![Page 1: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/1.jpg)
Environmental and Social Monitoring Report
Project Number: 50330-001 January 2020
INO: Rantau Dedap Geothermal Power Project
(Phase 2)
Semi-Annual Report (July to December 2019)
Prepared by PT Supreme Energy Rantau Dedap (PT SERD) for Asian Development Bank
This environmental and social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
![Page 2: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/2.jpg)
Rantau Dedap
Geothermal Power Project
Environment & Social Monitoring Report
RD
Issued on 30 January 2020
RD-RSH-RPT-IEE Rev 1
July - December 2019
![Page 3: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/3.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 2
PT Supreme Energy Rantau Dedap
Menara Sentraya, 23rd
Floor, Jl. Iskandarsyah Raya No. 1A
Kebayoran Baru, Jakarta 12160, Indonesia
P +62-21-2788 2222
F +62-21-2788 2333
www.supreme-energy.com
COPYRIGHT:
The concepts and information contained in this document are the property of PT Supreme Energy Rantau Dedap.
Use or copying of this document in whole or in part without the written permission of PT Supreme Energy Rantau Dedap
constitutes an infringement of copyright.
The Supreme Energy project companies - SE Muara Laboh, SE Rajabasa and SE Rantau Dedap are independent
companies developing geothermal projects in Sumatra, Indonesia. Based on the agreement of the shareholders of the
individual project companies, the Supreme Energy companies are managed in an integrated way in order to maximize
the synergies in terms of use of resources and organization of their core and supporting processes. Consequently,
important portions of the documentation body developed and applied within each company (manuals, procedures,
description of processes, guidelines etc.) are common to all project companies. The applicability of each document to
one or several project companies is reflected in the reference of each document.
Any document applicable to SE Muara Laboh contains the characters “ML” in the document reference.
Any document applicable to the SE Rajabasa project company contains the characters “RB” in the document reference.
Any document applicable to the SE Rantau Dedap project company contains the characters “RD” in the document reference.
If a document applies to all three Supreme Energy companies, the term “Supreme Energy” may refer to any and all of these companies.
![Page 4: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/4.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 3
Table of Contents
1. Project Information 6
1.1 Project Participants 6
1.2 Project Location 6
1.3 8
1.4
Project Summary
Contacts 9
2. Relevant Environmental Permits or Compliance Certificates 13
2.1 New Permit or Compliance Certificates Required and Obtained 13
2.2 Key Developments and Major Changes in Location and Design 13
2.3 Findings of Environmental and OHS Regulatory Inspections or Audits 15
2.4 Monitoring Table Permit / Consultation 16
3. Incidents of Environmental Safeguards Violations or Non-compliance 17
3.1 Summary of Incidents 17
2.3 Summary Table of Incidents 17
4. Incidents of Environmental, OHS Accidents 18
4.1 Environmental Incidents 18
4.2 Occupational / Community Health Incidents 18
4.3 Safety Incidents 18
4.4 Summary Table of Incidents 18
5. Social Safeguards Monitoring 23
5.1 Social Safeguards Monitoring General Overview 23
5.2 Status of Corrective Actions 24
5.3 Summary of Activities Carried Out, Issues and Challenges 25
5.4 Summary of Stakeholder Engagement Plan 26
5.5 Livelihood and Skill Development Opportunities to Affected Persons
through the ISDP of SERD 27
5.6 Forward Plan / Next steps (for the next 6 months) 27
5.7 Labour Hiring and Management 27
6. Environmental Capacity 29
6.1 Staff Capacities in Environmental Management 29
6.2 Degree of Awareness 29
6.3 Training Conducted 29
6.4 Needs Assessment of Environmental Management Capacity 44
6.5 Awareness Level of Contractors’ Field Personnel 45
7. Social Management Capacity 46
7.1 SERD’s Relations Team 46
7.2 Number and Adequacy of Staff to Monitor Labour and Working Conditions 46
![Page 5: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/5.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 4
7.3 Training Conducted 46
7.4 Designation and Signature of person responsible 46
8. Issues, Status of Implementation of Mitigating Measures in the EMP 47
8.1 Pollution (Air Quality) Monitoring 47
8.2 Water Quality Monitoring 51
8.3 Wastes 53
8.4 Erosions 54
8.5 Water Flow 55
8.6 Aquatic Biota 56
8.7 Flora and Fauna 58
9. Permit Compliance 64
9.1 Compliance with AMDAL Document 64
9.2 Compliance with Environmental Permit 64
10. Biodiversity 65
10.1 Biodiversity Action Plan Details 65
10.2 Biodiversity (Endangered Species) 73
10.3 Biodiversity Offset Strategy 81
11. Information Disclosure 84
List of Attachments
Attachment 1 : Environmental Activities
Attachment 2 : Safety Health Activities
Attachment 3 : Social Activities
Attachment 4 : Form 4 Facilities Agreement
Attachment 5 : Environmental and Biodiversity Monitoring Maps
Attachment 6 : Grievance Log
Attachment 7 : Environmental Monitoring Trends
Attachment 8 : Summary of Hazardous Waste Temporary Storage Inspection
![Page 6: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/6.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 5
Abbreviations
ADB Asia Development Bank
AMDAL Analisa Mengenai Dampak Lingkungan (Environmental Impact Analysis)
EPC Engineering, Procurement, and Construction
ERM Environmental Resources Management
ESAP Environmental and Social Action Plan
FC Financial Close
FEED Front End Engineering Design
ISDP Integrated Social Development Program
JBIC Japan Bank for International Cooperation
LAPI ITB Lembaga Afiliasi Penelitian dan Industri Institut Teknologi Bandung
LIPI Lembaga Ilmu Pengetahuan Indonesia (National Science Body)
LRP Livelihood Restoration Program
NEXI Nippon Export and Investment Insurance
OHS Occupational Health and Safety
PLN Perusahaan Listrik Negara (National Power Company)
PP Pembangunan Perumahan`
PPA Power Purchase Agreement
PRA Plumpang Raya Anugerah
RD Rantau Dedap
Rekind Rekayasa Industri
RKL Rencana Pengelolaan Lingkungan (Environmental Management Plan)
RPL Rencana Pemantauan Lingkungan (Environmental Monitoring Plan)
SCAR Social Compliance Audit Report
SERD PT Supreme Energy Rantau Dedap
SEP Stakeholder Engagement Plan
SGS Steam Gathering System
SHE Safety Health Environment
![Page 7: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/7.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 6
1. Project Information
1.1 Project Participants
The Project Sponsors of PT Supreme Energy Rantau Dedap (SERD) are PT Supreme Energy, Engie
Energy Asia Co., Ltd, Marubeni Corporation, and Tohoku Electric Power Co. The Sponsors have
secured finance for the construction and operation of the Project from commercial banks, with
Mizuho Bank, Ltd. (Mizuho) as the mandated lead arranger (MLA), and the following international
finance organisations: Asian Development Bank (ADB), Japan Bank for International Cooperation
(JBIC) and Nippon Export and Investment Insurance (NEXI) (together the Lenders).
1.2 Project Location
SERD Geothermal Power Plant Project is located in a mountainous area approximately 290 km by
road direction south west of Palembang, the capital city of South Sumatra in Indonesia. The road
access to the site is generally in good condition as main public road is asphalted. The site can also be
reached by plane through a small airport at Pagar Alam and by train from Palembang to Lahat city.
A 20 km unsealed road, suitable for transportation and mobilization, exists as the last section of road
from village Kota Agung until the site entrance and geothermal project area.
The project site is located around 35 km south east of an active volcano and a risk assessment of an
eruption has been studied and hazards of ash fall identified.
The topography of the Rantau Dedap Geothermal field is best described as “rugged” – the bulk of it
being within a protected forest. Elevations of the steam production facilities range from 1,752 metres
above sea level at Wellpad RD-B, to 1,960 masl at the proposed power station site adjacent to
Wellpad RD-E, to 2,564 masl at the Wellpad RD-L as the highest project facility.
![Page 8: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/8.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 7
Picture 1 : Location of Rantau Dedap Geothermal Project in Sumatera
![Page 9: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/9.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 8
Picture 2 : Site Overview and Power Plant
1.3 Project Summary
Under the Decrees of the Minister of Energy and Mineral Resource (MEMR) issued in 2008, PT
Supreme Following the tender award of the Rantau Dedap concession (WKP – Wilayah Kuasa
Pertambangan) to the Supreme Energy Consortium in late 2010, a mining license (IUP or Ijin Usaha
Pertambangan) was issued to the project company PT Supreme Energy Rantau Dedap (SERD). On 16
November 2017 the Third Amendment of Power Purchase Agreement (PPA) between Perusahaan
Listrik Negara (PLN) and SERD was signed and the Ministry of Finance of the Republic Indonesia
issued the Government Guarantee Letter for the Rantau Dedap Geothermal Power Project on 04
April 2018.
