Environmental and Social Monitoring Report Project Number: 50330-001 January 2020 INO: Rantau Dedap Geothermal Power Project (Phase 2) Semi-Annual Report (July to December 2019) Prepared by PT Supreme Energy Rantau Dedap (PT SERD) for Asian Development Bank This environmental and social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: others

Post on 23-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environmental and Social Monitoring Report

Project Number: 50330-001 January 2020

INO: Rantau Dedap Geothermal Power Project

(Phase 2)

Semi-Annual Report (July to December 2019)

Prepared by PT Supreme Energy Rantau Dedap (PT SERD) for Asian Development Bank

This environmental and social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Rantau Dedap

Geothermal Power Project

Environment & Social Monitoring Report

RD

Issued on 30 January 2020

RD-RSH-RPT-IEE Rev 1

July - December 2019

Page 3: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 2

PT Supreme Energy Rantau Dedap

Menara Sentraya, 23rd

Floor, Jl. Iskandarsyah Raya No. 1A

Kebayoran Baru, Jakarta 12160, Indonesia

P +62-21-2788 2222

F +62-21-2788 2333

www.supreme-energy.com

COPYRIGHT:

The concepts and information contained in this document are the property of PT Supreme Energy Rantau Dedap.

Use or copying of this document in whole or in part without the written permission of PT Supreme Energy Rantau Dedap

constitutes an infringement of copyright.

The Supreme Energy project companies - SE Muara Laboh, SE Rajabasa and SE Rantau Dedap are independent

companies developing geothermal projects in Sumatra, Indonesia. Based on the agreement of the shareholders of the

individual project companies, the Supreme Energy companies are managed in an integrated way in order to maximize

the synergies in terms of use of resources and organization of their core and supporting processes. Consequently,

important portions of the documentation body developed and applied within each company (manuals, procedures,

description of processes, guidelines etc.) are common to all project companies. The applicability of each document to

one or several project companies is reflected in the reference of each document.

Any document applicable to SE Muara Laboh contains the characters “ML” in the document reference.

Any document applicable to the SE Rajabasa project company contains the characters “RB” in the document reference.

Any document applicable to the SE Rantau Dedap project company contains the characters “RD” in the document reference.

If a document applies to all three Supreme Energy companies, the term “Supreme Energy” may refer to any and all of these companies.

Page 4: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 3

Table of Contents

1. Project Information 6

1.1 Project Participants 6

1.2 Project Location 6

1.3 8

1.4

Project Summary

Contacts 9

2. Relevant Environmental Permits or Compliance Certificates 13

2.1 New Permit or Compliance Certificates Required and Obtained 13

2.2 Key Developments and Major Changes in Location and Design 13

2.3 Findings of Environmental and OHS Regulatory Inspections or Audits 15

2.4 Monitoring Table Permit / Consultation 16

3. Incidents of Environmental Safeguards Violations or Non-compliance 17

3.1 Summary of Incidents 17

2.3 Summary Table of Incidents 17

4. Incidents of Environmental, OHS Accidents 18

4.1 Environmental Incidents 18

4.2 Occupational / Community Health Incidents 18

4.3 Safety Incidents 18

4.4 Summary Table of Incidents 18

5. Social Safeguards Monitoring 23

5.1 Social Safeguards Monitoring General Overview 23

5.2 Status of Corrective Actions 24

5.3 Summary of Activities Carried Out, Issues and Challenges 25

5.4 Summary of Stakeholder Engagement Plan 26

5.5 Livelihood and Skill Development Opportunities to Affected Persons

through the ISDP of SERD 27

5.6 Forward Plan / Next steps (for the next 6 months) 27

5.7 Labour Hiring and Management 27

6. Environmental Capacity 29

6.1 Staff Capacities in Environmental Management 29

6.2 Degree of Awareness 29

6.3 Training Conducted 29

6.4 Needs Assessment of Environmental Management Capacity 44

6.5 Awareness Level of Contractors’ Field Personnel 45

7. Social Management Capacity 46

7.1 SERD’s Relations Team 46

7.2 Number and Adequacy of Staff to Monitor Labour and Working Conditions 46

Page 5: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 4

7.3 Training Conducted 46

7.4 Designation and Signature of person responsible 46

8. Issues, Status of Implementation of Mitigating Measures in the EMP 47

8.1 Pollution (Air Quality) Monitoring 47

8.2 Water Quality Monitoring 51

8.3 Wastes 53

8.4 Erosions 54

8.5 Water Flow 55

8.6 Aquatic Biota 56

8.7 Flora and Fauna 58

9. Permit Compliance 64

9.1 Compliance with AMDAL Document 64

9.2 Compliance with Environmental Permit 64

10. Biodiversity 65

10.1 Biodiversity Action Plan Details 65

10.2 Biodiversity (Endangered Species) 73

10.3 Biodiversity Offset Strategy 81

11. Information Disclosure 84

List of Attachments

Attachment 1 : Environmental Activities

Attachment 2 : Safety Health Activities

Attachment 3 : Social Activities

Attachment 4 : Form 4 Facilities Agreement

Attachment 5 : Environmental and Biodiversity Monitoring Maps

Attachment 6 : Grievance Log

Attachment 7 : Environmental Monitoring Trends

Attachment 8 : Summary of Hazardous Waste Temporary Storage Inspection

Page 6: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 5

Abbreviations

ADB Asia Development Bank

AMDAL Analisa Mengenai Dampak Lingkungan (Environmental Impact Analysis)

EPC Engineering, Procurement, and Construction

ERM Environmental Resources Management

ESAP Environmental and Social Action Plan

FC Financial Close

FEED Front End Engineering Design

ISDP Integrated Social Development Program

JBIC Japan Bank for International Cooperation

LAPI ITB Lembaga Afiliasi Penelitian dan Industri Institut Teknologi Bandung

LIPI Lembaga Ilmu Pengetahuan Indonesia (National Science Body)

LRP Livelihood Restoration Program

NEXI Nippon Export and Investment Insurance

OHS Occupational Health and Safety

PLN Perusahaan Listrik Negara (National Power Company)

PP Pembangunan Perumahan`

PPA Power Purchase Agreement

PRA Plumpang Raya Anugerah

RD Rantau Dedap

Rekind Rekayasa Industri

RKL Rencana Pengelolaan Lingkungan (Environmental Management Plan)

RPL Rencana Pemantauan Lingkungan (Environmental Monitoring Plan)

SCAR Social Compliance Audit Report

SERD PT Supreme Energy Rantau Dedap

SEP Stakeholder Engagement Plan

SGS Steam Gathering System

SHE Safety Health Environment

Page 7: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 6

1. Project Information

1.1 Project Participants

The Project Sponsors of PT Supreme Energy Rantau Dedap (SERD) are PT Supreme Energy, Engie

Energy Asia Co., Ltd, Marubeni Corporation, and Tohoku Electric Power Co. The Sponsors have

secured finance for the construction and operation of the Project from commercial banks, with

Mizuho Bank, Ltd. (Mizuho) as the mandated lead arranger (MLA), and the following international

finance organisations: Asian Development Bank (ADB), Japan Bank for International Cooperation

(JBIC) and Nippon Export and Investment Insurance (NEXI) (together the Lenders).

1.2 Project Location

SERD Geothermal Power Plant Project is located in a mountainous area approximately 290 km by

road direction south west of Palembang, the capital city of South Sumatra in Indonesia. The road

access to the site is generally in good condition as main public road is asphalted. The site can also be

reached by plane through a small airport at Pagar Alam and by train from Palembang to Lahat city.

A 20 km unsealed road, suitable for transportation and mobilization, exists as the last section of road

from village Kota Agung until the site entrance and geothermal project area.

The project site is located around 35 km south east of an active volcano and a risk assessment of an

eruption has been studied and hazards of ash fall identified.

The topography of the Rantau Dedap Geothermal field is best described as “rugged” – the bulk of it

being within a protected forest. Elevations of the steam production facilities range from 1,752 metres

above sea level at Wellpad RD-B, to 1,960 masl at the proposed power station site adjacent to

Wellpad RD-E, to 2,564 masl at the Wellpad RD-L as the highest project facility.

Page 8: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 7

Picture 1 : Location of Rantau Dedap Geothermal Project in Sumatera

Page 9: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 8

Picture 2 : Site Overview and Power Plant

1.3 Project Summary

Under the Decrees of the Minister of Energy and Mineral Resource (MEMR) issued in 2008, PT

Supreme Following the tender award of the Rantau Dedap concession (WKP – Wilayah Kuasa

Pertambangan) to the Supreme Energy Consortium in late 2010, a mining license (IUP or Ijin Usaha

Pertambangan) was issued to the project company PT Supreme Energy Rantau Dedap (SERD). On 16

November 2017 the Third Amendment of Power Purchase Agreement (PPA) between Perusahaan

Listrik Negara (PLN) and SERD was signed and the Ministry of Finance of the Republic Indonesia

issued the Government Guarantee Letter for the Rantau Dedap Geothermal Power Project on 04

April 2018.

On January 2013, civil construction works commenced to support drilling exploration activities and

finished the construction of access roads and wellpads in November 2014. A total of 4 wellpads RD-B,

RD-C, RD-E, RD-I and ± 42 km access roads from Kota Agung - Tunggul Bute - Rantau Dedap site.

The first exploration well RD-B1 was spudded-in on 3 February 2014 and exploration drilling

continued until early 2015. In total 6 wells were completed which are RD-B1, RD-B2, RD-C1, RD-C2,

RD-I1 and RD-I2, and followed by an extensive well testing program, which was completed in August

2015. Based on the drilling and well testing results, SERD’s subsurface team prepared the numerical model of the resource and issued the well field assumption.

GeothermEx, Inc. (GTX) as Lenders’ Resource Consultant has performed a due-diligence review on

the assumption of the Rantau Dedap geothermal resource and issued the Final Resource Assessment

Page 10: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 9

report in October 2015 and an addendum in October 2017. The Feasibility Study was carried out by

AECOM as Owner Engineer by end of 2015, followed by the FEED in 2016. AECOM was also involved

in preparing the tender documents.

The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract was signed on 22 March 2018 and Notice to Proceed (NTP)

issued on 19 April 2018. Under the EPC Contract the Contractor is responsible for the procurement,

installation, testing and commissioning of the SGS system, the Power Plant and the Substation, as

well as interconnection to the PLN grid connection point, wellpads, access roads and accommodation

complex.

1.4 Contacts

Company: PT Supreme Energy Rantau Dedap

Menara Sentraya, 23rd

Floor

Jl. Iskandarsyah Raya no. 1A, Kebayoran Baru, Jakarta 12160

Ph: +62-21 2788 2222 Fax: +62-21 2788 2333

Attn: Nisriyanto

Page 11: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 13

2. Relevant Environmental Permits or Compliance

Certificates

This Chapter discusses relevant environmental permits or compliance certificates as required by

SERD, including the latest permits or compliance certificates obtained until end of December 2019,

key developments and any major changes in location and design, and findings of any environmental

and OHS regular inspections audits.

2.1 New Permit or Compliance Certificates Required and Obtained

During July up to the end of December 2019, Hazardous Waste Storage facilty needed re-

certification. Re-certification process was conducted (23 January, 2020) and administration have

been approved by the Environment Agency of Muara Enim. Temporary permit was obtained on 28

January 2020 and the new permit is being processed.

No. Permit Issue Date Remarks

1. Hazardous Waste Temporary

Storage Permit

TBA All requirements including a site visit have been

completed.

Waiting the new permit issuance from Muara Enim.

See Attachment 8

2.2 Key Developments and Major Changes in Location and Design

No major changes to location and design were made.

The environmental activities done on site included:

Recruit Site SHE Manager and Deputy (expatriates)

Recruit Site Safety Inspector

Continue efforts for crop compensation of offset site (with local forestry and Muara Enim

regency government)

Monitor regularly the condition of offset location (patrol, drone)

Continue wildlife monitoring by camera trap

Control of Invasive species (maintain wheel wash condition, invasive species clearing)

Regular joint forest patrol with province forestry officers and regency forestry officers

Final document of AMDAL’s 6-monthly RKL/RPL has been completed and will be issued to

the relevant parties in January 2020.

Monitor H2S & Noise at various receptors

Maintain the existing SERD nursery at WP-C

Establish new nursery at access to WP-B.

Continue revegetation program

Page 12: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 14

EPC Contractor

Maintain sediment traps

Conduct dust control / dust suppresion measures by way of water spraying truck.

Conduct noise monitoring

Installed SHE banners around project area

Page 13: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 15

2.3 Findings of Environmental and OHS Regulatory Inspections or Audits

No regulatory inspection or audits were conducted specifically for Environmental/OHS purposes

during the second semester of 2019. If any environmental/OHS inspections related matters were

inspected, they were conducted in conjunction with inspections for the fatality incident and drilling

activities. No major findings were encountered. Red flag items from the previous MMD/ADB

inspections were being addressed.

MMD Inspection (3-5 September 2019)

Findings Follow Up/Documentation Status

Spills and Leaks were found at:

Fuel Tank Ware house

Removed spill potential by providing a proper

space for storage of oil drums; provided proper

spill kit.

Close

Generator Storage room at HazMat

Storage Area

Built a secondary containment bundwall to

prevent potential spill from spreading.

Close

Landslide Potential at sensitive areas

(ie. Shortcut area)

Performed maintenance and install additional

gabion walls around the project area, when

necessary.

Close

SBI Fuel Tank Leak Recovered the fuel oil, repaired the leak, installed

oil catchers and performed housekeeping Close

Page 14: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 16

Scrap and used wood waste scattered

around GPP area.

Rekind performed general housekeeping at GPP

area.

Close

2.4 Monitoring Table Permit /Consultation

Monitoring Item Monitoring Results during Reporting Period

Hazardous Waste Temporary Storage Permit

Permit

Obtained /Not obtained

Not Obtained

(reason : un availability of the governm

Application Date: November 2019

Obtained Date: TBA

Valid until: Valid for years

Other environmental permits (if any permit obtained during the monitoring period) Name of permit:

Obtained Date: YYYY/MM/DD

Valid until: YYYY/MM/DD

*If obtained, please submit a copy of the permit together with this monitoring form.

Page 15: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 17

3. Incidents of Environmental Safeguards Violations or

Non-compliance

This Chapter discusses relevant incidents of environmental safeguards violations based on applicable

environmental standards and regulations along with the correctives actions, deadlines, identification

of responsible parties, and status of implementation of corrective action plan.

3.1 Summary of Incidents

No incidents of environmental safeguards, violations or non-compliance, and corrective

actions required.

No incidents with security forces

3.2 Summary Table of Incidents

There had been no issues found related to incidents of environmental safeguards, violations or non-

compliance, and hence no corrective actions were required.

Date /

Time

Responsible

Agency

Nature of

Non-

compliance

Standards and

Regulations

Violated

Date &

Authorities

Recorded

Corrective

Actions

Status of

Corrective Action

Implementation

---- --- --- --- --- ---- ---

Page 16: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 18

4. Incidents of Environmental, OHS Accidents

This Chapter discusses incident recorded dates and responsible agencies, the scale of damage and

injury, authorities in charge of investigation/ recording, media or community reactions and corrective

actions, deadlines, identification of responsible parties.

4.1 Environmental Incidents

There were No environmental incidents reported during the period.

4.2 Occupational / Community Health Incidents

See Summary Table of Incidents.

4.3 Safety Incidents

The safe working hours are:

Safe Working Hours Safe MH YTD

(to end of Dec 2019)

Safe MH since Last LTA

(since 20 August 2019)*

Employee and Temporary Workers 75,015 75,015

Contractors 3,347,628 3,347,628

For the period of July-December 2019, there were [7] property damage incident [12] near misses,

[0] HIPO (high potential) near miss, [2] first aid treatment, [2] security case and [1] fatalities/lost

time incidents.

4.4 Summary Table of Incidents

Activity YTD

(Jul-Dec) Description Corrective Action PIC Date of Target Status

Number of Occupational

Fatality Incident

(Company and

Contractor)

1 1) RD-IR-19-050 : a concrete

truck mixer driver passed

away due to thrown off out

of the cabin while the truck

toppled

1-EBTKE Final Report-Fatality TM-20

EPC & SERD 30 Oct 2019 Complete

Number of Occupational

Lost Time Incident

(Company and

Contractor)

0 -

Number of Medically

Treated Incident

(Company and

Contractor)

0 -

Number of First Aid

Treatment (Company

and Contractor)

2

1) RD-IR-19-042 : 07 July’19

Right hand finger

scratched/open wound hit by

hand grinding disc.

1) Prepare the work plan. For

this activity need prepare

the drawing, traffic

management, worker and

equipment list and JSA.

2) Conduct the power tools

inspection and tagging

SERD 08 Jul 2019 Complete

Page 17: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 19

Activity YTD

(Jul-Dec) Description Corrective Action PIC Date of Target Status

3) IP routine check to medic

in one weeks

2) RD-IR-19-045 : 08 July’19

Right Eye hit by grinding

sparks

1) Prepare Job safety Analysis

and state face shield are

Mandatory PPE for Grindin

g works

2) Conduct the power tools in

spection and taging

3) IP routine check to medic

in one weeks

Dani SP 09 Jul 2019 Complete

Number of High

Potential Serious

Incidents or High

Potential Near

Misses/Near Hits

(Company and

Contractor)

0

Number of Near Misses

/ Near Hits (Company

and Contractor)

12 1) RD-IR-19-041 : 02 Jul’19

Dump Truck slipped at ch.

0+800 due to loss power and

failed to climb up.

Complete

2) RD-IR-19-044 : 07 Jul’19 a

fuel truck was slipped near

office E due to muddy road

1) To conduct road repair and

maintenance road for the

slippery/muddy road and

damaged road

Atok 08 Jul 2019 Complete

3) RD-IR-19-046 : 24 Jul’19

Bed of trailer detached from

its prime mover

1) Conduct assessment for

the evacuation of The

Trailer

2) Change flexible bed hoist

connection with fixed hoist

type

Atok 25 Jul 19 Complete

4) RD-IR-19-048 : 06 Aug’19 LV get in the trenches at

Access road ( Air Tupai)

1) All driver of Volvo

Maintenance shall be

conducted DDC Training

before entering site project

2) The driver minimal has 30

minutes for rest while

driving more than 4 hours.

Dobiet K 07 Aug’19 Complete

5) RD-IR-19-049 : 19 Aug’19

TMC breaking system failure

at Shortcut road - No injury

person

1) Conduct random check to

all vehicles especially is

checked breaking system

2) The driver shall be

conducted daily checklist

before activity

Dobiet 20 Aug 19 Complete

6) RD-IR-19-054 : 22 Sep’19

Nearmiss trailer and prime

mover (license plate BM

8759 DM) was observed in

breakdown status access to

M.

1) Conduct detail inspection/

replace suspension system

periodically as per PM

guideline/ Hazard Hunt

IEM/PSL 24 Sep 19 Complete

Page 18: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 20

Activity YTD

(Jul-Dec) Description Corrective Action PIC Date of Target Status

7) RD-IR-19-056 : 11 Oct’19

One mini bus crew Rekind in

breakdown, at access road

climb near pump station-3,

driver not avaialble, no

support

1) Remove the inspection

pass

2) Repair the broken axle

3) Conduct re-inspection to

the minibus

Dobiet 12 Oct 2019 Complete

8) RD-IR-19-057 : 11 Oct’19

Near Miss: One unit Light

vehicle Rekind, dangerous

driving behaviour at access

road climb near PS-3

1) Give the warning to the

driver (verbal warning –

recorded)

2) Give the briefing to the

driver

Dobiet 12 Oct 2019 Complete

9) RD-IR-19-058 : 14 Oct’19

Master valve from RD-I3 well

has been opened status in

LOTO taging is close.

1) Refresh LOTO Training

2) Periodic inspection for

LOTO were installed

Rifky A 16 Oct 19 Complete

10) RD-IR-19-060 : 19 Nov’19

Grounding cable broken due

to lightning strike

1) Instructed to EPC contracto

r to installed proper lighten

ing protection ASAP

2) Monitoring progress

installation until finish

EPC 26 Nov’19 Complete

11) RD-IR-19-064 : 20 Nov’19

1 unit LV was moving from

Kota Agung to site for

commuting purpose. When

passing the road at CH

9+000, the road was climb up

and the road condition was

damage with in the middle of

the road

1) Repair the road

EPC Complete

12) RD-IR-19-74 : 30 Dec’19

Light vehicle (left side) of PT.

