Page 1: enjoys an enviable reputation across a broad range of
Page 2: enjoys an enviable reputation across a broad range of

Above : Grange Dental Care, Omagh

Right : North Western health BoardManorhamilton

The company is based at Carrickmore,near Omagh, and from this base hasgrown a reputation for quality andexperience that has led it to becomeone of the most respected names in thebuilding and civil engineering industry.

Acting as Principal Contractor,completed projects range from housingschemes to large office block projectsand both major and minorrefurbishment works.

The family-run business is headed upby founder Brendan Loughran,supported by sons Enda, Dermot andEunan along with daughter Eilis, and aworkforce of over 80 employees.

Health and Safety, along withenvironmental awareness are toppriorities. The company has a fully

qualified in-house health and safetyofficer and an ongoing environmentalpolicy based on sustainabledevelopment.

The company structure is based on asimple hierarchy system whereby thevarious finishing foremen report to thesite foreman who in turn is answerableto a site agent who then reports back tothe directors on a weekly basis.

Brendan Loughran & Sons find that acombination of weekly progressmeetings with directors, site agent, siteforemen and respective domestic sub-contractors, together with a ‘hands on’approach provides a well structuredand well managed project ensuring aquality product completed within theclient’s programme and budget.

Established in 1974, Brendan Loughran & Sonsenjoys an enviable reputation across a broad range ofbuilding contracts all over Ireland.

“We are fully committed tocompleting projects to thehighest standards, on timeand within budget.”

Page 3: enjoys an enviable reputation across a broad range of

We are currently in the process ofworking towards full accreditation to ISO9001 and have adopted the BusinessExcellence Model to facilitate effectivequality environmental management anddeliver continual improvement.

With a view to continually improve thequality of Brendan Loughran & Sons Ltdbusiness, the company will develop thequality objectives on an annual basis,which will endeavour to:

• Work with our supply chain toensure communication ofrequirements and identification ofopportunities for improved projectdelivery

• Continually review and assesscompetences of all personnel andsupply chain and ensure effectivetraining is delivered when required.

• Continually review and monitor clientsatisfaction

• Where within our scope co-ordinatematerial specification with clients,sub-contractors and suppliers toensure high quality materials areused throughout the constructionprocess.

• The management system will bedocumented so that it can beinterpreted consistently, readilycommunicated and continuouslyimproved through audit and review

• Employees are expected to followthe documented procedures and toidentify any areas where practicecan be improved therebycontributing to the continuingdevelopment and growth of thecompany.

The above policy will be reviewedannually and communicated to allinterested parties.

Brendan Loughran &Sons Ltd is committed tomeeting the needs of itsclients and delivering ahigh standard ofdevelopment through itsconstruction projects.

Page 4: enjoys an enviable reputation across a broad range of

castleblaney arts andcommunity resourcecentre

This project comprised the constructionof a two storey Arts and CommunityResource Centre, and includedassociated drainage, external and sitedevelopment works. The building, approx3200m2 is located on Brae St.,Castleblaney.

As the adjacent school had to remainopen during the construction period, itwas important that the entrance of thesite and adjoining areas were kept freeand unobstructed.

f. e. mcwilliam centre

This wide ranging project, located on theNewry Road, Banbridge, contained alarge range of works on a variety ofbuildings, including a Main Building, awashblock and an Arts Studio.

The project included construction of anew single storey extension, demolition,provision of piling, building timber framestructures, curtain walling, a variety offloor finishings, tiling, drainage, andfencing.

the tara hotel, killybegs

This scheme, in Killybegs, Co. Donegal,encompassed the demolition of the PierBar, Killybegs, and construction of a new31 bedroom hotel and bars, working withArchitects Sean Dockry & Associates,Galway, and Structural Engineers CoyleKennedy Consulting Engineers.

construction

Page 5: enjoys an enviable reputation across a broad range of

the alley theatre,strabane

This program, which includedsurveying of existing buildings fordefects, was carried out for StrabaneDistrict Council at Dock St., CanalSt., Railway St., Strabane, Co.Tyrone.

The work, keeping to tight budgetaryand time constraints, was carried outin eight weeks, and included paving,ramps, railings, street furniture,electrical services and planting.

fairview drive, killygoan,monaghan

Employed by Monaghan UrbanDistrict Council, this undertakingconsisted of the construction of two 4bedroom semi-detached houses, andtwo corner blocks, each consisting offour 2 bedroom houses and twentyfour 3 bedroom semi-detachedhouses (a total of 34 dwellings) aswell as the required services andamenities, working in tandem witharchitect, Hamilton Young LawlorEllison.

