Environmental and Social Monitoring Report
Project Number: 51209-002
January–December 2018 Appendix March 2021
Indonesia: Eastern Indonesia Renewable Energy Project (Phase 2)
Prepared by PT Infrastruktur Terbarukan Lestari for the Asian Development Bank
The Environment and Social Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Appendix-1 Laboratory Analysis Results
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 1 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
SERTIFIKAT HASIL ANALISIS
CERTIFICATE OF ANALYSIS
No. BMT-EMTL-510.19-0066
Nama Klien : PT VENA ENERGY (LIKUPANG 25 MW) Client Name
Address : THE PLAZA OFFICE TOWER, 25TH FLOOR Address JL. MH. THAMRIN KAV. 28-30, JAKARTA, INDONESIA 10350
Concerning : Construction RKL RPL Implementation
Concerning
U.p. : Mr. Adi Nataatmadja
Attention to
REFERENSI REFERENCES
No. Registrasi : 0066/EMTL-REG/I/2019 Registration No.
Tanggal Penerbitan Sertifikat : 11 Februari 2019 Date of Certificate Issuance
Jumlah Total Halaman : 15 halaman Total Page
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 2 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
INFORMASI CONTOH
No. Sertifikat : BMT-EMTL-510.19-0066
No. Registrasi : 0066/EMTL-REG/I/2019
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
NO NO. LAB. IDENTITAS CONTOH LOKASI JENIS CONTOH PENERIMAAN
1 190066-1 MM – Area Sutet Projek PLTS Kab. Minahasa
Utara Medan Magnet &
Medan Listrik 31 Januari 2019
2 190066-2 AP1 – Upnstrean Drainase Projek PLTS Kab. Minahasa
Utara Air Permukaan 31 Januari 2019
3 190066-3 AP 2 – Downstream Drainase Projek PLTS Dekat Reteantion Pound
Kab. Minahasa Utara
Air Permukaan 31 Januari 2019
4 190066-4 TA1 – Area Singkupan Bukit Projek PLTS Kab. Minahasa
Utara Tanah 31 Januari 2019
5 190066-5 TA 2 – Area Pondasi Panel PLTS Kab. Minahasa
Utara Tanah 31 Januari 2019
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 3 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
HASIL ANALISIS LABORATORIUM
No. Sertifikat : BMT-EMTL-510.19-0066
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
Identitas Contoh : MM – Area Sutet Projek PLTS
Matriks Contoh : Medan Magnet & Listrik Jenis Contoh : Medan Magnet dan Medan Listrik
Lokasi : Kab. Minahasa Utara No. Lab. : 190066-1
Tanggal Sampling : 21 Januari 2019 Waktu Sampling : 16.30 WITA
Koordinat : N 1°39’22.5”; E 125°05’45.7”
PARAMETER UJI HASIL BAKU
MUTU ¹ LOR UNIT METODE ANALISIS
MEDAN MAGNET DAN MEDAN LISTRIK
Medan magnet (Rapat fluks magnet)
1,6850 2000 0,0001 mT IEC 61786:1998
KETERANGAN : 1 PerMenKes No. 70 Tahun 2016 ( Tentang Standar dan Syarat Kesehatan Lingkungan Kerja ) - BAB II.A.d.1.a. Tabel 10 (Seluruh
Tubuh – Tempat Kerja Umum)
LOR = Batas Pelaporan (Limit of Reporting)
PARAMETER UJI HASIL BAKU
MUTU ¹ LOR UNIT METODE ANALISIS
MEDAN MAGNET DAN MEDAN LISTRIK
Kuat Medan Listrik Satis <30 kHz
0,312 25 0,001 kV/m IEC 61786:1998
KETERANGAN : 1 PerMenKes No. 70 Tahun 2016 ( Tentang Standar dan Syarat Kesehatan Lingkungan Kerja ) –
BAB II.A.d.2.a. Tabel 11 ( Tempat Kerja Tidak lebih dari 8 Jam Kerja)
LOR = Batas Pelaporan (Limit of Reporting)
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 4 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
HASIL ANALISIS LABORATORIUM
No. Sertifikat : BMT-EMTL-510.19-0066
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
Identitas Contoh : AP 1 – Upstream Drainase Projek PLTS
Matriks Contoh : Air Jenis Contoh : Air Permukaan
Lokasi : Kab. Minahasa Utara No. Lab. : 190066-2
Tanggal Sampling : 21 Januari 2019 Waktu Sampling : 11.01 WITA
Koordinat : N 1°39’14.1”; E 125°05’31.5”
PARAMETER UJI HASIL BAKU
MUTU a) LOR UNIT METODE ANALISIS
FISIKA Temperatur 28,2 deviasi 3 - °C SNI 06-6989.23-2005 Padatan terlarut total, TDS 240 1.000 2 mg/L SNI 06-6989.27-2005 Padatan tersuspensi total, TSS 12 50 1 mg/L SNI 06-6989.3-2004
KIMIA ANORGANIK pH 7,56 6,0 - 9,0 - - SNI 06-6989.11-2004 Kebutuhan oksigen biokimia, BOD 3 3 2 mg/L SMEWW 22nd ed:5210 D, 2012 Kebutuhan oksigen kimiawi, COD 6 25 4 mg/L SMEWW 22nd ed:5220 D, 2012 Oksigen terlarut, DO 5,1 ≥4 0,1 mg/L SMEWW 22nd ed:4500-O G, 2012 Fosfat total sebagai P <0,02 0,2 0,02 mg/L SNI 06-6989.31-2005 Nitrat sebagai N, NO3-N 5,89 10 0,08 mg/L SMEWW 22nd ed:4500-NO3ˉ C, 2012 Amonia, NH3-N <0,1 - 0,1 mg/L SNI 06-6989.30-2005 Arsen, As <0,002 1 0,002 mg/L SMEWW 22nd ed:3114 B, 2012 Kobalt, Co <0,04 0,2 0,04 mg/L SMEWW 22nd ed:3111 B, 2012 Barium, Ba 0,1 - 0,1 mg/L SNI 06-6989.39-2005 Boron, B < 0,01 1 0,01 mg/L SMEWW 22nd ed:3120 B, 2012 Selenium, Se <0,002 0,05 0,002 mg/L SMEWW 22nd ed:3114 B, 2012 Kadmium, Cd <0,002 0,01 0,002 mg/L SNI 6989.16:2009 Kromium heksavalensi, Cr(VI) <0,01 0,05 0,01 mg/L SNI 6989.71:2009 Tembaga, Cu <0,007 0,02 0,007 mg/L SNI 6989.6:2009 Besi, Fe 1,20 - 0,03 mg/L SNI 6989.4:2009 Timbal, Pb 0,047 0,03 0,02 mg/L SNI 6989.8:2009 Mangan, Mn 0,02 - 0,01 mg/L SNI 6989.5:2009 Air raksa, Hg <0,0002 0,002 0,0002 mg/L SMEWW 22nd ed:3112 B, 2012 Seng, Zn a <0,008 0,05 0,008 mg/L SNI 6989.7:2009 Nitrit sebagai N, NO2-N <0,01 0,06 0,01 mg/L SNI 06-6989.9-2004 Sulfat, SO4