On January 2013, civil construction works commenced to support drilling exploration activities and
finished the construction of access roads and wellpads in November 2014. A total of 4 wellpads RD-B,
RD-C, RD-E, RD-I and ± 42 km access roads from Kota Agung - Tunggul Bute - Rantau Dedap site.
The first exploration well RD-B1 was spudded-in on 3 February 2014 and exploration drilling
continued until early 2015. In total 6 wells were completed which are RD-B1, RD-B2, RD-C1, RD-C2,
RD-I1 and RD-I2, and followed by an extensive well testing program, which was completed in August
2015. Based on the drilling and well testing results, SERD’s subsurface team prepared the numerical model of the resource and issued the well field assumption.
GeothermEx, Inc. (GTX) as Lenders’ Resource Consultant has performed a due-diligence review on
the assumption of the Rantau Dedap geothermal resource and issued the Final Resource Assessment
![Page 10: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/10.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 9
report in October 2015 and an addendum in October 2017. The Feasibility Study was carried out by
AECOM as Owner Engineer by end of 2015, followed by the FEED in 2016. AECOM was also involved
in preparing the tender documents.
The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract was signed on 22 March 2018 and Notice to Proceed (NTP)
issued on 19 April 2018. Under the EPC Contract the Contractor is responsible for the procurement,
installation, testing and commissioning of the SGS system, the Power Plant and the Substation, as
well as interconnection to the PLN grid connection point, wellpads, access roads and accommodation
complex.
1.4 Contacts
Company: PT Supreme Energy Rantau Dedap
Menara Sentraya, 23rd
Floor
Jl. Iskandarsyah Raya no. 1A, Kebayoran Baru, Jakarta 12160
Ph: +62-21 2788 2222 Fax: +62-21 2788 2333
Attn: Nisriyanto
![Page 11: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/11.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 13
2. Relevant Environmental Permits or Compliance
Certificates
This Chapter discusses relevant environmental permits or compliance certificates as required by
SERD, including the latest permits or compliance certificates obtained until end of December 2019,
key developments and any major changes in location and design, and findings of any environmental
and OHS regular inspections audits.
2.1 New Permit or Compliance Certificates Required and Obtained
During July up to the end of December 2019, Hazardous Waste Storage facilty needed re-
certification. Re-certification process was conducted (23 January, 2020) and administration have
been approved by the Environment Agency of Muara Enim. Temporary permit was obtained on 28
January 2020 and the new permit is being processed.
No. Permit Issue Date Remarks
1. Hazardous Waste Temporary
Storage Permit
TBA All requirements including a site visit have been
completed.
Waiting the new permit issuance from Muara Enim.
See Attachment 8
2.2 Key Developments and Major Changes in Location and Design
No major changes to location and design were made.
The environmental activities done on site included:
Recruit Site SHE Manager and Deputy (expatriates)
Recruit Site Safety Inspector
Continue efforts for crop compensation of offset site (with local forestry and Muara Enim
regency government)
Monitor regularly the condition of offset location (patrol, drone)
Continue wildlife monitoring by camera trap
Control of Invasive species (maintain wheel wash condition, invasive species clearing)
Regular joint forest patrol with province forestry officers and regency forestry officers
Final document of AMDAL’s 6-monthly RKL/RPL has been completed and will be issued to
the relevant parties in January 2020.
Monitor H2S & Noise at various receptors
Maintain the existing SERD nursery at WP-C
Establish new nursery at access to WP-B.
Continue revegetation program
![Page 12: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/12.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 14
EPC Contractor
Maintain sediment traps
Conduct dust control / dust suppresion measures by way of water spraying truck.
Conduct noise monitoring
Installed SHE banners around project area
![Page 13: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/13.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 15
2.3 Findings of Environmental and OHS Regulatory Inspections or Audits
No regulatory inspection or audits were conducted specifically for Environmental/OHS purposes
during the second semester of 2019. If any environmental/OHS inspections related matters were
inspected, they were conducted in conjunction with inspections for the fatality incident and drilling
activities. No major findings were encountered. Red flag items from the previous MMD/ADB
inspections were being addressed.
MMD Inspection (3-5 September 2019)
Findings Follow Up/Documentation Status
Spills and Leaks were found at:
Fuel Tank Ware house
Removed spill potential by providing a proper
space for storage of oil drums; provided proper
spill kit.
Close
Generator Storage room at HazMat
Storage Area
Built a secondary containment bundwall to
prevent potential spill from spreading.
Close
Landslide Potential at sensitive areas
(ie. Shortcut area)
Performed maintenance and install additional
gabion walls around the project area, when
necessary.
Close
SBI Fuel Tank Leak Recovered the fuel oil, repaired the leak, installed
oil catchers and performed housekeeping Close
![Page 14: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/14.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 16
Scrap and used wood waste scattered
around GPP area.
Rekind performed general housekeeping at GPP
area.
Close
2.4 Monitoring Table Permit /Consultation
Monitoring Item Monitoring Results during Reporting Period
Hazardous Waste Temporary Storage Permit
Permit
Obtained /Not obtained
Not Obtained
(reason : un availability of the governm
Application Date: November 2019
Obtained Date: TBA
Valid until: Valid for years
Other environmental permits (if any permit obtained during the monitoring period) Name of permit:
Obtained Date: YYYY/MM/DD
Valid until: YYYY/MM/DD
*If obtained, please submit a copy of the permit together with this monitoring form.
![Page 15: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/15.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 17
3. Incidents of Environmental Safeguards Violations or
Non-compliance
This Chapter discusses relevant incidents of environmental safeguards violations based on applicable
environmental standards and regulations along with the correctives actions, deadlines, identification
of responsible parties, and status of implementation of corrective action plan.
3.1 Summary of Incidents
No incidents of environmental safeguards, violations or non-compliance, and corrective
actions required.
No incidents with security forces
3.2 Summary Table of Incidents
There had been no issues found related to incidents of environmental safeguards, violations or non-
compliance, and hence no corrective actions were required.
Date /
Time
Responsible
Agency
Nature of
Non-
compliance
Standards and
Regulations
Violated
Date &
Authorities
Recorded
Corrective
Actions
Status of
Corrective Action
Implementation
---- --- --- --- --- ---- ---
![Page 16: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/16.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 18
4. Incidents of Environmental, OHS Accidents
This Chapter discusses incident recorded dates and responsible agencies, the scale of damage and
injury, authorities in charge of investigation/ recording, media or community reactions and corrective
actions, deadlines, identification of responsible parties.
4.1 Environmental Incidents
There were No environmental incidents reported during the period.
4.2 Occupational / Community Health Incidents
See Summary Table of Incidents.
4.3 Safety Incidents
The safe working hours are:
Safe Working Hours Safe MH YTD
(to end of Dec 2019)
Safe MH since Last LTA
(since 20 August 2019)*
Employee and Temporary Workers 75,015 75,015
Contractors 3,347,628 3,347,628
For the period of July-December 2019, there were [7] property damage incident [12] near misses,
[0] HIPO (high potential) near miss, [2] first aid treatment, [2] security case and [1] fatalities/lost
time incidents.
4.4 Summary Table of Incidents
Activity YTD
(Jul-Dec) Description Corrective Action PIC Date of Target Status
Number of Occupational
Fatality Incident
(Company and
Contractor)
1 1) RD-IR-19-050 : a concrete
truck mixer driver passed
away due to thrown off out
of the cabin while the truck
toppled
1-EBTKE Final Report-Fatality TM-20
EPC & SERD 30 Oct 2019 Complete
Number of Occupational
Lost Time Incident
(Company and
Contractor)
0 -
Number of Medically
Treated Incident
(Company and
Contractor)
0 -
Number of First Aid
Treatment (Company
and Contractor)
2
1) RD-IR-19-042 : 07 July’19
Right hand finger
scratched/open wound hit by
hand grinding disc.
1) Prepare the work plan. For
this activity need prepare
the drawing, traffic
management, worker and
equipment list and JSA.
2) Conduct the power tools
inspection and tagging
SERD 08 Jul 2019 Complete
![Page 17: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/17.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 19
Activity YTD
(Jul-Dec) Description Corrective Action PIC Date of Target Status
3) IP routine check to medic
in one weeks
2) RD-IR-19-045 : 08 July’19
Right Eye hit by grinding
sparks
1) Prepare Job safety Analysis
and state face shield are
Mandatory PPE for Grindin
g works
2) Conduct the power tools in
spection and taging
3) IP routine check to medic
in one weeks
Dani SP 09 Jul 2019 Complete
Number of High
Potential Serious
Incidents or High
Potential Near
Misses/Near Hits
(Company and
Contractor)
0
Number of Near Misses
/ Near Hits (Company
and Contractor)
12 1) RD-IR-19-041 : 02 Jul’19
Dump Truck slipped at ch.