Stanley pick up stuck on

drainage

1) Repair the road and

drainage

EPC Complete

Number of Incident /

Accident (Company and

Contractor)

16 1) Property Damage: RD-IR-19-

43: 7 Jul’19 a car from

subcontractor hit the other

car while reverse parked at

the GPP office parking area.

1) Refresh Training for the

involved driver

2) Give a warning letter.

EPC 09 Jul’19 Complete

2) Property Damage : RD-IR-19-

47 : 30 Jul’19 LV BG 1744

EH Hit the Warehouse Gate

1) Give warning the Driver (M

r. Nopi Relo (DKB 18158)

2) Suspend the driver

3) Coach the driver

4) Prepare lesson learn for ot

her driver

5) Add striking paint for ware

house gate for illumination

Hazairiadi 5 Aug’19 Complete

3) Property Damage : RD-IR-19-

53 : 12 Sep’19 Light

Vehicle PT. Baker Hughes BG

1909 ON, thrown by

unknown person outside the

security Pos-1

1) Move the accommodation

near security post 1 area.

2) Reduce night travel and

activity where possible.

3) Escalate the report to

Security coordinator

BHI 15 Sep 2019 Complete

4) Theft: RD-IR-19-55: 01

Oct’19 2 (two) batteries

1) Install additional light at

open yard

SERD 02 Oct 2019 Complete

Page 19: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 21

Activity YTD

(Jul-Dec) Description Corrective Action PIC Date of Target Status

TMC (crane truck) be stolen

at the open yard.

2) Reinforce the security

patrol

5) Property Damage : RD-IR-19-

59 : 08 Nov’19 Damage

Minor Road traffic accident

involving local dump truck at

CH 3500

1) Review / improve current

training package and

enforce monthly refresher

training to local operators.

2) Socialize all local drivers on

accident.

3) Post / communicate

lessons learned to all

project

SERD 15 Nov 2019 Complete

6) Property Damage : RD-IR-19-

61 : 09 Nov’19 Lightning

strike on network server

causing internet connect

down

1) Coordination with local pro

vider (TELKOMSEL)

2) Call technician for fixed the

problem

SERD 14 Nov’19 Complete

7) Security : RD-IR-19-62 : 11

Nov’19 The Driver light

Truck compel the SERD HSE

to allow light truck passing

from Block 0 check point

1) Solve the issue to the local

vendor and Light Truck driv

er

2) Renewal the simper and va

lidation inspection for the li

ght truck

3) Continue to monitoring all

the vehicle and equipment

passing from block 0 check

point

SERD 31 Dec ‘19 Complete

8) Property Damage : RD-IR-19-

063 : 18 Nov’19 During

log up at 1730 m, suddenly

drum free wheel to 2387.41,

and then cable cut and lost in

hole

1) Modified shaft on machine

shop

2) Design three lock thread

on drum shaft

3) NDT inspection by

Supreme inspector

SDI 25 Nov’19 Complete

9) Property damage : RD-IR-19-

73 : 30 Dec’19 Telkom-

Gratelindo Radio Receiver

Device at Warehouse Hit by

Lightning Strike During Heavy

Rain

1) Install new grounding and

replace the broken cable

SERD 03 Jan’20 Complete

10) External Relation : RD-IR-

19-065 : 28 Nov’19 Road

blockage by three resident

from Yayasan village

Remove the blockage SERD 28 Nov’19 Complete

11) External Relation: RD-IR-19-

066 5 (five) resident came

up use of three motorcycles

to GPP area.

Improve Security SERD 31 Dec’19 Complete

12) External relation : RD-IR-19-

067 : 05 Dec’19 Road

blockage at ch. 8+000 and

ch. 3+500

Remove the blocake SERD 5 Dec’19 Complete

13) External Relation : RD-IR-19-

068 : 10 Dec’19 Road

block at near Gate-one by ex-

land owner

Mention the land status SERD 10 Dec’19 Complete

14) External Relation : RD-IR-19-

069 : 11 Dec’19 Road

block at near Gate-one and

near Talang Pisang Village

Remove the blocake SERD 11 Dec’19 Complete

Page 20: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 22

Activity YTD

(Jul-Dec) Description Corrective Action PIC Date of Target Status

15) External Relation : RD-IR-19-

071 : 13 Dec’19 Road

blockage at near

accomodation Camp by

person who failed on

security selection

Remove the blocake SERD 13 Dec’19 Complete

16) External Relation : RD-IR-19-

071 : 17 Dec’19 Road

Blockage by the drivers and

job seekers

Remove the blocake SERD 17 Dec’19 Complete

Page 21: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 23

5. Social Safeguards Monitoring

This Chapter discusses progress in implementation of the social safeguard compliance audit report

and corrective action plan, implementation of grievance mechanisms, resources for implementation

of social safeguards, forward plan of social safeguards, labour hiring and management.

5.1 Social Safeguards Monitoring General Overview

Based on the Livelihood Improvement Program, the Consultant starts to monitor the quality of the

coffee bean. The improvement of coffee training and distribution of bean size grader makes the

production became better. SERD plan to deliver the refractometer on Q1 2020, waiting the proposal

from the farmer group. During the coffee harvest season, the farmers contiunues delivers the

green bean to the off-taker and roasted in Rumah Kopi Ranin in Bogor up to 400 kgs.

Starting Q3 2019, the social consultant conduct revalidation of the PAP for developing the LIP

for 2nd

year. The revalidation results shows good improvement and Capacity Building training will

be conducted in Q1 2020 for 43 PAP.

SERD social team continued monitoring the operation of the Community Committee that had been

established in 2019. Coordination meeting with District Forum that consisted of Head of Sub

district, Head of Sub district’s Police and Head of Sub district Military, and representatives from the Contractors. In November 2019, SERD Conduct Stakeholder Meeting to develop CSR Program for

2020.

Several CSR programs have been conducted in 2H2019, such as:

• Support the education tools to Kindergarten and Elementary School in Yayasan Area.

• Continue to support the development of new classroom at Islamic School in Yayasan Hamlet.

• Repairing the ditch at Batu Surau.

• Delivering the water supply fire truck for Muara Enim Regency

• Support the inauguration ceremony of Kindergarten School at Rantau Dedap

• Support the community for celebrating Indonesia independence Day

• Support the community for celebrating Sacrifice Festival

• Support the Muara Enim Sector Police for soccer competition.

• Conduct blood donor to commemorate the 74th Energy and Mining Day,

• Supporting the ceremony of the 74th Energy and Mining Day,

• Providing water pumping machines for watering dust for villager,

• Continue to support the development of new classroom at Islamic School in Yayasan Hamlet.

• Continued delivering the safety net program to the elder Vulnerable Affected People (every 3

months)

• Supporting Padang Panjang Hamlet Program

• Assesment of proposed CSR Program 2020 as a result from Stakeholder Meeting 2019

• Community relations to surrounding project stakeholders,

• Support LIP Program in Coffee Plantation Improvement, this semester they try new varieties

Arabica Luwak and Robusta Luwak.

Page 22: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 24

Grievance Management

In total, From July to December 2019, SERD received 31 grievances. Most of the grievances

regarding job opportunities and the property damage due to the mobilization and water run-

off during rainy season. While all property damage has been resolved, the demand of job

opportunities still high. The details was shown in Attachment 6.

PLN Transmission Line

The status of PLN transmission line within protection forest area is:

Continued survey the landusers for 38 tranmission line tower.

PLN already received the Forest Lend-Use Permit (IPPKH) from Ministry of Environment and

Forestry in September 2019

5.2 Status of Corrective Actions

Summary of corrective action status is as follows:

Corrective Actions Completion status % Comment

Ensure all relevant permits are renewed.

SERD should provide update on the

following permits:

● Borrow and use permit of forest area (IPPKH) for PLN transmission lines

100% The PLN-led land acquisition process is 52%

complete as of December 2019. The

proposals of IPPKH alredy in MoFE and

already obtained on September 2019

Most revisions have been accommodated

within the revised SEP, however the

following are still required to be addressed:

● Grievance log does not capture contact details, however, these details are recorded

in the grievance form.

● In addition, some of the stakeholder engagement activities in April 2019 were

meant to address previous grievances. SERD

are advised to also include the results of the

engagement to grievance log to tally both

documents and record outcomes for such

engagements.

100% Outstanding grievance log has been

updated. Some of the pending grievances

was resolved. The outstanding grievance log

ststus has been submit to LESC.

Page 23: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 25

5.3 Summary of Activities Carried Out, Issues and Challenges

During the period of Semester 2 of 2019, Relations Team continously participate activities as follows:

Land Acquisition/Change in land ownership and land tenure

1. Do changes in land ownership and land tenure (if any) for the project purpose cause conflict in communities? If yes, please describe the details and the measures.

Yes No No

2. Please describe on the land acquisition process during the monitoring period (if any). (e.g. land certification process) Latest land acquisition activity was to obtain the land for project accommodation block which has been settled before end of 2017

Livelihood Restoration 1. Please describe integrated Social Development Program, including CSR activities, which are conducted during the monitoring period. ISDP program is being focused to the Livelihood Improvement Program (LIP) for DPAP. Based on the Livelihood Improvement Program, the Consultant starts to monitor the quality of the coffee bean. The improvement of coffee training and distribution of bean size grader makes the production became better. SERD plan to deliver the refractometer on Q1 2020, waiting the proposal from the farmer group. During the coffee harvest season, the farmers contiunues delivers the green bean to the off-taker and roasted in Rumah Kopi Ranin in Bogor up to 400 kgs.

Starting Q3 2019, the social consultant conduct revalidation of the PAP for developing the LIP for 2nd year. The revalidation results shows good improvement and Capacity Building training will be conducted in Q1 2020 for 43 PAP.

SERD social team continued monitoring the operation of the Community Committee that had been established in 2018. Several CSR programs have been conducted in 1H2019, such as:

Support the education tools to Kindergarten and Elementary School in Yayasan Area. Continue to support the development of new classroom at Islamic School in Yayasan Hamlet. Repairing the ditch at Batu Surau. Delivering the water supply fire truck for Muara Enim Regency

Support the inauguration ceremony of Kindergarten School at Rantau Dedap

Support the community for celebrating Indonesia independence Day

Support the community for celebrating Sacrifice Festival Support the Muara Enim Sector Police for soccer competition. Conduct blood donor to commemorate the 74th Energy and Mining Day, Supporting the ceremony of the 74th Energy and Mining Day, Providing water pumping machines for watering dust for villager, Continue to support the development of new classroom at Islamic School in Yayasan Hamlet. Continued delivering the safety net program to the elder Vulnerable Affected People (every 3

months) Supporting Padang Panjang Hamlet Program Assesment of proposed CSR Program 2020 as a result from Stakeholder Meeting 2019 Community relations to surrounding project stakeholders, Support LIP Program in Coffee Plantation Improvement, this semester they try new varieties Arabica

Luwak and Robusta Luwak.

2. Please provide with the monitoring of Livelihood Improvement Programs for Affected Households. Especially, please describe in case any household whose livelihood has been worse than pre-project level. Discuss impacts on the vulnerable households, in a separate section. This activity will be conducted after LIP program implementation by 2H2020

Grievances

1. Please provide us with the grievance log, if any receiving/on-going/closing grievances during the monitoring period, which includes the contents, receiving date, closing date, current situation, etc. of the grievance. Please refer to grievances log (Attachment 5)

Employment Opportunities

1. Please describe number and proportion of local workforce employed for the project. Please include the numbers of affected persons who have been engaged in the workforce. Total local workforce employed for the project is around 645 persons (136 males ; 26 Females)

Community Income 1. Please describe if any changes can be quantitatively observed in the community income due to the project. (e.g. increasing income by working as local labor, doing small business, etc.)

Page 24: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 26

Not only the quality and the price is being improved, but the farmers now try a new variety of coffee luwak type

Community Perception

1. Are there any negative perceptions towards the Project activities? If yes, please describe the details and mitigation measures.

Yes No No. But the dmands of employment become higher.

Community Health

1. Are there any negative impacts on community health caused by the project? (eg increasing of infectious disease, problems at sanitation facilities, etc.) If yes, please describe the details and mitigation measures.

Yes No No

5.4 Summary of Stakeholder Engagement Plan

There were many stakeholder engagement activities have been carried out by SERD during the

reporting period in line with the project’s commitments in the stakeholder engagement plan. SERD always noting every stakeholder engagement activities in the stakeholder engagement log book.

Some of stakeholder engagement activities are summarized in the following table:

Date of

Consultation Location Theme

Participants

(Number of

Participants)

Information

Disseminated Key Issues Raised

SERD Response and

Action Taken

9 July 2019 SERD office

Talang Tiga

Transparent in

recruitment

Member of

Committee

2019

SERD relation

Together with the

Committee, the

candidates for the

local workforce.

Local workforce SERD will monitor

committee

29 August

2019

Padang

Panjang

Handover partcipation of

program by SERD, Rekind

and CIP

Muara Enim

Police Head

SERD Relation

The project

situation updated

Maintain the

conducive situation

Close coordination

with police

18-Sep-19 SERD Office Blood Donation Red Cross

(PMI),

contractors and

community

SERD relation

Celebrating the

anniversary of

ESDM Ministry

(MEMR) with Blood

Donation Event, the

event was attended

by PMI Muara Enim

Regency

Appreciation from the

Red Cross (PMI)

Continue support the

Red Cross and MEMR

Program

7 October 2019 Grand Zuri Coordination Meeting

with Forestry and Police

Forest Police &

Police of

Muara Enim

SERD relation

Coordination

Meeting with Lahat

police and Karhutla

(Forestry) discuss

about secure of

SERD and forest fire

around SERD

The patrol of Forestry

Police will be more

intensive with SERD

support

SERD support the

program

01-Nov-19 Yayasan CSR Program Progress

Update

Zainudin

(Village Com

Dev Officer)

SERD Relations

Supervise Yayasan

Al Jami'ah school as

CSR program.

Progress has reached

60%

SERD support the

program

17-Dec-19 KPH Office Biodiversity Meeting with

Tripika and KPH at KPH

office

KPH,

Sub District

authority

SERD relation

Discussion regarding

DAS Musi

restoration plan

The program was

reviewed by KPH and

SERD ask for support

SERD will monitor the

progress

Page 25: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 27

5.5 Livelihood and Skill Development Opportunities to Affected Persons

through the ISDP of SERD

Activities releted to the Implementation of ISDP components to affected persons during July -

December 2019 were:

No Activity Target beneficiaries Status Remarks

1 Economic empowerment

Livelihood Improvement Program assessment &

monitoring

Coffee farmers of Direct Project

Affected People

Continued ISDP livelihood

improvement program

continues

2 Education and Helth

Blood Donor in commemoration of Mines and

Energy Day

In collaboration with Local Red Cross Completed

3 Infrastructure improvements

Road Repair in Kota Agung Sub District

Local Communities affected by the

project

Continues Support in kind

4 Donations and community relationship

Deliveriy water fire truck to Regency of Muara Enim To support fire protection in

Semendo Sub District Area near

SERD Project

Completed Support in kind

5 Support for implementation of social development program

ISDP consultant for report and documentation Project Affected Household Continued Livelihood

Improvement Program

(LIP) continues

conducted

Continues deliver the safety net program to the

elder Vulnerable Affected People (every 3 month)

Vulnerable Direct Project Affected

People

Continue To be continued in

every three (3) months

5.6 Forward Plan / Next Steps (for the next 6 months)

SERD has set a forward plan for the next 6 (six) months that consists of the following programs, i. e:

Together with SERD’s social consultant will continue the implementation of Livelihood Improvement Program including the advance training for build the capacity of the Project

Affected People.

Continue to implement the CSR programs to support affected community

Continue to conduct public disclosure and consultation with all key stakeholders.

Continue to maintain and improve good relationships with all key stakeholders, and improving

the grievance mechanism process and resolution.

Have a coordination meeting with PLN to discuss the progress of PLN led land acquisition for

transmission line.

5.7 Labour Hiring and Management

Project procedures for hiring :

SERD, contractors and the Committee discussed the local labour recruitment and local

business opportunity.

Page 26: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 28

All contractors should follow and obey SERD’s Hiring and Selection Procedures. Grievance mechanism & procedures is always monitored and open to everybody for

filing complaint during this process.

Requirements on workers recruitment with information on origin of migrant or local

workers, position/work occupied, and with sex disaggregation (the Borrower and the

contractors).

Refer to Section 5.3 Employment Opportunities. Regular update is through Project

Monthly Report.

Tracking of recruitment of women personnel (the Borrower and the contractors)

Please refer to Section 5.3 Employment Opportunities. Regular update is through

Project Monthly Report.

Compliance to core labor standards and compliance with national laws, based on

workplace inspection, observation and audit.

Procedure and the recruitment process was witnessed by local government officials

and SERD’s Human Resources Department for the sake of fairness and compliance to

national regulations.

Nature of labour dispute or grievance, including conflicts between groups

No labour grievance was found, potential dispute is only miscommunication between

labours or groups.

Legal requirements, permit conditions and renewal requirements related to labor

management

(N/A)

Media, civil society /NGOs, or community reactions (if any)

Those stakeholders are still manageable.

Corrective actions, deadlines, identification of responsible parties

Please refer to table in Section 5.2 above.

Labour relations and living conditions for construction labour force

The EPC (Rekind) Labour Camp is still under construction

Page 27: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 29

6. Environmental Capacity

This Chapter discusses staff capacities in environmental management, degree of awareness, training

conducted, needs assessment of environmental management capacity and awareness level of

contractors’ staff trained.

This Chapter discusses staff capacities in social management, degree of awareness, training

conducted, needs assessment of social management capacity and awareness level of contractors’ staff trained.

6.1 Staff Capacities in Environmental Management

During this period PT SERD currently employs 6 personels at site. An additional Site Safety Manager

and Inspector was added at site to support the team at site as to improve and cover a range of

activities.

No. SERD Site SHE

Name Title Years of Experience

1. Hazariadi SHE Coordinator 10+ years

2. Marc Blondeel Site SHE Manager 20+ years

3. Rifqi Alfaizi Safety Officer 10+ years

4. Dian Amali Safety Officer 10+ years

5. Sepriandi Maulana Environmental Engineer 1 Year

6. Ariyanto SHE Inspector 7 years

7. Miguelito Abrasaldo Deputy SHE Manager 10+ Years

8. Sunaryo Trainer & Safety Inspector 10+ Years

9. Ahmad Zikrillah Trainer & Safety Inspector 10+ Years

10. Dedy Setiawan Safety Officer 10+ Years

11 Azhari Safety Administration 4 Years

SERD Corporate SHE

Name Title Years of Experience

1. M. Arief Tarunaprawira Senior Manager SHE 25+ years

2. Andreas Hartono Head of Environment 20+ years

3. Bima Yudhistiranto Environment Engineer 6 years

4. Akhmad Wahyudi Safety Engineer 10+ years

6.2 Degree of Awareness

The current personnel responsible for SHE management have sufficient knowledge of environmental

management, health and safety requirements, including environmental laws and regulations.

6.3 Training Conducted

SHE induction is conducted to all new workers and visitors. Various SHE trainings are conducted to

SERD employees and long-term contractor workers.

