarcation & Boundary Metering Streamlined Scheduling and Settlement Mechanism Assessment of Transfer Capability Congestion Management Imbalance Handling Mechanism Methodology for Transmission Charge Sharing Treatment of Transmission Losses Transparent and Non-discriminatory Implementation Compliance Monitoring and Regulatory Oversight Dispute Redressal Mechanism
![Page 37: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/37.jpg)
Competitive Regime
National Transmission and Despatch Company
![Page 38: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/38.jpg)
STDC features
National Transmission and Despatch Company
1. "Transmission Business" means
planning, development, construction and
maintenance and operation of
transmission facilities;
2. The term is thirty (30) years;
3. The Licensee shall comply with the
provisions, terms & conditions of the
Grid Code;
4. The Licensee shall adhere to the IGCEP;
5. The Licensee shall offer its transmission
and inter-connection services to NTDC
![Page 39: Engr. Salis Usman, General Manager, Power System Planning ... · Engr. Salis Usman, General Manager, Power System Planning National Transmission and Despatch Company 10th January](https://reader034.vdocument.in/reader034/viewer/2022042306/5ed1bb7221276e370023b487/html5/thumbnails/39.jpg)
STDC License Granted
National Transmission and Despatch Company