Below :North Western health Board

Manorhamilton

civils

Page 6: enjoys an enviable reputation across a broad range of

m-tek, knockaconny,monaghan

Employed by Monaghan CountyEnterprise Fund, this design andconstruction program was for atechnology focused office workspaceaccommodation together with sundryadditional accommodation.

The work also included all associatedservices engineering, site developmentworks, external works and readying foroccupation. In total, there was 30,000sqft of workspace accommodation,including 15,000sq ft of the total areafitted out with lighting, heating, receptionareas, kitchen, toilets etc.

design & build Right : m-tek, monaghanBelow : Social housing scheme, Lisburn

Page 7: enjoys an enviable reputation across a broad range of

ballymacoss central,phases 2, 4, 5

A project containing 176 traditionalconstruction decorative brick dwellings(50 in phase 2, 51 in phase 4 and 75 inphase 5) of various formats (bungalows,houses and flats) as well as associatedexternal and site development works.

Later phases also included accessroads and gas central heating.

multi-elementimprovementsdunavon park,dungannon

Work on this scheme consisted of multi-elemental improvements of twelve flatsin Dungannon and included majorelements such as new porches andstaircases, layout changes and floorarea enlargements, roofing, windows,electrical rewiring, replumbing andinstallation of new oil fired centralheating, plus external improvements.

multi-elementimprovementsomagh, beragh, trillick &carrickmore

This program of improvements, carriedout for Northern Ireland HousingExecutive, covered 41 dwellings in 4different towns, at 7 different sites,which required phasing of the work dueto the houses being occupied bytenants.

The works included repair andreplacement of walls, floors, roofs,finishes, windows, doors, frames,fascias, mechanical and electricalservices, rainwater goods, paths,fencing etc, as well as external re-decoration, and some more majorelements including electrical re-wiring,re-plumbing and re-heating, plus newbathrooms and kitchens to all dwellings.

social housing

Page 8: enjoys an enviable reputation across a broad range of
Page 9: enjoys an enviable reputation across a broad range of

dental surgery andapartmentscrevenagh road, omagh

This project comprised of the demolitionof an existing two story house, and theerection and completion of two 2 storeyblocks containing a dental surgery andapartments, together with associatedmechanical and electrical works,drainage and sitework. The timescale forcompletion of the project was 8 months.

sixmilecross primary schoolcooley road, sixmilecross

This 14 month scheme was for a newprimary school and nursery unit ofapproximately 1254m2. Employed by theWestern Education and Library Board, andworking in conjunction with Keys &Monaghan Architects Ltd.

st. patricks grammar school,armagh

This program, for St. Patricks GrammarSchool, Cathedral Road, Armagh, involvedwork on a 1011m2 technology block withplant room and basement, a 667m2 twostorey music / history block andrefurbishment of existing areas, includingsite preparation, substructure,superstructure, internal finishing, mechanicaland electrical and external work.

With the school being open and operationalthroughout the works, special care had tobe taken.

education

commercial

Page 10: enjoys an enviable reputation across a broad range of

apartment development,carrickfergus

This private housing scheme forMorrison Homes Ltd consisted of theconstruction of a four story apartmentdevelopment with piled foundations,blockwork rendered walls with featurebalconies, precast concrete ground andupper floors, trussed and cut roof, fullyserviced with associated siteworks anddrainage.

All work needed to be carried out instrict accordance with NHBC standards,and, due to the nature of thedevelopment, the purchaser was able toselect their own kitchen, bathroom andwall tiles from ranges identified withintender documentation. The project wascompleted in 3 phases, those being a 9unit, a 12 unit, and a final 9 unit blockrespectively.

private housing

Page 11: enjoys an enviable reputation across a broad range of

Right topOmagh Aluminium Systems

BottomGrange Dental Care, Omagh

letterkenny generalhospital

Works undertaken for the NorthWestern Health Board at LetterkennyGeneral Hospital included alterationsand extensions to provide echo-cardiograph and oncology /haematology ward accommodation.Mainly in the form of phased projects,the work included provision of amodular building by a nominated sub-contractor and extensive structuralalterations and refurbishment of theexisting hospital building.

Given the health and safety implicationsof work in and around an operationalhospital, prevention measures had to betaken to reduce health risks withoperational procedures and anti-aspergillosis infection measures inplace.

health

Page 12: enjoys an enviable reputation across a broad range of

brendan loughran & sons ltdBuilding & Civil Engineering Contractors

11 Termon RoadCarrickmore

OmaghBT79 9JW

T. 028 8076 1313F. 028 8076 1013

E. [email protected]