Page 28: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 30

List Training Record SERD July – December 2019:

No. Training Name Dept Company Date

of Training Location

Number of

Participant

JULY

1 Site Induction EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6

2 Site Induction EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9

3 Site Induction EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14

4 Site Induction EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27

5 Site Induction EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8

6 Site Induction EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4

7 Site Induction EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4

8 Site Induction EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6

9 Site Induction EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1

10 Site Induction EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10

11 Site Induction EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5

12 Site Induction EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15

13 Site Induction EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12

14 Site Induction EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11

15 Site Induction EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4

16 Site Induction EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2

17 Site Induction EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3

18 Site Induction EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3

19 Site Induction EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1

20 Site Induction EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5

21 Site Induction EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3

22 Site Induction EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18

23 Site Induction EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8

24 Site Induction EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7

25 Site Induction EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9

26 safety observation card EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6

27 safety observation card EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9

28 safety observation card EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14

29 safety observation card EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27

30 safety observation card EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8

31 safety observation card EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4

32 safety observation card EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4

33 safety observation card EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6

34 safety observation card EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1

35 safety observation card EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10

36 safety observation card EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5

37 safety observation card EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15

38 safety observation card EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12

39 safety observation card EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11

Page 29: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 31

40 safety observation card EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4

41 safety observation card EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2

42 safety observation card EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3

43 safety observation card EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3

44 safety observation card EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1

45 safety observation card EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5

46 safety observation card EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3

47 safety observation card EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18

48 safety observation card EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8

49 safety observation card EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7

50 safety observation card EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9

51 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6

52 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9

53 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14

54 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27

55 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8

56 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4

57 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4

58 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6

59 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1

60 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10

61 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5

62 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15

63 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12

64 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11

65 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4

66 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2

67 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3

68 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3

69 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1

70 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5

71 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3

72 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18

73 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8

74 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7

75 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9

76 Introduce to PTW EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6

77 Introduce to PTW EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9

78 Introduce to PTW EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14

79 Introduce to PTW EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27

80 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8

81 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4

82 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4

83 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6

84 Introduce to PTW EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1

85 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10

Page 30: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 32

86 Introduce to PTW EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5

87 Introduce to PTW EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15

88 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12

89 Introduce to PTW EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11

90 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4

91 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2

92 Introduce to PTW EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3

93 Introduce to PTW EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3

94 Introduce to PTW EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1

95 Introduce to PTW EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5

96 Introduce to PTW EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3

97 Introduce to PTW EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18

98 Introduce to PTW EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8

99 Introduce to PTW EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7

100 Introduce to PTW EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9

101 PPE Awarness EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6

102 PPE Awarness EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9

103 PPE Awarness EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14

104 PPE Awarness EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27

105 PPE Awarness EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8

106 PPE Awarness EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4

107 PPE Awarness EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4

108 PPE Awarness EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6

109 PPE Awarness EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1

110 PPE Awarness EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10

111 PPE Awarness EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5

112 PPE Awarness EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15

113 PPE Awarness EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12

114 PPE Awarness EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11

115 PPE Awarness EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4

116 PPE Awarness EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2

117 PPE Awarness EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3

118 PPE Awarness EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3

119 PPE Awarness EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1

120 PPE Awarness EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5

121 PPE Awarness EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3

122 PPE Awarness EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18

123 PPE Awarness EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8

124 PPE Awarness EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7

125 PPE Awarness EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9

126 Enviromental Awarness EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6

127 Enviromental Awarness EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9

128 Enviromental Awarness EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14

129 Enviromental Awarness EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27

130 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8

131 Enviromental Awarness EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4

Page 31: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 33

132 Enviromental Awarness EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4

133 Enviromental Awarness EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6

134 Enviromental Awarness EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1

135 Enviromental Awarness EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10

136 Enviromental Awarness EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5

137 Enviromental Awarness EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15

138 Enviromental Awarness EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12

139 Enviromental Awarness EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11

140 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4

141 Enviromental Awarness EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2

142 Enviromental Awarness EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3

143 Enviromental Awarness EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3

144 Enviromental Awarness EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1

145 Enviromental Awarness EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5

146 Enviromental Awarness EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3

147 Enviromental Awarness EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18

148 Enviromental Awarness EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8

149 Enviromental Awarness EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7

150 Enviromental Awarness EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9

151 Basic Electrical Safety EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6

152 Basic Electrical Safety EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9

153 Basic Electrical Safety EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14

154 Basic Electrical Safety EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27

155 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8

156 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4

157 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4

158 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6

159 Basic Electrical Safety EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1

160 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10

161 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5

162 Basic Electrical Safety EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15

163 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12

164 Basic Electrical Safety EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11

165 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4

166 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2

167 Basic Electrical Safety EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3

168 Basic Electrical Safety EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3

169 Basic Electrical Safety EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1

170 Basic Electrical Safety EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5

171 Basic Electrical Safety EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3

172 Basic Electrical Safety EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18

173 Basic Electrical Safety EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8

174 Basic Electrical Safety EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7

175 Basic Electrical Safety EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9

176 Basic first aid EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 9

177 DDC EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 3

Page 32: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 34

178 DDC EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 5

179 DDC EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 1

180 WAH EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 2

181 BFA EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 3

182 BFF EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 14

183 First Aid Training FODD SERD 07-Jul-19 Acc. Camp 6

184 First Aid Training FODD SERD 14-Jul-19 Acc. Camp 4

185 First Aid Training FODD SERD 21-Jul-19 Acc. Camp 1

186 First Aid Training FODD SERD 28-Jul-19 Acc. Camp 1

AUGUST

187 Site Induction EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

188 Site Induction EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10

189 Site Induction EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11

190 Site Induction EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9

191 Site Induction EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3

192 Site Induction EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14

193 Site Induction EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14

194 Site Induction EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2

195 Site Induction EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5

196 Site Induction EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9

197 Site Induction EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6

198 Site Induction EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17

199 Site Induction EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4

200 Site Induction EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5

201 Site Induction EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5

202 Site Induction EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1

203 Site Induction EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7

204 Site Induction EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35

205 Site Induction EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15

206 Site Induction EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10

207 Site Induction EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17

208 Site Induction EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27

209 safety observation card EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

210 safety observation card EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10

211 safety observation card EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11

212 safety observation card EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9

213 safety observation card EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3

214 safety observation card EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14

215 safety observation card EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14

216 safety observation card EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2

217 safety observation card EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5

218 safety observation card EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9

219 safety observation card EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6

220 safety observation card EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17

221 safety observation card EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4

222 safety observation card EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5

Page 33: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 35

223 safety observation card EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5

224 safety observation card EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1

225 safety observation card EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7

226 safety observation card EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35

227 safety observation card EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15

228 safety observation card EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10

229 safety observation card EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17

230 safety observation card EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27

231 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

232 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10

233 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11

234 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9

235 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3

236 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14

237 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14

238 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2

239 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5

240 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9

241 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6

242 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17

243 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4

244 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5

245 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5

246 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1

247 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7

248 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35

249 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15

250 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10

251 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17

252 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27

253 Introduce to PTW EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

254 Introduce to PTW EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10

255 Introduce to PTW EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11

256 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9

257 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3

258 Introduce to PTW EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14

259 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14

260 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2

261 Introduce to PTW EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5

262 Introduce to PTW EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9

263 Introduce to PTW EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6

264 Introduce to PTW EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17

265 Introduce to PTW EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4

266 Introduce to PTW EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5

267 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5

268 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1

Page 34: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 36

269 Introduce to PTW EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7

270 Introduce to PTW EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35

271 Introduce to PTW EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15

272 Introduce to PTW EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10

273 Introduce to PTW EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17

274 Introduce to PTW EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27

275 PPE Awarness EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

276 PPE Awarness EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10

277 PPE Awarness EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11

278 PPE Awarness EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9

279 PPE Awarness EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3

280 PPE Awarness EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14

281 PPE Awarness EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14

282 PPE Awarness EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2

283 PPE Awarness EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5

284 PPE Awarness EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9

285 PPE Awarness EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6

286 PPE Awarness EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17

287 PPE Awarness EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4

288 PPE Awarness EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5

289 PPE Awarness EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5

290 PPE Awarness EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1

291 PPE Awarness EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7

292 PPE Awarness EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35

293 PPE Awarness EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15

294 PPE Awarness EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10

295 PPE Awarness EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17

296 PPE Awarness EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27

297 Enviromental Awarness EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

298 Enviromental Awarness EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10

299 Enviromental Awarness EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11

300 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9

301 Enviromental Awarness EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3

302 Enviromental Awarness EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14

303 Enviromental Awarness EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14

304 Enviromental Awarness EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2

305 Enviromental Awarness EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5

306 Enviromental Awarness EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9

307 Enviromental Awarness EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6

308 Enviromental Awarness EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17

309 Enviromental Awarness EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4

310 Enviromental Awarness EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5

311 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5

312 Enviromental Awarness EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1

313 Enviromental Awarness EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7

314 Enviromental Awarness EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35

Page 35: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 37

315 Enviromental Awarness EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15

316 Enviromental Awarness EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10

317 Enviromental Awarness EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17

318 Enviromental Awarness EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27

319 Basic Electrical Safety EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

320 Basic Electrical Safety EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10

321 Basic Electrical Safety EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11

322 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9

323 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3

324 Basic Electrical Safety EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14

325 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14

326 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2

327 Basic Electrical Safety EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5

328 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9

329 Basic Electrical Safety EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6

330 Basic Electrical Safety EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17

331 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4

332 Basic Electrical Safety EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5

333 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5

334 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1

335 Basic Electrical Safety EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7

336 Basic Electrical Safety EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35

337 Basic Electrical Safety EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15

338 Basic Electrical Safety EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10

339 Basic Electrical Safety EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17

340 Basic Electrical Safety EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27

341 DDC EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 3

342 DDC EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 1

343 DDC EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 3

344 DDC EPC-C PT. Rekayasa Industri 16-Agust-19 Office Rekind 3

345 DDC EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 3

346 DDC EPC-C PT. Rekayasa Industri 25-Agust-19 Office Rekind 1

347 BFA EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4

348 Confined Space EPC-C PT. Rekayasa Industri 16-Agust-19 Office Rekind 1

349 Working at height and

scaffolding

FODD SERD 14-Agust-19 Office SERD GPP 11

350 Working at height and

scaffolding

FODD SERD 15-Agust-19 Office SERD GPP 10

351 Working at height and

scaffolding ( Practic)

FODD SERD 16-Agust-19 Office SERD GPP 10

352 Working at height and

scaffolding ( Practice)

FODD SERD 17-Agust-19 Office SERD GPP 5

353 First Aid Training FODD SERD 08-Agust-19 Acc. Camp 4

354 First Aid Training FODD Defriwangga 24-Agust-19 Mess Depriwangga 15

355 Defensive Driving Course

(DDC)

WS, WT &

SDI

Depriwangga 31-Agust-19 Mess Depriwangga 17

Page 36: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 38

SEPTEMBER

356 DDC ( Defensive Driving

Course )

FODD PT. GMK, PT. CIP and CV.

Local contraktor

02-Sep-19 Warehouse Gate-1 11

357 DDC ( Defensive Driving

Course )

FODD PT. GMK, and transporter 03-Sep-19 Warehouse Gate-1 22

358 First Aid Training FODD SERD, CMD and DKB 10-Sep-19 GPP Office 3

359 DDC ( Defensive Driving

Course )

FODD PT. Rekayasa Industri 12-Sep-19 GPP Office 18

360 DDC ( Defensive Driving

Course )

FODD CV. Local contractor 16-Sep-19 Warehouse Gate-1 4

361 DDC ( Defensive Driving

Course )

FODD CV. Local contractor 17-Sep-19 Office Rekind 13

362 DDC ( Defensive Driving

Course )

FODD CV. Local contractor 06-Sep-19 Office Rekind 6

363 Site Induction FODD CV. Local contractor 07-Sep-19 Office Rekind 18

364 safety observation card FODD CV. Local contractor 07-Sep-19 Office Rekind 18

365 JSA & Risk Assesment FODD CV. Local contractor 07-Sep-19 Office Rekind 18

366 Introduce to PTW FODD CV. Local contractor 07-Sep-19 Office Rekind 18

367 PPE Awarness FODD CV. Local contractor 07-Sep-19 Office Rekind 18

368 Enviromental Awarness FODD CV. Local contractor 07-Sep-19 Office Rekind 18

369 Basic Electrical Safety FODD CV. Local contractor 07-Sep-19 Office Rekind 18

370 DDC ( Difensive Driving

Course )

FODD CV. Local contractor 08-Sep-19 Office Rekind 5

371 Site Induction FODD CV. Local contractor 09-Sep-19 Office Rekind 4

372 safety observation card FODD CV. Local contractor 09-Sep-19 Office Rekind 4

373 JSA & Risk Assesment FODD CV. Local contractor 09-Sep-19 Office Rekind 4

374 Introduce to PTW FODD CV. Local contractor 09-Sep-19 Office Rekind 4

375 PPE Awarness FODD CV. Local contractor 09-Sep-19 Office Rekind 4

376 Enviromental Awarness FODD CV. Local contractor 09-Sep-19 Office Rekind 4

377 Basic Electrical Safety FODD CV. Local contractor 09-Sep-19 Office Rekind 4

378 DDC ( Difensive Driving

Course )

FODD CV. Local contractor 12-Sep-19 GPP Office 19

379 Site Induction EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

380 safety observation card EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

381 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

382 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

383 PPE Awarness EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

384 Enviromental Awarness EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

385 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

386 WAH EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2

387 Site Induction EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3

388 safety observation card EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3

389 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3

390 Introduce to PTW EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3

391 PPE Awarness EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3

Page 37: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 39

392 Enviromental Awarness EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3

393 Basic Electrical Safety EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 3

394 Site Induction EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1

395 safety observation card EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1

396 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1

397 Introduce to PTW EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1

398 PPE Awarness EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1

399 Enviromental Awarness EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1

400 Basic Electrical Safety EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1

401 First Aid Training Baker

Hughes

Baker Hughes 03-Sep-19 Well Pad L 15

402 H2S Training Inspector WS & WT Depriwangga 12 - 13 Sep 19 Jakarta 4

403 Pengawas Operasional

Pertama ( POP )

HSE Depriwangga 22 - 26 Sep 19 Bogor 1

OCTOBER

404 1st aid level 2 HSE PT. SERD 21-Okt-19 Acc. Camp 12

405 1st aid level 2 HSE PT. SERD 22-Okt-19 Acc. Camp 12

406 1st aid level 2 HSE PT. SERD 23-Okt-19 Acc. Camp 12

407 1st aid level 2 HSE PT. SERD 28-Okt-19 Acc. Camp 12

408 1st aid level 2 HSE PT. SERD 29-Okt-19 Acc. Camp 11

409 1st aid level 2 HSE PT. SERD 30-Okt-19 Acc. Camp 10

410 DDC ( Defensive Driving

Course )

HSE PT. SERD 27-Okt-19 Office GPP 1

411 Site Induction EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3

412 Site Induction EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

413 Site Induction EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1

414 safety observation card EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3

415 safety observation card EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

416 safety observation card EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1

417 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3

418 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

419 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1

420 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3

421 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

422 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1

423 PPE Awarness EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3

424 PPE Awarness EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

425 PPE Awarness EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1

426 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3

427 Enviromental Awarness EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

427 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1

Page 38: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 40

428 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3

429 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

430 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1

431 Refresh induction EPC-C PT. Rekayasa Industri 09-Okt-19 Office Rekind 179

432 Refresh induction EPC-C PT. Rekayasa Industri 10-Okt-19 Office Rekind 154

433 Refresh induction EPC-C PT. Rekayasa Industri 11-Okt-19 Office Rekind 58

434 Refresh induction EPC-C PT. Rekayasa Industri 12-Okt-19 Office Rekind 24

435 Refresh induction EPC-C PT. Rekayasa Industri 14-Okt-19 Office Rekind 4

436 Refresh induction EPC-C PT. Rekayasa Industri 15-Okt-19 Office Rekind 18

437 Refresh induction EPC-C PT. Rekayasa Industri 17-Okt-19 Office Rekind 4

438 Refresh induction EPC-C PT. Rekayasa Industri 21-Okt-19 Office Rekind 21

439 Refresh induction EPC-C PT. Rekayasa Industri 23-Okt-19 Office Rekind 9

440 Refresh induction EPC-C PT. Rekayasa Industri 24-Okt-19 Office Rekind 4

441 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 10-Okt-19 Office Rekind 12

442 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 11-Okt-19 Office Rekind 3

443 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2

444 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 4

445 Refresh WAH EPC-C PT. Rekayasa Industri 10-Okt-19 Office Rekind 19

446 Refresh Flagman EPC-C PT. Rekayasa Industri 11-Okt-19 Office Rekind 19

447 Refresh PTW EPC-C PT. Rekayasa Industri 12-Okt-19 Office Rekind 38

448 Refresh Hot Work EPC-C PT. Rekayasa Industri 15-Okt-19 Office Rekind 23

449 Refresh Rigging and Lifting EPC-C PT. Rekayasa Industri 15-Okt-19 Office Rekind 26

450 Refresh Enviro awareness EPC-C PT. Rekayasa Industri 24-Okt-19 Office Rekind 15

NOVEMBER

451 First aid level two training

Third batch

FODD PT. SERD 18-20 Nov 2019 Accomodation

Camp

12

452 First aid level two training

4 batch

FODD PT. SERD 25-27 Nov 2019 Office Gate-1 10

453 Lifting Operation training

subsurface team

FODD PT. Depriwangga 12-16 Nov 19 Office Gate-2 10

454 Re-Induction EPC-C PT. Rekayasa Industri 04-Des-19 Ofiice Rekind 21

455 Re-Induction EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 14

456 Site Induction EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2

457 safety observation card EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2

458 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2

459 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2

460 PPE Awarness EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2

461 Enviromental Awarness EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2

462 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2

463 Site Induction EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

464 safety observation card EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

Page 39: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 41

465 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

466 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

467 PPE Awarness EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

468 Enviromental Awarness EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

469 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

470 Site Induction EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4

471 safety observation card EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4

472 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4

473 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4

474 PPE Awarness EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4

475 Enviromental Awarness EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4

476 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4

477 Training DDC EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1

478 Training DDC EPC-C PT. Rekayasa Industri 14-Nop-19 Ofiice Rekind 2

479 Re-Induction EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 4

480 Re-Induction EPC-C PT. Rekayasa Industri 13-Nop-19 Ofiice Rekind 7

481 Re-Induction EPC-C PT. Rekayasa Industri 14-Nop-19 Ofiice Rekind 2

482 Training WAH EPC-C PT. Rekayasa Industri 10-Nop-19 Ofiice Rekind 41

483 Rigging and Lifting EPC-C PT. Rekayasa Industri 13-Nop-19 Ofiice Rekind 12

484 Site Induction EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30

485 safety observation card EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30

486 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30

487 Introduce to PTW EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30

488 PPE Awarness EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30

489 Enviromental Awarness EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30

490 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30

491 Site Induction EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16

492 safety observation card EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16

493 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16

494 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16

495 PPE Awarness EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16

496 Enviromental Awarness EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16

497 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16

498 Site Induction EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3

499 safety observation card EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3

500 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3

501 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3

502 PPE Awarness EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3

503 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3

Page 40: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 42

504 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3

505 Training WAH EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 7

DECEMBER

506 Site Induction EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7

507 Site Induction EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4

508 Site Induction EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21

509 Site Induction EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7

510 safety observation card EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7

511 safety observation card EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4

512 safety observation card EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21

513 safety observation card EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7

514 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7

515 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4

516 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21

517 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7

518 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7

519 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4

520 Introduce to PTW EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21

521 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7

522 PPE Awarness EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7

523 PPE Awarness EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4

524 PPE Awarness EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21

525 PPE Awarness EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7

526 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7

527 Enviromental Awarness EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4

528 Enviromental Awarness EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21

529 Enviromental Awarness EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7

530 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7

531 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4

532 Basic Electrical Safety EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21

533 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7

534 Training WAH EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 18

535 Training WAH EPC-C PT. Rekayasa Industri 06-Des-19 Ofiice Rekind 17

536 Flagman Training EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 14

537 DDC ( Defensive Driving

Course )

EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 14

538 Site Induction EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2

539 Site Induction EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10

540 Site Induction EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4

541 Safety observation card EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2

Page 41: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 43

542 Safety observation card EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10

543 Safety observation card EPC-C PT. Rekayasa Industri

15-Des-19 Ofiice Rekind 4

544 JSA & Risk Assesment EPC-C PT. Rekayasa Industri

12-Des-19 Ofiice Rekind 2

545 JSA & Risk Assesment EPC-C PT. Rekayasa Industri

14-Des-19 Ofiice Rekind 10

546 JSA & Risk Assesment EPC-C PT. Rekayasa Industri

15-Des-19 Ofiice Rekind 4

547 Introduction to PTW EPC-C PT. Rekayasa Industri

12-Des-19 Ofiice Rekind 2

548 Introduction to PTW EPC-C PT. Rekayasa Industri

14-Des-19 Ofiice Rekind 10

549 Introduction to PTW EPC-C PT. Rekayasa Industri

15-Des-19 Ofiice Rekind 4

550 PPE Awareness EPC-C PT. Rekayasa Industri

12-Des-19 Ofiice Rekind 2

551 PPE Awareness EPC-C PT. Rekayasa Industri

14-Des-19 Ofiice Rekind 10

552 PPE Awareness EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4

553 Enviromental Awareness EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2

554 Enviromental Awareness EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10

555 Enviromental Awareness EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4

556 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2

557 Basic Electrical Safety EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10

558 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4

559 HE Operation Awareness EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 1

560 HE Operation Awareness EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4

561 DDC ( Defensive Driving

Course )

EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 6

562 DDC ( Defensive Driving

Course )

EPC-C PT. Rekayasa Industri 13-Des-19 Ofiice Rekind 1

563 Refresh induction EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 6

564 Refresh induction EPC-C PT. Rekayasa Industri 13-Des-19 Ofiice Rekind 4

565 Refresh induction EPC-C PT. Rekayasa Industri 16-Des-19 Ofiice Rekind 2

566 Training WAH EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2

567 Confined Space EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 8

568 Site Induction EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7

569 Site Induction EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1

570 Site Induction EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42

571 Site Induction EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20

572 Site Induction EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3

573 Safety observation card EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7

574 Safety observation card EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1

575 Safety observation card EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42

576 Safety observation card EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20

577 Safety observation card EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3

578 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7

579 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1

580 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42

Page 42: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 44

6.4 Needs Assessment of Environmental Management Capacity

SERD employs consultants (PT Radiant Utama, ERM Siam, PT Arindhita, and experts from

University of Sriwijaya Palembang) to support for biodiversity assessment and environmental

monitoring/advices.