2¯ 11 - 3 mg/L SNI 6989.20:2009 Klorin bebas, Cl2 <0,02 0,03 0,02 mg/L SMEWW 22nd ed:4500-Cl G, 2012 Klorida, Cl¯ 37,2 - 1,5 mg/L SNI 6989.19:2009 Sulfur sebagai H2S <0,001 0,002 0,001 mg/L SMEWW 22nd ed:4500-S2ˉ F, 2012 Sianida, CN¯ <0,01 0,02 0,01 mg/L SMEWW 22nd ed:4500-CN¯ E, 2012 Fluorida, F¯ 0,34 1,5 0,06 mg/L SNI 06-6989.29-2005
MIKROBIOLOGI Fecal coliform 255 1.000 2 jumlah/100 mL SMEWW 22nd ed:9222 B, 2012 Total coliform 359 5.000 2 jumlah/100 mL SMEWW 22nd ed:9222 B, 2012
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 5 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
PARAMETER UJI HASIL BAKU
MUTU a) LOR UNIT METODE ANALISIS
KIMIA ORGANIK Minyak dan lemak <1 1000 500 µg/L SNI 6989.10:2011 Detergen, sebagai MBAS <0,025 200 25 µg/L SNI 06-6989.51-2005 Senyawa fenol, sebagai fenol <0,001 1 1 µg/L SNI 06-6989.21-2004
KETERANGAN : a) Peraturan Pemerintah No. 82 Tahun 2001 Tentang Pengelolaan Kualitas Air Dan Pengendalian Pencemar (Kelas II)
LOR = Limit of Reporting
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 6 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
HASIL ANALISIS LABORATORIUM
No. Sertifikat : BMT-EMTL-510.19-0066
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
Identitas Contoh : AP 2 - Dowstream Drainase Projek PLTS Dekat Retantion Pound
Matriks Contoh : Air Jenis Contoh : Air Permukaan
Lokasi : Kab. Minahasa Utara No. Lab. : 190066-3
Tanggal Sampling : 21 Januari 2019 Waktu Sampling : 10.22 WITA
Koordinat : N 1°39’05.1”; E 125°05’72.9”
PARAMETER UJI HASIL BAKU
MUTU a) LOR UNIT METODE ANALISIS
FISIKA Temperatur 27,8 deviasi 3 - °C SNI 06-6989.23-2005 Padatan terlarut total, TDS 316 1.000 2 mg/L SNI 06-6989.27-2005 Padatan tersuspensi total, TSS 24 50 1 mg/L SNI 06-6989.3-2004
KIMIA ANORGANIK pH 7,35 6,0 - 9,0 - - SNI 06-6989.11-2004 Kebutuhan oksigen biokimia, BOD 8 3 2 mg/L SMEWW 22nd ed:5210 D, 2012 Kebutuhan oksigen kimiawi, COD 16 25 4 mg/L SMEWW 22nd ed:5220 D, 2012 Oksigen terlarut, DO 5,4 ≥4 0,1 mg/L SMEWW 22nd ed:4500-O G, 2012 Fosfat total sebagai P 0,03 0,2 0,02 mg/L SNI 06-6989.31-2005 Nitrat sebagai N, NO3-N 6,99 10 0,08 mg/L SMEWW 22nd ed:4500-NO3ˉ C, 2012 Amonia, NH3-N <0,1 - 0,1 mg/L SNI 06-6989.30-2005 Arsen, As <0,002 1 0,002 mg/L SMEWW 22nd ed:3114 B, 2012 Kobalt, Co <0,04 0,2 0,04 mg/L SMEWW 22nd ed:3111 B, 2012 Barium, Ba 0,1 - 0,1 mg/L SNI 06-6989.39-2005 Boron, B < 0,01 1 0,01 mg/L SMEWW 22nd ed:3120 B, 2012 Selenium, Se <0,002 0,05 0,002 mg/L SMEWW 22nd ed:3114 B, 2012 Kadmium, Cd <0,002 0,01 0,002 mg/L SNI 6989.16:2009 Kromium heksavalensi, Cr(VI) <0,01 0,05 0,01 mg/L SNI 6989.71:2009 Tembaga, Cu <0,007 0,02 0,007 mg/L SNI 6989.6:2009 Besi, Fe 1,44 - 0,03 mg/L SNI 6989.4:2009 Timbal, Pb <0,02 0,03 0,02 mg/L SNI 6989.8:2009 Mangan, Mn 0,02 - 0,01 mg/L SNI 6989.5:2009 Air raksa, Hg <0,0002 0,002 0,0002 mg/L SMEWW 22nd ed:3112 B, 2012 Seng, Zn a <0,008 0,05 0,008 mg/L SNI 6989.7:2009 Nitrit sebagai N, NO2-N 0,01 0,06 0,01 mg/L SNI 06-6989.9-2004 Sulfat, SO4
2¯ 10 - 3 mg/L SNI 6989.20:2009 Klorin bebas, Cl2 <0,02 0,03 0,02 mg/L SMEWW 22nd ed:4500-Cl G, 2012 Klorida, Cl¯ 41,2 - 1,5 mg/L SNI 6989.19:2009 Sulfur sebagai H2S <0,001 0,002 0,001 mg/L SMEWW 22nd ed:4500-S2ˉ F, 2012 Sianida, CN¯ <0,01 0,02 0,01 mg/L SMEWW 22nd ed:4500-CN¯ E, 2012 Fluorida, F¯ 0,10 1,5 0,06 mg/L SNI 06-6989.29-2005
MIKROBIOLOGI Fecal coliform 120 1.000 2 jumlah/100 mL SMEWW 22nd ed:9222 B, 2012 Total coliform 155 5.000 2 jumlah/100 mL SMEWW 22nd ed:9222 B, 2012
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 7 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
PARAMETER UJI HASIL BAKU
MUTU a) LOR UNIT METODE ANALISIS
KIMIA ORGANIK Minyak dan lemak <500 1000 500 µg/L SNI 6989.10:2011 Detergen, sebagai MBAS <25 200 25 µg/L SNI 06-6989.51-2005 Senyawa fenol, sebagai fenol <1 1 1 µg/L SNI 06-6989.21-2004
KETERANGAN : a) Peraturan Pemerintah No. 82 Tahun 2001 Tentang Pengelolaan Kualitas Air Dan Pengendalian Pencemar (Kelas II)
LOR = Limit of Reporting
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 8 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
HASIL ANALISIS LABORATORIUM
No. Sertifikat : BMT-EMTL-510.19-0066
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
Identitas Contoh : Biota ( Plankton )
Matriks Contoh : Air Jenis Contoh : Air Permukaan
Lokasi : Kab. Minahasa Utara No. Lab. : 190066-2 & 3
Tanggal Sampling : - Waktu Sampling : -
Koordinat : -
FITOPLANKTON 190066-2 190066-3
AP 1 AP 2
TANGGAL 21 Januari 2019 21 Januari 2019
CYANOPHYCEAE
Trichodesmium sp 11,292 7,526
BACILLARIOPHYCEAE
Chaetoceros sp. 127,976 126,094
Bacteriastrum sp. 0 1,882
Thalassionema sp. 9,410 1,882
Thalassiotrix sp. 0 1,882
Coscinodiscus sp. 7,528 9,410
Rhizosolenia sp. 0 0
