entrance, front side gate - usembassy.gov · entrance, front side gate. compound electric swing...
TRANSCRIPT
![Page 1: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/1.jpg)
Entrance,
Front Side
Gate
![Page 2: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/2.jpg)
Compound Electric Swing Gate
NASATKAN
ew W
all
New
HPU
Drain
Old Guard
Post
Access Holes
Basic Layout
![Page 3: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/3.jpg)
Remove Existing Barrier System
Remove cobblestone and replace per final
excavation and installation requirements
![Page 4: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/4.jpg)
Power and Control from
CAC SIC Room
![Page 5: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/5.jpg)
Install new DSC2000-5 Barrier System
PVC/Pressure lines
linesPVC/Limit switch
![Page 6: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/6.jpg)
Install Vehicle Sensors
PVC run to
Hydraulic
Pumping Unit
PVC run to
Hydraulic
Pumping Unit
![Page 7: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/7.jpg)
Install 3” PVC to each module for
drainage and connect to city drain
![Page 8: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/8.jpg)
Remove Flower Bed and install
cobblestone surface
4.34 meters
Remove wall
![Page 9: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/9.jpg)
Cut and remove the wall as
outlined
242.57 cm
304.8 cm
![Page 10: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/10.jpg)
Install new wall as shown
below. Top side of new wall
will be completely level
Remove concrete crown
and level existing block
132.08 cm
Install new concrete pillar
block
![Page 11: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/11.jpg)
Install new wall as shown
below. Top side of new wall
will be completely level
Remove concrete
crown. Level existing
block
Install a total of three storm
drains. One additional storm
drain not shown to far right
side of wall.
![Page 12: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/12.jpg)
Install new stop light mounted
on top of new block
Traffic light PVC to Hydraulic
Pumping Unit
![Page 13: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/13.jpg)
Compound Electric Swing Gate
New
Wall
Drain
Old Guard
Post
Access Holes
Basic Layout
NEW
HPU
Pressure lines
Limit switch
Traffic light
Sensors
Not a true
representation of
the PVC
requirements.
New corner
block
![Page 14: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/14.jpg)
Soil Soil
91.44 cm
22.86 cm 22.86 cm
Wall
Footing
![Page 15: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/15.jpg)
91.44 cm
81.28
cm
91.44
cm
434.34 cm
Vertical rebar
13 mm deformed
rebar
45.72 cm
New Wall
Top View
28.9
c m
15.24 cm
New Wall
Side View
![Page 16: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/16.jpg)
60.96 cm
60.96 cm
101.6 cm
24.384 cm
24.384
cmCorner Block
Corner Block
Top View
Vertical Rebar
13 mm
deformed rebar
![Page 17: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/17.jpg)
Soil SoilFooting
60.96 cm
Corner
Block
![Page 18: Entrance, Front Side Gate - USEmbassy.gov · Entrance, Front Side Gate. Compound Electric Swing Gate NASATKA all New HPU Drain Old Guard Post Access Holes Basic Layout. Remove Existing](https://reader034.vdocument.in/reader034/viewer/2022051511/601d5e8103498227bf65803f/html5/thumbnails/18.jpg)
13 mm deformed rebar to be
installed in new wall and corner
block
New Wall Basic
Layout Wall to be level with corner
block