When needed External supports are available through existing consultants such as ERM Siam, as

well as experts from local universities, Forestry offices, and NGOs.

No additional need is currently required at this stage. If the need to improve the capacity

comes, it will be done accordingly.

581 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20

582 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3

583 Introduction to PTW EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7

584 Introduction to PTW EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1

585 Introduction to PTW EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42

586 Introduction to PTW EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20

587 Introduction to PTW EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3

588 PPE Awareness EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7

589 PPE Awareness EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1

590 PPE Awareness EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42

591 PPE Awareness EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20

592 PPE Awareness EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3

593 Enviromental Awareness EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7

594 Enviromental Awareness EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1

595 Enviromental Awareness EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42

596 Enviromental Awareness EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20

597 Enviromental Awareness EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3

598 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7

599 Basic Electrical Safety EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1

600 Basic Electrical Safety EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42

601 Basic Electrical Safety EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20

602 Basic Electrical Safety EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3

603 Confined Space EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 17

604 Refresh DDC EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 1

605 Training WAH EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 7

Page 43: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 45

6.5 Awareness Level of Contractors’ Field Personnel

On the job training has been conducted in the form of direct coaching, pre-job meeting, use of

display boards, and banners.

EPC and Drilling contractors have SHE induction and training courses conducted by their internal

SHE personnel.

EPC Personel are also expected to adhere to the B-15 and B-16 documents as stated in

their contract. The B-15 and B-16 documents are guidelines for both national as well as

international standards for all contractors to follow.

Page 44: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 46

7. Social Management Capacity

This Chapter discusses staff capacities in social management, degree of awareness, training

conducted, needs assessment of social management capacity and awareness level of contractors’ staff trained.

7.1 SERD’s Relations Team

7.2 Number and Adequacy of Staff to Monitor Labour and Working

Conditions

To monitor labour and working conditions, SERD employs 1 (one) experienced managerial levels (Site

Support Manager) and 3 (three) Site Representatives.

7.3 Training Conducted

Training of CSR and Stakeholder Engagement for Field Relations Officers was conducted on 31

October 2019.

7.4 Designation and Signature of Person Responsible

Head of Community Relations is responsible for preparing the social safeguards monitoring reports,

while Manager of Field Relations and Business Relations Manager are the responsible persons for

reviewing the reports.

Page 45: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 47

8. Issues, Status of Implementation of Mitigating

Measures in the Environmental Management Plan

This Chapter discusses status of implementation of mitigating measures in the environmental

management plan, and if such issues arise, corrective actions and recommendations, would be act

upon.

See attachment for latest laboratory analysis results. The samples were taken by consultant experts

and analysis was conducted in a laboratory approved by the Ministry of Environment and Forestry

(MoEF / KLHK).

8.1 Pollution monitoring

Summary of Air Quality Monitoring as follows:

Measurement Period A. [Construction Phase]

Two Times for:

Noise

Ambient Air Quality

B. [Operation Phase]

1. Every 6 months for:

Noise

Air Ambient Quality

Odor

Emission for Geothermal Power Plant

2. Yearly (Every One Year) for:

GHG emissions

Excess of standard for

Contract (Yes/No)

If yes, please describe the

outline of planned

mitigation measures.

Air and noise quality has for

the most part has been in

good condition at SERD. 24-

hour H2S monitoring at

sensitive receptor areas are

implemented on a 3

monthly basis (as agreed

with MMD) as well as 48 hr

noise monitoring is also

implemented. The results

also show that the closest

receptors are relatively

unaffected. PM2,5 and PM10

had a slight exceedance at

AQN-7 in 1H19, however it

has stabilized during 2H19.

Measurement Method Indonesian National Standards (SNI) guidelines or other standards as

follows:

Noise : Measurement method and equipment used are based on

Decree of MoE No. 48/1996

Emission of Geothermal Power Plant : Measurement method and

equipment used are based on Decree of MoE No. 21/2008

Green House Gas

Odor Standard: Measurement method and equipment used are

based on Decree of MoE No. 50/1996

Parameter Measurement

Method Equipment

Ammonia (NH3) indophenol method spectrophotometer

Methyl

Mercaptan

(CH3SH)

gas absorption gas chromatography

Hydrogen Sulfide

(H2S)

a. mercury thiocyanate

b. gas absorption

spectrophotometer

Methyl Sulfide

((CH3)2)S

gas absorption gas chromatography

Styrene

(C6H8CHCH2)

gas absorption gas chromatography

Page 46: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 48

Ambient Air Quality: Measurement method and equipment used are

based on Government Regulation PP No. 41/1999

Parameter Analysis Method Equipment

SO2 (Sulfur Dioxide) Pararosanalin Spectrophotometer

CO (Carbon Monoxide) NDIR NDIR Analyzer

NO2 (Nitrogen Dioxide) Saltzman Spectrophotometer

O3 (Oxide) Chemiluminescent Spectrophotometer

HC (Hydrocarbon) Flamed Ionization Chromatography Gas

PM10

(Particle < 10 μm) Gravimetric Hi-Vol.

PM2,5

( Particle < 2.5 μm) Gravimetric Hi-Vol.

TSP (Dust) Gravimetric Hi-Vol.

Pb (Lead) Gravimetric Hi-Vol.

Measurement Points No Code Location Long / Lat

1 AQN-1 Sukarami Village 103’25”52,90/4’4” 04,90

2 AQN-2 Padang Panjang 103’26”12,01/4’6” 41,01

3 AQN-3 Tunggul Bute Village 103’26”12,01/4’9” 49,05

4 AQN-4 Yayasan Village 103’27”16,07/4’12” 20,40

5 AQN-5 Wellpad B 103’24”31,20/4’12” 39,01

6 AQN-6 Wellpad E 103’22”59,05/4’12” 26,07

7 AQN-7 Represent the new

wellpads (L, M, N)

103’22”49,30/4’14”22,80

No Emissions From Geothermal Power Plant due to Project being still in pre-construction phase

Measurement Point Parameter Unit Measured Result

National Standard*1

Power Plant Cooling Tower Stack

Hydrogen Sulphide (H2S) mg/Nm3 N/A 35 mg/Nm3

Ammonia (NH3) mg/Nm3 N/A 0.5 mg/Nm3

Notes : NA= Not Applicable During Pre-Construction

No GHG emission due to still in pre-construction phase

Measurement Point Parameter Unit Measured Result

Power Plant Cooling Tower Stack CO2 tonnes of CO2 /year N/A

CH4 tonnes of CO2 equivalent /year N/A

Notes: NA= Not Applicable During Pre-Construction

Odor Measurement base on Indonesia Ministry of Environment Decree No. 50/1996

No Parameter Unit TLV

*)

Ds.

Tunggul

Bute

Kp.

Yayasan

Wellpad

I

Wellpad

C

Wellpad

B

Wellpad

E

Wellpad

L,M, N

Power Plant

Access

Road

1 Ammonia (NH3) **) ppm 2.0 0.02 0.07 0.2 0.2 0.2 0.09 0.08 0.2

2 Methyl Mercaptan (CH3SH) ppm 0.02 0.003 0.004 0.004 0.004 0.003 0.003 0.003 0.004

3 Hydrogen Sulphide (H2S) **) ppm 2 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017

Page 47: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 49

4 Methyl Sulphide (CH3)2S ppm 0.01 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008

5 Styrene (C6H5CHCH2) **) ppm 0.1 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02

Notes : Location for odour testing may vary each semester depending on project activity

24-hour H2S Measurement Based on WHO Standard

No. Parameter WHO

Threshold Unit

1 Hydrogen Sulphide (H2S) **) 2 ppm

Reference: WHO Air Quality Guidelines for Europe, 2000

Ambient Air Measurement Results

No Parameter TLV *) IFC Unit AQN-1 AQN-2 AQN-3 AQN-4 AQN-5 AQN-6 AQN-7

1 SO2 900 500 µg/Nm3 32 33 30 29 25 32 34

2 CO 30,000 NR µg/Nm3 3,891 4,025 3,853 3,784 3,674 3,914 4,067

3 NO2 400 200

guideline µg/Nm3 28 28 27 26 22 30 28

4 O3 235 100 µg/Nm3 28 24 35 33 28 30 33

5 HC 160 NR µg/Nm3 94 123 59 56 61 104 154

6 TSP - 25,000

(1 yr) µg/Nm3 44 60 25 23 28 50 75

7 PM10 (Particle < 10 µm) - 50 µg/Nm3 22 29 12 12 14 26 35

8 PM2,5 (Particle < 2,5 µm) - 25 µg/Nm3 0.1 0.1 0.1 <0.1 <0.1 0.1 0.1

9 Pb - NR µg/Nm3 9 11 9 7 7 11 11

Reference: IFC EHS General Guidelines, dated 30 April 2007; Baku Mutu Kualitas Udara Ambien PP 41 Tahun 1999

0

0.5

1

1.5

2

2.5

1 3 5 7 9 11 13 15 17 19 21 23

H2

S R

esu

lts

(pp

m)

H2S (24 hr) Monitoring at Wellpad

M

19 December 2019

H2S (ppm)

Threshold

Page 48: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 50

Summary of Noise Monitoring Results:

No. Criteria Noise Level dB(A)

Threshold AQ-1 AQ-2 AQ-3 AQ-4 AQ-5 AQ-6 AQ-7

1. Working Area - - - 48 46 45 - 70

2. Settlement Area 47 48 48 - - - 46 55

Additional Noise Monitoring (48 Hrs)

Closest Settlement area Yayasan Village

Date Interval Noise (dB (A))

Leq LAFmax LAFmin LCpk LAeq T. LAE

13-Des L1 07 00 80.0 39.5 100.6 60.4 88.2 52.8

L2 10 00 75.1 47.7 94.3 55.3 83.1

L3 15 00 86.5 40.4 103.9 58.3 86.1

L4 20 00 60.3 38.3 - 44.7 3.0

L5 23 00 76.9 36.5 94.2 46.4 74.4 43.5

14-Des L6 01 00 63.2 35.6 87.4 42.7 70.6

L7 04 00 63.3 34.9 88.1 41.1 68.9

L1 07 00 75.2 49.3 90.1 59.9 87.7 53.9

L2 10 00 82.6 42.0 96.4 52.8 80.7

L3 15 00 78.9 42.4 97.9 54.7 82.5

L4 20 00 74.7 36.9 93.8 48.3 76.1

L5 23 00 72.6 36.3 86.5 49.2 77.1 4.2

15-Des L6 01 00 61.6 34.6 83.6 40.6 68.5

L7 04 00 55.2 34.0 39.8 67.7

Closest Settlement area Yayasan Village

Date Interval Noise (dB (A))

Leq LAFmax LAFmin LCpk LAeq T. LAE

14-Sep L1 07 00 85.7 44.5 105.3 63.6 91.4 56.9

L2 10 00 83.9 43.4 95.9 61.0 88.8

L3 15 00 93.6 45.0 104.1 67.7 95.5

L4 20 00 67.7 27.1 87.7 42.1 70.0

L5 23 00 59.3 24.3 78.5 33.5 60.9 38.9

15-Sep L6 01 00 72.5 23.9 101.4 42.4 70.6

L7 04 00 68.6 23.9 97.8 40.8 69.0

L1 07 00 83.2 47.5 94.2 62.4 90.2 64.1

L2 10 00 84.9 36.0 105.7 62.8 90.7

L3 15 00 97.0 38.1 107.4 70.2 98.2

L4 20 00 84.6 38.3 101.0 61.0 88.8

L5 23 00 61.4 33.0 83.6 42.9 70.7 45.3

16-Sep L6 01 00 68.9 37.9 85.1 47.0 75.7

L7 04 00 75.0 32.8 92.6 46.1 74.0

Page 49: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 51

8.2 Water Quality

Summary of Water Quality Monitoring as follows:

Measurement Period A. [Construction Phase] Two Times for:

Surface Water Quality

Domestic Waste

B. [Operation & Post Operation Phase]

Every 6 months for: Surface Water Quality

Active Water Pond (Produced Water) Community Shallow Ground Water

Domestic Waste

Excess of national standard (Yes/No)

If yes, please describe the outline of planned mitigation measures.

While no complex chemicals were found within the water bodies surrounding the project, parameters such as: pH, BOD, COD and DO suffered a bit of a decline. This is most probably due to the accumulation of both natural occurences such as high movement of particles due to high rainfall rate as well as impact from construction activity. During the first half of 2019, a case of minor landslide and mudflow caused some disturbance in turbidity. This has since been dealt with and cleaned up. 2H19 also saw PT SERD improve road condition and slopes at a number of project area and access roads (shortcut). PT SERD also closed out cases involving slope failures. High rainfall rate in SERD area is a very recurring issue. Thus, SERD aims to improve on stabilizing and preventing landslides and issues as such.

Measurement Method Indonesian National Standards (SNI) guidelines or other standards

Measurement Points

Surface Water s

Water Ponds (Active Water Ponds)

Domestic Waste Water Outlet Location

Code Location Coordinat E Coordinat NS

SW-1 Cawang Kiri River 103°24’ 41.80” 4°12’ 42.30”

SW-2 Asahan River 103°25’ 40.10” 4°12’ 08.80”

SW-3 Deduruk Lake 103°26’ 30.10” 4°12’ 09.40”

SW-4 Cawang Tengah River 103°24’ 43.90” 4°12’ 34.80”

SW-5 Endikat River 103°27’ 40.40” 4°12’ 03.50”

Quality of Surface Water Results as follows:

No Parameter Unit TLV SW-1 SW-2 SW-3 SW-4 SW-5

A. Physical

1 Temperature 0C Dev 3 26 24 22 25 27

2 Total Dissolved Solids mg/L 1,000 46 35 27 45 42

3 Total Suspended Solids mg/L 50 7 <2 5 4 5

B. Chemical

1 pH - 6 - 9 TBA TBA TBA TBA TBA

2 BOD **) mg/L 2 3 3 2 4 3

3 COD **) mg/L 10 13 44 11 20 12

4 Dissolved Oxygen (DO) **) mg/L 6 5.6 5.7 6 6.1 5.7

5 Total Phosphate sbg P **) mg/L 0.2 0.05 0.07 0.05 0.06 <0.03

6 Nitrate (NO -N) **) mg/L 10 0.06 0.07 0.1 <0.05 0.08

7 Ammonia (NH -N) **) mg/L 0.5 <0.01 <0.01 <0.01 <0.01 0.06

8 Arsenic (As) mg/L 0.05 <0.005 <0.005 <0.005 <0.005 <0.005

9 Cobalt (Co) **) mg/L 0.2 0.03 <0.0007 <0.0007 <0.0007 <0.0007

10 Barium (Ba) **) mg/L 1 0.03 0.002 0.005 0.005 0.003

11 Boron (B) **) mg/L 1 0.1 0.03 0.03 0.05 0.05

12 Selenium (Se) mg/L 0.01 <0.002 <0.002 <0.002 <0.002 <0.002

13 Cadmium (Cd) **) mg/L 0.1 0.03 <0.0006 <0.0006 <0.0006 <0.0006

14 Chromium Hexavalent (Cr VI) **) mg/L 0.05 <0.01 <0.01 <0.01 <0.01 <0.01

15 Copper (Cu) **) mg/L 0.02 <0.005 <0.005 <0.005 <0.005 <0.005

Page 50: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 52

No Parameter Unit TLV SW-1 SW-2 SW-3 SW-4 SW-5

16 Iron (Fe) **) mg/L 0.3 0.5 0.02 0.2 0.1 0.1

17 Lead (Pb) **) mg/L 0.3 0.04 <0.009 <0.009 <0.009 0.01

18 Manganese (Mn) **) mg/L 0.1 0.04 <0.0007 0.003 0.001 <0.0007

19 Mercury (Hg) mg/L 0.001 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005

20 Zinc (Zn) **) mg/L 0.05 0.03 0.002 0.01 0.004 0.04

21 Chloride (Cl) **) mg/L 600 4 2 2 4 3

22 Cyanide (CN) **) mg/L 0.02 <0.005 <0.005 <0.005 <0.005 <0.005

23 Floride (F) **) mg/L 0.5 <0,01 <0.01 <0.01 <0.01 <0.01

24 Nitrite (NO -N) **) mg/L 0.06 <0.004 <0.004 <0.004 <0.004 <0.004

25 Sulphate (SO ) **) mg/L 400 2 0.5 0.8 0.7 0.6

26 Chlorine (Cl ) **) mg/L 0.03 0.01 0.01 0.01 0.03 0.01

27 Oil & Fat @g/L 1,000 <0.002 <0.002 <0.002 <0.002 <0.002

28 Detergent (MBAS) **) @g/L 200 <0.2 <0.2 <0.2 <0.2 <0.2

29 Phenol **) @g/L 1 <0.01 <0.01 <0.01 <0.01 <0.01

30 Sulphide (H S) **) mg/L 0.002 <0.001 <0.001 <0.001 <0.001 <0.001

C. Microbiological

1 Fecal Coliform **) MPN/

100mL 100 450 5,800 4,600 1,300 4,900

2 Total Coliform MPN/

100 mL 1,000 680 8,400 7,000 2,300 7,900

*) PerGub Sumatera Selatan no. 16 tahun 2005 Lampiran II. Kelas I

**) Parameter Terakreditasi oleh KAN no. LP-195-IDN

Summary of Geothermal Produced Water Results as follows:

No Parameter Unit TLV Waterpond Mudpond

RD-B RD-C RD-E RD-I RD-B RD-C RD-E RD-I

1 Dissolved Sulfide as H2S mg/L 1 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002

2 Ammonia as NH3-N mg/L 10 0.1 0.2 <0.01 0.4 0.1 0.06 <0.01 0.07

3 Total Mercury (Hg) mg/L 0.005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005

4 Total Arsenic (As) mg/L 0.5 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005

5 Temperature ˚C 45 30 30 31 22 29 34 26 22

6 pH (insitu) **) - 6-9 7 6.8 6.9 6.3 6.8 7.8 7 6.2

7 Boron (B) mg/L - 0.06 59 13 38 0.06 <0.02 0.2 26

8 Total Organic Carbon (TOC) mg/L - 9 7 5 4 8 19 15 6

9 Total Dissolved Solid (TDS) mg/L - 76 2,650 595 1,962 65 218 1,205 1,091

10 Salinity o/oo - 0.1 3 0.6 2 0.1 0.2 1 1

11 Oil and Fat mg/L - <1.8 <1,8 <1.8 <1.8 <1.8 <1.8 <1.8 <1.8

12 BOD5 mg/L - 6 4 2 4 4 23 10 4

13 COD mg/L - 24 24 11 21 18 86 38 16

*) PerMen LH no. 19 tahun 2010 Lampiran II

**) Parameter Terakreditasi oleh KAN no. LP-195-DN

Summary of Community Shallow Ground Water Wells as follows:

Monitoring Point

Community Shallow ground water wells

Code Location Coordinat E Coordinat NS

GW-1 Kampung Yayasan 103°27’ 21.11” 4°12’ 18.70”

GW-2 Tunggul Bute Village 103°26’ 12.63” 4°9’ 44.43”

GW-3 Camp Area SERD/ Drilling Camp 103°25’ 56.16” 4°11’ 37.65”

Page 51: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 53

Ground Water Monitoring Result

No. Parameter Unit TLV *) GW-1 GW-2 GW-3

A. Physics

1. Odor **) - Odorless Odorless Odorless Odorless

2. Total Suspended Solid (TDS) **) mg/L 500 33 17 28

3. Turbidity **) NTU 5 < 1 4 3

4. Taste **) - Tasteless Tasteless Tasteless Tasteless

5. Temperature (insitu) **) 0C Water

temperature

+3

24 24 25

6. Color **) TCU 15 < 1 < 1 < 1

B. Chemical

1. Mercury (Hg) mg/L 0.001 <0.0005 <0.0005 <0.0005

2. Arsenic (As) mg/L 0.01 <0.005 <0.005 <0.005

3. Iron (Fe) **) mg/L 0.3 0.02 0.02 0.006

4. Flouride (F) **) mg/L 1.5 <0.01 <0.01 <0.01

5. Cadmium (Cd) **) mg/L 0.003 <0.0006 <0.0006 <0.0006

6. Chloride (Cl) **) mg/L 250 4 3 6

7. Chromium hexavalent (Cr VI) **) mg/L 0.05 <0.0006 <0.0006 <0.0006

8. Manganese (Mn) **) mg/L 0.4 0.02 0.008 0.04

9. Nitrate(NO3-N) **) mg/L 50 0,8 14 7

10. Nitrite (NO2-N) **) mg/L 3 <0.004 <0.004 <0.004

11. pH (insitu) **) - 6.5 – 8.5 6,6 6,3 6.47

12. Selenium (Se) mg/L 0.01 <0.002 <0.002 <0.002

13. Zinc (Zn) **) mg/L 3 0.008 0.04 0.06

14. Cyanide (CN) **) mg/L 0.07 <0.005 <0.005 <0.005

15. Sulphate (SO4) **) mg/L 250 10 0,6 0.6

16. Lead (Pb) **) mg/L 0.01 <0.009 <0.009 <0.009

17. Detergent (MBAS) **) mg/L 0.05 <0.01 <0.01 <0.01

18. Potassium permanganate (KMnO4) **) mg/L 10 1 2 1

C. Microbiology

1. Total Coliform **) MPN/100ml 0 0 0 0

2. E. Coli MPN/100 ml 0 0 0 0

*) PerMenKes RI no. 492/MenKes/Per/IV/2010

**) Parameter accredited by KAN no. LP-195-IDV

8.3 Wastes

Summary of Waste monitoring as follows:

Measurement Period and

[Construction Phase] Two times

[Operation & Post Operation Phase] Every 6 months

Any concerns and measures taken: Re-certification of Hazardous Waste Temporary Storage Building is ongoing. Administrative requirements and site verification have been completed. Waiting for the issuance of the permit from Muara Enim regency.