Dithylum sp. 1,882 1,882
Climacodium sp. 3,764 1,882
Lauderia sp. 13,174 126,094
Navicula sp. 5,646 7,528
Nitzschia sp. 15,056 13,174
Gyrosigma sp. 1,882 3,764
Amphora sp. 0 0
Hemiaulus sp. 7,528 13,174
Pinmularia sp. 1,882 0
Biddulpia sp. 0 0
Campilodiscus sp. 0 0
Fragillaria sp. 0 0
DYNOPHYCEAE
Ceratium sp. 5,056 7,528
Peridinium sp. 0 0
Dinophysis sp. 0 0
Orinthocercus sp. 0 0
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 9 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
FITOPLANKTON 190066-2 190066-3
AP 1 AP 2
TANGGAL 21 Januari 2019 21 Januari 2019
Jumlah Taksa 11 13
Kelimpahan sel/m³ 225,23 205,14
Indeks Keragaman 1.69 1.52
Indeks Keseragaman 0.66 0.61
Indeks Dominansi 0.34 0.40
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 10 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
HASIL ANALISIS LABORATORIUM
No. Sertifikat : BMT-EMTL-510.19-0066
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
Identitas Contoh : Biota ( Benthos )
Matriks Contoh : Air Jenis Contoh : Air Permukaan
Lokasi : Kab. Minahasa Utara No. Lab. : 190066-2 & 3
Tanggal Sampling : - Waktu Sampling : -
Koordinat : -
ZOOPLANKTON 190066-5 190066-6
AP 1 AP 2
TANGGAL 21 Januari 2019 21 Januari 2019
PROTOZOA
Codonellopsis sp. 0 0
Rhabdonella sp. 317 317
CRUSTACEAE
Nauplius 3,487 2,536
Calanus sp. 3,170 0
Corycaeus sp. 0 2,219
Oithona sp. 951 317
Oncaea sp. 0 0
Eucalamus sp. 0 0
Microsetella sp. 634 317
Jumlah Taksa 5 5
Kelimpahan (Ind/m3) 8,559 5,706
Indeks Keragaman 1.18 1.19
Indeks Keseragaman 1,36 1.35
Indeks Dominansi 0.40 0.37
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 11 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
HASIL ANALISIS LABORATORIUM
No. Sertifikat : BMT-EMTL-510.19-0066
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
Identitas Contoh : TA 1 – Area Singkupan Bukit Projek PLTS
Matriks Contoh : Tanah Jenis Contoh : Tanah
Lokasi : Kab. Minahasa Utara No. Lab. : 190066-4
Tanggal Sampling : 21 Januari 2019 Waktu Sampling : 11.30 WITA
Koordinat : N 1°39’16.0”; E 125°05’45.2”
Parameter Uji
Satuan
Hasil
pH (H2O) - 4,68
pH (KCl) - 4,60
Basa-basa Dapat Ditukar
Kalium, K mg/Kg 7,22
Kalsium, Ca mg/Kg 9,31
Magnesium, Mg mg/Kg 4,02
Natrium, Na mg/Kg 1,98
Total Basa mg/Kg 30,22
Kapasitas Tukar Kation (KTK) meq/100 g 0,45
Kejenuhan Basa % 52,23
C- Organik % 1,04
N-Total % 0,18
C/N Rasio % 14,12
P tersedia mg/100g 14,22
H-dapatditukar (KCl 1M) me/100g 0,09
Al-dapatditukar (KCl 1M) me/100g 0,06
Tekstur:
Pasir % 0,04
Debu % 78,98
Liat % 18,21
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia
Perkantoran Hijau Arkadia Tower C, P Floor
Jl: T.B. Simatupang Kav.88,
Jakarta Selatan, 12520 DKI Jakarta
Tel: (62) 21 7827639 / 7820827
Fax: (62) 21 7827636
Web: www.bmtasia.co.id
Divisi Laboratorium (BMT Lab)
Grha BMT Asia Pacific Indonesia
Jl. Pageran Sogiri No.61 RT/RW 01/05
Kel. Tanah Baru, Kec. Bogor Utara
Kota Bogor, 16154 Jawa Barat
Tel/Fax: (62) 251 8327533
Email: [email protected]
Halaman 12 dari 15
BMT-EMTL-IV.5.10.1.1
Terbit/Revisi : 2/0 ( 03-08-2015 / -)
Sertifikat ini diterbitkan di bawah syarat dan ketentuan PT BMT Asia Pacific Indonesia, dan tidak dapat digandakan; Salinan sertifikat ini tersedia sesuai permintaan Sertifikat ini hanya berlaku untuk contoh yang diuji; Keluhan/keberatan setelah 2 (dua) minggu dari tanggal penerbitan sertifikat ini tidak akan diterima
HASIL ANALISIS LABORATORIUM
No. Sertifikat : BMT-EMTL-510.19-0066
Nama Klien : PT. Vena Energy
U.p. : Mr. Adi Nataatmadja
Identitas Contoh : TA 2 – Area Pondasi Panel PLTS
Matriks Contoh : Tanah Jenis Contoh : Tanah
Lokasi : Kab. Minahasa Utara No. Lab. : 190066-5
Tanggal Sampling : 21 Januari 2019 Waktu Sampling : 13.22 WITA
Koordinat : N 1°39’30.0”; E 125°05’44.4”
Parameter Uji
Satuan
Hasil
pH (H2O) - 4,88
pH (KCl) - 4,22
1 Basa-basa Dapat Ditukar
Kalium, K mg/Kg 7,84
Kalsium, Ca mg/Kg 10,15
Magnesium, Mg mg/Kg 3,95
5 Natrium, Na mg/Kg 3,19
Total Basa mg/Kg 26,43
Kapasitas Tukar Kation (KTK) meq/100 g 0,68
Kejenuhan Basa % 32,18
C- Organik % 2,77
N-Total % 0,27
C/N Rasio % 15,12
P tersedia mg/100g 12,47
H-dapatditukar (KCl 1M) me/100g 0,18
Al-dapatditukar (KCl 1M) me/100g 0,12
Tekstur:
Pasir % 0,08
Debu % 86,11
Liat % 11,32
11 Februari 2019
Dahlan Suteja
Laboratory Manager
Hal 1 dari 4
LAPORAN HASIL UJI
File : D.01.031/LHU/2019
Pelanggan : PT. Vena Energy (Likupang 5 MW)
Alamat : The Plaza Office Tower, 25th Floor
Jl. MH. Thamrin Kav. 28-30, Jakarta
Laporan : - Kualitas Udara Ambien - Kualitas Udara Ruang Kerja
Tanggal diterima : 30 Januari 2019
Tanggal selesai : 13 Februari 2019
PT. ITEC SOLUTION INDONESIA
Endih Saikudin
Supervisor Teknis
1. Complaints within two (2) weeks of the issuance of certificates; 2. The results of these tests are not to be duplicated and only applies to parameter mentioned; 3. The laboratory is not responsible in the process of sampling for sample sent directly from the customer.
