    Analysis for 1 KW Solar Power System

    Our hybrid solar solution will be designed to take care of all your lighting & energy needs. The solar plant installed will be an intelligent system that would supply majority of load through

    solar power & significantly reduce your dependency on grid & DG set.This sheet will also provide you with comparative analysis done by our team of experts between

    solar & other sources (DG Set & Grid Power).

    AREA REQUIRED & COST OF SOLAR SYSTEM (1 KW)Approx. Area required = 11 Sq.Mts

    =118.4 Sq.Ft

    COMPARISON BETWEEN SOLAR AND DG FOR 1KW SYSTEM

    DG System (1KW/ 1.25KVA)

    Cost of diesel: Rs 52/Ltr

    Diesel consumption: 0.2Ltr/Hr

    Hours of operations (Assumed): 5 Hrs

    Description Solar Plant DG Set

    Running Cost/Year Rs. 0 Rs. 18, 720 (=52*0.2*5*30*12)

    Maintenance/Year 1 % of Capex Rs. 400 - Rs. 500

    Efficiency over Lifetime Generation is never Even the new system has only

    below 80 % (42-45) % efficiency

    Spillage & Pilferage NA 1% of the Diesel consumed.

    Expected Life 25 years 7-8 Years

    Utilization of Area Utilization of unused Mainly ground based,

    roof-top Consuming usable space.

    Noise & Vibration NA Heavy

    Pollution NA Both sound & air pollution

    Subsidy benefits Available @ 30 % NA

    Enrys Engineering Pvt. Ltd.

    C-47, Sector-19, Noida, U.P. 201301

    Website: www.enrys.in Email: [email protected]

    Contact: +91-8285579967, 8285579968

    Costing of System with Battery Back-up of 5Hrs

    Approx. costing of 1KW plant with 5 hrs battery

    back-up = Rs 1.45 Lakhs Capital Subsidy from MNRE @ 30% = Rs 0.43 Lakhs

    Effective Cost of System = Rs 1.02 Lakhs

    Costing of System without Battery Back-up

    Approx. costing of 1KW plant = Rs 1.1 Lakhs

    Capital Subsidy from MNRE @ 30% = Rs 0.33 Lakhs

    Effective Cost of System = Rs 77, 000

    http://www.enrys.in/mailto:[email protected]:[email protected]://www.enrys.in/
  • 7/29/2019 Enrys_SolarSystemAnalysis_1KW

    2/2

    PAYBACK & SAVINGS

    Generally the payback period for above system lies between 6-7 years.

    Hence free electricity for next 18-19 years.

    No. of units generated by 1Kw panel/day =5.5 KWHr

    Units generated by installed capacity/year =1650 KWHr (5.5*1*300)

    (Considering 300 days of operation)

    Savings:

    If 50% of these solar generated units (50% of 1650) were taken from grid then,

    Monthly Saving from decreased Grid usage = Rs. 4, 950 (6*825)

    (Cost of Grid electricity assumed= Rs. 6/- per unit)

    If 50% of these solar generated units (50% of 1650) were taken from DG set then,

    Monthly Saving from decreased DG set usage =Rs. 12, 375 (15*825)

    (Cost of electricity Generation using DG= 15/- per unit)

    Total Savings Yearly =Rs. 17, 325/-

    PAYBACK CALCULATION

    Commercial & Industrial users can also claim 80% depreciation in 1st

    year to

    save Income tax.

    Terms & Conditions

    Payment Terms:

    o 20% advance by Demand Draft / Cheque in favour of Godrej payable at MUMBAI

    along with Purchase Order.

    o 65% against Performa Invoice before dispatch of the material.

    o 15% against successful installation and commissioning.o All applicable taxes, duties will be charged extra on the above cost.

    This sheet should be used only for rough estimation, actual quotation will be delivered by Godrej.

    Without Battery Back-up:Payback = Capital Investment / Annual Saving.

    = 77,000 / 17,325

    = 4.44 Years

    Free Electricity for 20.56 Years

    With Battery Back-up:

    Payback = Capital Investment / Annual Saving.

    = 1,02,000 / 17,325

    = 5.88 Years

    Free Electricity for 19.12 Years