    Evolution of Dabhol Project

    Pioneering project, thus policies and approvalsare still evolving.

    Decision to enter market based on

    attractiveness of the marketwesternizedlegal code, widespread use of English anddemocracy

    Source gas unreliable thus LNG chosen Gulf countries chosen to supply LNG

    Simultaneous construction of modern port

  • 8/21/2019 Enron - Dahbol Power Project

    3/9

    CHRONOLOGY

    Feb 1992 Investigating Indian power sector after an advertisement was placed

    for a 200MW plant near Delhi. Discussions with the World Bank and a

    meeting with governments power secretary S.Rajgopal

    may 1992 Enron invited Rajgopal to Houston, to talk to Mark and Lay about

    private power business. They said youneed pioneers we will be path

    breakers and set the precedent

    June 1992 Enron team visited Delhi as a potential site. But Delhi state authority

    appeared unenthusiastic. According to Enron Rajgopal guided them

    towards Maharashtra State Electricity Board(MSEB).

    Phase 1: generate 695MW without LNG supplies and burn distillate

    fuel sourced locally.

    Phase 2: introduce additional 1320MW and would entail building rest

    of the plant

    June 1992 Enron and MSEB signed MoU with sparse details except cap on the

    ultimate price of power at 7.3 cents per KwH.

  • 8/21/2019 Enron - Dahbol Power Project

    4/9

    June-oct 1992 Lawyers were hired to begin drafting the documents of the risk

    sharing relationships of Enron, Bechtel and GE as builders ,

    owners and operators and MSEB as purchaser. It was MSEBs

    first contract.

    Oct 1992 Enron presented their proposal to the Foreign Investment

    Promotion Board(FIPB) with Rajgopal as the guiding force.

    Dec 1992 FIPB approved the project. Rajgopal promoted from power

    secretary to cabinet secretary. The World Bank said that Dabhol

    plant would create years of excess capacity, proving anexpensive alternative to coal. Sutton challenged the bad press

    generated by the report by stressing the environmental benefits

    of the project. Lobbying at the World Bank headquarters, Enron

    and MSEB strategized demand/cost analysis to present to the

    bank.

    Jan 1993 Bombay witnessed widespread communal rioting. Subsequentterrorist bombings of BSE and various commercial centres

    forced the new chief minister to take office.

  • 8/21/2019 Enron - Dahbol Power Project

    5/9

    Feb 1993 The GOM objected to the projected 26.52% return to equity holders

    because previous projects had been approved with lower 16% return.

    After negotiation Enron offered lower ROR of 25.22% and 10%

    permanent equity ownership to MSEB.

    May 1993 Various documents including Power Purchase Agreement(PPA) that

    defined the relationship between MSEB and DPC were readied.

  • 8/21/2019 Enron - Dahbol Power Project

    6/9

    Enrons experience in various countries

    It followed a market led approach and provided solution forcomplex energy problems

    China$135 million 150 MW plant on Hainan Island,economic free trade zone, was developed by a US company,

    Enron would be the operator, fuel manager andconstruction contractor. 50% of Ownership interest was tobe given to Enron Global Power and Pipelines. This projecthelped EDCs success in other fast track projects.

    Dominican RepublicFirst phase project, $200 million 185

    MW combined cycle plant. 20 year power purchaseagreement with government. Enron would serve asoperator, fuel manager and construction contractor. 49%stake to be given to Enron Global Power and Pipelines.

  • 8/21/2019 Enron - Dahbol Power Project

    7/9

    Enrons experience in various countries

    Turkey - $545 million 478 MW gas-fired powerplant. Enron would act as an operator andturnkey contractor. Power purchase agreementwith State and guaranteed payment obligations.

    Indonesiatwo projects, $520 million 500 MWgas-fired power project in East Java and $138million 136 MW gas-fired power project in EastKalimantan. 20 year power purchase agreement

    with subject to a gas contract. Enron would bethe turnkey contractor and operator. 50% stake inboth plants.

  • 8/21/2019 Enron - Dahbol Power Project

    8/9

    Why DPC failed??

    BJP which was vehemently against foreign

    dominance in power sector, won in 1995 general

    Elections.

    Central government cancelled the project stating

    higher tariff, lack of transparency, and for

    breaching environmental standards.

    Enron agreed to new contract terms of reducedtariff etc.

    MSEB failed to failed to pay its debts.

    Enron finally decided to terminate the contract.

  • 8/21/2019 Enron - Dahbol Power Project

    9/9

    Ethical Dimensions

    Few clearances were ignored

    Lack of transparency and competition in

    bidding process

    Concerns raised by WB were ignored

    High cost of project

    High tariff