Measurement Method

Calculation of Waste quantity: Liquid Domestic Waste

Based on Ministry of Environment and Forestry Regulation No. 68/2016

Solid Waste

Solid Industrial Waste quantity

Solid Domestic Waste quantity

Hazardous Waste sent to Licensed Hazardous Waste Treatment Facility Company

Measurement Points 1. Outlets of Domestic Waste Water Treatment from accommodation area

2. Solid Waste

-Solid Industrial Waste Collection Area

-Solid Domestic Waste Collection Area

3. Temporary Storage of Hazardous Waste

Page 52: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 54

Summary of Solid Waste Monitoring as follows:

Type Type of Waste Parameter/ Unit Measurement Result Remarks

Solid Industrial

Waste Collecting

Area

Metal Industrial Waste Weight/Tones 4 On 21 December 2019, sent 1

small dump truck of metal

industrial waste (scrap from

casing perforation) to CV. Muara

Steel (Lampung) for recycling.

Non Metal Industrial

Waste

Weight/Kg 6 For non metal industrial waste

mostly as casing protector at

warehouse. Some of this material

is being used for support of

signage leg, reebar protector at

GPP and ashtray. On 21 December

2019 also, 2 small dump trucks

were sent to CV. Muara Steel

(Lampung) for recycling.

Solid Domestic

Waste Collecting

Area

Domestic Waste Sent to

Government

Facility/ Trip

37 Domestic waste is sent from

temporary domestic storage at

open yard (Gate 1) to

government-owned final disposal

facility at Lahat. For 6 months

(July - December) of 2019 there

were 37 trips.

Summary of Hazardous Waste Monitoring as follows:

No Location Parameter Unit Measurement Result Remarks

1 Waste Oil / Oily Waste Quantity kg 2,835 This is the total hazardous waste

which has been hauling out from

SERD project to designated

disposal. This activity is handled by

third party (PT. Primanru) which

hired by PT. SERD. It has been done

2 times which are in July and

December 2019.

2 Medical waste Quantity kg 7

3 Used filter Quantity kg 100

4 Used rags Quantity kg 85

5 Contaminated packaging Quantity kg 53

6 Catridge Quantity kg 10

7 Contaminated sand Quantity kg 135

8.4 Erosions

Summary of Erosions Monitoring as follows:

Measurement Period [Construction Phase] Two Times

[Operation Phase] Every 6 months

Any concerns and measures taken:

The end of second half of 2019 had a constant high rate of rainfall and caused erosions and landslides. SERD and EPC-C conducted mitigation efforts on mud control / water turbidity. As of now corrective actions have been in place and is continuously being implemented. Certain areas were identified as having potential erosion/landslide potential, however are mostly light-medium category. Shortcut area was identified as having high potential of erosion/landslide and thus SERD and EPC-C perform regular maintenance of vegetation, drainage, gabion walls, and road repairs.

Measurement Method Land erosion measurement using small square method,

Rainfall measurement

Measurement Points Areas prone to erosion along access road, wellpad, and geothermal power plant area

Page 53: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 55

Location Coordinate Type Erosion / Landslide

Category Lenght (m) Width (m)

Access Wellpad L 4 14 15 – 103 21 44 Landslide 25-<50 50-150 Medium

Wellpad L 4 14 25 – 103 21 29 Landslide 25-<50 50-150 Medium

Access Wellpad M 4 13 54 – 103 21 53 Landslide <10 >150 Low

Wellpad M 4 14 12 -103 22 11 Landslide <10 >150 Low

4 14 22-103 22 11 Landslide 25-<50 50-150 Medium

4 14 23- 103 22 10 Landslide 25-<50 50-150 Medium

Short cut 4 11 44 – 103 24 29 Landslide 50 - <100 50 - 150 High

Intersection Wellpad C -

Access Wellpad I

04 13 41,8 – 103 21 55,12 Landslide 1-25 <20 Medium

04 13 26,38 – 103 22 22,17 Landslide 25-<50 <20 Medium

04 13 08,00 – 103 22 36,2 Landslide 25-<50 <20 Low

8.5 Water Flow

Summary of Water Flow Monitoring as follows:

Measurement Period [Construction Phase] Two Times

[Post Operation Phase] Every 6 months

Any concerns and measures taken:

Water flow is maintained regularly. Drainage systems, sediment traps, settling ponds and cloth screen have been constructed and regularly maintained to control water flow and quality. Despite high rainfall, SERD and EPC-C continued their efforts to improve water flow and quality.

No major/significant issues were encountered with domestic waste water monitoring during 2H19.

Measurement Method Sediment charge sampling in inlet and outlet of the catch pond, and laboratory analysis for Total Suspended Solids (TSS) using SNI 06-6989.3-2004 method, as well as determine the effectiveness of catch ponds.

Measurement Points Please attach map(s) showing monitoring points including following locations:

Sediment loads from well pads of PLTP project sites,

Inlet and outlet of the catchpond, representing sediment that can be managed.

Page 54: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 56

Summary of Domestic Waste Water Monitoring as follows:

Coordinate : S 04o 12’ 01,34” N 103o

24’ 11,34” ( domestic waste water at outlet of WTP)

No. Parameter Unit Threshold* Results from WTP Outlet

A. Physical

1 Turbidity NTU 25 2

2 Color Pt-Co 50 17

3 TDS mg/L 1.000 41

4 Temperature (insitu) °C Temperature ± 3 °C 21

5 Taste - No Taste Tasteless

6 Odour (insitu) - No Odour Odorless

B. Chemical

1 pH (insitu) - 6.5 - 8,5 7.9

2 Fe mg/L 1 0.06

3 F mg/L 1.5 <0.,01

4 CaCO3 mg/L 500 17

5 Mn mg/L 0.5 <0.0007

6 NO3-N mg/L 10 0.13

7 NO2-N mg/L 1 <0.004

8 CN mg/L 0.1 <0.005

9 MBAS mg/L 0.05 <0.01

10 Hg mg/L 0.001 <0.0005

11 As mg/L 0.05 <0.005

12 Cd mg/L 0.005 <0.0006

13 Cr VI mg/L 0.05 <0.01

14 Se mg/L 0.01 <0.002

15 Zn mg/L 15 0.0076

16 SO4 mg/L 400 <0.3

17 Pb mg/L 0.05 <0.009

18 KMnO4 mg/L 10 5

19 Total Pesticide Mg/L 0.1 <0.00004

C. Microbiological

1 Total Coliform CFU/100 mL 50 53

2 E. coli CFU/100 mL 0 0

Peraturan Menteri Kesehatan RI No. 32 Tahun 2017 Lampiran I Bab II A

8.6 Aquatic Biota

Summary of Aquatic Biota Monitoring as follows:

Measurement Period [Construction Phase]

Two times

[Operation & Post Operation Phase] Every 6 months

Any concerns and measures taken:

No concerns, plesase see results of Aquatic biota survey below.

Measurement Method Data analysis of number of types, composition, abundance, and diversity of plankton and benthos

Measurement Points

1. Code Location Coordinat E Coordinat NS

SW-1 Cawang Kiri River 103°24’ 41.80” 4°12’ 42.30”

SW-2 Asahan River 103°25’ 40.10” 4°12’ 08.80”

SW-3 Deduruk Lake 103°26’ 30.10” 4°12’ 09.40”

SW-4 Cawang Tengah River 103°24’ 43.90” 4°12’ 34.80”

SW-5 Endikat River 103°27’ 40.40” 4°12’ 03.50”

Page 55: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 57

Phytohoplankton:

SW-1 SW-2 SW-3 SW-4 SW-5

Density (Ind/m2) 4 3 2 18 8

Number of taxon 3 3 2 11 6

Diversity index 1,50 1,58 1 3,31 2,50

Uniformity index 0,95 1,00 1,00 0,96 0,97

Note

The phytoplankton community around PT SERD's work area in Semester 2 of 2019 monitoring period is composed of 4 classes, namely

Chlorophyta (5 species) Chrysophyta (11 types), Cyanophyta (1 type), and.Euglenophyta (1 type). The number of taxa and the

abundance of phytoplankton at each monitoring location varies.

The abundance of phytoplankton in SERD's work area is quite low (2 - 18),

The diversity index of phytoplankton during this period shows low-moderate diversity ranging from1 to 3.31.

The uniformity index value of river phytoplankton uniformity in all monitoring locations in Semester 2 of 2019 ranges from 0.96

– 1.00. The range shows that the amount of phytoplankton species are spread equally with no specific species being dominant.

Zooplankton:

SW-1 SW-2 SW-3 SW-4 SW-5

Density (Ind/m2) 12 7 7 9 4

Number of taxon 8 4 5 6 3

Diversity index 2.86 1.84 2.13 2.5 1.50

Uniformity index 0.95 0.92 0.92 0.97 0.95

Note:

The Zooplankton community around PT SERD's work area in Semester 2 of 2019 monitoring period is composed of 4 classes namely

Actinopodes (1 type), Cilliata (4 types), Flagellata (6 types), and Rhyzopodes (4 types).

The abundance and number of zooplankton taxa in Semester 2 of 2019 monitoring period shows that abundance of river

zooplankton at each monitoring location ranges from 4 - 12 Ind/L, while the number of zooplankton taxa ranged from 3 - 8 taxa.

The diversity index of zooplankton during this period shows low-moderate diversity ranging from 1.5 to 2.86.

The uniformity index value of zooplankton in all monitoring locations in Semester 2 of 2019 ranged from 0.92 – 0.97. The range

of values is in the category of high uniformity.

Benthos:

SW-1 SW-2 SW-3 SW-4 SW-5

Density (Ind/m2) 14 182 42 14 14

Number of taxon 1 5 1 1 1

Diversity index 0.00 2.20 0.00 0.00 0.00

Uniformity index 0.00 0.95 0.00 0.00 0.00

Note:

The Benthos community around PT SERD's work area in Semester 2 of 2019 monitoring period is composed of 2 groups, namely

Diptera (3 types), and Coleoptera (2 type).

The density and number of benthic taxa around PT SERD in the Semester 2 of 2019 monitoring period vary at all locations.

Benthos abundance density is between 14 - 182 Ind/m2 and between 1 - 5 taxa.

The diversity index of benthos during this period shows low diversity ranging from 0 - 2,20.

The uniformity index value of benthos in all monitoring locations in Semester 2 of 2019 ranges from 0 – 0.95. The range of

values is in the category of high uniformity.

Page 56: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 58

8.7 Flora / Fauna Summary of Flora / Fauna Monitoring as follows:

Measurement Period [Construction Phase] Two times

[Post operation Phase] Every 6 months

Any concerns and measures taken:

Flora and fauna monitoring is done on a regular basis. Camera traps, fauna sightings, and and flora inventory are done. 6-monthly monitoring is done by PT Radiant Utama (RKL-RPL consultant). Drone surveys are also conducted in preparation for biodiversity offset and routine patrol for possible illegal land clearing around project area/offset area.

Measurement Method Data collection method through Inventory /direct observation of the area to be cleared and re-vegetated.

Data analysis through vegetation analysis.

Measurement Points

1. Code Location Coordinat E Coordinat NS

FF-1 PLTP Facility Area 103°25’ 28.50” 4°11’ 42.87”

FF-2 Wellpad B 103°24’ 25.42” 4°12’ 36.82”

FF-3 Shortcuts Area 103°24’ 33.94” 4°11’ 35.38”

FF-4 Wellpad D 103°23’ 25.25” 4°12’ 8.31”

FF-5 IP-1 103°24’ 11.74” 4°10’ 37.12”

FF-6 Wellpad I 103°21’ 39.43” 4°13’ 42.91”

Table of Land Cover at Sampling Location

No Land Cover Lokasi

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

1 Forest + + + + +

2 Moor/ field +

3 Mixed Garden + +

4 Coffee Farm + + +

5 Scrub + + + + +

Table Flora Inventarization Result in All Area Semester 2 Year 2019

No Latin Name FF-1 FF-2 FF-3 FF-4 FF-5 FF-6 IUCN

1 Quercus sp ++ + + + + LC

2 Quercus sundaica + LC

3 Ficus gibbosa + LC

4 Dilleniaceae + ++ ++ + -

5 Dacrycarpus imbricatus ++ ++ +++ + LC

6 Cinnamomum spp + VU

7 Litsea spp + + VU

8 Podocarpus neriifolia + LC

9 Schima spp ++ ++ ++ ++ ++ LC

10 Litsea spec + VU

11 Neolamaerckia spp ++ ++ -

12 Scorodocarpus ++ -

13 Toona spp + LC

14 Cyathea contaminans ++ + ++ LC

15 Exbucklandia sp + + -

16 Ochthocharis bornensis + -

17 Litsea sp + + LC

18 Alstonia spp + + + LC

Page 57: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 59

No Latin Name FF-1 FF-2 FF-3 FF-4 FF-5 FF-6 IUCN

19 Santiria spp ++ LC

20 Myrtaceae + -

21 Mimosa + ++ LC

22 Lantana camara ++ LC

23 Macaranga + + + VU

24 Piper spp + -

25 Melastoma ++ LC

26 Glichenia linearis ++ + ++ -

27 Imperata cylindrica ++ ++ ++ -

28 Dillenia + -

29 Bambusa ++ LC

30 Mollotus + + -

31 Vatica + ++ ++ -

32 Vitex pubescens + -

33 Hopea + VU

34 Intsia + VU

35 Cassia alata + -

36 Litsea + LC

37 Artocarpus elastica + + -

38 Dryobalanops + ++ + LC

39 Dioscorea + LC

40 Hopea sp + VU

41 Cyperus + LC

42 Eugenia + -

43 Peronema canescens + -

44 Hibiscus sp + -

45 Lagerstroemia speciosa + -

46 Pithecellobium jiringa + -

47 Syzygium zolingeriana + -

48 Cofea spp + +++ -

49 Musa spp + ++ LC

50 Cocos nucifera + + -

51 Mangifera spp + LC

52 Albizia chinensis + + LC

53 Cordyline + -

54 Manihot esculenta + + -

55 Hibiscus tiliaceus + + -

56 Disambiguasi + -

57 Pterospermum sp + -

58 Nephelium lappaceum + LC

59 Antidesma neurocarpum + -

60 Litsea spathulata + -

61 Casuarina spp + ++ + ++ -

62 Litsea ++ ++ ++ ++ LC

63 Pennisetum purpureum +++ ++ LC

64 Moducha spp + + -

65 Meliaceae + -

66 Cinnamomum spp + -

67 Styrax + LC

68 Eugenia sp + + + -

69 Lithocarpus + + + + + -

70 Syzygium + -

71 Neobalanocarpus + -

72 Pogostemon cablin + -

73 Litsea firma + LC

74 Macaranga spp + VU

75 Ficus spp ++ ++ VU

76 Schima ++ + ++ -

Page 58: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 60

Table Ecological value of plant communities in the PT SERD work area in Semester 2 of 2019

No Ecology Value FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

Tree Sapling Tree Sapling Tree Sapling Tree Sapling Tree Sapling Tree Sapling

1 Number of Type 9 14 18 21 13 13 12 16 12 16 5 9

2 Number of Individu 15 26 37 48 30 30 26 25 21 25 8 19

3 Density 93,75 650 231,25 1200 187,5 750 75 625 131,25 625 50 475

4 Diversity 2,14 2,37 2,69 2,56 2,42 2,36 2,32 2,60 2,40 2,68 1,77 2,17

5 Uniformity 0,97 0,90 0,93 0,84 0,94 0,92 0,93 0,94 0,97 0,97 1,09 0,99

Vegetation analysis at PLTP locations (FF1)

No Local Name Latin Name Tree Sapling

FR KR DR NP FR KR DR NP

1 Medang cabe Litsea spp 8.70 6.67 7.10 22.47 8.33 16.67 5.78 30.78

2 Medang putih Litsea sp 13.04 10.0 10.25 33.29 4.17 3.33 2.10 9.60

3 Pasang babi Quercus sp 4.35 10.0 5.20 19.55 4.17 3.33 1.80 9.30

4 Lengkanai Dacrycarpus

imbricatus

13.04 13.33 30.10 56.47 8.33 6.67 15.15 30.15

5 Kapas Exbucklandia sp 4.35 6.67 7.25 18.27

6 Seru Schima spp 17.39 13.33 9.25 39.97 12.5 13.33 12.30 38.13

7 Kelat Dilleniaceae 13.04 13.33 9.75 36.12 12.5 10.0 9.10 31.60

8 Kapur Dryobalanops 4.35 6.67 4.15 15.17 4.17 3.33 6.35 13.85

9 Medang cantik Litsea spp 4.35 6.67 2.75 13.77 8.33 6.67 25.17 40.17

10 Pasang Quercus sundaica 4.35 3.33 4.10 11.78 4.17 3.33 2.75 10.25

11 Temalun Hopea sp 4.17 3.33 3.10 10.16

12 Pakis tiang Cyathea contaminans 12.5 10.0 6.20 28.70

13 Medang perangwas - 4.35 3.33 3.25 10.93

14 Cemara gunung - 4.35 3.33 3.75 11.43

15 Sapat - 8.33 13.33 9.15 30.81

16 Kirinyuh - 8.33 6.67 1.05 16.05

17 Asam-asam - 4.35 3.33 3.10 10.78

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Wellpad B (FF-2)

No Local Name Latin Name Tree Sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 6.67 9.52 27.10 43.29 5.0 4.0 3.10 12.10

