STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATION

SOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 3: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

< CLICK >

< CLICK >

Page 4: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

-higher strength and stiffness compared to other structural materials

-stays straight and true, preventing cracks due to shrinking

-non combustible

-does not warp, split, rot over time.

-heavy and expensive

-has tendency to corrode, expensive treatments need to be considered

-slender and exposed steel work may be used to good architectural effects

-steel is formed into sections of efficient shape to minimize weight and make optimal use of expensive materials

< CLICK >

< CLICK >

Page 5: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

easy material to work with-

readily available as a natural product from renewable resources-

Low energy system of construction-

building can be deconstructable or relocatable-

has a wide range of structural uses and appealing- finishes and can be reused many times

stable material which does not conduct heat and cold-

not as strong as steel-

affected by termites and rot-

Flammable-

problems rising from shrinks, warp, splits and twists-

< CLICK >

< CLICK >

Page 6: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

The structure that we’ll look into will be as follows;

POSTS / BEAMS PORTAL FRAMETRUSSES SPACE FRAME

>CLICK ON THUMBNAILS<

< CLICK >

The selection of a generic type structure is based on a number of factors. The most important of which are; scale, which determines the spans involved; internal planning, which dictates the nature of

the internal spaces required; and external treatment. The final selection will be determined by the issues of cost and technical feasibility.

Page 7: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

POSTS / BEAMS

PORTAL FRAMETRUSSES SPACE FRAME

Brief intro-seen in most architectural structures-consist of horizontal spanning elements supported on vertical columns or walls.-Subdivided into 2 categories- skeleton frame and panel structure.

Skeleton frame A network of beams and columns which support floor slabs and roof cladding, and to which wall cladding is attached. Considerable freedom is available for the matter of internal planning. Both the internal partition and exterior walls are non-load bearing. Large wall free space can therefore be created.

Panel structures An arrangement of structural walls and horizontal panels. It imposes greater constraints on planning freedom than skeleton framing.

>CLICK ON THUMBNAILS<< CLICK >

NEXT >>

Page 8: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

POSTS / BEAMS

PORTAL FRAMETRUSSES SPACE FRAME

Characteristics of posts and beams structures-horizontal elements are subjected to bending-type internal forces (gravitational load).-requires structural materials to be capable of resisting both tension and compression (e.g. steel, reinforced concrete, timber)

Advantages- Simple and therefore cheap to construct

Disadvantages-larger amount of materials are required to support a given load which are unnecessary in other types of structure. Thus it is an inefficient type of structure.

<END>

>CLICK ON THUMBNAILS<< CLICK >

<<PREVIOUS

Page 9: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

PORTAL FRAME

TRUSSES

SPACE FRAMEPOSTS / BEAMS

Brief intro-a braced framework of ties, beams or bars usually arranged in a series of triangles, as for the support of roofs.

Characteristics of trusses -2 basic types-main difference being that in one, the principle elements are spaced close together and carry the roof cladding directly. In the other, they are located at fairly wide spacing and are linked by a secondary system of elements to which the cladding is attached.

Advantages-wide variety of roof geometry in elevational forms; flat, mono-pitch, duo-pitch and curved.-relative simplicity and low cost in analyzing and fabrication.

Disadvantages-a vertical load applied is not shared throughout the structure. -labour intensive, rising in labour cost.

<END>

>CLICK ON THUMBNAILS<< CLICK >

Page 10: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

PORTAL FRAMETRUSSES

SPACE FRAME

POSTS / BEAMS

Brief intro-3 dimensional triangulated frame work for enclosing space in which all members are interconnected and act as a single entity.

Characteristics of space frame-vertical load applied to any point will be distributed through all the other elements and thus to all of the supports.

Advantages-Easy installation of mechanical and electrical services and air handling ducts within the structural depth. Thus greatly reducing or even eliminating the need for secondary steel work.-failure of one or a limited number of elements does not necessarily lead to overall collapse of structure.-highly modular structures assembled from components that are almost exclusively factory made.-due to modular nature, space grids may be extended without difficulty and even taken down and reassembled else where.-great choice in the location of supports. Within reason, space grids can be supported at any node of the grid and at practically any location on plan.

