1 ENTERPRISE MODEL FOR INTEGRATING ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL PROCESS CONTROL INTO CAM SYSTEMS INTO CAM SYSTEMS Samuel BASSETTO, Ali SIADAT, François VERNADAT, Patrick MARTIN Samuel BASSETTO, Ali SIADAT, François VERNADAT, Patrick MARTIN

Upload: ebony

Post on 13-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL INTO CAM SYSTEMS. Samuel BASSETTO, Ali SIADAT, François VERNADAT, Patrick MARTIN. 1 2 3 4. ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL INTO CAM SYSTEMS. Position of process control, need for integration How we infer business process… - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1

ENTERPRISE MODEL FOR INTEGRATING ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL PROCESS CONTROL INTO CAM SYSTEMSINTO CAM SYSTEMS

Samuel BASSETTO, Ali SIADAT, François VERNADAT, Patrick MARTINSamuel BASSETTO, Ali SIADAT, François VERNADAT, Patrick MARTIN

Page 2: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

22

1.1. Position of process control, need for integrationPosition of process control, need for integration

2.2. How we infer business process…How we infer business process…

3.3. Model proposedModel proposed

4.4. Enterprise model of process control reuse during Enterprise model of process control reuse during projectsprojects

ENTERPRISE MODEL FOR INTEGRATING ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL INTO CAM SYSTEMSPROCESS CONTROL INTO CAM SYSTEMS

OU

TLIN

EO

UTLIN

E1

2

3

4

Page 3: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

33

Several Point of view for« process control »

Need

s f

or

inte

gra

tion

Need

s f

or

inte

gra

tion

1

2

3

4 Process Control @ Organizational level @ Organizational level– Change Mgt, Risk Mgt, DOE, (Pinaton, 2004)– Organizational FeedBack (Zur Muehlen, 2005)

Process Control @ Manufacturing level @ Manufacturing level– SPC (Montgomery, 2001)– 3 level Architecture process control (Sachs, 1991)

Process Control @ Tool level @ Tool level– Tool regulation (Corriou, 1996)– R2R Ctrl (Zamaï, 1997)– Fault Detection And Classification (Van Herk, 1999)

Page 4: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

44

Complexity of process control

Complex interactions

No clear view Interactions explicited case after case, like scenarii No link between Control @ orga level, @ process level, @ tool level

Need

for

inte

gra

tion

Need

for

inte

gra

tion

Process control system

IndicatorsChange mangement

Investigations

Automation & measures

Statistical Control

Risk analysis

1

2

3

4

Product

MeansManufacturing process

Status :

Page 5: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

55

It is easy to :

Drive with poles of expertises Structure and monitor manufacturing

processes Be Reactive

It is not so easy to : Have a global picture of activities Support :

– Activities interactions

– Take care of system evolution

Be Proactive

Need

for

inte

gra

tion

Need

for

inte

gra

tion

1

2

3

4

Lack of integration Strong IT supplier

dependance

Computer base support for experts

Consequences

Page 6: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

66

Use enterprise modelling to :

Furnish a global picture (activities, BP, Data) Help methods convergences in redefining activities scope Understand interactions between activities Drive application with a development path : From AS-IS to TO-BE

Need

for

inte

gra

tion

Need

for

inte

gra

tion

1

2

3

4

Our method

Page 7: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

77

Position of process control, need for integrationPosition of process control, need for integration

2.2. How we infer business process…How we infer business process…

3.3. Model proposedModel proposed

4.4. Enterprise model of process control reuse during Enterprise model of process control reuse during projectproject

ENTERPRISE MODEL FOR INTEGRATING ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL INTO CAM SYSTEMSPROCESS CONTROL INTO CAM SYSTEMS

OU

TLIN

EO

UTLIN

E1

2

3

4

Page 8: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

88

Some process control process (1/2)B

usin

ess p

rocess m

od

ellin

gB

usin

ess p

rocess m

od

ellin

g

Customer reclaim

Customer Claims recording

Action plan

Synthesis

Identification of risked areas

Customer claim off line analysis

Investigations

Customer claims management

procedure R000770

1

2

3

4Event recording

Maintenance analysis and action

Action planSynthesis

Major detractors identification

Tool unschedule event

Investigations

Tool risk management

X-Site Tool

Specific maintenance

program

Tool C2_Report

Page 9: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

99

Bu

sin

ess p

rocess m

od

ellin

gB

usin

ess p

rocess m

od

ellin

g

Non conformity recording

Off line analysis of non conformance

Action plan

Synthesis

Major detractor

Changes (2, 3 per week)

Demand of change record

Action planSynthesis

Non conformities (<4% of the WIP)

Off line analysis of change’s impacts

InvestigationsInvestigations

PCRB Minutes

Change management Non conformities management

Some process control process (2/2)

8D process

SCRAP FormProcédure

ECN

Procédure PCRB

Intranet

Intranet

1

2

3

4

Page 10: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1010

From many processes to a business process

Event collect & record

Event off line analysis

Action plan

Synthesis

Informations on off line analysis

Event

Define the control plan

Collect

Off line analyse

Investigations

Need for investigate

Results of investigation

Loop until the data collection is satisfying

Bu

sin

ess p

rocess m

od

ellin

gB

usin

ess p

rocess m

od

ellin

g

1

2

3

4

Page 11: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1111

Position of process control, need for integrationPosition of process control, need for integration

How we infer business process…How we infer business process…

3.3. Model proposedModel proposed

4.4. Enterprise model of process control reuse during Enterprise model of process control reuse during projectproject

ENTERPRISE MODEL FOR INTEGRATING ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL INTO CAM SYSTEMSPROCESS CONTROL INTO CAM SYSTEMS