2 Kelat arang/medang Sp-1 20.0 14.29 18.15 52.44 5.0 8.0 4.70 17.70

3 Pasang Quercus sundaica 6.67 9.52 5.70 21.89 5.0 8.0 6.60 19.60

4 Bekegung Sp-2 13.33 14.29 5.10 32.72 5.0 4.0 5.10 14.10

5 Pasang babi Quercus sp 6.67 4.76 3.15 14.58 5.0 4.0 4.75 13.75

6 Medang sirei Litsea spec 6.67 4.76 6.75 18.18 5.0 4.0 3.80 12.80

7 Punggung kijang Scorodocarpus 6.67 4.76 6.28 17.71 5.0 4.0 4.45 13.45

8 Jambu-jambu Myrtaceae 6.67 4.76 3.10 14.53 5.0 4.0 10.15 19.75

9 Seru Schima spp 6.67 19.05 13.15 38.87

10 Seru berubah/

medang gatal

Schima Litsea 6.67 4.76 5.10 16.53

11 Jabon Neolamaerckia spp 5.0 12.0 4.15 21.15

12 Cengkelung/ angrum/

cendelung

Sp-3 15.0 12.0 18.50 45.50

13 Sapat Vatica 10.0 8.0 11.69 29.69

14 Mahang d kecil Macaranga 6.67 4.76 3.20 14.63 5.0 4.0 4.12 13.12

Page 59: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 61

15 Sengon Albizia Chinensis 6.67 4.76 3.22 14.65 10.0 8.0 6.10 24.10

16 Sikejut - 5.0 4.0 4.79 13.79

17 Anggrum - 5.0 8.0 4.25 17.25

18 Tilam - 5.0 4.0 3.15 12.15

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Shortcut (FF-3)

No Local Name Latin Name Tree Sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 20.00 20.00 12.5 52.5 5.00 3.85 9.30 18.15

2 Pasang putih Quercus sundaica 20.00 20.00 28.18 68.18

3 Surian - 5.67 5.67 12.10 10.55 15.00 15.38 8.15 48.53

4 Bekulung Sp-1 5.67 5.67 10.55 21.89 10.00 7.69 5.25 22.94

5 Cemara gunung Casuarina spp 20.00 20.00 18.15 58.15 5.00 7.69 10.20 22.89

6 Pasang babi Quercus sp 5.67 5.67 8.10 19.44

7 Medang basah Litsea 5.67 5.67 4.70 16.04

8 Cendelung Sp-2 5.67 5.67 3.28 14.62 15.00 11.54 19.70 46.24

9 Seru Schima spp 5.67 5.67 2.65 13.99 5.00 7.69 9.15 21.84

10 Medang cabe Litsea spp 5.00 3.85 3.10 11.95

11 Sapat Vatica 15.00 15.38 25.30 55.68

12 Pisang - 5.00 7.69 2.15 14.84

13 Anggrum - 10.00 11.54 3,.5 24.69

14 Merdeka - 10.00 7.69 3.45 21.14

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Wellpad D (FF-4)

No Local Name Latin Name Tree Sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 5.26 7.69 9.35 22.3 5.26 4.0 8.10 17.36

2 Seru Schima spp 15.79 15.38 15.10 46.27 5.26 8.0 7.20 20.46

3 Lengkanai Dacrycarpus

imbricatus

15.79 15.38 12.05 43.22 5.26 8.0 8.40 21.16

4 Pasang babi Quercus sp 10.53 11.54 11.05 33.12 5.26 4.0 3.50 12.76

5 Cemara gunung Casuarina spp 5.26 3.85 4.60 13.71 5.26 4.0 4.15 13.41

6 Medang putih Litsea sp 10.53 19.23 23.75 53.51 5.26 4.0 2.10 11.36

7 Kelat arang Sp-1 10.53 7.69 4.80 23.02 5.26 4.0 1.18 10.44

8 Punggung kijang Scorodocarpus 5.26 3.85 3.70 12.81 10.53 8.0 8.10 26.63

9 Balam Palaquium 5.26 3.85 3.80 12.91

10 Bernai Antidesma

neurocarpum

5.26 3.85 4.20 13.31

11 Sapat Vatica 10.53 12.0 30.25 52.78

12 Paku tiang Sp-3 10.53 20.0 10.20 40.73

13 Tilam Sp-4 5.26 4.0 2.60 11.86

14 Medang cabe Litsea spp 5.26 3.85 3.50 12.61 5.26 4.0 2.10 11.38

15 Pasang Quercus sundaica 5.26 3.85 4.10 13.21 5.26 4.0 2.25 11.51

16 Asam-asam Santiria spp 5.26 4.0 1.85 11.11

17 Kirinyuh - 5.26 4.0 3.12 12.38

18 Balik angin - 5.26 4.0 4.90 14.16

Notes:

FR = Relative Frequency;

KR= Relative Density;

Page 60: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 62

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at IP-1 (FF-5)

No Local Name Latin Name Tree Sapling

FR KR DR NP FR KR DR NP

1 Cemara gunung Casuarina spp 14.29 12.50 25.75 52.54

2 Seru Schima spp 28.52 37.53 25.15 91.25 13.33 10.53 15.75 39.61

3 Pasang Quercus sundaica 28.52 25.20 20.25 73.62 6.67 5.26 5.15 17.08

4 Cendelung Sp-1 6.67 15.79 17.25 39.71

5 Semantung Sp-2 13.33 10.53 20.10 43.96

6 Bambu betung Bambusa 6.67 5,.6 5.10 17.03

7 Kayu manis - 13.33 15.79 10.75 39.87

8 Cempedak - 14.29 12.50 18.75 45.54

9 Kirinyuh - 13.33 10.53 10.15 34.01

10 Anggrum - 13.33 15.79 7.12 36.17

11 Lengkanai - 14.29 12.50 15.10 41.89

12 Mahang daun kecil - 13.33 10.53 8.70 32.56

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Vegetation analysis at Wellpad I (FF-6)

No Local Name Latin Name Tree sapling

FR KR DR NP FR KR DR NP

1 Kelat Dilleniaceae 3.70 5.41 4.25 13.36 3.23 2.08 3.75 9.06

2 Kenari Canarium ovatum 14.81 13.51 17.98 46.3 3.23 2.08 5.10 10.41

3 Lengkanai Dacrycarpus

imbricatus

14.81 13.51 22.15 51.47 3.23 8.33 9.20 20.76

4 Seru Schima spp 11.11 18.92 22.48 52.51 9.68 25.00 15.30 49.98

5 Medang cabe Litsea spp 3.70 2.70 2.10 8.50 12.90 8.33 3.15 24.38

6 Punggung kijang Scorodocarpus 7.41 5.41 4.15 16.97 6.45 4.17 7.10 17.72

7 Medang cantik Litsea 3.70 2.70 1.13 7.53 6.45 14.58 10.15 31.18

8 Cemara gunung Casuarina spp 3.70 2.70 1.18 7.58 3.23 2.08 3.10 8.41

9 Simpur Dillenia 3.70 5.41 5.10 14.21 6.45 4.17 6.75 17.37

10 Asam-asam Santiria spp 3.70 5.41 1.75 10.86 3.23 2.08 4.10 9.41

11 Medang pelawas Cinnamomum spp 3.70 2.70 2.10 8.50 3.23 2.08 3.15 8.46

12 Pasang Quercus sundaica 3.70 2.70 1.25 7.65 3.23 2.08 4.10 9.41

13 Kayu aro Ficus gibbosa 3.70 2.70 2.30 8.70 3.23 2.08 3.25 8.56

14 Pasang babi Quercus sp 3.70 2.70 3.55 9.96 3.23 2.08 2.15 7.46

15 Medang putih Litsea sp 3.70 5.41 2.18 11.29 3.23 2.08 2.30 7.61

16 Balam Sp-1 3.70 2.70 3.35 9.75

17 Cengal Dipterocarpaceae 3.70 2.70 2.75 9.15

18 Kapur Dryobalanops 3.70 2.70 2.63 9.03 3.23 2.08 2.10 7.41

19 Balik angin Mollotus 6.45 4.17 2.35 12.97

20 Jabon Neolamaerckia spp 6.45 4.17 2.75 13.37

21 Pakis tiang Sp-3 3.23 2.08 2.85 8.16

22 Sikejut - 3.23 2.08 3.70 9.01

23 Mahang - 3.23 2.08 3.60 8.41

Notes:

FR = Relative Frequency;

KR= Relative Density;

DR= Relative Dominance;

NP: Important Value

Page 61: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 63

Important Value Index distribution> 15% at the level of trees and saplings

No Local Name

Species Latin Name

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

tree sapling tree sapling tree sapling tree sapling tree sapling tree sapling

1 Medang cabe Litsea spp 6 5 3

2 Medang putih Litsea sp 1 4 3

3 Pasang babi Quercus sp 6 2 7 6

4 Lengkanai Dacrycarpus imbricatus 3 3 1 3 1 4

5 Kapas Exbucklandia sp 3 6

6 Seru Schima spp 6 1 2 1 4 2 1 2 1 4 5

7 Kelat Dilleniaceae 3 5 5 5 4 5 1

8 Kapur Dryobalanops 9 8

9 Medang cantik Litsea sp 2 9 2

10 Pasang Quercus sundaica 1 5 8

11 Pakis tiang Sp-1 2 - 6

12 Sapat Vatica 1 1 - 7 1

13 Kelat arang Syzygium 6 2

14 Beke Sp-2 5 3 7

15 Punggung kijang Scorodocarpus 7 3 4 5 5

16 Medang sirei Litsea spec 5

17 Kelat gulandah Syzygium 6

18 Seru berubah Schima spp 6

19 Cengkelung/

angrum/ bangkirai

Sp-3 2 3 2

20 Sengon Albizia chinensis 3

21 jabon Neolamaerckia spp 4

22 Mahang kecil Macaranga 6

23 Cemara gunung Casuarina spp 2 4 2 7 6

24 Simpur Dillenia 4

25 Surian Disambiguasi 4 3

26 Medang basah Litsea 7

27 Semantung Sp-4 1

28 Bambu betung Bambusa 4

Page 62: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 64

9. Permit Compliance

9.1. Compliance with AMDAL Documents

Summary of AMDAL Document compliance as follows:

Monitoring Item Monitoring Results during Report Period

Conditions attached to AMDAL

approval (Conditions shown in

the Articles of AMDAL Approval

letter dated 15 March 2017)

1. Please confirm if you have achieved all conditions attached to AMDAL approval. : [Yes / No]

2. Describe the situation and measures taken if delays/complications in implementation of the

conditions/ obligations are identified.

AMDAL Approval has been obtained.

9.2. Compliance with Environmental Permit

Summary of environmental permit compliance as follows:

Name Competent Authority Status

Renewal of Permit for

Hazardous Material

Temporary Storage Building

(Izin Tempat Penyimpanan

Sementara Limbah B3)

Regent of Muara Enim

(Bupati Muara Enim)

Has the permit been approved/ issued? : Yes / No

If "Yes", please provide the approved/issued date (17/Nov/2014). Please

also submit a copy of the permit together with this monitoring form. (See :

Attachment : ---

If "No", please provide the expected approval/issuance date

(DD/MM/YYYY).

Soonest from Muara Enim regency. All administrative requirements and

site inspection have been completed.

Any issues regarding

Monitoring Item mentioned

above

Reasons/ Background

Information

No

Measures: -

Page 63: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 65

10.Biodiversity Action Plan Summary

Summary of Biodiversity Action Plan as follows:

Monitoring & Action Item Monitoring Results during Report Period

Completion of Biodiversity Action Plan Has Biodiversity Action Plan (BAP)(including Supplemental Report) been completed? : Yes/No If "Yes", please provide the information of the completion date. (9 Jan 2018)

Please submit a copy of the final BAP together with this monitoring form and share the

information about the modified contents from the draft plan that is issued on 16 January

2018.

If "No", please provide the expected completion date of the final BAP: MM/YYYY. For each action item detail the actions taken and the current status and outcomes.

BAP document has been finalized in 2018. Please see the table below for action plan status. Impacts on biodiversity in/around the

project site Are there any problems regarding impacts on biodiversity pointed out by the National / Local

authority? Yes/No If yes, please describe the outline of the problems and measures taken.

Any issues regarding Monitoring Item

mentioned above

Reasons / Background Information Mitigation Measures

No aissue - -

10.1 Biodiversity Action Plan Details

BAP Status

No Action Plan Status Date/Reference

1 Appoint a Site Support Manager to

supervise SHE aspects at site

SHE is now under Site SHE Manager.

Biodiversity Officer directly reports to

Senior Manager SHE.

Site SHE Manager (Marc Blondeel), Site

Support Manager (Franky Tungka), and KTPB

(Ridha Mulia) are located at site.

Biodiversity Officer is Muhammad Hendra.

2 Implement adaptive management measure Establishing site specific procedure Site Specific Procedures are constantly

updated (as necessary).

3 Develop protocols for the management of

injured wildlife

Done -

4 Establish an incident reporting mechanism Done -

5 Identification of Wildlife Crossing Points Installation of Camera traps and

hourly manpower to observe

Upon discovery, none have been identified

so far

6 Assess the need for the installation of

artificial crossing for endangered arboreal

mammals

No wildlife crossing has been

identified to intersect with project

roads

-

7 Conduct a flora and fauna survey prior to

construction of wellpad

Done by Rekind and Sriwijaya

University

6 times during pre-construction before land

clearing

Current update:

No land clearing by SERD occured during

2H19.

8 Wildlife shepherding activities Have already been socialized to

company employees

-

9 Ensure clearing has been limited to the

identified area

Done by Project and EPC Contractor Cross country brine line clearing monitoring

and ensuring the area openings do not

exceed the provisions set by the government

or other regulations.

Page 64: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 66

10 Brief all involved personnel on wildlife

shepherding activities

Procedure has been socialized to all

SERD and EPC-C workers

During induction and prior to work,

employees will be given induction/toolbox

meetings that include socialization of

biodiversity protection and management.

11 Establish a site nursery Established near Wellpad C area and

at access to WP-B (jalan Badak)

Has been established since exploration

phase.

Current update:

Expansion and maintenance of nursery

facility.

12 Develop a comprehensive Offsite

Biodiversity Offset Design

Final draft issued. Document is continuously being improved

and improvements are regularly

communicated with related parties.

Note : BOMP v 3.4 was issued to ADB on 23

January 2020

Page 65: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 67

13 Conduct a water extraction pre-feasiblity

assessment

Conducted by FODD. Done -

14 Collect native flora seed before land

clearance

Conducted by Site SHE. Done Prior to land clearing (Seeds used for nursery

establishment and revegetation programs).

Native seeds are also collected regularly to

support the establishment of the site

nursery.

15 Local community engagement to raise

awareness of the conservation value of

forest

Socialization on forestry

management protection (signs,

campaign, etc.)

Conducted regularly by Biodiversity Offset

team (installation of signs, community

outreach and campaigns are done as

necessary)

16 Undertake daily monitoring of PT SERD

access roads to secure them from poaching

activity

Joint patrols with local forestry police Conducted regularly by Site SHE and

Biodiversity team with support from local

forestry and police.

Investigation of potential animal sighting

near the cross country brine line area

Drone survey around WP-B access

17 Company drivers to receive internal

defensive driving training

Done on a regular and as needed

basis

Conducted on a regular and as needed basis

(see list of training).

DDC instructor has been recruitted.

18 Conduct speed check Done on a regular basis Conducted on a regular basis

Page 66: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 68

19 Lighting management Being conducted during drilling /

construction activities

Regularly monitored by Project, Drilling, and

SERD SHE teams.

20 Ensure night works will not disturb wildlife SERD SHE and EPC-C’s SHE have been

conducting surveys, socialisation with

workers and nearby settlers, creating

signs, award campaigns, discussions,

etc. to ensure the sucess of

Conducted and monitored by Site SHE on a

regular basis during construction period.

Current update:

- Night works are currently minimal, but is

regularly monitored by site SHE and

Project team

- Biodiversity team regularly monitors and

reports as well as conduct patrols with

relevant officers

- Biodiversity awareness is socialized

regularly by site SHE and Biodiversity

team

- Biodiversity campaign is continuosly

improved, addition and maintenance of

signs are updated as necessary

- RKL-RPL monitoring is conducted on a 6-

monthly basis to ensure all regulated

environmental protection policy is within

the regulated threshold

- Signs and biodiversity campaigns are

installed at construction and sensitive

areas

21 Conduct regular monitoring of flora and

fauna in Project areas

22 All construction personnel and PT SERD

staff will undertake biodiversity awareness

training

23 Put up and maintain information posters

and literature on ecological awareness

24 Monitor compliance with PT SERD

environmental protection policy

25 Monitor construction areas for signs of

potential wildlife conflict, illegal logging

and poaching

26 Workers to be trained in noise-reduction

behaviours

A number of workers and SHE

personel equiped with Noise

detectors

Conducted and monitored by Site SHE on a

regular basis.

Current update:

Noise monitoring is conducted regularly

Page 67: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 69

27 Crossing points/ arboreal crossing bridge is

retained in good functional condition

Will be installed if necessary. None of

wildlife crossing has been identified /

required.

Will be reassessed and installed when

necessary.

28 Measure long term population changes and

trends for key species

Camera trap results and fauna

sightings are recorded for future

habitat databse mapping

Will be reassesed with experts in the future

29 Consultation relevant stakeholders to

determine the composition and type of

planting to be achieved

Consultation with local and provincial

forestry agencies

Types of plants have been approved by DAS

Musi and provincial foresty.

30 Develop a community based forest

restoration project

Community will be engaged during

forestry restoration project

Community will be engaged in the planting

and maintenance of the revegetation within

the PT SERD Biodiversity Offset area.

Socialization of Foresty status to Segamit

Villagers regarding forest clearing and

socialization of Police Head Announcement

to ban forest burning.

Contributed to KPH 8 Semendo 6 manual

portable water pump for fighting forest fire

in a remote area.

Discuss offset location and farmers’ involvement with official from Muara Enim

regency

Page 68: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 70

Discuss offset location and farmers’ involvement with officials from Semendo

sub-district.

31 Install warning signs regarding hunting and

poaching at the border of the buffer area of

the Protection Forest.

Several have been installed. Will be a

continuous effort and additional

signs will be added if necessary

Banner installation for wildlife conflict,

illegal logging, poaching awareness is added

as necessary.

Currently:

Addition of 20+ signs and banners at the

Protection Forest and villages nearby project

site. have been installed at project site.

32 Establish a communication system with the

local forestry office and report illegal

hunting / logging.

PT SERD has a routine patrol not only

with local forestry agency but also

with Provincial forestry agency

Consultation with relevant parties is

regularly conducted and

Current update:

Consultation and discussion with the South

Sumatra provincial forestry service

(government) regarding land clearing and

forest fires by the planters and residents

Page 69: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 71

Confiscation of 3 motorbikes by

environmental and forestry law enforcement

and pieces of wood as evidence of illegal

logging.

33 Develop and update habitat mapping

database

Will be conducted every 3 years Camera trap results and fauna sightings are

recorded for future habitat databse

mapping.

Will be reassesed with experts in the future.

34 Construct security gates to restrict access

of vehicle

Already installed in several areas: for

example : Post-0 at Block-0 ; Post-1

at Warehouse ; Post 2 at near Talang

Tinggi Accomodation.

35 Conduct regular patrols of the project

boundary

Regularly conducted by PT SERD

security, and often accompanied by

local and provincial forestry agency

Conducted on a regular basis

Conducted joint patrol with forestry

enforcement team, following up on PT.

SERD’s report regarding land clearing and

burning of land.

36 Conduct regular drone flight On a weekly basis. Drone monitoring of Access B area

Drone Utilization for joint patrol; Monitoring

of landfire and clearing at Junction B project

site, opened by coffee planter

Page 70: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 72

37 Conduct invasive species survey of WP-

L,M,N and X and injection brine pipeline

route.

Has been conducted prior land

clearing

Current Update:

Invasive species monitoring is regularly

maintained.

38 Educate local people and restrict clearing

by local people

PT SERD has routine socialization not

only with local forestry agency but

also with provincial forestry agency

Is done as necessary. Regular consultations

are done between PT SERD Biodiversity

manager with local forestry and community

on a daily/weekly basis.

Conducted a socialization program for the

Musi Catchment Rehabilitation with the

head of Yayasan village.

39 Interviews with local people on their

ecosystem service use within Project Area

and AoI

Has been Done by ERM Document was composed in November

2017.

40 Monitor land clearing and assess feasibility

of providing alternative income

Land clearing is monitored by

Security Patrol and Drone flying.

CSR is also meant to improve the likelihood

of the farmers and reduce new illegal

farming within the protection forest.

For example : intensification of coffee farms

(with local Universitas Sriwijaya, contribute

barley seeds to farmers.

Delivered of barley seeds to farmers as an

alternative crop for a source of income.