NEXT >>

>CLICK ON THUMBNAILS<< CLICK >

Page 11: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

PORTAL FRAMETRUSSES

SPACE FRAME

POSTS / BEAMS

Advantages-the whole roof can be assembled safely at or near ground level, complete with decking and services and then jacked into it final position.

Disadvantages-the cost can sometimes be high when compared with alternative structural systems.-the number and complexity of the joints can lead to a longer erection time on site.

<END>

>CLICK ON THUMBNAILS<< CLICK >

<<PREVIOUS

Page 12: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

PORTAL FRAME

TRUSSES SPACE FRAMEPOSTS / BEAMS

Brief intro-portal frames are in effect arches, but whereas true arches are curved, portal frames may consist of straight members.

Characteristics-can be 3 pin 2 pin or completely rigid-exert horizontal thrust on their foundation-‘pin’ connection does not transfer bending-less stress on knee with low pitches

Advantages-economical-spanning ability of 15-45m column free-ease and speed of erection-simple in construction-less trade skills are required

Disadvantages-bracing needs to be considered as building gets longer.

<END>

>CLICK ON THUMBNAILS<< CLICK >

Page 13: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 14: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

The most ineffective place to do work for a building is on-site, for workers and the weather are unpredictable, therefore any work that can be done off site by other companies saves money and time.

Multiple companies could be all working at the same time and then just truck in there goods at the appropriate time.

Colorbond (non-insulated)

Pros-$15 - $16.50 square meter-Cheap than insulated colorbond-Refinished-Excellent spanning capacity-Excellent speed of erection-Low maintenance-Easy to replace-Quick installation-Can be installed by builder, cheap- Recyclable-Lightweight-Installation time-Small so 1 truck can carry a large surface area -Long life

Cons-Little strength if hit by vehicle-Non-load bearing-No insulation-Extra cost to insulate-Risk in interstitial condensation-Air leakage-Accounts for around 50% of all energy loss.-Low sound insulation-Fire resistance-Transport costs

NEXT>>

< CLICK >

Page 15: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Insulated colorbond

Pros-Cheap-Insulated-Refinished-Excellent spanning capacity-Long life-Excellent speed of erection-Excellent insulation properties-Low maintenance-Easy to replace-Quick installation-Can be installed by builder, cheap-Lightweight-Small so 1 truck can carry a large surface area -Energy payback period of less than 4 years-Low air loss-Accounts for around 50% of all energy loss.-Installation time

Cons-Little strength if hit by vehicle-Non-load bearing-Fire spreads easily through panels-Low sound insulation-Low Fire resistance-Not recyclable-Transport costs

<END>

< CLICK >

<<PREVIOUS

Page 16: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Precast

Pros-$28 - $35 square meter-Reduced maintenance-Thermal properties-Acoustic properties-Fire resistant-Design freedom-Strength if hit by a forklift-Finishes; Aggregate -Load bearing-Installation time

Cons -Expensive-Occupies floor space while curing-Crane needed to lift-Special workers needed to build and lift-Shop drawings needed-Transport costs-Not recyclable

Tilt Up

Pros-Reduce maintenance

-Thermal properties-Acoustic properties

-Fire resistant-Design freedom

-Strength if hit by forklift-No transport

-Installation time-Load bearing

-Long life

Cons-Expensive (less than pre-cast)

-Occupies floor space while curing-Limited finishes when compared

to pre-cast-Crane needed to lift

-Special workers needed to build and lift

-Shop drawings needed -Not recyclable

<END>

< CLICK >

Page 17: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Pros

-Moderate costs-Cheap-Installed by builder-Moderate sound absorption-Easy to replace/ maintain-Recyclable

Cons

-Moderate strength-Non-load bearing-No insulation-Extra cost to insulate-Moisture may get into insulation when it’s onsite, before installation has begun. -Risk in interstitial condensation-Air leakage-Accounts for around 50% of all energy loss.-Sound insulation-Fire resistance-Transport costs -Extra formwork need to support cladding-Additional surface protection needed-Installation time -Short life span when compared to the other cladding listed