OU

TLIN

EO

UTLIN

E1

2

3

4

Page 12: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1212

Process control activities

CollectData, event, implicit information

Data collected, collected event, explicit informations

Tools and methods

Control plan, capability

Analyse off lineAnalysis needs, collected data Control plan, analysis results, action plan

Tools, methods, experts

Analysis methods

Analyse on lineLevel of master, action

plan

Tools, methods, experts

Call / Analysis need

Collected data

Analysis methods

SynthesisInformation on current

activity behavior

Tools

Other activities outputs

Synthesis rules

Th

e m

od

el p

rop

osed

Th

e m

od

el p

rop

osed

1

2

3

4

Page 13: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1313

Process control data modelTh

e m

od

el p

rop

osed

Th

e m

od

el p

rop

osed

1

2

3

4

Data comming from element

Data collection toolValidated data

Control plan

*

* -collected by

*-Furnish

1

*

information on data collection

Page 14: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1414

Process control data modelTh

e m

od

el p

rop

osed

Th

e m

od

el p

rop

osed

1

2

3

4

Analysis tool

On line Analysis tool Off line Analysis tool

Validated data

*

-Uses*

action plan

analysis result

analysis information

*1

*

1

*1

analyse request

* *

-call

Page 15: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1515

Process control data modelTh

e m

od

el p

rop

osed

Th

e m

od

el p

rop

osed

1

2

3

4

Page 16: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1616

Links between activities Activities interelation (and not sequential view)

Th

e m

od

el p

rop

osed

Th

e m

od

el p

rop

osed

1

2

3

4

A0 - Control Process

A1

Collect

Validateddata

A2

Analyseoff line

ControlPlan

results

action plan

A3

Analyseon line

Analysis need action plan

A4

Synthesise

Off line actionplan

On lineaction plan

Datafromelement

Analysisneed

Aggregatedinformation

about off lineanalysis

Aggregatedinformation

about on lineanalysis

Information

Page 17: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1717

Two business processes Sequential view of activities

Th

e m

od

el p

rop

osed

Th

e m

od

el p

rop

osed

1

2

3

4

Collect

Analyseon line

Synthesis

PA I

Data

BP 2 : On lineAnalysis process

AnalysisResults

BP 1 Offline

AnalysisProcess

Analyse offline

Collect

Analyse offline

Synthesis

PA I I

Analysis Need

BP 1 OfflineAnalysisprocess

Until the collectis notsatisfactory

Data

A0 - Control Process

A1

Collect

Validateddata

A2

Analyseoff line

ControlPlan

results

action plan

A3

Analyseon line

Analysis need action plan

A4

Synthesise

Off line actionplan

On lineaction plan

Datafromelement

Analysisneed

Aggregatedinformation

about off lineanalysis

Aggregatedinformation

about on lineanalysis

Information

Page 18: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1818

Synthesis VISION for process control (TO-BE model ) 4 activities et 2 associated Business Process functionnal & temporal view separation Distinction between functions – means – contraintes – flows Master information flows:

Th

e m

od

el p

rop

osed

Th

e m

od

el p

rop

osed

Complex interactionsNOT Mastered

Complex interactionsMastered and tooled

1

2

3

4

Collect

Analyseon line

Synthesis

PA I

Data

BP 2 : On lineAnalysis process

AnalysisResults

BP 1 Offline

AnalysisProcess

Analyse offline

Collect

Analyse offline

Synthesis

PA I I

Analysis Need

BP 1 OfflineAnalysisprocess

Until the collectis notsatisfactory

Data

A0 - Control Process

A1

Collect

Validateddata

A2

Analyseoff line

ControlPlan

results

action plan

A3

Analyseon line

Analysis need action plan

A4

Synthesise

Off line actionplan

On lineaction plan

Datafromelement

Analysisneed

Aggregatedinformation

about off lineanalysis

Aggregatedinformation

about on lineanalysis

Information

Page 19: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

1919

Position of process control, need for integrationPosition of process control, need for integration

How we infer business process…How we infer business process…

Model proposedModel proposed

4.4. Enterprise model of process control reuse during Enterprise model of process control reuse during projectproject

ENTERPRISE MODEL FOR INTEGRATING ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL INTO CAM SYSTEMSPROCESS CONTROL INTO CAM SYSTEMS

OU

TLIN

EO

UTLIN

E1

2

3

4

Page 20: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

2020

Application case (1/2) Computer base application development for business process BP1 :

Computer supported off line analysis

Mod

el re

use

Mod

el re

use

1

2

3

4Analyse off

line

Collect

Analyse offline

Synthesis

PA I I

Analysis Need

BP 1 OfflineAnalysisprocess

Until the collectis notsatisfactory

Data

Page 21: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

2121

Application case (2/2) Computer base application development for business process BP2 :

automatic online analysis

Mod

el re

use

Mod

el re

use

1

2

3

4Collect

Analyseon line

Synthesis

PA I

Data

BP 2 : On lineAnalysis process

AnalysisResults

BP 1 Offline

AnalysisProcess

Page 22: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

2222

Conclusion

Proposition of a process control model– 4 activities : Collect, Analyse off line, Analyse on line, Synthesis

– At least 2 business processes

– 2 industrial applications

This model contributes at information system bricks convergence toward business requirements.

Con

clu

sio

n &

dis

cu

ssio

ns

Con

clu

sio

n &

dis

cu

ssio

ns

Page 23: ENTERPRISE MODEL FOR INTEGRATING PROCESS CONTROL  INTO CAM SYSTEMS

2323

Thank you for your Thank you for your attentionattention