0+800 due to loss power and
failed to climb up.
Complete
2) RD-IR-19-044 : 07 Jul’19 a
fuel truck was slipped near
office E due to muddy road
1) To conduct road repair and
maintenance road for the
slippery/muddy road and
damaged road
Atok 08 Jul 2019 Complete
3) RD-IR-19-046 : 24 Jul’19
Bed of trailer detached from
its prime mover
1) Conduct assessment for
the evacuation of The
Trailer
2) Change flexible bed hoist
connection with fixed hoist
type
Atok 25 Jul 19 Complete
4) RD-IR-19-048 : 06 Aug’19 LV get in the trenches at
Access road ( Air Tupai)
1) All driver of Volvo
Maintenance shall be
conducted DDC Training
before entering site project
2) The driver minimal has 30
minutes for rest while
driving more than 4 hours.
Dobiet K 07 Aug’19 Complete
5) RD-IR-19-049 : 19 Aug’19
TMC breaking system failure
at Shortcut road - No injury
person
1) Conduct random check to
all vehicles especially is
checked breaking system
2) The driver shall be
conducted daily checklist
before activity
Dobiet 20 Aug 19 Complete
6) RD-IR-19-054 : 22 Sep’19
Nearmiss trailer and prime
mover (license plate BM
8759 DM) was observed in
breakdown status access to
M.
1) Conduct detail inspection/
replace suspension system
periodically as per PM
guideline/ Hazard Hunt
IEM/PSL 24 Sep 19 Complete
![Page 18: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/18.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 20
Activity YTD
(Jul-Dec) Description Corrective Action PIC Date of Target Status
7) RD-IR-19-056 : 11 Oct’19
One mini bus crew Rekind in
breakdown, at access road
climb near pump station-3,
driver not avaialble, no
support
1) Remove the inspection
pass
2) Repair the broken axle
3) Conduct re-inspection to
the minibus
Dobiet 12 Oct 2019 Complete
8) RD-IR-19-057 : 11 Oct’19
Near Miss: One unit Light
vehicle Rekind, dangerous
driving behaviour at access
road climb near PS-3
1) Give the warning to the
driver (verbal warning –
recorded)
2) Give the briefing to the
driver
Dobiet 12 Oct 2019 Complete
9) RD-IR-19-058 : 14 Oct’19
Master valve from RD-I3 well
has been opened status in
LOTO taging is close.
1) Refresh LOTO Training
2) Periodic inspection for
LOTO were installed
Rifky A 16 Oct 19 Complete
10) RD-IR-19-060 : 19 Nov’19
Grounding cable broken due
to lightning strike
1) Instructed to EPC contracto
r to installed proper lighten
ing protection ASAP
2) Monitoring progress
installation until finish
EPC 26 Nov’19 Complete
11) RD-IR-19-064 : 20 Nov’19
1 unit LV was moving from
Kota Agung to site for
commuting purpose. When
passing the road at CH
9+000, the road was climb up
and the road condition was
damage with in the middle of
the road
1) Repair the road
EPC Complete
12) RD-IR-19-74 : 30 Dec’19
Light vehicle (left side) of PT.
Stanley pick up stuck on
drainage
1) Repair the road and
drainage
EPC Complete
Number of Incident /
Accident (Company and
Contractor)
16 1) Property Damage: RD-IR-19-
43: 7 Jul’19 a car from
subcontractor hit the other
car while reverse parked at
the GPP office parking area.
1) Refresh Training for the
involved driver
2) Give a warning letter.
EPC 09 Jul’19 Complete
2) Property Damage : RD-IR-19-
47 : 30 Jul’19 LV BG 1744
EH Hit the Warehouse Gate
1) Give warning the Driver (M
r. Nopi Relo (DKB 18158)
2) Suspend the driver
3) Coach the driver
4) Prepare lesson learn for ot
her driver
5) Add striking paint for ware
house gate for illumination
Hazairiadi 5 Aug’19 Complete
3) Property Damage : RD-IR-19-
53 : 12 Sep’19 Light
Vehicle PT. Baker Hughes BG
1909 ON, thrown by
unknown person outside the
security Pos-1
1) Move the accommodation
near security post 1 area.
2) Reduce night travel and
activity where possible.
3) Escalate the report to
Security coordinator
BHI 15 Sep 2019 Complete
4) Theft: RD-IR-19-55: 01
Oct’19 2 (two) batteries
1) Install additional light at
open yard
SERD 02 Oct 2019 Complete
![Page 19: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/19.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 21
Activity YTD
(Jul-Dec) Description Corrective Action PIC Date of Target Status
TMC (crane truck) be stolen
at the open yard.
2) Reinforce the security
patrol
5) Property Damage : RD-IR-19-
59 : 08 Nov’19 Damage
Minor Road traffic accident
involving local dump truck at
CH 3500
1) Review / improve current
training package and
enforce monthly refresher
training to local operators.
2) Socialize all local drivers on
accident.
3) Post / communicate
lessons learned to all
project
SERD 15 Nov 2019 Complete
6) Property Damage : RD-IR-19-
61 : 09 Nov’19 Lightning
strike on network server
causing internet connect
down
1) Coordination with local pro
vider (TELKOMSEL)
2) Call technician for fixed the
problem
SERD 14 Nov’19 Complete
7) Security : RD-IR-19-62 : 11
Nov’19 The Driver light
Truck compel the SERD HSE
to allow light truck passing
from Block 0 check point
1) Solve the issue to the local
vendor and Light Truck driv
er
2) Renewal the simper and va
lidation inspection for the li
ght truck
3) Continue to monitoring all
the vehicle and equipment
passing from block 0 check
point
SERD 31 Dec ‘19 Complete
8) Property Damage : RD-IR-19-
063 : 18 Nov’19 During
log up at 1730 m, suddenly
drum free wheel to 2387.41,
and then cable cut and lost in
hole
1) Modified shaft on machine
shop
2) Design three lock thread
on drum shaft
3) NDT inspection by
Supreme inspector
SDI 25 Nov’19 Complete
9) Property damage : RD-IR-19-
73 : 30 Dec’19 Telkom-
Gratelindo Radio Receiver
Device at Warehouse Hit by
Lightning Strike During Heavy
Rain
1) Install new grounding and
replace the broken cable
SERD 03 Jan’20 Complete
10) External Relation : RD-IR-
19-065 : 28 Nov’19 Road
blockage by three resident
from Yayasan village
Remove the blockage SERD 28 Nov’19 Complete
11) External Relation: RD-IR-19-
066 5 (five) resident came
up use of three motorcycles
to GPP area.
Improve Security SERD 31 Dec’19 Complete
12) External relation : RD-IR-19-
067 : 05 Dec’19 Road
blockage at ch. 8+000 and
ch. 3+500
Remove the blocake SERD 5 Dec’19 Complete
13) External Relation : RD-IR-19-
068 : 10 Dec’19 Road
block at near Gate-one by ex-
land owner
Mention the land status SERD 10 Dec’19 Complete
14) External Relation : RD-IR-19-
069 : 11 Dec’19 Road
block at near Gate-one and
near Talang Pisang Village
Remove the blocake SERD 11 Dec’19 Complete
![Page 20: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/20.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 22
Activity YTD
(Jul-Dec) Description Corrective Action PIC Date of Target Status
15) External Relation : RD-IR-19-
071 : 13 Dec’19 Road
blockage at near
accomodation Camp by
person who failed on
security selection
Remove the blocake SERD 13 Dec’19 Complete
16) External Relation : RD-IR-19-
071 : 17 Dec’19 Road
Blockage by the drivers and
job seekers
Remove the blocake SERD 17 Dec’19 Complete
![Page 21: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/21.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 23
5. Social Safeguards Monitoring
This Chapter discusses progress in implementation of the social safeguard compliance audit report
and corrective action plan, implementation of grievance mechanisms, resources for implementation
of social safeguards, forward plan of social safeguards, labour hiring and management.
5.1 Social Safeguards Monitoring General Overview
Based on the Livelihood Improvement Program, the Consultant starts to monitor the quality of the
coffee bean. The improvement of coffee training and distribution of bean size grader makes the
production became better. SERD plan to deliver the refractometer on Q1 2020, waiting the proposal
from the farmer group. During the coffee harvest season, the farmers contiunues delivers the
green bean to the off-taker and roasted in Rumah Kopi Ranin in Bogor up to 400 kgs.