<END>

< CLICK >

Page 18: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Pros

-Cheapest of all cladding-Quick installation time-Long life-Recyclable

Cons

-Lowest strength of all materials-Non-load bearing-No insulation-Extra cost to insulate-Risk in interstitial condensation-Air leakage-Accounts for around 50% of all energy loss.-Low sound insulation-Low fire resistance-Transport costs -Possibility of warping

<END>

< CLICK >

Page 19: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<END>

Pros

-Ability to see through-Airtight joins-Easy installation-Easy to replace-Quick installation time-Can be fire rated-Moderate thermal rating-Moderate sound insulation-Long life -Recyclable

Cons -Easy to break-Costly -Non-load bearing-Transport costs

< CLICK >

Page 20: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<END>

Pros

-$17 - $21.50 per square meter-Reduced maintenance-Thermal properties-Acoustic properties-Fire resistant-Design freedom-Strength if hit by forklift-Load bearing-Long life

Cons

-Cost-Limited finishes -Special workers needed to build-Transport-Installation time-Not easily recyclable

< CLICK >

Page 21: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 22: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

‘Green Warehouse’ on Briggs Drive, Altona,

18/03/2004

• Portal Frame Structure with two rows of internal columns• Dimensions: 52 x 70 meters

NEXT>>

< CLICK >

Page 23: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

• Front Stanchion (UB)

•Precast (Concrete)

•Door Column (Parallel Flange Channel)

Door and Front Stanchions

NEXT>><<PREVIOUS

< CLICK >

Page 24: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

15mm Nut

15mm Bolt

15mm Bolt

20mm Nut

10mm Thick

75mm

80 mm

NEXT>><<PREVIOUS

Pin Joint Connection of Stanchion and Cross Bracing

< CLICK >

Page 25: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

310mm

165mm

230mm

80mm

10mm

10mm

160mm

Stanchion

Precast Panel

Door Column

Stanchion, Door Column and Precast Panel

NEXT>><<PREVIOUS

< CLICK >

Page 26: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Cross Bracing (Front)

50mm50mm

Angle Cross Bracing with one bolt connection

NEXT>><<PREVIOUS

< CLICK >

Page 27: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Fly Bracing and Apex Connection

Rafter ApexConnection

Fly Bracing780 mm

6mm Thick

50 x 50mm

NEXT>><<PREVIOUS

< CLICK >

Page 28: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

8 Bolt Connection

Rafter

Apex Connection

NEXT>><<PREVIOUS

< CLICK >

Page 29: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Stanchion

Rafter

Haunching

3650mm

Side Stanchion, Rafter and Haunching

380mm

6 Bolt Connection From Stanchion to Rafter

4 Bolt Connection From Stanchion to Haunching

NEXT>><<PREVIOUS

< CLICK >

Page 30: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

210mm

530mm 15mmThick

25mm Bolt

20mm Nut

10mm ThickConcrete

Stanchion and Cross Bracing

3 Bolt Connection

10mm Thick

90mm

<<PREVIOUS

<RECOMMENDATION>CLICK

< CLICK >

Page 31: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<RECOMMENDATION>

Side Stanchions of 210 x 530mm (15mm thick) dimension,

which are used in this case study, would be sufficiently sized

for implication into a 30 x 54 meter warehouse without

internal columns.

The 230 x 80mm Door Columns are in all probability an

appropriate dimension for our warehouse design.

<<PREVIOUS <END>

< CLICK >

Page 32: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 33: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

‘Blue Warehouse’ on Swann Drive, Derrmit,

23/03/2004

• Portal Frame Structure with no internal columns• Dimensions: 42 x 84 meters

< CLICK >

NEXT>>

Page 34: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Front Stanchion and Concrete Pad

1000mm

310mm

160mm

25mm Bolt

25mm Nut

10mm Thick

NEXT>><<PREVIOUS

< CLICK >

Page 35: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Z and C Purlins

200mm

70mm

2mm Thick

260mm

2mm Thick

70mm

NEXT>><<PREVIOUS

< CLICK >

Page 36: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Side Stanchion, Rafter and Haunching Connection