PT. ITEC SOLUTION INDONESIA Bogor Nirwana Residence
Jl.PadmaNirwana Raya No. 6 Bogor P:0251-7560193, F:021-8715685 Email: [email protected]
www.itec.co.id
Hal 2 dari 4
PT. ITEC SOLUTION INDONESIA Bogor Nirwana Residence
Jl.PadmaNirwana Raya No. 6 Bogor P:0251-7560193, F:021-8715685 Email: [email protected]
www.itec.co.id
File : D.01.031/LHU/2019 No. Analisis : D.01.031.a-UA.19 Deskripsi contoh : Kualitas Udara Ambien Lokasi : Gardu Induk PLN Koordinat : U 01039’29.3”; T 125005’36.8” Tanggal diterima : 30 Januari 2019
Tanggal pengujian : 30 Januari 2019 - 12 Februari 2019
No Parameter Satuan Hasil
Analisa Baku Mutu Metode
1 Sulfur Dioksida (SO2)*** µg/Nm3 31.61 900* SNI 19-7119.7-2005
2 Karbon Monoksida (CO) µg/Nm3 1332 30000* SNI 19-7119.10-2011
3 Nitrogen Dioksida (NO2)*** µg/Nm3 6.61 400* SNI 19-7119.2-2005
4 Ozon (O3) µg/Nm3 <0.015 235* SNI 19-7119.8-2005
5 Hidrokarbon (HC) µg/Nm3 5.21 160* SNI 7119.13-2009
6 Partikel <10 μm (PM10) µg/Nm3 7.70 150* Gravimetric
7 Partikel <2,5 μm (PM2,5) µg/Nm3 2.15 65* Gravimetric
8 Particulate (TSP) µg/Nm3 12.41 230* SNI 19-7119.3-2005
9 Timbal (Pb) µg/Nm3 <0.005 2* SNI 19-7119.4-2005
10 Kebisingan*** dBA 57.3 70** ITEC.IKM-19
(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999 (**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri) (***) Accredited parameter by KAN (ISO/IEC 17025) <: Lebih kecil dari deteksi limit
Supporting Parameters
No. Parameter Hasil
Analisa Satuan
1 Temperatur 31.1 oC
2 Kelembaban 68.2 %
3 Tekanan 755.2 MmHg
4 Kecepatan Angin 0.0 – 0.8 m/s
5 Arah Angin Barat Laut -
Bogor, 13 Februari 2019
Endih Saikudin Supervisor Teknis
Hal 3 dari 4
PT. ITEC SOLUTION INDONESIA Bogor Nirwana Residence
Jl.PadmaNirwana Raya No. 6 Bogor P:0251-7560193, F:021-8715685 Email: [email protected]
www.itec.co.id
File : D.01.031/LHU/2018 No. Analisis : D.01.031.b-UA.18 Deskripsi contoh : Kualitas Udara Ambien Lokasi : Lapangan Bola Dusun Wineru Koordinat : U 01039’29.4”; T 125006’13.3” Tanggal diterima : 30 Januari 2019
Tanggal pengujian : 30 Januari 2019 - 12 Februari 2019
No Parameter Satuan Hasil
Analisa Baku Mutu Metode
1 Sulfur Dioksida (SO2)*** µg/Nm3 29.49 900* SNI 19-7119.7-2005
2 Karbon Monoksida (CO) µg/Nm3 1270 30000* SNI 19-7119.10-2011
3 Nitrogen Dioksida (NO2)*** µg/Nm3 3.98 400* SNI 19-7119.2-2005
4 Ozon (O3) µg/Nm3 <0.015 235* SNI 19-7119.8-2005
5 Hidrokarbon (HC) µg/Nm3 5.11 160* SNI 7119.13-2009
6 Partikel <10 μm (PM10) µg/Nm3 7.05 150* Gravimetric
7 Partikel <2,5 μm (PM2,5) µg/Nm3 1.97 65* Gravimetric
8 Particulate (TSP) µg/Nm3 11.37 230* SNI 19-7119.3-2005
9 Timbal (Pb) µg/Nm3 <0.005 2* SNI 19-7119.4-2005
10 Kebisingan*** dBA 54.1 70** ITEC.IKM-19
(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999 (**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri) (***) Accredited parameter by KAN (ISO/IEC 17025) <: Lebih kecil dari deteksi limit
Supporting Parameters
No. Parameter Hasil
Analisa Satuan
1 Temperatur 35.5 oC
2 Kelembaban 57.5 %
3 Tekanan 753.3 MmHg
4 Kecepatan Angin 0.0 – 0.75 m/s
5 Arah Angin Barat -
Bogor, 13 Februari 2019
Endih Saikudin Supervisor Teknis
Hal 4 dari 4
PT. ITEC SOLUTION INDONESIA Bogor Nirwana Residence
Jl.PadmaNirwana Raya No. 6 Bogor P:0251-7560193, F:021-8715685 Email: [email protected]
www.itec.co.id
File : D.01.031/LHU/2019 No. Analisis : D.01.031.c-RK.19
Deskripsi contoh : Kualitas Udara Ruang Kerja
Lokasi : Depan Kantor PLTS Likupang Koordinat : U 01039’30.04”; T 125005’46.8” Tanggal diterima : 30 Januari 2019 Tanggal pengujian : 30 Januari 2019 - 12 Februari 2019
No Parameter Satuan Hasil
Analisa Baku Mutu
Metode
1 Sulfur Dioksida (SO2) mg/m3 0.0282 - SNI 19-7119.7-2005
2 Karbon Monoksida (CO) mg/m3 1.3143 - SNI 19-7119.10-2011
3 Nitrogen Dioksida (NO2) mg/m3 0.0108 - SNI 19-7119.2-2005
4 Oksidan (O3) mg/m3 <0.015 - SNI 19-7119.8-2005
5 Hidrokarbon (HC) mg/m3 <0.0005 - SNI 7119.13-2009
6 Partikulat (TSP) mg/m3 0.1315 - SNI 16-7058-2004
7 Timbal (Pb) mg/m3 <0.005 - SNI 19-7119.4-2005
8 Hydrogen Sulfide (H2S) mg/m3 0.0032 - ITEC.IKM-28
9 Ammonia (NH3) mg/m3 0.0220 - SNI 19-7119.1-2005
10 Kebisingan** dBA (a) 47.6 85 ITEC.IKM-13
* : Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan Kerja Lingkungan Kerja (Lampiran 1. Faktor Fisika dan 3.C.d Faktor Kimia). a) Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan
Kerja Lingkungan Kerja (Lampiran 1.B. Nilai Ambang Batas Fisika, Kebisingan di Lingkungan Kerja Waktu Pemaparan perhari 8 jam)
** : Accredited parameter by KAN (ISO/IEC 17025)
Supporting Parameters
No. Parameter Hasil
Analisa Satuan
1 Temperatur 35.4 oC
2 Kelembaban 55.4 %
3 Tekanan 753.5 MmHg
4 Kecepatan Angin 0.0 – 0.7 m/s
5 Arah Angin Barat -
Bogor, 13 Februari 2019
Endih Saikudin Supervisor Teknis
Appendix-2 Environmental permit
Appendix-3 Engagement Register
NO Date Vena/ Attendees External/Community Participants VillageSubdistrict
Area
Municipality/
regency Meeting Agenda Key Discussion Point/Issue Issue category Level of Concern Action Plan/Feedback Received
Minutes of
Meetings
1 2-Jan-18 Roy (PP)Head of Local Likupang area Police (Mr.