Starting Q3 2019, the social consultant conduct revalidation of the PAP for developing the LIP
for 2nd
year. The revalidation results shows good improvement and Capacity Building training will
be conducted in Q1 2020 for 43 PAP.
SERD social team continued monitoring the operation of the Community Committee that had been
established in 2019. Coordination meeting with District Forum that consisted of Head of Sub
district, Head of Sub district’s Police and Head of Sub district Military, and representatives from the Contractors. In November 2019, SERD Conduct Stakeholder Meeting to develop CSR Program for
2020.
Several CSR programs have been conducted in 2H2019, such as:
• Support the education tools to Kindergarten and Elementary School in Yayasan Area.
• Continue to support the development of new classroom at Islamic School in Yayasan Hamlet.
• Repairing the ditch at Batu Surau.
• Delivering the water supply fire truck for Muara Enim Regency
• Support the inauguration ceremony of Kindergarten School at Rantau Dedap
• Support the community for celebrating Indonesia independence Day
• Support the community for celebrating Sacrifice Festival
• Support the Muara Enim Sector Police for soccer competition.
• Conduct blood donor to commemorate the 74th Energy and Mining Day,
• Supporting the ceremony of the 74th Energy and Mining Day,
• Providing water pumping machines for watering dust for villager,
• Continue to support the development of new classroom at Islamic School in Yayasan Hamlet.
• Continued delivering the safety net program to the elder Vulnerable Affected People (every 3
months)
• Supporting Padang Panjang Hamlet Program
• Assesment of proposed CSR Program 2020 as a result from Stakeholder Meeting 2019
• Community relations to surrounding project stakeholders,
• Support LIP Program in Coffee Plantation Improvement, this semester they try new varieties
Arabica Luwak and Robusta Luwak.
![Page 22: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/22.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 24
Grievance Management
In total, From July to December 2019, SERD received 31 grievances. Most of the grievances
regarding job opportunities and the property damage due to the mobilization and water run-
off during rainy season. While all property damage has been resolved, the demand of job
opportunities still high. The details was shown in Attachment 6.
PLN Transmission Line
The status of PLN transmission line within protection forest area is:
Continued survey the landusers for 38 tranmission line tower.
PLN already received the Forest Lend-Use Permit (IPPKH) from Ministry of Environment and
Forestry in September 2019
5.2 Status of Corrective Actions
Summary of corrective action status is as follows:
Corrective Actions Completion status % Comment
Ensure all relevant permits are renewed.
SERD should provide update on the
following permits:
● Borrow and use permit of forest area (IPPKH) for PLN transmission lines
100% The PLN-led land acquisition process is 52%
complete as of December 2019. The
proposals of IPPKH alredy in MoFE and
already obtained on September 2019
Most revisions have been accommodated
within the revised SEP, however the
following are still required to be addressed:
● Grievance log does not capture contact details, however, these details are recorded
in the grievance form.
● In addition, some of the stakeholder engagement activities in April 2019 were
meant to address previous grievances. SERD
are advised to also include the results of the
engagement to grievance log to tally both
documents and record outcomes for such
engagements.
100% Outstanding grievance log has been
updated. Some of the pending grievances
was resolved. The outstanding grievance log
ststus has been submit to LESC.
![Page 23: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/23.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 25
5.3 Summary of Activities Carried Out, Issues and Challenges
During the period of Semester 2 of 2019, Relations Team continously participate activities as follows:
Land Acquisition/Change in land ownership and land tenure
1. Do changes in land ownership and land tenure (if any) for the project purpose cause conflict in communities? If yes, please describe the details and the measures.
Yes No No
2. Please describe on the land acquisition process during the monitoring period (if any). (e.g. land certification process) Latest land acquisition activity was to obtain the land for project accommodation block which has been settled before end of 2017
Livelihood Restoration 1. Please describe integrated Social Development Program, including CSR activities, which are conducted during the monitoring period. ISDP program is being focused to the Livelihood Improvement Program (LIP) for DPAP. Based on the Livelihood Improvement Program, the Consultant starts to monitor the quality of the coffee bean. The improvement of coffee training and distribution of bean size grader makes the production became better. SERD plan to deliver the refractometer on Q1 2020, waiting the proposal from the farmer group. During the coffee harvest season, the farmers contiunues delivers the green bean to the off-taker and roasted in Rumah Kopi Ranin in Bogor up to 400 kgs.
Starting Q3 2019, the social consultant conduct revalidation of the PAP for developing the LIP for 2nd year. The revalidation results shows good improvement and Capacity Building training will be conducted in Q1 2020 for 43 PAP.
SERD social team continued monitoring the operation of the Community Committee that had been established in 2018. Several CSR programs have been conducted in 1H2019, such as:
Support the education tools to Kindergarten and Elementary School in Yayasan Area. Continue to support the development of new classroom at Islamic School in Yayasan Hamlet. Repairing the ditch at Batu Surau. Delivering the water supply fire truck for Muara Enim Regency
Support the inauguration ceremony of Kindergarten School at Rantau Dedap
Support the community for celebrating Indonesia independence Day
Support the community for celebrating Sacrifice Festival Support the Muara Enim Sector Police for soccer competition. Conduct blood donor to commemorate the 74th Energy and Mining Day, Supporting the ceremony of the 74th Energy and Mining Day, Providing water pumping machines for watering dust for villager, Continue to support the development of new classroom at Islamic School in Yayasan Hamlet. Continued delivering the safety net program to the elder Vulnerable Affected People (every 3
months) Supporting Padang Panjang Hamlet Program Assesment of proposed CSR Program 2020 as a result from Stakeholder Meeting 2019 Community relations to surrounding project stakeholders, Support LIP Program in Coffee Plantation Improvement, this semester they try new varieties Arabica
Luwak and Robusta Luwak.
2. Please provide with the monitoring of Livelihood Improvement Programs for Affected Households. Especially, please describe in case any household whose livelihood has been worse than pre-project level. Discuss impacts on the vulnerable households, in a separate section. This activity will be conducted after LIP program implementation by 2H2020
Grievances
1. Please provide us with the grievance log, if any receiving/on-going/closing grievances during the monitoring period, which includes the contents, receiving date, closing date, current situation, etc. of the grievance. Please refer to grievances log (Attachment 5)
Employment Opportunities
1. Please describe number and proportion of local workforce employed for the project. Please include the numbers of affected persons who have been engaged in the workforce. Total local workforce employed for the project is around 645 persons (136 males ; 26 Females)
Community Income 1. Please describe if any changes can be quantitatively observed in the community income due to the project. (e.g. increasing income by working as local labor, doing small business, etc.)
![Page 24: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/24.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 26
Not only the quality and the price is being improved, but the farmers now try a new variety of coffee luwak type
Community Perception
1. Are there any negative perceptions towards the Project activities? If yes, please describe the details and mitigation measures.
Yes No No. But the dmands of employment become higher.
Community Health
1. Are there any negative impacts on community health caused by the project? (eg increasing of infectious disease, problems at sanitation facilities, etc.) If yes, please describe the details and mitigation measures.
Yes No No
5.4 Summary of Stakeholder Engagement Plan
There were many stakeholder engagement activities have been carried out by SERD during the
reporting period in line with the project’s commitments in the stakeholder engagement plan. SERD always noting every stakeholder engagement activities in the stakeholder engagement log book.
Some of stakeholder engagement activities are summarized in the following table:
Date of
Consultation Location Theme
Participants
(Number of
Participants)
Information
Disseminated Key Issues Raised
SERD Response and
Action Taken
9 July 2019 SERD office
Talang Tiga
Transparent in
recruitment
Member of
Committee
2019
SERD relation
Together with the
Committee, the
candidates for the
local workforce.
Local workforce SERD will monitor
committee
29 August
2019
Padang
Panjang
Handover partcipation of
program by SERD, Rekind
and CIP
Muara Enim
Police Head
SERD Relation
The project
situation updated
Maintain the
conducive situation
Close coordination
with police
18-Sep-19 SERD Office Blood Donation Red Cross
(PMI),
contractors and
community
SERD relation
Celebrating the
anniversary of
ESDM Ministry
(MEMR) with Blood
Donation Event, the
event was attended
by PMI Muara Enim
Regency
Appreciation from the
Red Cross (PMI)
Continue support the
Red Cross and MEMR
Program
7 October 2019 Grand Zuri Coordination Meeting
with Forestry and Police
Forest Police &
Police of
Muara Enim
SERD relation
Coordination
Meeting with Lahat
police and Karhutla
(Forestry) discuss
about secure of
SERD and forest fire
around SERD
The patrol of Forestry
Police will be more
intensive with SERD
support
SERD support the
program
01-Nov-19 Yayasan CSR Program Progress
Update
Zainudin
(Village Com
Dev Officer)
SERD Relations
Supervise Yayasan
Al Jami'ah school as
CSR program.