8 Bolt Connection

610 mm

NEXT>><<PREVIOUS

< CLICK >

Page 37: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Side Stanchion Connection

610mm

230mm

20mm Thick

10mm

25mm Nut

25mm Bolt

NEXT>><<PREVIOUS

< CLICK >

Page 38: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Rod Bracing and Connection

25mm Diameter

Rod Bracing Connection

NEXT>><<PREVIOUS

< CLICK >

Page 39: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

8 Bolt ApexConnection

Apex

NEXT>><<PREVIOUS

< CLICK >

Page 40: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Door Column

230 mm

10mm Thick

80mm

<<PREVIOUS

<RECOMMENDATION>CLICK

< CLICK >

Page 41: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

A Side Stanchion of 230 x 610mm (20mm thick) dimension would be somewhat oversized for a

30 meter span. However it gives a good indication of what the column dimension should be

approximately

25mm diameter Rod Bracing, 260 x 70mm C purlins and 200 x 70mm Z purlins, are all suitable

proportions for our design

Door Columns are of the same proportions as case study one, which further emphasises the point that

the 230 x 80mm (10mm thick) dimensions are suitable

<RECOMMENDATION>

<END><<PREVIOUS

< CLICK >

Page 42: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 43: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

‘Bridgestone Distribution Center’ on Fitzgerald Road, Sunshine,

25/03/2004

Portal Frame Structure30 x 35 meters

NEXT>>

< CLICK >

Page 44: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Stanchion, Rafter and Modified Haunchion

190mm

460mm

2 Bolt Connection

All Three MembersWelded

Welded Connection

15mm Thick

NEXT>><<PREVIOUS

< CLICK >

Page 45: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Apex

8 Bolt Connection

<RECOMMENDATION>CLICK

<<PREVIOUS

` < CLICK >

Page 46: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<RECOMMENDATION>

Case study three provides great examples of member dimensions for our own warehouse design. This is due to its 30 meter span which matches up

with our warehouse

The 8 bolt apex connection seems to be the standard for all portal frame designs.

The 460 x 190mm (15mm thick) stanchions and rafters will most probably be the same members

implicated in our design.

<END><<PREVIOUS

< CLICK >

Page 47: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 48: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

PRECAST RETAINING WALL

NEXT>>

2800MM

2400MM

115MM

200MM

< CLICK >

Page 49: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<<PREVIOUS

CONCRETE RETAINING WALL

NEXT>>

100MM300MM

100MM

2800MM

< CLICK >

Page 50: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<<PREVIOUS

SLEEPER RETAINING WALL

<TIMBER PORTAL FRAME>CLICK

2800MM

115MM

200MM

2400MM

200MM

< CLICK >

Page 51: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 52: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Once the building permits and other relevant construction documentation are correctly completed, the site is prepared for construction with portal offices delivered. The site is cleared, leveled and services are fitted.

NEXT>>

< CLICK >

Page 53: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Pad footing holes are excavated, concrete is poured and column bolts are set. Stanchions are positioned.

NEXT>><<PREVIOUS

< CLICK >

Page 54: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Cranes are brought in to lift prefabricated members into place. Cherrypickers are used to fix members. Concrete panels can then be lifted and placed.

NEXT>><<PREVIOUS

< CLICK >

Page 55: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Steel bracing is fixed into panels and temporary concrete slab.

NEXT>><<PREVIOUS

< CLICK >

Page 56: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Panels are correctly connected. Grids, bracings, water proofing membranes and insulations are applied.

NEXT>><<PREVIOUS

< CLICK >

Page 57: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Office rafters and purlins are assembled and fixed into the concrete walls. The office slab in prepared, concrete is delivered and properly laid.

NEXT>><<PREVIOUS

< CLICK >

Page 58: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<<PREVIOUS

< CLICK >

<END>

A cherrypicker is required to install the metal roof and wall cladding. The interior of the warehouse is cleaned, leveled and prepared for the concrete floor slab. The site is cleared and the road surfaces are laid. The warehouse is now ready

for occupation.