Hendrik Rantung)wineru Likupang timur Minahasa Utara
coordination
meeting
coordination regarding security for an emergency action
and site control Company regulations/procedure Increase Attention Continue coordination No
2 11-Jan-18 Roy (PP)Head of Likupang health clinic
(puskesmas), Dr.Davidwineru Likupang timur Minahasa Utara
coordination
meeting
coordination for emergency procedure and action also
one day care serviceCompany regulations/procedure Increase Attention Continue coordination No
3 13-Feb-18 James, pangeran Head of Village (Mr.Zubair) wineru Likupang timur Minahasa Utara goodwill visit continue coordination and update construction progress No issueNeutral/ maintain
engagementContinue coordination no
4 26-Feb-18 JamesHead of Likupang Sub District (Mr. Donny
Rondonuwu)Likupang 1 Likupang Timur Minahasa Utara Goodwill visit continue coordination and update construction progress Government Relations
Neutral/ maintain
engagementContinue coordination No
5 27-Feb-18 James Village office staff (Mr. Benny) wineru Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
Ask recruitment for Security at site Employment opportunities Increase Attention will coordination with PP for recruitment No
6 27-Feb-18 James Head of Village (Mr.Zubair) wineru Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
Ask the recruitment status not so many until now employment opportunities Increase Attention will coordination with PP for recruitment No
7 28-Feb-18 JamesMinut Police Operational Head (KomPol
Farly)Other Other Minahasa Utara
coordination
meeting
introduce the company, update the construction progress
and coordination if any criminal action at siteGovernment Relations
Neutral/ maintain
engagementContinue coordination No
8 1-Mar-18 JamesAssistant II of Bupati Minut (Mr.Alan
Mingkid)Other Other Minahasa Utara goodwill visit continue coordination and update construction progress Government Relations
Neutral/ maintain
engagementContinue coordination No
9 6-Mar-18 James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa Utaracoordination
meetingSocialization of Grievance mechanism procedure form Company regulations/procedure Increase Attention Continue coordination No
10 7-Mar-18 James Ex Landowner (Mr. Herman L) wineru Likupang timur Minahasa UtaraCoordination
meetingPossibility as the local sub-cont Local Business opportunity Increase Attention will coordination with PP No
11 7-Mar-18 JamesPLN Sulut - Land Acquisition Team
(Mr.Andit), Ex Landowner (Mr.Herman)wineru Likupang timur Minahasa Utara
coordination
meeting
Land Boundary the land that PLN will buy from Pak
Herman, between the S/S and ITL landLand, road access & properties Increase Attention Continue coordination No
12 9-Mar-18 James, Bilma, Daniel GM PLN North Sulawesi (Mr.Edison) Other Other Manadocoordination
meeting
Introduction of Equis Director, update the construction
progress Company regulations/procedure
Neutral/ maintain
engagementContinue coordination No
13 12-Mar Roy (PP), JamesHead of TNI-likupang sub district (Mayor
Tony Wurangian)Likupang 1 Likupang timur Minahasa Utara goodwill visit
information about mutation Mayor Tony and will be
substitute with Sergeant mayor AndriasGovernment Relations
Neutral/ maintain
engagementContinue coordination No
14 15-Mar James, Rian, Isoon, Amir GM PLN North Sulawesi (Mr.Edison) Other Other Manadocoordination
meetingFinancial document signing Company regulations/procedure Urgent attention Continue coordination No
15 17-Mar Roy (PP) , JamesHead of Likupang health clinic
(puskesmas), Dr.DavidLikupang 1 Likupang timur Minahasa Utara goodwill visit
information about mutation Dr.David and will be
substitute with Dr.RonaldGovernment Relations
Neutral/ maintain
engagementContinue coordination No
16 20-Mar James BPN-Land Office Minut (Mrs. Vonny) Other Other Minahasa Utaracoordination
meetingprogress for the splitting certificate Company regulations/procedure Urgent attention Urgent attention No
17 21-Mar James, Pangeran, Harry, AnggraHead of Likupang health clinic
(puskesmas), Dr.RonaldLikupang 1 Likupang timur Minahasa Utara goodwill visit
Introduce the company, and coordination if any
emergency action, also for fogging serviceCompany regulations/procedure Increase Attention Continue coordination No
18 27-Mar James, Anggra Head Of Wineru Village, village secretary wineru Likupang timur Minahasa Utaracoordination
meetinglandowner identification for additional land for Minut 2 Company regulations/procedure Increase Attention Continue coordination No
19 28-Mar James, anggra, Roy (PP), Alfi (PP)Head of Wineru village and local
community (the orphan)wineru Likupang timur Minahasa Utara goodwill visit PP-CSR program donation for the orphan in wineru viilage Company regulations/procedure
Neutral/ maintain
engagementContinue coordination No
20 9-Apr James, pangeran, Navis NGO-KPK, Likupang Police, Mr.Yoas wineru Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
Double claim of land status and mediation Land, road access & properties Urgent attentionwill conduct mediation between ITL, NGO, and
Pak HermanYes
21 10-Apr James, Navis HoV wineru wineru Likupang timur Minahasa Utaracoordination
meetingcoordination meeting regarding double claim on ITL land Land, road access & properties Urgent attention invite HoV to attend the mediation Yes
22 10-Apr James, Navis Pak Herman (Ex LO) wineru Likupang timur Minahasa Utaracoordination
meetingcoordination meeting regarding double claim on ITL land Land, road access & properties Urgent attention invite Pak Herman to attend the mediation No
23 16-Apr James, Gerry Head of Land office (BPN) Other Other Minahasa Utaracoordination
meetingpreparation of land mortgage Company regulations/procedure Increase Attention continue coordination No
24 19-Apr Roy (PP), Sugiyarno (PP) Chief of Likupang TNI wineru Likupang timur Minahasa Utara goodwill visit coordination meeting and update project progress Government RelationsNeutral/ maintain
engagementContinue coordination No
25 20-Apr Roy (PP), sub cont workers Head of Likupang Health Clinic Likupang 1 Likupang timur Minahasa Utara
Compliance of
mandatory
requirement
Medical check up for the sub-cont workers Company regulations/procedureNeutral/ maintain
engagementContinue coordination No
26 25-Apr James, Bilma, Rian Notary (Grace Sarendatu) Other Other Minahasa Utara
Compliance of
mandatory
requirement
Signing of Land Mortgage with the Lender Company regulations/procedure Urgent attention Continue coordination No
27 28-Apr James HoV wineru wineru Likupang timur Minahasa Utaracoordination
meetingLand documents review for Minut 2 land acquisition Company regulations/procedure Increase Attention Continue coordination No
28 30-Apr James Notary (Grace Sarendatu) Other Other Minahasa Utara
Compliance of
mandatory
requirement
coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
MoM File already kept on Share drive
Additional list from submitted MoM
No MoMPT. INFRASTRUKTUR TERBARUKAN LESTARI
29 30-Apr James BPN-Land Office Minut (Mrs. Tresye) Other Other Minahasa Utara
Compliance of
mandatory
requirement
coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
30 2-May JamesPLN Suluttenggo - Planning Division
(Mr.Aguesno)Other Other Manado
Compliance of
mandatory
requirement
Drawings and Electrical Documents submission Company regulations/procedure Increase Attention Continue coordination No
31 3-May James Likupang House Owner (Mr.Denny) Likupang 1 Likupang timur Minahasa Utaracoordination
meetingControl and check the progress of the Renovation No issue
Neutral/ maintain
engagementContinue coordination No
32 4-May James Head of Likupang Police (Mr.Steven) Likupang 1 Likupang timur Minahasa Utaracoordination
meeting
coordination meeting and following up the mediation
invitationLand, road access & properties Increase Attention Continue coordination No
33 7-May James Notary (Grace Sarendatu) Other Other Minahasa Utara
Compliance of
mandatory
requirement
coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
34 8-May James BPN-Land Office Minut (Mrs. Tresye) Other Other Minahasa Utara
Compliance of
mandatory
requirement
Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
35 9-May Roy (PP) PTSP office of North Sulawesi Other Other Manado
Compliance of
mandatory
requirement
SIPPA documents submission (ground water permit) Company regulations/procedure Increase Attention Continue coordination No
36 14-May James, Pangeran, KeziaNGO-KPK, Likupang Police, Mrs.