Progress has reached
60%
SERD support the
program
17-Dec-19 KPH Office Biodiversity Meeting with
Tripika and KPH at KPH
office
KPH,
Sub District
authority
SERD relation
Discussion regarding
DAS Musi
restoration plan
The program was
reviewed by KPH and
SERD ask for support
SERD will monitor the
progress
![Page 25: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/25.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 27
5.5 Livelihood and Skill Development Opportunities to Affected Persons
through the ISDP of SERD
Activities releted to the Implementation of ISDP components to affected persons during July -
December 2019 were:
No Activity Target beneficiaries Status Remarks
1 Economic empowerment
Livelihood Improvement Program assessment &
monitoring
Coffee farmers of Direct Project
Affected People
Continued ISDP livelihood
improvement program
continues
2 Education and Helth
Blood Donor in commemoration of Mines and
Energy Day
In collaboration with Local Red Cross Completed
3 Infrastructure improvements
Road Repair in Kota Agung Sub District
Local Communities affected by the
project
Continues Support in kind
4 Donations and community relationship
Deliveriy water fire truck to Regency of Muara Enim To support fire protection in
Semendo Sub District Area near
SERD Project
Completed Support in kind
5 Support for implementation of social development program
ISDP consultant for report and documentation Project Affected Household Continued Livelihood
Improvement Program
(LIP) continues
conducted
Continues deliver the safety net program to the
elder Vulnerable Affected People (every 3 month)
Vulnerable Direct Project Affected
People
Continue To be continued in
every three (3) months
5.6 Forward Plan / Next Steps (for the next 6 months)
SERD has set a forward plan for the next 6 (six) months that consists of the following programs, i. e:
Together with SERD’s social consultant will continue the implementation of Livelihood Improvement Program including the advance training for build the capacity of the Project
Affected People.
Continue to implement the CSR programs to support affected community
Continue to conduct public disclosure and consultation with all key stakeholders.
Continue to maintain and improve good relationships with all key stakeholders, and improving
the grievance mechanism process and resolution.
Have a coordination meeting with PLN to discuss the progress of PLN led land acquisition for
transmission line.
5.7 Labour Hiring and Management
Project procedures for hiring :
SERD, contractors and the Committee discussed the local labour recruitment and local
business opportunity.
![Page 26: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/26.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 28
All contractors should follow and obey SERD’s Hiring and Selection Procedures. Grievance mechanism & procedures is always monitored and open to everybody for
filing complaint during this process.
Requirements on workers recruitment with information on origin of migrant or local
workers, position/work occupied, and with sex disaggregation (the Borrower and the
contractors).
Refer to Section 5.3 Employment Opportunities. Regular update is through Project
Monthly Report.
Tracking of recruitment of women personnel (the Borrower and the contractors)
Please refer to Section 5.3 Employment Opportunities. Regular update is through
Project Monthly Report.
Compliance to core labor standards and compliance with national laws, based on
workplace inspection, observation and audit.
Procedure and the recruitment process was witnessed by local government officials
and SERD’s Human Resources Department for the sake of fairness and compliance to
national regulations.
Nature of labour dispute or grievance, including conflicts between groups
No labour grievance was found, potential dispute is only miscommunication between
labours or groups.
Legal requirements, permit conditions and renewal requirements related to labor
management
(N/A)
Media, civil society /NGOs, or community reactions (if any)
Those stakeholders are still manageable.
Corrective actions, deadlines, identification of responsible parties
Please refer to table in Section 5.2 above.
Labour relations and living conditions for construction labour force
The EPC (Rekind) Labour Camp is still under construction
![Page 27: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/27.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 29
6. Environmental Capacity
This Chapter discusses staff capacities in environmental management, degree of awareness, training
conducted, needs assessment of environmental management capacity and awareness level of
contractors’ staff trained.
This Chapter discusses staff capacities in social management, degree of awareness, training
conducted, needs assessment of social management capacity and awareness level of contractors’ staff trained.
6.1 Staff Capacities in Environmental Management
During this period PT SERD currently employs 6 personels at site. An additional Site Safety Manager
and Inspector was added at site to support the team at site as to improve and cover a range of
activities.
No. SERD Site SHE
Name Title Years of Experience
1. Hazariadi SHE Coordinator 10+ years
2. Marc Blondeel Site SHE Manager 20+ years
3. Rifqi Alfaizi Safety Officer 10+ years
4. Dian Amali Safety Officer 10+ years
5. Sepriandi Maulana Environmental Engineer 1 Year
6. Ariyanto SHE Inspector 7 years
7. Miguelito Abrasaldo Deputy SHE Manager 10+ Years
8. Sunaryo Trainer & Safety Inspector 10+ Years
9. Ahmad Zikrillah Trainer & Safety Inspector 10+ Years
10. Dedy Setiawan Safety Officer 10+ Years
11 Azhari Safety Administration 4 Years
SERD Corporate SHE
Name Title Years of Experience
1. M. Arief Tarunaprawira Senior Manager SHE 25+ years
2. Andreas Hartono Head of Environment 20+ years
3. Bima Yudhistiranto Environment Engineer 6 years
4. Akhmad Wahyudi Safety Engineer 10+ years
6.2 Degree of Awareness
The current personnel responsible for SHE management have sufficient knowledge of environmental
management, health and safety requirements, including environmental laws and regulations.
6.3 Training Conducted
SHE induction is conducted to all new workers and visitors. Various SHE trainings are conducted to
SERD employees and long-term contractor workers.
![Page 28: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/28.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 30
List Training Record SERD July – December 2019:
No. Training Name Dept Company Date
of Training Location
Number of
Participant
JULY
1 Site Induction EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6
2 Site Induction EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9
3 Site Induction EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14
4 Site Induction EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27
5 Site Induction EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8
6 Site Induction EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4
7 Site Induction EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4
8 Site Induction EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6
9 Site Induction EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1
10 Site Induction EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10
11 Site Induction EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5
12 Site Induction EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15
13 Site Induction EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12
14 Site Induction EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11
15 Site Induction EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4
16 Site Induction EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2
17 Site Induction EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3
18 Site Induction EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3
19 Site Induction EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1
20 Site Induction EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5
21 Site Induction EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3
22 Site Induction EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18
23 Site Induction EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8
24 Site Induction EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7
25 Site Induction EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9
26 safety observation card EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6
27 safety observation card EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9
28 safety observation card EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14
29 safety observation card EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27
30 safety observation card EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8
31 safety observation card EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4
32 safety observation card EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4
33 safety observation card EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6
34 safety observation card EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1
35 safety observation card EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10
36 safety observation card EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5
37 safety observation card EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15
38 safety observation card EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12
39 safety observation card EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11
![Page 29: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/29.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 31
40 safety observation card EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4
41 safety observation card EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2
42 safety observation card EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3
43 safety observation card EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3
44 safety observation card EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1
45 safety observation card EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5
46 safety observation card EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3
47 safety observation card EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18
48 safety observation card EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8
49 safety observation card EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7
50 safety observation card EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9
51 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6
52 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9
53 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14
54 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27
55 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8
56 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4
57 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4
58 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6
59 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1
60 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10
61 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5
62 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15
63 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12
64 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11
65 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4
66 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2
67 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3
68 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3
69 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1
70 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5
71 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3
72 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18
73 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8
74 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7
75 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9
76 Introduce to PTW EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6
77 Introduce to PTW EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9
78 Introduce to PTW EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14
79 Introduce to PTW EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27
80 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8
81 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4
82 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4
83 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6
84 Introduce to PTW EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1
85 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10
![Page 30: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/30.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 32
86 Introduce to PTW EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5
87 Introduce to PTW EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15
88 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12
89 Introduce to PTW EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11
90 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4