Page 59: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 60: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

A

A

NEXT>>BUILDING LAYOUT

1:400

< CLICK >

Page 61: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

SECTION A-A

PALLET LAYOUT

MALE

W.C

FEMALE

W.C TEA ROOM

NEXT>>

office

<<PREVIOUS

< CLICK >

A total of 2223m of soil is cut from the site and moved to create the building plains.

3

Page 62: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

OFFICE/SHOWROOM LAYOUT<<PREVIOUS <END>

< CLICK >

Page 63: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 64: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

TYPES COMPONENTS CONSTRUCTION

>CLICK ON THUMBNAILS<

The type of frame most commonly used in the region is the portal frame with pinned bases. This kind of frame is commonly used in factory shells, warehouses and some

commercial buildings.

< CLICK >

Page 65: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

TYPES

COMPONENTS CONSTRUCTION

>CLICK ON THUMBNAILS<

3 pin- 3 pin joints 2 at each of the supports, and 1 at the crown

2 pin- 2 pin frame has 2 pin joints at the supports. The bending moments are more evenly distributed, as a result the 2 pin frame is more economical

Rigid frame- the rigid frame design due to the fact that its joints are rigid. Bending occurs in the columns of the framing. The column must therefore be of sufficient thickness to resist these bending moments.

<END>

< CLICK >

Page 66: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

COMPONENTS

CONSTRUCTION

>CLICK ON THUMBNAILS<

TYPES

<END>

< CLICK >

Page 67: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

CONSTRUCTION

>CLICK ON THUMBNAILS<

TYPES COMPONENTS

All connections are usually bolted or welded. In the case of timber, its usually nailed.

<BOLTED DETAILS>

<WELDED DETAILS>

STEEL JOINTS

TIMBER JOINTS NEXT>>

< CLICK >

Page 68: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

CONSTRUCTION

>CLICK ON THUMBNAILS<

TYPES COMPONENTS

All connections are usually bolted or welded. In the case of timber, its usually nailed.

<TIMBER JOINTS>

NEXT>><<PREVIOUS

-TIMBER SPANNING UP TO 50M.

-CHEAPER

-EASY TO WORK WITH

-EASE OF FABRICATION AND ERECTION

< CLICK >

Page 69: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

CONSTRUCTION

>CLICK ON THUMBNAILS<

TYPES COMPONENTS

-each frame is linked by longitudinal beams at the top of the columns and purlins between the rafters-diagonal bracing at the first and last bays and roof plane.-bracing is very important to the stability of the frame

<<PREVIOUS <END>

< CLICK >

Page 70: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 71: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

WAREHOUSEWe wanted to have the warehouse with cladding so that anything could be

stored inside giving freedom to any company that wanted to occupy it. So we needed cladding that was insulated against noise, heat, weather and that couldn’t get damaged too easily. Therefore we came up with the following

recommendations.

Pre-cast on all walls up to 2mPre-Cast will be used up to 2 m on all walls of the warehouse due to its strength properties, if it got hit by a forklift, or similar. Also the thickness of the panels

gives good acoustic installation.

Insulated colorbond for 2-7m gap on wallsCheap to install, and has great thermal qualities for the cost of the product. The

people and equipment needed to implement the material is also quite low. Resistance to water penetration due to off site production doubles the life of the

product.

Insulated colorbond for roofingCheap to install, and has great thermal qualities for the cost of the product and the people and equipment needed to implement the material. Also resistant to

water penetration due to off site production, doubles the life of the product. Colorbond can have a very low roof angle saving on expensive roof structure. Easy to add skylights at 2 sheet intervals of light penetration colorbond. Must

be backed internally by a weather proofing membrane.

OFFICE>>

< CLICK >

Page 72: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

OFFICEThe office needs to be quiet and bright to work in, and the display space

needs easy access for forklifts, with a front glass façade, so that customers would be able to see the product as they drove by.

Pre-cast for south, east, and west façadeThe great acoustic insulation is what made pre-cast so good for the office

space, it meant that all the noise from the trucks and forklifts outside and in the warehouse would not be heard. Able to be finished in many ways and

colors also made pre-cast more appealing.