AntonettaOther Other Minahasa Utara
Resolving Issues,
complaint,
grievance
Double claim of land status (2nd mediation) Land, road access & properties Increase Attention Continue coordination Yes
37 15-May James Notary (Grace Sarendatu) Other Other Minahasa Utara
Compliance of
mandatory
requirement
coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination no
38 15-May James BPN-Land office Minut (Mr.Jamal) Other Other Minahasa Utara
Compliance of
mandatory
requirement
Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
39 16-May James Head of PLN airmadidi office Other Other Minahasa Utara goodwill visit To Introduce the company No issueNeutral/ maintain
engagementContinue coordination No
40 16-May Roy (PP) Head of Likupang Police (Mr.Steven) Likupang 1 Likupang timur Minahasa Utaracoordination
meeting
updating the project progress and discussing territprial
security situationNo issue
Neutral/ maintain
engagementContinue coordination No
41 21-May James BPN Minut (Mr.Jamal) Other Other Minahasa Utaracoordination
meetingcoordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention estimate will completed on 25 May 2018 No
42 22-May Roy (PP) ESDM North Sulawesi (Mr. Roy Terop) Other Other Manado
Compliance of
mandatory
requirement
scheduling the site visit to check the deep well for the SIPA
permit processCompany regulations/procedure Increase Attention the schedule on 30 May 2018 No
43 23-May James Head of PLN airmadidi office Other Other Minahasa Utaracoordination
meetingRegistration for power capacity upgrade No issue Increase Attention Continue coordination No
44 25-May James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa Utaracoordination
meeting
t Land, road access & propertiesNeutral/ maintain
engagementContinue coordination No
46 18-Jun James, Syahrial, Roy(PP) Likupang Police (Mr.Akhmad) wineru Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
Land, road access & properties Increase Attention Continue coordination No
47 19-Jun Roy (PP)Local Likupang NGO (Aliansi Doyot
Linekepan)wineru Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
Giving permission the NGO entering the site to see
actually the Praying room was not a mosque.Land, road access & properties Increase Attention Continue coordination No
48 20-Jun James, Kezia NGO LTL (Ms.Yanti) Other Other ManadoCoordination
meeting
Discussion and coordination for The CSR Program - Free
Health Clinic in Wineru-Likupang on July 11Company regulations/procedure Increase Attention Continue coordination No
49 23-Jun James vilage secretary (Mrs Olga) wineru Likupang timur Minahasa UtaraCoordination
meeting
Send the letter regarding the Health clinic program and
technical coordination to prepare the health clinic Company regulations/procedure Increase Attention
She will start to socialization to the community
to participate to the programNo
50 25-Jun James Governor office staff (Mr. Steven) Other Other Manadocoordination
meeting
Giving information about Likupang project and
coordination for set up meeting with The Governor with
ITL Management
Company regulations/procedure Increase AttentionITL will prepare the Letter to have the meeting
with the GovernorNo
51 30-Jun James Subdistrict Head (Mr.Donny) wineru Likupang timur Minahasa Utara Goodwill visit Update project progress Government RelationsNeutral/ maintain
engagementcontinue maintain engagement No
52 2-Jul James HoV wineru wineru Likupang timur Minahasa Utaracoordination
meeting
Coordination and to get permission to use Village function
room for ITL CSR Program (Health Clinic)Community contribution request Increase Attention
To coordination with village secretary to prepare
the Function RoomNo
53 3-Jul James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa UtaraCoordination
meeting
inform what the LTL team need from the village function
room and to put on our banner to socialize the Health
clinic
Community contribution request Increase Attention Continue coordination No
54 5-Jul Bilma, James GM UIP PLN Sulbagut (Mr.Sigit) Other Other ManadoCoordination
meeting
coordination regarding the part of ITL's land to grant to
PLN for the substation expansionCompany regulations/procedure Increase Attention
ITL will make a coordination with the Notary and
Land office for splitting land certificateNo
55 6-Jul James Ex Landowner (Mr. Herman L) wineru Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
discussion related the double claim by Mrs.A.Montalalu Land, road access & properties Increase Attention Continue coordination No
56 9-Jul James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa UtaraCoordination
meeting
final coordination to prepare function room and other
tools needed for the Health clinic programCommunity contribution request Increase Attention prepare all things ready to use for the program No
57 10-Jul James, Filip Police North Minahasa (Mr.Rizal) Other Other Minahasa Utaracoordination
meeting
discussion and what the procedure if any criminal action
at siteLand, road access & properties Increase Attention
will make an official report to police if any
criminal action at siteNo
58 11-Jul James, Ratih, Kezia Locals community, NGO LTL, Village staff wineru Likupang timur Minahasa Utara
Compliance of
mandatory
requirement
Free health clinic CSR program for Wineru vilage and the
surrounding villageCommunity contribution request
Neutral/ maintain
engagementmore than 100 patients registered No
59 16-Jul jamesSection Head at Invesment Office
(Mr.Jan)Other Other Manado goodwill visit Update report project progress Company regulations/procedure
Neutral/ maintain
engagementcontinue maintain engagement No
60 17-Jul jamesHead of Elementary School, Local
Groceries Tentwineru Likupang timur Minahasa Utara Goodwill visit
Discussion about Likupang project, the positive and
negative effect to social and economicNo issue
Neutral/ maintain
engagementcontinue maintain engagement no
61 18-Jul Adi, jamesNorth Minahasa Labor Office
(Mrs.Marlen)Other Other Minahasa Utara
Compliance of
mandatory
requirement
Request Labor Data of north Minahasa for AMDAL report Company regulations/procedure Increase Attention continue coordination No
62 19-Jul Bilma, JamesVice Governor North Sulawesi, Vice
Regent North MinahasaOther Other Manado goodwill visit Update report project progress Government Relations
Neutral/ maintain
engagementcontinue maintain engagement No
63 23-Jul James HoV wineru wineru Likupang timur Minahasa Utaracoordination
meeting
Discussion about the community issue related the Family
whom always try to claim the landLand, road access & properties Increase Attention
HoV will issued confirmation letter that the
inheritance letter that used by the family as
their land ownership letter is not registered in
the Village's Land Registration
No
64 24-Jul James, Filip BPN Minut (Mr.Jamal) Other Other Manadocoordination
meetingcoordination related the certificate of land in the PTUN Land, road access & properties Increase Attention
BPN will prepare the documents/land
registration process that related to land
certificate
No
65 24-Jul James, Filip Ex Landowner (Mr. Herman L) Other Other Manadocoordination
meeting
coordination and to get additional documents that related
to the land ownership Land, road access & properties Increase Attention Continue coordination No
66 25-Jul Roy (PP) Locals (Mr.Kelvin) wineru Likupang timur Minahasa Utaracoordination
meetingmake new access road for the villagers Land, road access & properties Increase Attention PP will prepare and make the new access No
67 27-Jul James, Anggra Subdistrict Head (Mr.Donny) Likupang 1 Likupang timur Minahasa Utaracoordination
meeting
Request top soil for the road around Likupang 1 village,
that prepared for the Independence day celebration Community contribution request
Neutral/ maintain
engagementcoordination with PP to prepare the material No
68 28-Jul James HoV wineru wineru Likupang timur Minahasa Utaracoordination
meeting
To get confirmation letter stated the inheritance letter
that used by the family as their land ownership letter is
not registered in the Village's Land Registration
Land, road access & properties Increase Attention Continue coordination No
70 30-Jul James security at site (Mr.Stevy) wineru Likupang timur Minahasa Utaracoordination
meeting
To collect additional information and pictures of the
criminal action at site as the proof for the policeLand, road access & properties Increase Attention
ask the security come to police officer if the
police need the report as a witnessNo
72 1-Aug James Notary (Grace Sarendatu) Other Other Minahasa Utaracoordination
meeting
to get cover note from the notary that stated all land
certificate are in bank as a mortgageLand, road access & properties
Neutral/ maintain
engagementto submit to the police No
73 1-Aug james Telkom Office (Customer service) Other Other Minahasa Utara
Compliance of
mandatory
requirement
registration for the fixed line phone at site office No issue Increase Attention Continue coordination No
No
75 15-Aug-18 Navis Steven (Kapolsek Likupang) & Ahmad
(Khabintimas)Likupang 1 Likupang timur Minahasa Utara Goodwill visit Local employment oppurtinities in PP Employment opportunities Increase Attention Reguler informal meeting No
76 15-Aug-18 Navis Jhon (Guru SMK Likupang)
Likupang 1 Likupang timur Minahasa Utara Goodwill visit Collect community concern about CSR program Community contribution requestNeutral/ maintain
engagementDevelop proposal about repair for field sport No
77 16-Aug-18 Navis & Kezia
Edwin K, Heince V (Kantor Pelayanan
Pajak Bitung) Minahasa Utara
Compliance of
mandatory
requirement
Inspection about NPWP from tax department (Minut
District)Company regulations/procedure Increase Attention Coordination with Legal Dept. No
78 20-Aug-18 Navis Dina (Sekdes likupang 1) Likupang 1 Likupang timur Minahasa Utara Goodwill visitCollect community concern related local employment
opportunitiesEmployment opportunities
Neutral/ maintain
engagementReguler informal meeting No
79 23-Aug James, Navis, KeziaPublic Works Office - National Road
Maintanance dept.Other Other Manado goodwill visit
Socialization and discussion related the material
mobilization from port to site in 40" containerCompany regulations/procedure
Neutral/ maintain
engagementTheir team will conduct site visit in nearest time No
81 25-Aug James, Anggra Subdistrict Head (Mr.Donny) Likupang 1 Likupang timur Minahasa Utara goodwill visitCollect community concern related local employment
opportunitiesEmployment opportunities Urgent attention
ITL inform that Wineru HoV will have formal
meeting with PP team and ITL team on Monday No
82 27-Aug James, Anggra, Roy (PP), Rois (PP) Village apparatus and Hov wineru wineru Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
HoV checked in the data that workers from Java were
more than the locals. He asked no more additional
workers from Java except the skilled workers.