91 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2
92 Introduce to PTW EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3
93 Introduce to PTW EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3
94 Introduce to PTW EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1
95 Introduce to PTW EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5
96 Introduce to PTW EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3
97 Introduce to PTW EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18
98 Introduce to PTW EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8
99 Introduce to PTW EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7
100 Introduce to PTW EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9
101 PPE Awarness EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6
102 PPE Awarness EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9
103 PPE Awarness EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14
104 PPE Awarness EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27
105 PPE Awarness EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8
106 PPE Awarness EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4
107 PPE Awarness EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4
108 PPE Awarness EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6
109 PPE Awarness EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1
110 PPE Awarness EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10
111 PPE Awarness EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5
112 PPE Awarness EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15
113 PPE Awarness EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12
114 PPE Awarness EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11
115 PPE Awarness EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4
116 PPE Awarness EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2
117 PPE Awarness EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3
118 PPE Awarness EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3
119 PPE Awarness EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1
120 PPE Awarness EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5
121 PPE Awarness EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3
122 PPE Awarness EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18
123 PPE Awarness EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8
124 PPE Awarness EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7
125 PPE Awarness EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9
126 Enviromental Awarness EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6
127 Enviromental Awarness EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9
128 Enviromental Awarness EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14
129 Enviromental Awarness EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27
130 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8
131 Enviromental Awarness EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4
![Page 31: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/31.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 33
132 Enviromental Awarness EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4
133 Enviromental Awarness EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6
134 Enviromental Awarness EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1
135 Enviromental Awarness EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10
136 Enviromental Awarness EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5
137 Enviromental Awarness EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15
138 Enviromental Awarness EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12
139 Enviromental Awarness EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11
140 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4
141 Enviromental Awarness EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2
142 Enviromental Awarness EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3
143 Enviromental Awarness EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3
144 Enviromental Awarness EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1
145 Enviromental Awarness EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5
146 Enviromental Awarness EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3
147 Enviromental Awarness EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18
148 Enviromental Awarness EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8
149 Enviromental Awarness EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7
150 Enviromental Awarness EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9
151 Basic Electrical Safety EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 6
152 Basic Electrical Safety EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 9
153 Basic Electrical Safety EPC-C PT. Rekayasa Industri 03-Jul-19 Office Rekind 14
154 Basic Electrical Safety EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 27
155 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Jul-19 Office Rekind 8
156 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Jul-19 Office Rekind 4
157 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Jul-19 Office Rekind 4
158 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Jul-19 Office Rekind 6
159 Basic Electrical Safety EPC-C PT. Rekayasa Industri 10-Jul-19 Office Rekind 1
160 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Jul-19 Office Rekind 10
161 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Jul-19 Office Rekind 5
162 Basic Electrical Safety EPC-C PT. Rekayasa Industri 13-Jul-19 Office Rekind 15
163 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Jul-19 Office Rekind 12
164 Basic Electrical Safety EPC-C PT. Rekayasa Industri 17-Jul-19 Office Rekind 11
165 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 4
166 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Jul-19 Office Rekind 2
167 Basic Electrical Safety EPC-C PT. Rekayasa Industri 22-Jul-19 Office Rekind 3
168 Basic Electrical Safety EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 3
169 Basic Electrical Safety EPC-C PT. Rekayasa Industri 24-Jul-19 Office Rekind 1
170 Basic Electrical Safety EPC-C PT. Rekayasa Industri 25-Jul-19 Office Rekind 5
171 Basic Electrical Safety EPC-C PT. Rekayasa Industri 26-Jul-19 Office Rekind 3
172 Basic Electrical Safety EPC-C PT. Rekayasa Industri 27-Jul-19 Office Rekind 18
173 Basic Electrical Safety EPC-C PT. Rekayasa Industri 29-Jul-19 Office Rekind 8
174 Basic Electrical Safety EPC-C PT. Rekayasa Industri 30-Jul-19 Office Rekind 7
175 Basic Electrical Safety EPC-C PT. Rekayasa Industri 31-Jul-19 Office Rekind 9
176 Basic first aid EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 9
177 DDC EPC-C PT. Rekayasa Industri 01-Jul-19 Office Rekind 3
![Page 32: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/32.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 34
178 DDC EPC-C PT. Rekayasa Industri 02-Jul-19 Office Rekind 5
179 DDC EPC-C PT. Rekayasa Industri 04-Jul-19 Office Rekind 1
180 WAH EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 2
181 BFA EPC-C PT. Rekayasa Industri 18-Jul-19 Office Rekind 3
182 BFF EPC-C PT. Rekayasa Industri 23-Jul-19 Office Rekind 14
183 First Aid Training FODD SERD 07-Jul-19 Acc. Camp 6
184 First Aid Training FODD SERD 14-Jul-19 Acc. Camp 4
185 First Aid Training FODD SERD 21-Jul-19 Acc. Camp 1
186 First Aid Training FODD SERD 28-Jul-19 Acc. Camp 1
AUGUST
187 Site Induction EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
188 Site Induction EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10
189 Site Induction EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11
190 Site Induction EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9
191 Site Induction EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3
192 Site Induction EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14
193 Site Induction EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14
194 Site Induction EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2
195 Site Induction EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5
196 Site Induction EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9
197 Site Induction EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6
198 Site Induction EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17
199 Site Induction EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4
200 Site Induction EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5
201 Site Induction EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5
202 Site Induction EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1
203 Site Induction EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7
204 Site Induction EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35
205 Site Induction EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15
206 Site Induction EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10
207 Site Induction EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17
208 Site Induction EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27
209 safety observation card EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
210 safety observation card EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10
211 safety observation card EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11
212 safety observation card EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9
213 safety observation card EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3
214 safety observation card EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14
215 safety observation card EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14
216 safety observation card EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2
217 safety observation card EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5
218 safety observation card EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9
219 safety observation card EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6
220 safety observation card EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17
221 safety observation card EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4
222 safety observation card EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5
![Page 33: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/33.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 35
223 safety observation card EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5
224 safety observation card EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1
225 safety observation card EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7
226 safety observation card EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35
227 safety observation card EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15
228 safety observation card EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10
229 safety observation card EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17
230 safety observation card EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27
231 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
232 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10
233 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11
234 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9
235 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3
236 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14
237 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14
238 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2
239 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5
240 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9
241 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6
242 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17
243 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4
244 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5
245 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5
246 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1
247 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7
248 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35
249 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15
250 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10
251 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17
252 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27
253 Introduce to PTW EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
254 Introduce to PTW EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10
255 Introduce to PTW EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11
256 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9
257 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3
258 Introduce to PTW EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14
259 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14
260 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2
261 Introduce to PTW EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5
262 Introduce to PTW EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9
263 Introduce to PTW EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6