Glass for the North facade, and some on the east and westA show room needs to grab the attention of a passer by, and this is done through the front glass façade, side windows on the west and east façade

allow light to get into the office and display space.

Insulated colorbond for roofingCheap to install, and has great thermal qualities for the cost of the product

and the people and equipment needed to implement the material. Also resistant to water penetration due to off site production, this helps the life of the product. Colorbond will match the warehouse in roof slope and look and

save money due to the inexpensive roof structure needed.

<END><<PREVIOUS

< CLICK >

Page 73: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

<END>

RETAINING WALLS

We recommend that all retaining walls are made from steel I-beams and pre-cast panels. This option was chosen due to the strength of both materials and life span. Wooden members tend to rot or be eaten after only a 10 year

period. The warehouse is also made of pre-cast panels and I-beams, thus reducing the cost of attaining another

contractor.

< CLICK >

Page 74: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

STRUCTURES RULES OF THUMB

CLADDING RECOMMENDATIONSOURCES

<CLICK ON TOPIC TO VIEW PAGE>

Page 75: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

(Believe it or not, almost a third of all forklift injuries involve slips, trips and falls while getting on or off forklifts. )

SAFETY RECOMMENDATIONSAll persons (including vehicle drivers) moving about the site must wear high visibility

clothing at all times. High visibility clothing is to be available for all visitors. Area lighting must clearly illuminate pedestrians and vehicles in all traffic areas.

A documented Traffic Management Plan is an invaluable aid to resolving many of the hazards and issues associated with forklift operations. The plan should be based on an assessment of

forklift hazards and issues. It will govern all activities and procedures relating to forklift operations, and should cover areas such as:

·         Pedestrian exclusion zones ·         Black spots ·         Loading and unloading ·         Right of way ·         Policy development ·         Maintenance ·         Incident reporting and investigation

·         Site layout ·         Designated traffic zones ·         Use of attachments ·         Signage ·         Purchasing ·         Training

NEXT>>

FORKLIFTS SAFETYWhile the forklift has transformed modern warehouse, storage and loading operations, the

benefits can come at a terrible price. Forklifts present serious potential dangers to operators and pedestrians - dangers which frequently result in serious injury or death.

The reality is that from January 1985 to January 2003, forklifts were associated with 48 fatalities in Victorian workplaces. These fatalities were preventable.

< CLICK >

Page 76: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Counter Balance Forklift, has a weight at the back which is slightly more than anything it will lift, hence the name counter balance. Much older design and actually has a seat like a car. These are rarely used compared to the other two types, their turning circle is 5 metres, which is just another negative for them.

Ride or Reach Forklift, also has a turning circle 3.1 metres. It takes a person up with the platform, and they can simply pick up the required items and place them on the platform. Obviously only used for light objects and only the odd one, has no use when moving palettes unless its platform is removed. The platform can move up and down as the entire forklift travels down the aisle. This is all controlled from the platform.

GENERAL INFORMATION ON FORKLIFTS

Extend Fork Forklift, has a turning circle of 3.1 metres, therefore aisle widths are generally also at least 3.1metres wide. In the case

of the Deakin printery warehouse they are 3.1 meters wide.

<<PREVIOUS NEXT>>

< CLICK >

Page 77: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

FIREWALL

A firewall allows the warehouse to become like two warehouses as this wall is basically impenetrable, allowing the areas of each warehouse to be smaller and thus the need for sprinklers to be not applicable. This door shuts on activation and locks each area, it is fireproof along with the wall for a considerable amount of time, and will resist considerable explosion. So at worst only half the warehouse could be destroyed. I.e. either side of the wall.

The firewall here is comprised of hollow bricks tied in stages of 8 runs, then they are

pumped full of concrete, and the entire wall becomes a solid. A firewall like this would also

be used on an outer wall when any adjoining building is touching or reasonably close by, as

well as for the above purpose of dividing the warehouse in two.