Page 71: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 73

10.2 Biodiversity (endangered species) Summary of Biodiversity (endangered species) Monitoring as follows:

Measurement Period [Construction Phase]

Regularly (At least every 3 years) [Operation Phase]

Regularly (At least every 3 years)

Any concerns and measures taken:

Various actions for biodiversity protection have been taken, such as Direct Observations (fauna sighting) by workers at SERD project area and recording them, camera trap installation and data logging on a monthly basis, as well as surveys prior to land clearing for wellpad purposes. Joint patrols are conducted on a regular basis. The patrols involve instances from the local forestry, consultant, SERD security, SERD SHE and biodiversity team. Drone surveys are also conducted to monitor changes in land cover. Induction and biodiversity campaigns are conducted regularly. Forestry and biodiversity protection signs are installed within and outside project area.

Measurement Method Direct observation

Camera Trap

Joint Patrols

Measurement Points Number of locations will be determined later based on analysis of the observation data. The below are the previous locations during biodiversity study.

Fauna Monitoring Result Semester 2 Year 2019

No Local Name Scientific Name

Location

Status IUCN

WP-B Power

Station WP-I

Access

Road

WP-D

IP-i Shortcut

A MAMALIA

1 Bear Helarctos malayanus + - - + - - P VU

2 Deer Cervidae unicolor + - + - - P VU

3 Monkey Macaca fascicularis + + + + + - LC

4 Beruk Macaca nemestrina + + + - - VU

5 Chimpanzee Presbytis melalophos + + - + - + P EN

6 Boar Sus scrofa + + + + + + LC

7 Siamang Symphalangus syndactylus. + + + + + P EN

8 Weasel Mustela nivalis + - - + - - LC

9 Mountain Cat Felis (Prionaliurus) spp + - + - - - P LC

10 Bat + - + - - - LC

B HERPETOFAUNA

1 Lizard Mabouya sp + + + + + + LC

2 Monitor Lizard Varanus salvator + - - - - - LC

3 Ular sendok Naja sp + + + + - - LC

4 Ular tikus - - + - - - LC

C AVES

1 Cinenen gunung Orthotomus cuculatus + + + + - + LC

2 Prenjak Prinia atrogularis + - + - + + LC

3 Tekukur Streptopelia chinensis + - - - + - LC

4 Layang-layang Hirundo tahitica + + + + + + LC

5 Butbut Centropus sinensis + + - + - - LC

6 Cekakak Todirhamphus chloris + + + + - + P LC

7 Burung madu belukar Hypogramma sp + - + - - - P LC

8 Srigunting Dicrurus + - + + - + LC

9 Elang hitam Ictinaetus malayensis + - + - - + P LC

10 Cabecabean Dicaeum spp + + - + - - LC

11 Kijoan Chloropsis sp + - - - - - LC

12 Punai Treron sp + - - + - - LC

13 Kutilang Pygnonotus - - - - + - LC

14 Walet dada putih Colocalia linchi + + + + + + LC

Page 72: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 74

No Local Name Scientific Name

Location

Status IUCN

WP-B Power

Station WP-I

Access

Road

WP-D

IP-i Shortcut

15 Sriti Colocalia esculenta - + - - - - LC

16 Elang putih Elanus caerulens + - - + - + P LC

17 Percici Trichoglos sp + - - - - + LC

18 Elang brontok Spizaetus cirrhatus. + - - - - + P LC

19 Rangkong/ Kangkareng hitam Anthracoceros malayanus + - + + - - P VU

Jumlah 29 13 19 20 8 14

Notes : P = Protected

Species Monitoring by Camera Trap Summary

Note: See Lender’s Monthly Report for each month for detailed camera trap results

Camera

Trap No. Month Species Documentation Status

CT-03

(WP-L)

July

Unidentified Bird

N/A

Marbled Cat

(Pardofelis marmorata)

Near threatened

Weasels

(Mustela)

Least concern

August

Unidentified Bird

Martes Flavigula

Least concern

Page 73: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 75

Marbled cat

(Pardofelis marmorata)

Near threatened

September

Martes Flavigula

Least concern

Tapir

(Tapirus indicus)

Endangered

October

Deer

(Cervidae)

Least Concern

Marbled cat

(Pardofelis marmorata)

Near threatened

Martes Flavigula

Least concern

Mydaus Javanensis

Page 74: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 76

December

Sumatran Cocoa

Vulnerable

Sus Scrofa

Least concern

CT-02

(WP-C)

July Wild Boar

(Sus scrofa)

Least concern

August

Civet

(Paradoxurus

hermaphroditus)

Least concern

September

Martes Flavigula

Least concern

Marbled Cat

(Pardofelis marmorata)

Near threatened

Page 75: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 77

Dhole

(Cuon Alpinus)

Endangered

Badger

(Mydaus javanensis)

Least Concern

Civet

(Viverra tangalunga)

Least Concern

Deer

(Cervidae)

Least Concern

Golden Cat

(Catopuma temminckii)

Near Treatened

Sun Bear

(Helarctos malayanus)

Vulnerable

October Sumatran Cocoa

Vulnerable

Page 76: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 78

Martes Flavigula

Least Concern

Marbled Cat

Near Theatened

Prionodon linsang

Least Concern

Sus Scrofa

Least Concern

December Sumatran Cocoa

vulnerable

CT-04

(WP-M) July

Marbled Cat

(Pardofelis marmorata)

Near threatened

Page 77: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 79

Civet

(Viverra tangalunga)

Least concern

Wild Boar

(Sus scrofa)

Least concern

August

Paguma larvata

Least concern

Sun Bear

(Helarctos malayanus)

Vulnerable

Deer

(Cervidae)

Least Concern

CT-1

(around

labour

camp 1)

July Wild Boar

(Sus scrofa)

Least concern

Page 78: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 80

Civet

(Viverra tangalunga)

Least concern

August

Martes Flavigula

Least Concern

Civet

(Viverra tangalunga)

Least concern

October Tapirus Indicus

Endangered

CT-05

July

Dhole

(Cuon Alpinus)

Endangered

Tapir

(Tapirus indicus)

Endangered

September Wild Boar (Sus scrofa)

Least concern

Page 79: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 81

Endangered Species Encounter during July - December 2019 Reporting Period

Species Name Scientific Name IUCN CITES Indonesia Encounter

Observation

Method

Dhole Cuon alpinus EN II P √ Camera Trap

Sumatran Tiger Panthera tigris sumatrae EN I P - -

Asian Elephant Elephas maximus EN I P - -

Sunda Pangolin Manis javanica EN II P - -

Smoky Flying Squirrel Pteromyscus pulverulentus EN P - -

Agile Gibbon Hylobates agilis EN II P √ Sighting

Sumatran Surili Presbytis melalophos EN P √ Sighitng

Siamang Symphalangus syndactylus EN I P √ Sighting

Note: IUCN: EN = Endangered, CR = Critical Endangered, CITES: I = Appendix I, II = Appendix II, Indonesia: P = Protected

10.3 Biodiversity Offset Strategy (BOS)

Status of BOS as follows:

• Submitted final draft of Biodiversity Offset Management Plan (BOMP) v 3.1 in September 2019 to ADB

• Joint socialization to all farmers of Offsite Area on SERD Biodiversity Offset Program to Community by

Provincial Forestry Office, Head of Muara Enim Regency, Muara Enim forestry Office and Head Semende

Darat Ulu District to Community in Muara Enim on 16 July 2019

• Socialization to farmers by door-to-door method is conducted regularly

• Recruited one (1) biodiversity officer, provided light vehicle, office space and work equipment

• Continue discussions with Forestry of South Sumatera, KPHD Semendo, DAS Musi, Muara Enim district

• Biodiversity Offset Technical Meeting among SERD, Forestry Office Regency Muara Enim and Consultant in

Jakarta on 20 September 2019

• Joint patrols are conducted on regular basis (see BAP table)

• Social census was conducted and revalidation of census data is being conducted.

• The location biodiversity offset location is within the red and blue lines in the picture below:

Page 80: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 82

Joints Socialization on Biodiversity Offset Program to Community in Muara Enim on 16 July 2019

Page 81: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 83

Biodiversity Offset Technical Meeting among SERD, KPH Semendo, and Forestry Consultant in Jakarta on 20

September 2019

Page 82: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 84

11.Information Disclosure

Are the results of environmental and social safeguards monitoring

disclosed? ( Yes / No )

If yes, please provide URL or Monitoring reports.

・URL :

Environmental documents such as AMDAL/RKL-RPL reports are

disclosed for the public (should they want to review the

documents, they are available at the local environment office

and Supreme Energy office). The ESIA document has been

submitted to the lenders and is disclosed by them in their

websites.

JBIC,ADB, and NEXI will disclose URL or Monitoring reports on

their websites, unless disagreement expressed.

Page 83: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 85

ATTACHMENTS

Attachment 1 : Environmental Activities

Attachment 2 : Safety Health Activities

Attachment 3 : Social Activities

Attachment 4 : Form 4 Facilities Agreement

Attachment 5 : Environmental & Biodiversity Monitoring Maps

Attachment 6 : Grievance Log

Attachment 7 : Environmental Monitoring Trends

Attachment 8 : Summary of Hazardous Waste Temporary Storage Inspection

Page 84: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 86

ATTACHMENT 1 – ENVIRONMENTAL ACTIVITIES

Dust Control

Wheel Wash Facility Maintenance Camera Trap Monitoring

Invasive Species Clearing Housekeeping

Revegetation Hazardous Waste Storage Building Maintenance

Maintenance of Silt / Sediment traps

Page 85: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 87

Noise Monitoring H2S Monitoring

Soil Erosion / Landslide Prevention

Housekeeping & Maintenance at Domestic Waste Storage Area

Nursery Maintenance and Inventory Update

Joint Forestry Patrol / Socialization

Page 86: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 88

ATTACHMENT 2 - SAFETY HEALTH ACTIVITIES

SHE Training from Marubeni Distribution of Wheel Chock for Light Vehicle

SHE Coordination with Contractors Defensive Driving Course Refresher Training

Training of First Aid Level 2 ENGIE Site Visit (Management Walkthrough

First Aid Awareness : participants were from SERD,

CMD and DKB) Hazmat Handling Inspection

Page 87: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 89

Hygiene Inspection

SERD Ambulance Inspection Conduct SHE Induction to Dump Truck Drivers

Page 88: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 90

ATTACHMENT 3 - SOCIAL ACTIVITIES

Coffee Production Monitoring & Revalidation Survey to PAP

Page 89: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 91

CSR Programs & Grievance Mechanism

Page 90: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 92

ATTACHMENT 4 – FORM 4 FACILITIES AGREEMENT

Name of Project Rantau Dedap Geothermal Power Plant Project

Completion Date of This Form 2019/07/29

Monitoring Period (From)2019/06/30 (To)2019/12/31

Progress of Project Construction Phase / Operational Phase

Progress of Project Category required by JBIC

Construction Phase ESIA and Environmental Permits / Ecosystem and biota

Operational Phase ESIA and Environmental Permits / Ecosystem and biota

Notes ( e.g. Any comments made by the relevant authorities, and grievances from local people/NGO)

None

ESIA and Environmental

Permits

Compliance with ESIA Conditions

Monitoring Item Monitoring Results during Report Period

Conditions attached to the

ESIA( AMDAL) approval

( Conditions shown in the

Third Article and

Fourth Article of AMDAL

Approval letter dated 15

March 2017 )

1. Please confirm if you have achieved all conditions attached to the ESIA (AMDAL) approval. : [Yes / No]

2. Describe the situation and measures taken if delays/complications in implementation of the conditions/obligations are

identified.

Monitor the compliance of AMDAL is conducted regularly and reported every 6 months to the parties through RKL/RPL reports.

So far there is no feedback that have been received from the government.

Monitor the E&S compliance of ESIA is reported monthly (monthly E&S report) and MMD as LESC conducts a site visit every 6

months and submits a 6-monthly report to Lenders.

If there was any delay / complication in implementation, it will be reported, a corrective action plan is developed and followed

up to completion.

Ecosystem and biota

Monitoring Item Monitoring Results during Report Period

Status of several documents

related to the

Biodiversity※

Critical Habitat Assessment

(CHA),

Biodiversity Action Plan (BAP),

Biodiversity Offset Strategy

(BOS),

Biodiversity Offset

Management Plan (BOMP)

Have the documents related to the biodiversity been completed? : Yes / No

If "Yes", please submit a copy of the final version of the report together with this monitoring form and share the information

about the modified contents from the draft plan.

If "No", please share the information about the current status.

The CHA, BAP, BOS, and BOMP have been completed in this stage and will be updated based on relevant changes and progress.

- Critical Habitat Assessment (CHA) v13, dated 16 January 2018

- Biodiversity Action Plan (BAP) v6, dated 16 January 2018

- Biodiversity Offset Strategy (BOS) v5, dated 16 January 2018

- Biodiversity Offset Management Plan (BOMP) v 3.1, dated 23 September 2019.

Note : Update of BOMP has been submitted to Lenders (v 3.5, dated 23 January 2020).

Status of the Forest

Management Plan

( Conditions attached to the

IPPKH 115 ha )

Has the Forest Management Plan been completed and approved by Forestry Office of South Sumatra Government? : Yes / No

If "Yes", please provide the information of the completion date (DD/MM/YYYY).

If "No", please provide the expected completion date of the final report and current status.

Approved on 21 September 2018.

Approval Letter no : 522.053.331/3326-III/Hut

Impacts on biodiversity in/

around the project site

Please share the current status of the ecosystem conservation activities from the viewpoint of forest management and

biodiversity.

The location for biodiversity offset has been approved by Ministry of KLHK in 2018 (Approval Letter no. SK 7155/Menlhk-

PDASHL/KTA/DAS.1/10/2018). The location is adjacent to project facilities, the status is Protection Forest but has been

degraded as coffee farms. Currently in progress to free the land form farmers, with provincial forestry acting as the

Coordinator. The last public consultation was conducted on 16 July 2019 in Muara Enim district, attended by approximately

Page 91: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 93

100 participants from farmers, local leaders, NGO, Deputy District Head, local government officers, and forestry officers.

Are there any problems regarding impacts on biodiversity pointed out by the National/Local authority? Yes / No

If "Yes", please describe the outline of the problems and measures taken.

Any issues regarding

Monitoring Item mentioned

above

・ Reasons/ Background Information ・ Mitigation Measures

Information Disclosure

Are the results of

environmental monitoring

disclosed? ( Yes / No )

If yes, please provide URL or Monitoring reports.

・ URL :

Environmental Monitoring reports are not disclosed in any URLs but can be disclosed by request. Should a copy of the

document be needed, the requestor may obtain the report directly from Governmental Environmental Office. Latest

monitoring report is for Second Semester of 2019.

JBIC will disclose URL or Monitoring reports on our website, unless disagreement expressed.

ASIA-DOCS\10129473.14

Page 92: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 94

ATTACHMENT 5 - ENVIRONMENTAL AND BIODIVERSITY MONITORING MAPS

Code Location's Name Coordinate

Remarks E S

Camera Trap 3 Around Well Pad L 103°21'44.95"E 4°14'23.97"S

Camera Trap 2 Around Well Pad C 103°22'51.15"E 4°13'20.66"S

Page 93: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 95

Camera Trap 5 Around EPC-C Labour

Camp

103°22'54.53"E 4°12'3.35"S

Page 94: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 96

Page 95: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 97

Biodiversity Monitoring (Camera Trap Placement)

Page 96: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 98

ATTACHMENT - 6 GRIEVANCE LOG

No.

Complaint

Date

Reported

Complaint Description

Proposed

Corrective

Action

Date of

Proposed

Corrective

Action

Response Sent

to Complianant

Complaint

Closed Out

Date

Response of

Complainant

after

Complaint

Closed Out

Status

1 5 July 2019 Ali Sadikin complaint and

block the road (Anoa

road) and ask SERD to

recruit them, they have

several time visited to

site and ask recruit them

as landowner

attended also

by Rekind, SERD

and Rekind

comdev will

make them

priority and

record all

landowner and

recruit them

gradually as

previous SERD

promises

5 July 2019 Ali Sadikin CS

open the

blockade and

will waiting

Rekind and SERD

promise

15-Jul-19 Still Waiting

vacancy

Closing

Ali

Sadikin

already

work

2 5 July 2019 Gunawans family put the

wire peg at CH 3.500

before at 23 Juny 2019

they put stake at CH

6.500, Edo who has been

work as daily labour ask

to be contract worker,

Radius ask to be driver

and 2 others want to

work

SERD relation

and Rekind do

negotiation

with Gunawan,

Pak Agus

Sutarno from

SCM also do

negotiation

because

Gunawan want

get project and

supply material

8 July 2019 SERD will recruit

them because

Gunawan is

landowner at 3

areas and there

is an agreement

between SERD

and Gunawan

9 July 2019 Radius work

and there is

good

coorporation

between

Gunawan

and SERD

complaint is

closed

Closing,

radius

already

work as

driver

3 14 July 2019 Complaint from Lawang

Agung head village

regarding drainage

channel damage due to

mobilization Lawang

Agung villagers ask SERD

repair that drainage

SERD survey at

that area and

will propose to

management

15 July 2019 SERD approve to

repair drainage

at Lawang Agung

and ask local

supplier to

repair that area

On process On

process

4 16 July 2019 Some people (Womens)

from Tunggul Bute stop

the cars they complaint

to PT.SERD and

contractors to watering

road they village

regularly so many thick

dust on the road it can

cause the disease

SERD will ask

Rekind to do

regular

watering and

handle this

case/complaint

seriously

17 July 2019 Rekind has 4

watertank who

will do watering

regularly and

some of

watertank is

operating

01-Aug-19 SERD still

waiting

watering

until block 0

Closing

SERD do

watering

by water

tanker

5 30 July 2019 Blockade road by Samri

and Kamri at Padang

Panjang Ilir on Sunday 30

July 2019 at 23.00 PM

Sandri and Kamri charge

an SERD appointment to

recruit them several

months ago

SSM will

prioritize Kamri

son's at next

labor demand

31 July 2019 One of them will

recruit soon

5 August

2019

Kamri son's

is called to

work,

complaint

closed

Closing,

Samri

son's

already

work

Page 97: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 99

No.

Complaint

Date

Reported

Complaint Description

Proposed

Corrective

Action

Date of

Proposed

Corrective

Action

Response Sent

to Complianant

Complaint

Closed Out

Date

Response of

Complainant

after

Complaint

Closed Out

Status

6 29 July 2019 Complaint from

Izharudin/Isudin family

regarding water tanker

supply propose of CV.

Danau Deduruk which

was rejected by Rekind

and Rekind still uses

Stenly who has

experienced fatality

Relation

propose to

Rekind to

consider

submission

from Izharudin

if there is a

need for

additional

water tanker

because

Izharudin is

landowner

along Air Tupai

so we can reach

smooth

mobilization

30 July 2019 Rekind still

waiting their

management

regarding

addition of

water tanker and

will prioritize

Izharudin if there

is additional

water tanker

needed

Still waiting

additional

water tank

request

Closed,

Rekind

use his

water

tank

7 30 July 2019 Heldi's complaint

landowner of CH 2.600

who want get Gabion

and channel repairing

project trough

Dermawan's CV

Relations is

working with

Management

regarding this

complaint

31 July 2019 That's area is

include

PU.Binamarga

contract so it

can't do by local

supplier

Heldi still

waiting

decision

from SERD

Closing

Sapturi

already

work in

Yin

8 30 July 2019 Rudy and Hasan Ibnani

complaint about dust

they ask 1 m hose, speed

bump and sign

Rekind give

hose to them.

Speed bump

and sign will be

installed by

SERD

31 July 2019 Management

approve and will

put speed bump

and give signs at

that area

31-Aug-19 On process SERD

already

give

pump

machine

but they

reject

9 16 August 2019 Complaint from Aldi

(Ndan land) about

priority work for

landowner he ever install

the stake three months

ago, enter the job

application 1 year ago,

and install stakes again

on July 2019

Check

landowner

acqusition data

and confirm

with committee

18 August

2019

Still Waiting

vacancy

OPEN

10 16 August 2019 Cable of electricity hit by

MTU trailer at 06.00 WIB

on 16 August 2019, 100

meter cable can't use

and 1 soundsystem is

broken

Calling MTU

transporter

coordinator and

confirmation

about damage

that cause by

MTU, and give

direction to

MTU to be

careful

19 August

2019

Transporter

through SERD

responsible and

pay

compensation

accordance with

damage caused

23 August

2019

Closed CLOSE

Page 98: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 100

No.