264 Introduce to PTW EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17
265 Introduce to PTW EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4
266 Introduce to PTW EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5
267 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5
268 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1
![Page 34: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/34.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 36
269 Introduce to PTW EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7
270 Introduce to PTW EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35
271 Introduce to PTW EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15
272 Introduce to PTW EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10
273 Introduce to PTW EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17
274 Introduce to PTW EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27
275 PPE Awarness EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
276 PPE Awarness EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10
277 PPE Awarness EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11
278 PPE Awarness EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9
279 PPE Awarness EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3
280 PPE Awarness EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14
281 PPE Awarness EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14
282 PPE Awarness EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2
283 PPE Awarness EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5
284 PPE Awarness EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9
285 PPE Awarness EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6
286 PPE Awarness EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17
287 PPE Awarness EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4
288 PPE Awarness EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5
289 PPE Awarness EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5
290 PPE Awarness EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1
291 PPE Awarness EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7
292 PPE Awarness EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35
293 PPE Awarness EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15
294 PPE Awarness EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10
295 PPE Awarness EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17
296 PPE Awarness EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27
297 Enviromental Awarness EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
298 Enviromental Awarness EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10
299 Enviromental Awarness EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11
300 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9
301 Enviromental Awarness EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3
302 Enviromental Awarness EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14
303 Enviromental Awarness EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14
304 Enviromental Awarness EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2
305 Enviromental Awarness EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5
306 Enviromental Awarness EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9
307 Enviromental Awarness EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6
308 Enviromental Awarness EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17
309 Enviromental Awarness EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4
310 Enviromental Awarness EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5
311 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5
312 Enviromental Awarness EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1
313 Enviromental Awarness EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7
314 Enviromental Awarness EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35
![Page 35: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/35.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 37
315 Enviromental Awarness EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15
316 Enviromental Awarness EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10
317 Enviromental Awarness EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17
318 Enviromental Awarness EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27
319 Basic Electrical Safety EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
320 Basic Electrical Safety EPC-C PT. Rekayasa Industri 03-Agust-19 Office Rekind 10
321 Basic Electrical Safety EPC-C PT. Rekayasa Industri 04-Agust-19 Office Rekind 11
322 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Agust-19 Office Rekind 9
323 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 3
324 Basic Electrical Safety EPC-C PT. Rekayasa Industri 07-Agust-19 Office Rekind 14
325 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Agust-19 Office Rekind 14
326 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Agust-19 Office Rekind 2
327 Basic Electrical Safety EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 5
328 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Agust-19 Office Rekind 9
329 Basic Electrical Safety EPC-C PT. Rekayasa Industri 13-Agust-19 Office Rekind 6
330 Basic Electrical Safety EPC-C PT. Rekayasa Industri 14-Agust-19 Office Rekind 17
331 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Agust-19 Office Rekind 4
332 Basic Electrical Safety EPC-C PT. Rekayasa Industri 17-Agust-19 Office Rekind 5
333 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 5
334 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Agust-19 Office Rekind 1
335 Basic Electrical Safety EPC-C PT. Rekayasa Industri 20-Agust-19 Office Rekind 7
336 Basic Electrical Safety EPC-C PT. Rekayasa Industri 24-Agust-19 Office Rekind 35
337 Basic Electrical Safety EPC-C PT. Rekayasa Industri 26-Agust-19 Office Rekind 15
338 Basic Electrical Safety EPC-C PT. Rekayasa Industri 27-Agust-19 Office Rekind 10
339 Basic Electrical Safety EPC-C PT. Rekayasa Industri 28-Agust-19 Office Rekind 17
340 Basic Electrical Safety EPC-C PT. Rekayasa Industri 29-Agust-19 Office Rekind 27
341 DDC EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 3
342 DDC EPC-C PT. Rekayasa Industri 06-Agust-19 Office Rekind 1
343 DDC EPC-C PT. Rekayasa Industri 10-Agust-19 Office Rekind 3
344 DDC EPC-C PT. Rekayasa Industri 16-Agust-19 Office Rekind 3
345 DDC EPC-C PT. Rekayasa Industri 18-Agust-19 Office Rekind 3
346 DDC EPC-C PT. Rekayasa Industri 25-Agust-19 Office Rekind 1
347 BFA EPC-C PT. Rekayasa Industri 02-Agust-19 Office Rekind 4
348 Confined Space EPC-C PT. Rekayasa Industri 16-Agust-19 Office Rekind 1
349 Working at height and
scaffolding
FODD SERD 14-Agust-19 Office SERD GPP 11
350 Working at height and
scaffolding
FODD SERD 15-Agust-19 Office SERD GPP 10
351 Working at height and
scaffolding ( Practic)
FODD SERD 16-Agust-19 Office SERD GPP 10
352 Working at height and
scaffolding ( Practice)
FODD SERD 17-Agust-19 Office SERD GPP 5
353 First Aid Training FODD SERD 08-Agust-19 Acc. Camp 4
354 First Aid Training FODD Defriwangga 24-Agust-19 Mess Depriwangga 15
355 Defensive Driving Course
(DDC)
WS, WT &
SDI
Depriwangga 31-Agust-19 Mess Depriwangga 17
![Page 36: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/36.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 38
SEPTEMBER
356 DDC ( Defensive Driving
Course )
FODD PT. GMK, PT. CIP and CV.
Local contraktor
02-Sep-19 Warehouse Gate-1 11
357 DDC ( Defensive Driving
Course )
FODD PT. GMK, and transporter 03-Sep-19 Warehouse Gate-1 22
358 First Aid Training FODD SERD, CMD and DKB 10-Sep-19 GPP Office 3
359 DDC ( Defensive Driving
Course )
FODD PT. Rekayasa Industri 12-Sep-19 GPP Office 18
360 DDC ( Defensive Driving
Course )
FODD CV. Local contractor 16-Sep-19 Warehouse Gate-1 4
361 DDC ( Defensive Driving
Course )
FODD CV. Local contractor 17-Sep-19 Office Rekind 13
362 DDC ( Defensive Driving
Course )
FODD CV. Local contractor 06-Sep-19 Office Rekind 6
363 Site Induction FODD CV. Local contractor 07-Sep-19 Office Rekind 18
364 safety observation card FODD CV. Local contractor 07-Sep-19 Office Rekind 18
365 JSA & Risk Assesment FODD CV. Local contractor 07-Sep-19 Office Rekind 18
366 Introduce to PTW FODD CV. Local contractor 07-Sep-19 Office Rekind 18
367 PPE Awarness FODD CV. Local contractor 07-Sep-19 Office Rekind 18
368 Enviromental Awarness FODD CV. Local contractor 07-Sep-19 Office Rekind 18
369 Basic Electrical Safety FODD CV. Local contractor 07-Sep-19 Office Rekind 18
370 DDC ( Difensive Driving
Course )
FODD CV. Local contractor 08-Sep-19 Office Rekind 5
371 Site Induction FODD CV. Local contractor 09-Sep-19 Office Rekind 4
372 safety observation card FODD CV. Local contractor 09-Sep-19 Office Rekind 4
373 JSA & Risk Assesment FODD CV. Local contractor 09-Sep-19 Office Rekind 4
374 Introduce to PTW FODD CV. Local contractor 09-Sep-19 Office Rekind 4
375 PPE Awarness FODD CV. Local contractor 09-Sep-19 Office Rekind 4
376 Enviromental Awarness FODD CV. Local contractor 09-Sep-19 Office Rekind 4
377 Basic Electrical Safety FODD CV. Local contractor 09-Sep-19 Office Rekind 4
378 DDC ( Difensive Driving
Course )
FODD CV. Local contractor 12-Sep-19 GPP Office 19
379 Site Induction EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
380 safety observation card EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
381 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
382 Introduce to PTW EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
383 PPE Awarness EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
384 Enviromental Awarness EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
385 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
386 WAH EPC-C PT. Rekayasa Industri 19-Sep-19 Office Rekind 2
387 Site Induction EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3
388 safety observation card EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3
389 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3
390 Introduce to PTW EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3
391 PPE Awarness EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3
![Page 37: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/37.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 39
392 Enviromental Awarness EPC-C PT. Rekayasa Industri 24-Sep-19 Office Rekind 3
393 Basic Electrical Safety EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 3
394 Site Induction EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1
395 safety observation card EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1
396 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1
397 Introduce to PTW EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1
398 PPE Awarness EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1
399 Enviromental Awarness EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1
400 Basic Electrical Safety EPC-C PT. Rekayasa Industri 25-Sep-19 Office Rekind 1
401 First Aid Training Baker
Hughes
Baker Hughes 03-Sep-19 Well Pad L 15
402 H2S Training Inspector WS & WT Depriwangga 12 - 13 Sep 19 Jakarta 4
403 Pengawas Operasional
Pertama ( POP )
HSE Depriwangga 22 - 26 Sep 19 Bogor 1
OCTOBER
404 1st aid level 2 HSE PT. SERD 21-Okt-19 Acc. Camp 12
405 1st aid level 2 HSE PT. SERD 22-Okt-19 Acc. Camp 12
406 1st aid level 2 HSE PT. SERD 23-Okt-19 Acc. Camp 12
407 1st aid level 2 HSE PT. SERD 28-Okt-19 Acc. Camp 12
408 1st aid level 2 HSE PT. SERD 29-Okt-19 Acc. Camp 11
409 1st aid level 2 HSE PT. SERD 30-Okt-19 Acc. Camp 10
410 DDC ( Defensive Driving
Course )
HSE PT. SERD 27-Okt-19 Office GPP 1
411 Site Induction EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3
412 Site Induction EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
413 Site Induction EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1
414 safety observation card EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3
415 safety observation card EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
416 safety observation card EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1
417 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3
418 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
419 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1
420 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3
421 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
422 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1
423 PPE Awarness EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3
424 PPE Awarness EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
425 PPE Awarness EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1
426 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3
427 Enviromental Awarness EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
427 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1
![Page 38: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/38.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 40
428 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Okt-19 Office Rekind 3
429 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
430 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 1