Employment opportunities Urgent attention
PP team promised for the next additional
workers will prioritize from the locals. This was
because PP still had a contract with the workers
from Java.
Will have additional workers the estimation in
the mid of September.
Yes
83 27-Aug James, Rudy (RMA) Brimob (Mr.Wayan) Other Other Manado Goodwill visitUpdate project progress and coordination about security if
any threat at site to the workersNo issue
Neutral/ maintain
engagementReguler informal meeting No
84 28-Aug James Police North Minahasa (Mr.Eko) Other Other Minahasa UtaraCoordination
meetingdiscussion related the double claim by Mrs.A.Montalalu Land, road access & properties Urgent attention
Police will issue a summons to the party
involvedNo
85 28-Aug James, Kezia Permit Office Minut (Mr.Tormy) Other Other Minahasa Utara
Compliance of
mandatory
requirement
To collect information related some permit for Tax
registrationCompany regulations/procedure Increase Attention continue coordination No
No
No
88 31-Aug James GM UIP PLN Sulbagut (Mr.Sigit) Other Other ManadoCoordination
meeting
Submitted the Special Facilities documents for PLN
approvalCompany regulations/procedure Increase Attention
GM will disposition and circulate for approval
processNo
89 3-Sep James, Imam Head of Likupang Police (Mr.Steven) Likupang 1 Likupang timur Minahasa UtaraCoordination
meeting
Giving information about the planning of material
mobilization from Bitung port to siteLand, road access & properties Increase Attention
will doing the socialization to the villagers
together with one of Police personelNo
90 4-Sep James Likupang 1 Village Chief (Mr. Nus) Likupang 1 Likupang timur Minahasa Utara Goodwill visitGiving information about the project progress and the
possibilities for local recruiment from Likupang 1 VillageEmployment opportunities
Neutral/ maintain
engagementContinue coordination No
No
No
No
No
95 14-Sep James Tini (Enviromental Office SuLut) Other Other Manado
Compliance of
mandatory
requirement
Submission of environmental mid year report (RKL/RPL) Company regulations/procedureNeutral/ maintain
engagement
They will review the report and will conduct a
site visit if neededNo
96 17-Sep Kezia Heince (Tax Office - KPP Pratama) Other Other Bitung
Compliance of
mandatory
requirement
Submission of statement letter regarding the Tax for the
branch officeCompany regulations/procedure
Neutral/ maintain
engagementContinue coordination No
97 19-Sep James Police North Minahasa (Mr. Rizal) Other Other Minahasa Utara goodwill visit update the site condition related to the security No issueNeutral/ maintain
engagementContinue coordination No
98 21-Sep JamesEnviromental Office North Minahasa
(Mr.Ronal)Other Other Minahasa Utara
Compliance of
mandatory
requirement
Submission of environmental mid year report (RKL/RPL) Company regulations/procedureNeutral/ maintain
engagement
They will review the report and will conduct a
site visit if neededNo
99 24-Sep James, Navis, Farhan HoV wineru wineru Likupang timur Minahasa Utaracoordination
meeting
discussion regarding the next CSR program, Women
Empowerment. ITL team need to collect some datas and
also to conduct assesment to some woman and will be
held on Thursday, 27/9/18
Community contribution request Increase Attention
HoV is welcoming us and giving permission ITL
to do the assesment for this program and can
use Village Hall
No
100 25-Sep Navis, Farhan SMK Likupang Teacher (Mr.Helce) Other Likupang timur Minahasa Utara goodwill visitDiscussion to implement CSR program, that ITL will repair
the sport fieldCommunity contribution request Increase Attention
Will have technical meeting with the SMK Head
on Saturday, 29/09/18No
101 27-Sep James, Navis, Farhan, RatihVillage secretary (Mrs.Olga), and some
women from the village as the participantwineru Likupang timur Minahasa Utara
coordination
meeting
Assesment in Focus Group Discussion to collect the data
about they capabilities, resources, and needs so ITL can
give training based on the conclusion/the data
Community contribution request Increase AttentionITL got conclusion and data in order to
implement/to give training for the CommunityNo
Yes
103 29-Sep James, navisSome Villagers in Paslaten, Wangurer,
Kaweruan, KokolehOther Likupang Timur Minahasa Utara
Compliance of
mandatory
requirement
socialication to the villagers about the plan of mobilization
the materials from bitung Port to Site through some
villages, the cargoes using 40" container
Company regulations/procedure Increase Attention
giving and spread the brochure. the villagers
request the mobilization going in the night or
early morning to avoid any traffic jam
process
Yes
105 2-Oct James, Navis Likupang Police (Mr. Zelik) Other Likupang timur Minahasa Utara
Resolving Issues,
complaint,
grievance
Coordination and ask to facilitated the mediation between
ITL, Mogonta Family, Ex LandownerLand, road access & properties Urgent attention
Will conduct the mediation and will invite the
family and Ex landowner to attend the
mediation on 4th October
No
before they receive any payment
No
107 4-Oct Bilma, James, Navis, Filip Likupang Police Head (Mr.Steven) Other Likupang timur Minahasa Utaracoordination
meeting
coordination and request for the routine security at the
site at least for 1 month, so ITL can continue to work
around the zone 6
Land, road access & properties Urgent attention
Mr.Steven will instruct some of police to check
the area so after that to prepare how many
police will secure the area
No
108 10-Oct James, Navis, Rudy (RMA) Brimob (Mr.Wayan) Other Other Manado goodwill visitUpdate project progress and coordination about security if
any threat at site to the workersGovernment Relations
Neutral/ maintain
engagementContinue coordination No
109 11-Oct Kezia Tax Office - KPP pratama (Mr.Heince) Other Other Bitung
Compliance of
mandatory
requirement
submission of tax documentation Company regulations/procedure Increase Attention Continue coordination No
No
111 22-Oct Kezia Likupang Health clinic (Dr.Ronal) Other Likupang timur Minahasa Utara goodwill visitPuskesmas submit proposal to ITL request to provide the
trash can for the puskesmasCommunity contribution request
Neutral/ maintain
engagement
Will discuss with VE ESG depart, if we can
provide as CSR programNo
112 26-Oct James Likupang Police Head (Mr.Steven) Other Likupang timur Minahasa Utara goodwill visit update the site condition related to the security Company regulations/procedureNeutral/ maintain
engagementContinue coordination No
113 31-Oct James, Bilma Assistant of North Sulawesi Governor Other Other Manado goodwill visitTo get information about the Governor schedule to
conduct site visit company regulations/procedure
Neutral/ maintain
engagement
The planning schedule in the end of November,
but the fixed date will be informed laterNo
114 31-Oct James, Bilma Brimob (Mr.Wayan) Other Other Manado goodwill visit Update site condition related to the security Company regulations/procedureNeutral/ maintain
engagement
routine send some personel to check site
situationNo
115 1-Nov Dan Atsbury, James, Ambhara GM PLN North Sulawesi (Mr.Edison) Other Other Manadocoordination
meeting
Update the project progress and discuss possibility to
develop and or get new project in Bitung or in central
sulawesi
Company regulations/procedure Increase AttentionWill send the FS and GIS for the new project to
Planning DivisonNo
116 6-Nov JamesAssistant II of Bupati Minut (Mr.Alan
Mingkid)Other Other Minahasa Utara goodwill visit
Update the project progress and inform regarding the plan