<<PREVIOUS

< CLICK >

<END>

Page 78: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

COMPOSITE FLOORING

<END>

< CLICK >

Span

•Bondeck or Condeck generally spans 2.5 metres

•Felders steel decking spans 3.5 metres

Benefits

•Easy installation of services

•Speed of Construction

•Safe method of floor construction

•Saving in transportation of materials

•Easy installation of railing

•The temporary formwork required to assemble a composite floor, is considerably lower in cost, and required labour, when comparing to a conventional slab system. Once the concrete slab becomes rigid

its load bearing capabilities match that of a universal beam.

Page 79: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

SOURCES

BOOKS

Ham. Jeremy, Construction And Structures 2 Reader, Learning Resource Services, Deakin, Geelong, 2002.

Ham. Jeremy, Construction And Structures 2 Reader, Learning Resource Services, Deakin, Geelong, 2004.

Underwood. James R, Structural Design, A Practical Guide for Architects, John Wiley & Sons. United States of America, 1998.

Australian Institute of Steel Construction, Economical Structural Steelwork, Fourth Edition, 1996.

Australian Institute of Steel Construction, Economical Structural Steelwork, Student Edition - 2004.

ABCB, The BCA 2004 Volume One and Two, CanPrint Communications Pty Ltd, 2004.

NEXT>>

< CLICK >

Page 80: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

WEBSITES

http://www.workcover.vic.gov.au 02/03/04

http://www.dot.state.fl.us/structures/CADD/standards.htm 04/03/04

http://www.infolink.com.au/browse_directory.asp?dirid=12 16/03/04

http://oak.arch.utas.edu.au/projects/aus/207/stosda.html 16/03/04

http://www.bluescopesteel.com.au 19/03/04

http://www.epic.uk.com/cladding.pdf 20/03/04

http://www.concrete.net.au 26/03/04

http://www.constructionengineers.com/TiltupConst.htm 30/03/04

http://www.rcc-info.org.uk/powerpoint.htm 30/03/04

http://www.strang-inc.com/mailing/2001/11_01.pdf 31/03/04

http://www.visiongroup.co.uk/?referrer=GoogleAdWords 31/03/04

http://www.abcb.gov.au 02/04/04

http://www.vaughan.com.au 02/04/04

NEXT>><<PREVIOUS

< CLICK >

Page 81: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

MANY THANKS TO:

Stephen Quinlivian, Waurn Ponds Deakin Warehouse manager, for his time and effort, and the iniative to take us on a very detailed tour.

Dal Wild Architects and Ken Macleod Consulting, for their generosity of all the drawings of the Deakin warehouse printery.

Sunshine Bridgestone Distribution Centre Manager, for his allowance of entry to observe and capture images of the warehouse.

Paul Curmi from K&S Freighters, for his assistance in the planning of our schematic designs.

Richard Twentyman from Twentyman and Associates, for his help with contacts in terms of the Deakin Warehouse.

The entire team at Vaughan Construction for their inability to fence off a large number of their warehouse worksites, allowing us access at anytime when

workers aren't present.

<<PREVIOUS <END>

< CLICK >

Page 82: >ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]

Legend1.Portal frame 2.Purlin, 300 x 45 mm 3.Steel strap bracing, 50 x 2 mm 4.Box column, 900 x 426 mm 5.Box rafter, 900 x 426 mm 6.T section brace, 600 x45 and 400 x45 mm 7.L section strut, 2/300 x 45 mm 8.Crane running beam9.Nailed plywood gusset, 39 mm 10.Sheet steel connector, 2 mm 11.Ridge vent

Structural DescriptionThe store building is the largest structure in the complex. It is a 32m span fixed portal frame structure with 9 bays at 8.5m centres and one at 5m. The portal is 12m clear at the eaves and rises to 15m at

the ridge. Columns and rafters are fabricated from 63mm thick LVL forming a box section 900 x 426mm. The roof purlins and wall girts are 300 x 45mm LVL spaced at 1200 centres. The walls were trussed with

50 x 2mm steel straps and 90 x 45mm pine noggings.

<END>

INTERNET TIMBER PORTAL FRAME CASE STUDYhttp://oak.arch.utas.edu.au/projects/aus/207/stosda.html

<<PREVIOUS