Entering Component Changes
Trigger:
Concept
Use the Changes button in the Mass Change Bills page to enter component changes. You can
define a mass change to add, delete or replace a component, alter a component quantity or yield,
or change other component information.
If you do not wish to replace the values for the Supply Type, Supply Subinventory, and Supply
Locator fields, you must enter the current value when executing a mass change. If you leave the
Supply Type, Supply Subinventory, and Supply Locator fields blank when enteringcomponent changes, their values will be replaced by the blank (null) value when the mass change
is executed.
In this topic, you will enter component changes.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:37:00 AM Page 1
-
8/14/2019 Entering Component Changes_SPD
2/31
System Process DocumentEntering Component Changes
Procedure
Step Action
1. Begin by navigating to the Mass Change Bills page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
3/31
System Process DocumentEntering Component Changes
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:37:00 AM Page 3
-
8/14/2019 Entering Component Changes_SPD
4/31
System Process DocumentEntering Component Changes
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Mass Changes link.
Page 4 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
5/31
System Process DocumentEntering Component Changes
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:37:00 AM Page 5
-
8/14/2019 Entering Component Changes_SPD
6/31
System Process DocumentEntering Component Changes
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
7/31
System Process DocumentEntering Component Changes
Step Action
8. Use the Mass Change Bills page to change your manufacturing or engineering bills
of material in a mass.
Last changed on: 1/18/2010 09:37:00 AM Page 7
-
8/14/2019 Entering Component Changes_SPD
8/31
System Process DocumentEntering Component Changes
Step Action
9. Click in the Number field.
Step Action
10. Press [F11].
Page 8 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
9/31
System Process DocumentEntering Component Changes
Step Action
11. Enter the desired information into the Number field. Enter "M1-100".
Last changed on: 1/18/2010 09:37:00 AM Page 9
-
8/14/2019 Entering Component Changes_SPD
10/31
System Process DocumentEntering Component Changes
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Changes button.
Page 10 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
11/31
System Process DocumentEntering Component Changes
Step Action
14. Use the Component Changes page to enter component changes. For each
component item to change, indicate the action to perform. You can add or delete
components to or from a parent item.
Or, you can update existing information about the component on the parent item.
With this option a new row is created that you enter new information into.
Last changed on: 1/18/2010 09:37:00 AM Page 11
-
8/14/2019 Entering Component Changes_SPD
12/31
System Process DocumentEntering Component Changes
Step Action
15. Click in the Action field.
Page 12 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
13/31
System Process DocumentEntering Component Changes
Step Action
16. Enter the desired information into the Action field. Enter "Add".
Step Action
17. Click in the Item field.
Last changed on: 1/18/2010 09:37:00 AM Page 13
-
8/14/2019 Entering Component Changes_SPD
14/31
-
8/14/2019 Entering Component Changes_SPD
15/31
System Process DocumentEntering Component Changes
Step Action
19. Click in the Item Seq field.
Step Action
20. Enter the desired information into the Item Seq field. Enter "5".
Last changed on: 1/18/2010 09:37:00 AM Page 15
-
8/14/2019 Entering Component Changes_SPD
16/31
System Process DocumentEntering Component Changes
Step Action
21. Click in the Quantity field.
Page 16 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
17/31
System Process DocumentEntering Component Changes
Step Action
22. Enter the desired information into the Quantity field. Enter "10".
Step Action
23. Click the horizontal scrollbar.
Last changed on: 1/18/2010 09:37:00 AM Page 17
-
8/14/2019 Entering Component Changes_SPD
18/31
System Process DocumentEntering Component Changes
Step Action
24. Click in the Effective To field.
Page 18 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
19/31
System Process DocumentEntering Component Changes
Step Action
25. Enter the desired information into the Effective To field. Enter "13-Nov-2009
02:40:00".
Step Action
26. Use the Component Details tab to enter the planning percent. You can also enter
the yield and indicate whether the component should be quantity related andincluded in cost rollups.
Last changed on: 1/18/2010 09:37:00 AM Page 19
-
8/14/2019 Entering Component Changes_SPD
20/31
System Process DocumentEntering Component Changes
Step Action
27. Click the Component Details tab.
Page 20 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
21/31
System Process DocumentEntering Component Changes
Step Action
28. Click in the Planning % field.
Step Action
29. Enter the desired information into the Planning % field. Enter "110".
Last changed on: 1/18/2010 09:37:00 AM Page 21
-
8/14/2019 Entering Component Changes_SPD
22/31
System Process DocumentEntering Component Changes
Step Action
30. Use the Material Control tab to enter the supply type, the supply subinventory and
locator identifiers.
Page 22 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
23/31
System Process DocumentEntering Component Changes
Step Action
31. Click the Material Control tab.
Step Action
32. Click in the Subinventory field.
Last changed on: 1/18/2010 09:37:00 AM Page 23
-
8/14/2019 Entering Component Changes_SPD
24/31
System Process DocumentEntering Component Changes
Step Action
33. Enter the desired information into the Subinventory field. Enter "FGI".
Page 24 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
25/31
System Process DocumentEntering Component Changes
Step Action
34. Use the Order Entry tab for model, option class, and kit bills, and you can also
enter the minimum and maximum sales order quantities. You can also indicate
whether the component is optional and mutually exclusive.
Click the Order Entry tab.
Step Action
35. Click in the Minimum field.
Last changed on: 1/18/2010 09:37:00 AM Page 25
-
8/14/2019 Entering Component Changes_SPD
26/31
System Process DocumentEntering Component Changes
Step Action
36. Enter the desired information into the Minimum field. Enter "1".
Page 26 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
27/31
System Process DocumentEntering Component Changes
Step Action
37. Click the horizontal scrollbar.
Step Action
38. Click in the Maximum field.
Last changed on: 1/18/2010 09:37:00 AM Page 27
-
8/14/2019 Entering Component Changes_SPD
28/31
System Process DocumentEntering Component Changes
Step Action
39. Enter the desired information into the Maximum field. Enter "10".
Page 28 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
29/31
System Process DocumentEntering Component Changes
Step Action
40. Use the Shipping tab to indicate whether the component should be listed on
shipping documents, required to ship, or required for revenue.
Click the Shipping tab.
Step Action
41. Click the Include on Ship Docs option.
Last changed on: 1/18/2010 09:37:00 AM Page 29
-
8/14/2019 Entering Component Changes_SPD
30/31
System Process DocumentEntering Component Changes
Step Action
42. Click the Save button.
Page 30 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Entering Component Changes_SPD
31/31
System Process DocumentEntering Component Changes
Step Action
43. You have completed the Entering Component Changes procedure.