of North Sulawesi Governor site visit in the end of
November
Government RelationsNeutral/ maintain
engagement
He will inform Bupati and to match the visit
schedule with Bupati scheduleNo
117 7-Nov James Likupang Health clinic (Dr.Ronal) Other Likupang timur Minahasa Utara Goodwill visitTo give the donation to support clinic activities (CSR
program)community contribution request
Neutral/ maintain
engagementContinue coordination No
118 12-Nov James PLN UIP (Mr.Ronal) Other Other Manadocoordination
meeting
Submission some documents and discussion regarding the
operation committeeCompany regulations/procedure Increase Attention
Letter for operation committee will send to PLN
KitLur Sulawesi in MakassarNo
119 13-Nov James HoV wineru wineru Likupang timur Minahasa Utara goodwill visit Collect community concern and man power supply Government Relations Increase AttentionMan power from locals are ready, but waiting PP
to provide the PPE and hardware toolsNo
120 14-Nov Kezia BPJS Ketenagakerjaan Minut Other Other Minahasa Utara
Compliance of
mandatory
requirement
To get the cover letter from BPJS and submit some
required documentsCompany regulations/procedure
Neutral/ maintain
engagement
Getting the cover letter on hand and continue
coordinationNo
121 19-Nov James Ex Landowner (Mr. Herman L) wineru Likupang timur Minahasa Utara goodwill visit
Discussion and to get permission regarding the excavation
of the waterway (from site's drainage discharged to his
land)
Land, road access & properties Increase AttentionHe will support us for the waterway excavation
on his landNo
122 20-Nov Kezia Village secretary (Mrs. Olga) wineru Likupang timur Minahasa Utaracoordination
meeting
to collect participants/registration data for Women
empowerment training programCommunity contribution request Increase Attention continue coordination No
123 22-Nov James HoV wineru wineru Likupang timur Minahasa Utaracoordination
meeting
continue coordination regarding the local manpower
supply (to get total 362 manpower)Community contribution request Increase Attention
Slow to supply man power because have to
queud up in the health clinic to get Healthy
certificate
No
124 23-Nov James Likupang Health clinic (Dr.Ronal) Likupang 1 Likupang timur Minahasa Utaracoordination
meeting
discussion and to get support the possibility for overtime
in the health clinic for a few daysGovernment Relations
Neutral/ maintain
engagementHe can support us with overtime for a few days No
125 26-Nov james Likupang Police Head (Mr.Steven) Likupang 1 Likupang timur Minahasa Utara goodwill visit
Discussion regarding how to manage the security and
routine patrol at the site because of many workers works
at site but from different place.
Company regulations/procedureNeutral/ maintain
engagement
He will send his staff to conduct routine patrol
around siteNo
126 28-29 Nov james, Adisome women from Wineru and Likupang
1 villageOther Other Minahasa Utara
Compliance of
mandatory
requirement
Women empowerment - enterpreneurship training Community contribution requestNeutral/ maintain
engagement
Good response from the participants and will
start the business with good packaging and
brand as per training given
No
127 3-Dec James Ex Landowner (Mr. Herman L) wineru Likupang timur Minahasa Utara
Compliance of
mandatory
requirement
Discussion about drainage works off site goes to the ocean
through his landCompany regulations/procedure Increase Attention
He will prepare the quation and will mobilize his
excavator to site as soonNo
128 6-Dec James, Ambara Ikhsan (PLN KitLur Sulawesi region) Other Other makassar
Compliance of
mandatory
requirement
Discussion in preparation for the energise and
commissioningCompany regulations/procedure Increase Attention
He asked ITL to prepare some letter and
documents to be submitted to PLN kitLurNo
129 11-Dec James, Ambara Sugeng (PLN UP3B) Other Other Tomohon
Compliance of
mandatory
requirement
Discussion and coordination for the energise and
commissioningCompany regulations/procedure Increase Attention
Pak Sugeng will give permission ITL to energise,
when all the requirements completedNo
130 20-Dec James PTSP office of Minut Other Other Minahasa Utara
Compliance of
mandatory
requirement
To collect SIUP and TDP of ITL Branch office and discussion
regarding the new government regulation about
permitting
Company regulations/procedureNeutral/ maintain
engagementContinue coordination No
Appendix-4 Grievance Register
GRIEVANCE REGISTER – MINUT SOLAR PROJECT
No Name of
Reporting Person
Residence of
Informant
Date of Reporting
Report Category
Location Brief description on Grievance /Issues
Priority for Resolution
Action Taken (state person in charge to complete actions STATUS
(Open/Close
Date closed
out action
Notes I II III
1 HoV
(Zubair)
Wineru 27-Feb-18 Local
employment
and
Business
Opportunity
Village
office
Request more local people
to be recruited by the
project
Mid Coordination with PP and remind PP
that local labor recruitment need to
be prioritized from the Wineru village
PP already
coordination
with the HoV to
prepare the list
of the position
and number
required
Close 4-Mar-18 continue
cordination
with HoV for
the next
recruitment
2 HoV
(Zubair)
Wineru 28-Mar-
18
Local
employment
and
Business
Opportunity
Village
office
complaint because there are
companies from wineru
village that can supply heavy
equipment, but instead use
suppliers from other regions
High Coordination with PP for the
possibilities engage supplier from the
Wineru village
PP already
coordination
with the HoV
PP have
engage with
sub cont from
wineru village
to renting
numbers of
Heavy
equipment
Close 5-Apr-18
3
4
5 NGO-
Aliansi
Doyot
Linekepan
Likupang 18-Jun-18 Land and
Properties
Site
location
The NGO asked if The
Mosque inside the site has
the permit from
government
High Coordination with The HoV of
Wineru, related the NGO Status
Coordination
meeting with
Likupang Police,
and we had
agreed to put
the roof topper
Giving
permission
the NGO
entering the
site to saw
actual
condition of
close 21-Jun-18
GRIEVANCE REGISTER – MINUT SOLAR PROJECT
No Name of
Reporting Person
Residence of
Informant
Date of Reporting
Report Category
Location Brief description on Grievance /Issues
Priority for Resolution
Action Taken (state person in charge to complete actions STATUS
(Open/Close
Date closed
out action
Notes I II III
of the praying
room down.
the pray
building.
6 HoV
(Zubair)
Likupang 27-Aug-18 Local
Employment
and
Business
Opportunity
Site
location
Request clarification on
local and non local hiring
process, especially for
unskilled labor
Medium in the middle of september'18, PT PP
promise to open employment
acceptance for the local, for
installation work.
close 27-Aug-18
7 Mr. Benny Likupang 21-Sep-18 Access to
Natural
Resources
Site
location
Ask to move the fence
around Zone 6, because the
fence will close the access to
the locals farm
Medium Coordination with PP, NARI to check
the layout
fence will shift
to inside ITL
land around 2
meters, to give
access for the
community
Close 22-Aug-18
8
Close 15-Oct-18 Mediation
result with
the family is
ITL can
resume work
at zone 6
with some
requirements
which
acceptable
by the
company and
the
grievenant.
9 Wangurer
Village
Chief
Likupang 17-Oct-18 Community
Health and
Safety
Wangurer
village
The trailer to or from site
reported drive unsafe, near
miss that almost caused an
accident on the road that
passed by this vehicle.
High Coordination with OOCL, to follow as
per technical meeting, mobilization in
the night or in early morning and
provide police escort.
OOCL has closed
the action
required by the
project.
close 18-Oct-18