Complaint

Date

Reported

Complaint Description

Proposed

Corrective

Action

Date of

Proposed

Corrective

Action

Response Sent

to Complianant

Complaint

Closed Out

Date

Response of

Complainant

after

Complaint

Closed Out

Status

11 23 August 2019 13 Worker from KTA

complaint to PT.TPI

regarding temporary

dismissal of work by

EBTKE as suspended to

Rekind due to fatality

incident, TPI ask them to

work as usual from 07.00

Wib - 17.00 Wib, but

they ask to TPI can work

just untill 16.00 Wib

doesn't approve by TPI

Ask to TPI

regarding this

complaint and

give info to TPI

that they must

wait EBTKE

decision

24 August

2019

October

2019

Waiting

EBTKE

decision.

Revoked the

suspension

on October

CLOSE

12 26 August 2019 Complaint from

Akhirman he not working

until now, thick dust

covered coffee plant at

his Galang Tinggi

Plantation

Coordination

this complaint

with committee

and regarding

watering road

among

suspended by

EBTKE SERD will

try find solution

for this problem

26 August

2019

Still waiting

vacancy and

waiting

decision

from

managemen

t regarding

watering

road while

watertank

can't

operation

OPEN

13 22-Sep-19 Complaint Munawir to

Rekind regarding

payment of watertank

three month have not

been paid.

SERD convey to

Rekind and ask

to resolve that

complaint

23-Sep-19 Rekind Comdev

still coordination

with competent

part

Still waiting

info from

financial

department

open

14 25-Sep-19 Complaint from Samrun

regarding land acqusition

for drainage chanel he

had give his land with

cheap price with hope he

can work soon

SERD will

priority him if

suspension of

Rekind has over

26-Sep-19 This case has

been

coordinated with

committee and

Rekind

Still waiting

suspension

of Rekind

has over

open

15 15 October

2019

Complaint from Jumari

landowner CH 8.100

regarding land

acquisition CH 8.100 at

2012

SERD find all

document at

2012

17 October

2019

Mediation with

landowner, Kota

Agung Police,

Kota Agung head

village

20 October

2019

Case closed close

16 16 October

2019

Blockade from

landowner at Padang Ilir

, all landowner ask SERD

recruit them

SERD will note

their name and

find vacancy for

them because

for land

acquisition at

Padang Ilir

there is

comitment for

recruit them

17 October

2019

Find vacancy for

them

21 October

2019

CIP recruit

them, case

closed

close

Page 99: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 101

No.

Complaint

Date

Reported

Complaint Description

Proposed

Corrective

Action

Date of

Proposed

Corrective

Action

Response Sent

to Complianant

Complaint

Closed Out

Date

Response of

Complainant

after

Complaint

Closed Out

Status

17 1 November

2019

Road blockade at CH

5000 by Bpk Zulkifli

Karang Endah

SERD visit

Zulkifli and ask

reason why he

put the peg, he

want Ari his son

work at

contractor

06 November

2019

SERD and police

Kota Agung

convey to Zulkifli

SERD already

recruit their

family and help

them to be local

vendor and ask

him not to

inhibit SERD

operational

07

November

2019

Zulkifli

dismantle

his peg, case

closed

close

18 4 November

2019

Road blockade at CH

3.900 by Misno ask his

son work at SERD

SERD contact

and visit Pak

Bakti & Misno,

Pak Bakti ask

regarding when

Jepi can start

work and ask at

his area he will

determine

which vendor

will do drainage

chanel

06 November

2019

After

confirmation

with PT. YIN,

Relation convey

that his son will

work after

additional car

come to site and

give him adving

to coordination

with CIP directly

12

November

2019

Misno

dismantle

his peg, case

closed

close

19 11 November

2019

Complaint from

Gunawan landowner CH

4.030 piled up material

at his land

SERD survey to

location

23 November

2019

A lot of material

piled up at his

land 150x3 M2

with total

compensation

and amount of

compensation is

unknown

Under

negotiation

20 12 November

2019

Road blockade at CH

4.100 by Dani ask his son

in law work at SERD and

compensation letter

replaced in the name of

Dani not Gintan

Held meeting

with Dani and

Kota Agung

police SERD

replace

compensation

letterwith his

name and SERD

and committee

will recruit Aka

Efran if there is

vacancy

14 November

2019

Dani agree and

will dismantle

his peg

14

November

2019

Dani

dismantle

his peg, case

closed

Close

21 15 November

2019

Blockade road by

motorcycle at Danau

Dedorok by 11 people

from Aramantai,

Segamit, and Fajar Bulan

(Irsan Bandi CS) start

from 12.00 until 14.05

Wib all of them demand

to work they already

send aplication letter

since a long time ago

Relation,

security and

BKO go to

location and ask

why they block

the road they

convey that

they want to

work and

already waiting

for long time

15 November

2019

All the names

are noticed and

committee also

relation will

evaluate and

choose deserves

priority

15

November

2019

Block the

road is open

and they

wait SERD

and

committee

call and

recruit them

Close

Page 100: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 102

No.

Complaint

Date

Reported

Complaint Description

Proposed

Corrective

Action

Date of

Proposed

Corrective

Action

Response Sent

to Complianant

Complaint

Closed Out

Date

Response of

Complainant

after

Complaint

Closed Out

Status

22 18 November

2019

Road blockade by wood

and stone at CH 2500 he

want his nephew can

work at SERD

Relation visit

Irul and he

convey that his

nephew want

to work

23 November

2019

Under

management

consediration

01-Dec-19 Considering

a lot of

mobilization

and peg is

tighter and

Irul is one of

landowner

so SERD will

give a

chance for

Irul, case

closed peg is

dismantle

close

23 20 November

2019

Road blockade by wood

and stone at CH 10.500

start from 17.00 Wib ask

to work Ishar/Tomy

Relation,

security and

BKO go to

location and ask

why they block

the road they

convey that

they want to

work and

already waiting

for long time

20 November

2019

All the names

are noticed and

committee also

relation will

evaluate and

choose deserves

priority

20

November

2019

Road

blockcade is

open, case

closed

close

24 21 November

2019

Complaint from Mami

landowner CH 4.000

regarding piled up

material at his land

SERD survey to

location

23 November

2019

A lot of material

piled up at his

land 3x30 M2

with total

compensation

IDR 1.6 Million.

Mami approve

proposed value

Waiting

decision

open

25 21 November

2019

Road blockade by stake

at Padang Ilir ask to

work by jacky dkk

Relation and

security visit

Jacky and ask

why his install

the stake

24 November

2019

Do negotiation

between SERD

and Jacky

landowner, SERD

notice his name

Waiting job

vacancy

open

26 29 November

2019

Blockade roan at 4

intersection of Yayasan

by wood and motorcycle

(Safriansyah DKK)

protest their motorcycle

detained by Semende

police and ask again for

centainty when they will

work

Relation,

security and

BKO go to

location and ask

why they block

the road they

convey that

they want to

work and

already waiting

for long time,

and they angry

because 3

motorcycle

detained by

SDU police

29 November

2019

They can take

their motorbike

at Semende

police office and

their name

already noticed

by committee

29

November

2019

Case closed,

blockade

road is open

close

Page 101: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 103

No.

Complaint

Date

Reported

Complaint Description

Proposed

Corrective

Action

Date of

Proposed

Corrective

Action

Response Sent

to Complianant

Complaint

Closed Out

Date

Response of

Complainant

after

Complaint

Closed Out

Status

27 29 November

2019

Blockade road by Ilmani

and Karmi ask to work

and ask assistance for

pool excavation work at

his pool which has been

buried by material

SERD visit Karmi

he ask SERD

help him to

diging his pond

as request

when meeting

at Kota Agus

district office

with PU

Binamarga, and

he also ask 2

peoples work

3 December

2019

SERD will help to

digging the pond

and his family

will recruit

3 December

2019

Peg is

dementle

close

28 3 December

2019

Road blockade by

Khalisin & Dedi

(landowner) at Anoa

Road looking for job

oppurtunity from 09.00

wib - 09.30 wib

Relation team,

security do

negotiation at

location and

invite them to

Gate 1 office

3 December

2019

All the names

are noticed and

committee also

relation will

evaluate and

choose deserves

priority

Waiting job

oppurtunity

open

29 13 December

2019

Blockade road by

Akhirman (landowner at

Galang tinggi) at security

test 11 December 2019

SERD, committee and

rekind didn't give him

information, this test

seem closed and unfair,

blockade start from

07.30 wib and open at

08.35 wib

BKO SERD from

police open

blockade and

ask to do

negotiation at

office, security

test will be

repeated or

canceled

13 December

2019

BKO SERD from

police open

blockade and ask

to do

negotiation at

office, security

test will be

repeated or

canceled

Waiting job

security

vacancies

open

30 17 December

2019

Demonstation and

blockade road by driver

and job seeker at Batu

Surau, Padang Ilir,

Pengentaan, Yayasan,

Sukarami and gate 1 with

demand dismissed Mr.

Ralph Hoellmann & Tony

curran and other as to

work start from 06.00

Wib untill 13.00 wib

Resolve by Pak

Ridha, Adi,

Relation team,

BKO and

security

17 December

2019

Will report to

Management

Jakarta

Waiting

result

open

31 19 December

2019

Complaint from

Gunawan regarding

accumulate material at

coffee land due to bad

road condition

SERD relation

survey to

location

26 December

2019

FPP and

grievance for

compensation

that already

approve will

send to Jakarta

Waiting

routing

approval

open

Page 102: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 104

ATTACHMENT 7 – ENVIRONMENTAL MONITORING TRENDS

Note: Results are taken from the last 5 years RKL-RPL Monitoring results

Ambient Air

Consentration Variation of SO2

Consentration Variation of NO2

Measurement results for ambient air quality parameters such as Sulfur Dioxide (SO2), Carbon Monoxide

(CO), Nitrogen Dioxide (NO2), Oxidant (O3), Hydrocarbons (HC), Total Suspended Particulate (TSP), PM10,

and PM2,5 overall have results that still meet the required quality standards. All parameters also show a

constant/stable tendency. PM10, and PM2.5 had a slight exceedance (however, still under the regulated

threshold) during 1H19, possibly due to the ongoing construction of wellpads (L, M and N). The results of

0

200

400

600

800

1000

SO

2 L

ev

els

SO2

Threshold

SO2

0

50

100

150

200

250

300

350

400

450

No

2 L

ev

els

NO2

Threshold

NO2

Page 103: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 105

PM10 and PM2.5 have shown a decrease again during Semester 2 of 2019. Thus it can be concluded that

ambient air quality parameters is not in critical value in the monitoring of Semester 2 of 2019.

Surface Water

Concentration variation TSS

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = -0,0179x2 + 0,9107x + 1,4821

0

10

20

30

40

50

60

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Endikat

TSS Baku Mutu Trend TSS

y = 0,4178x2 - 3,0764x + 8,125

0

10

20

30

40

50

60

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Cawang

Tengah

TSS Baku Mutu Trend TSS

y = 0,1337x2 - 1,6666x + 7,8083

0

10

20

30

40

50

60

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Asahan

TSS Baku Mutu Trend TSS

y = -0,0606x2 + 0,2818x + 4,0333

0

10

20

30

40

50

60

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Sungai Cawang Kiri

TSS Baku Mutu Trend TSS

y = 0,2946x2 - 2,1254x + 6,27

0

10

20

30

40

50

60

TS

S (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi TSS di Danau Deduruk

TSS Baku Mutu Trend TSS

Page 104: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 106

Concentration variation BOD

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = -0,053x2 + 0,25x + 6,7667

0

3

6

9

12

15

18

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Asahan

BOD5 Baku Mutu Trend BOD5

y = 0,1071x2 - 0,8452x + 6,5714

0

3

6

9

12

15

18

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Endikat

BOD5 Baku Mutu Trend BOD5

y = -0,1402x2 + 1,4932x + 4,9833

0

3

6

9

12

15

18

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Cawang

Tengah

BOD5 Baku Mutu Trend BOD5

y = -0,1023x2 + 0,8947x + 5,6167

0

3

6

9

12

15

18

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Sungai Cawang

Kiri

BOD5 Baku Mutu Trend BOD5

y = -0,4464x2 + 3,0679x + 1,7

0

3

6

9

12

15

18

BO

D5

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi BOD5 di Danau Deduruk

BOD5 Baku Mutu Trend BOD5

Page 105: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 107

Concentration variation DO

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0394x2 - 0,3212x + 4,44

0

2

4

6

8

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Cawang

Tengah

DO Baku Mutu Trend DO

y = 0,0439x2 - 0,3652x + 4,5867

0

2

4

6

8

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Cawang Kiri

DO Baku Mutu Trend DO

y = 0,0477x2 - 0,3911x + 4,7233

0

2

4

6

8

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Asahan

DO Baku Mutu Trend DO

y = 0,0435x2 - 0,2613x + 4,7554

0

2

4

6

8

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Sungai Endikat

DO Baku Mutu Trend DO

y = -0,0143x2 + 0,32x + 3,58

0

2

4

6

8

DO

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi DO di Danau Deduruk

DO Baku Mutu Trend DO

Page 106: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 108

Concentration variation Nitrate

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = -0,0023x2 + 0,0069x + 0,1892

0

0,2

0,4

0,6

0,8

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Cawang

Tengah

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = -0,006x2 + 0,0508x + 0,0916

0

0,2

0,4

0,6

0,8

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Cawang

Kiri

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = 0,0002x2 - 0,0079x + 0,128

0

0,2

0,4

0,6

0,8

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Asahan

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = 0,0007x2 - 0,0097x + 0,1052

0

0,2

0,4

0,6

0,8

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Sungai Endikat

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

y = 0,0018x2 - 0,011x + 0,0735

0

0,2

0,4

0,6

0,8

Nit

rat

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Nitrat di Danau Deduruk

Nitrat Trend Nitrat Baku Mutu = 10 mg/L

Page 107: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 109

Concentration variation Phosphate

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Perio

y = 0,0004x2 - 0,0005x + 0,0348

0

0,05

0,1

0,15

0,2

0,25

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Cawang

Tengah

Fosfat Baku Mutu Trend Fosfat

y = 0,0001x2 + 0,0008x + 0,0469

0

0,05

0,1

0,15

0,2

0,25

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Cawang

Kiri

Fosfat Baku Mutu Trend Fosfat

y = 0,0001x2 + 0,0006x + 0,0303

0

0,05

0,1

0,15

0,2

0,25

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Asahan

Fosfat Baku Mutu Trend Fosfat

y = -0,0034x2 + 0,0321x + 0,0046

0

0,05

0,1

0,15

0,2

0,25

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Sungai Endikat

Fosfat Baku Mutu Trend Fosfat

y = -0,0018x2 + 0,0093x + 0,041

0

0,05

0,1

0,15

0,2

0,25

Fo

sfa

t(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi Fosfat di Danau Deduruk

Fosfat Baku Mutu Trend Fosfat

Page 108: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 110

Concentration variation Oil & Fat

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

Based on the monitoring carried out on river water quality within 5 locations, it is known that the organic

matter content in river water (shown in BOD5 and COD values) in the first and second semester of 2019

exceeds the limit. The high organic matter is suspected because river water has been polluted by dead

plants, coliform bacteria originating from the feces of wild animals and carcasses of decaying wild animals

and carried by river currents from upstream to downstream areas of the river. While no complex

chemicals were found within the water bodies surrounding the project, parameters such as: pH, BOD,

COD and DO suffered a bit of a decline. This is most probably due to the accumulation of both natural

occurences such as high movement of particles due to high rainfall rate as well as impact from

construction activity. During the second half of 2019, SERD performed maintenance to the road and slope

along its side at the project area to prevent erosion, landslide and mudflow that can cause some

disturbance in turbidity. SERD has since closed out all cases involving slope failures. High rainfall rate in

SERD area is a very recurring issue. Thus, SERD aims to improve on stabilizing and preventing landslides

and issues as such.

y = -6E-17x2 + 9E-16x + 0,19

0

0,2

0,4

0,6

0,8

1

1,2

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Cawang Tengah

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = -6E-17x2 + 9E-16x + 0,19

0

0,2

0,4

0,6

0,8

1

1,2

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Cawang Kiri

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = -6E-17x2 + 9E-16x + 0,19

0

0,2

0,4

0,6

0,8

1

1,2

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Asahan

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = 3E-17x2 + 4E-16x + 0,19

0

0,2

0,4

0,6

0,8

1

1,2

Min

ya

k d

an

le

ma

k (

µg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Sungai Endikat

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

y = -6E-17x2 + 4E-16x + 0,19

0

0,2

0,4

0,6

0,8

1

1,2

Min

ya

k d

an

le

ma

k (

mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi Minyak dan lemak di

Danau Deduruk

Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak

Page 109: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 111

Produced Water

Concentration variation Dissolved Sulphate (H2S)

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = -4E-19x2 + 5E-18x + 0,0019

0

0,001

0,002

0,003

H2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-E

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

y = 3E-18x + 0,0019

0

0,001

0,002

0,003

H2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-C

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

y = 3E-18x + 0,0019

0

0,001

0,002

0,003

H2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-B

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

y = 3E-18x + 0,0019

0

0,001

0,002

0,003H

2S

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi sulfida terlarut (H2S) di

Water Pond Well Pad RD-I

Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L

Page 110: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 112

Concentration variation Dissolved Ammonia

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 0,0074x2 - 0,0553x + 0,1619

0

0,1

0,2

0,3

0,4

0,5

NH

3-N

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-C

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

y = -0,0011x2 - 0,0049x + 0,1628

0

0,1

0,2

0,3

0,4

0,5

NH

3-N

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-E

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

y = 0,0128x2 - 0,1336x + 0,4298

0

0,1

0,2

0,3

0,4

0,5

NH

3-N

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-B

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

y = -0,0002x2 + 0,0565x + 0,1426

0

0,5

1

1,5

2

2,5

NH

3-N

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi amoniak total (NH3-N) di

Water Pond Well Pad RD-I

Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L

Page 111: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 113

Concentration variation Mercury

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = -1E-19x2 + 2E-18x + 0,0005

0

0,002

0,004

0,006

Hg

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-E

Air Raksa (Hg) Baku Mutu Trend Hg

y = 1E-19x2 + 9E-19x + 0,0005

0

0,002

0,004

0,006

Hg

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-B

Air Raksa (Hg) Baku Mutu Trend Hg

y = 1E-19x2 + 9E-19x + 0,0005

0

0,002

0,004

0,006

Hg

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-C

Air Raksa (Hg) Baku Mutu Trend Hg

y = 1E-19x2 + 9E-19x + 0,0005

0

0,002

0,004

0,006

Hg

(m

g/

L)

Periode pemantauan

Kecenderungan konsentrasi air raksa (Hg) di Water Pond

Well Pad RD-I

Air Raksa (Hg) Baku Mutu Trend Hg

Page 112: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 114

Concentration variation Arsenic

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

y = 9E-19x2 + 7E-18x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

As

(mg

/L)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-C

Arsen (As) Trend As BM = 0,5 mg/L

y = 9E-19x2 + 7E-18x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

As

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-B

Arsen (As) Trend As BM = 0,5 mg/L

y = 7E-18x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

As

(mg

/L

)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-E

Arsen (As) Trend As BM = 0,5 mg/L

y = 9E-19x2 + 7E-18x + 0,0049

0

0,002

0,004

0,006

0,008

0,01

As

(mg

/L)

Periode pemantauan

Kecenderungan konsentrasi arsen (As) di Water Pond

Well Pad RD-I

Arsen (As) Trend As BM = 0,5 mg/L

Page 113: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 115

Concentration variation pH

Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period

Based on monitoring conducted on produced water in the water pond and Wellpad RD-B mud pond, RD-

C, RD-E, and RD-I in the second semester of 2019, it is known that most parameters of produced water

quality parameters meet the quality standards so it is not in a critical condition. Drilling program during

the period occured but do not have a significant impact on produced water quality.

y = -0,028x2 + 0,2192x + 7,2833

0

3

6

9

12

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-E

pH Baku Mutu Baku Mutu Trend pH

y = -0,0315x2 - 0,1315x + 9,8339

0

3

6

9

12

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-B

pH Baku Mutu Baku Mutu Trend pH

y = 0,0982x2 - 1,1708x + 10,677

0

3

6

9

12

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-C

pH Baku Mutu Baku Mutu Trend pH

y = -0,125x2 + 0,8512x + 7,0821

0

3

6

9

12

pH

Periode pemantauan

Kecenderungan nilai pH di Water Pond Well Pad RD-I

pH Baku Mutu Baku Mutu Trend pH

Page 114: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract

Environment & Social Monitoring Report-2H19 Rev 1 Page 116

ATTACHMENT 8 – SUMMARY OF HAZARDOUS WASTE TEMPORARY STORAGE INSPECTION