431 Refresh induction EPC-C PT. Rekayasa Industri 09-Okt-19 Office Rekind 179
432 Refresh induction EPC-C PT. Rekayasa Industri 10-Okt-19 Office Rekind 154
433 Refresh induction EPC-C PT. Rekayasa Industri 11-Okt-19 Office Rekind 58
434 Refresh induction EPC-C PT. Rekayasa Industri 12-Okt-19 Office Rekind 24
435 Refresh induction EPC-C PT. Rekayasa Industri 14-Okt-19 Office Rekind 4
436 Refresh induction EPC-C PT. Rekayasa Industri 15-Okt-19 Office Rekind 18
437 Refresh induction EPC-C PT. Rekayasa Industri 17-Okt-19 Office Rekind 4
438 Refresh induction EPC-C PT. Rekayasa Industri 21-Okt-19 Office Rekind 21
439 Refresh induction EPC-C PT. Rekayasa Industri 23-Okt-19 Office Rekind 9
440 Refresh induction EPC-C PT. Rekayasa Industri 24-Okt-19 Office Rekind 4
441 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 10-Okt-19 Office Rekind 12
442 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 11-Okt-19 Office Rekind 3
443 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 16-Okt-19 Office Rekind 2
444 Refresh Elictrical safety EPC-C PT. Rekayasa Industri 18-Okt-19 Office Rekind 4
445 Refresh WAH EPC-C PT. Rekayasa Industri 10-Okt-19 Office Rekind 19
446 Refresh Flagman EPC-C PT. Rekayasa Industri 11-Okt-19 Office Rekind 19
447 Refresh PTW EPC-C PT. Rekayasa Industri 12-Okt-19 Office Rekind 38
448 Refresh Hot Work EPC-C PT. Rekayasa Industri 15-Okt-19 Office Rekind 23
449 Refresh Rigging and Lifting EPC-C PT. Rekayasa Industri 15-Okt-19 Office Rekind 26
450 Refresh Enviro awareness EPC-C PT. Rekayasa Industri 24-Okt-19 Office Rekind 15
NOVEMBER
451 First aid level two training
Third batch
FODD PT. SERD 18-20 Nov 2019 Accomodation
Camp
12
452 First aid level two training
4 batch
FODD PT. SERD 25-27 Nov 2019 Office Gate-1 10
453 Lifting Operation training
subsurface team
FODD PT. Depriwangga 12-16 Nov 19 Office Gate-2 10
454 Re-Induction EPC-C PT. Rekayasa Industri 04-Des-19 Ofiice Rekind 21
455 Re-Induction EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 14
456 Site Induction EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2
457 safety observation card EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2
458 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2
459 Introduce to PTW EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2
460 PPE Awarness EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2
461 Enviromental Awarness EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2
462 Basic Electrical Safety EPC-C PT. Rekayasa Industri 06-Nop-19 Ofiice Rekind 2
463 Site Induction EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
464 safety observation card EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
![Page 39: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/39.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 41
465 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
466 Introduce to PTW EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
467 PPE Awarness EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
468 Enviromental Awarness EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
469 Basic Electrical Safety EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
470 Site Induction EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4
471 safety observation card EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4
472 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4
473 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4
474 PPE Awarness EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4
475 Enviromental Awarness EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4
476 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Nop-19 Ofiice Rekind 4
477 Training DDC EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 1
478 Training DDC EPC-C PT. Rekayasa Industri 14-Nop-19 Ofiice Rekind 2
479 Re-Induction EPC-C PT. Rekayasa Industri 08-Nop-19 Ofiice Rekind 4
480 Re-Induction EPC-C PT. Rekayasa Industri 13-Nop-19 Ofiice Rekind 7
481 Re-Induction EPC-C PT. Rekayasa Industri 14-Nop-19 Ofiice Rekind 2
482 Training WAH EPC-C PT. Rekayasa Industri 10-Nop-19 Ofiice Rekind 41
483 Rigging and Lifting EPC-C PT. Rekayasa Industri 13-Nop-19 Ofiice Rekind 12
484 Site Induction EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30
485 safety observation card EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30
486 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30
487 Introduce to PTW EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30
488 PPE Awarness EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30
489 Enviromental Awarness EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30
490 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Nop-19 Ofiice Rekind 30
491 Site Induction EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16
492 safety observation card EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16
493 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16
494 Introduce to PTW EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16
495 PPE Awarness EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16
496 Enviromental Awarness EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16
497 Basic Electrical Safety EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 16
498 Site Induction EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3
499 safety observation card EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3
500 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3
501 Introduce to PTW EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3
502 PPE Awarness EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3
503 Enviromental Awarness EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3
![Page 40: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/40.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 42
504 Basic Electrical Safety EPC-C PT. Rekayasa Industri 18-Nop-19 Ofiice Rekind 3
505 Training WAH EPC-C PT. Rekayasa Industri 16-Nop-19 Ofiice Rekind 7
DECEMBER
506 Site Induction EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7
507 Site Induction EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4
508 Site Induction EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21
509 Site Induction EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7
510 safety observation card EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7
511 safety observation card EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4
512 safety observation card EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21
513 safety observation card EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7
514 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7
515 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4
516 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21
517 JSA & Risk Assesment EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7
518 Introduce to PTW EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7
519 Introduce to PTW EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4
520 Introduce to PTW EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21
521 Introduce to PTW EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7
522 PPE Awarness EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7
523 PPE Awarness EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4
524 PPE Awarness EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21
525 PPE Awarness EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7
526 Enviromental Awarness EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7
527 Enviromental Awarness EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4
528 Enviromental Awarness EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21
529 Enviromental Awarness EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7
530 Basic Electrical Safety EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 7
531 Basic Electrical Safety EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 4
532 Basic Electrical Safety EPC-C PT. Rekayasa Industri 10-Des-19 Ofiice Rekind 21
533 Basic Electrical Safety EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 7
534 Training WAH EPC-C PT. Rekayasa Industri 05-Des-19 Ofiice Rekind 18
535 Training WAH EPC-C PT. Rekayasa Industri 06-Des-19 Ofiice Rekind 17
536 Flagman Training EPC-C PT. Rekayasa Industri 11-Des-19 Ofiice Rekind 14
537 DDC ( Defensive Driving
Course )
EPC-C PT. Rekayasa Industri 09-Des-19 Ofiice Rekind 14
538 Site Induction EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2
539 Site Induction EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10
540 Site Induction EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4
541 Safety observation card EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2
![Page 41: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/41.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 43
542 Safety observation card EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10
543 Safety observation card EPC-C PT. Rekayasa Industri
15-Des-19 Ofiice Rekind 4
544 JSA & Risk Assesment EPC-C PT. Rekayasa Industri
12-Des-19 Ofiice Rekind 2
545 JSA & Risk Assesment EPC-C PT. Rekayasa Industri
14-Des-19 Ofiice Rekind 10
546 JSA & Risk Assesment EPC-C PT. Rekayasa Industri
15-Des-19 Ofiice Rekind 4
547 Introduction to PTW EPC-C PT. Rekayasa Industri
12-Des-19 Ofiice Rekind 2
548 Introduction to PTW EPC-C PT. Rekayasa Industri
14-Des-19 Ofiice Rekind 10
549 Introduction to PTW EPC-C PT. Rekayasa Industri
15-Des-19 Ofiice Rekind 4
550 PPE Awareness EPC-C PT. Rekayasa Industri
12-Des-19 Ofiice Rekind 2
551 PPE Awareness EPC-C PT. Rekayasa Industri
14-Des-19 Ofiice Rekind 10
552 PPE Awareness EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4
553 Enviromental Awareness EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2
554 Enviromental Awareness EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10
555 Enviromental Awareness EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4
556 Basic Electrical Safety EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2
557 Basic Electrical Safety EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 10
558 Basic Electrical Safety EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4
559 HE Operation Awareness EPC-C PT. Rekayasa Industri 14-Des-19 Ofiice Rekind 1
560 HE Operation Awareness EPC-C PT. Rekayasa Industri 15-Des-19 Ofiice Rekind 4
561 DDC ( Defensive Driving
Course )
EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 6
562 DDC ( Defensive Driving
Course )
EPC-C PT. Rekayasa Industri 13-Des-19 Ofiice Rekind 1
563 Refresh induction EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 6
564 Refresh induction EPC-C PT. Rekayasa Industri 13-Des-19 Ofiice Rekind 4
565 Refresh induction EPC-C PT. Rekayasa Industri 16-Des-19 Ofiice Rekind 2
566 Training WAH EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 2
567 Confined Space EPC-C PT. Rekayasa Industri 12-Des-19 Ofiice Rekind 8
568 Site Induction EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7
569 Site Induction EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1
570 Site Induction EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42
571 Site Induction EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20
572 Site Induction EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3
573 Safety observation card EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7
574 Safety observation card EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1
575 Safety observation card EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42
576 Safety observation card EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20
577 Safety observation card EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3
578 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7
579 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1
580 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42
![Page 42: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/42.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 44
6.4 Needs Assessment of Environmental Management Capacity
SERD employs consultants (PT Radiant Utama, ERM Siam, PT Arindhita, and experts from
University of Sriwijaya Palembang) to support for biodiversity assessment and environmental
monitoring/advices.
When needed External supports are available through existing consultants such as ERM Siam, as
well as experts from local universities, Forestry offices, and NGOs.
No additional need is currently required at this stage. If the need to improve the capacity
comes, it will be done accordingly.
581 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20
582 JSA & Risk Assessment EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3
583 Introduction to PTW EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7
584 Introduction to PTW EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1
585 Introduction to PTW EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42
586 Introduction to PTW EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20
587 Introduction to PTW EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3
588 PPE Awareness EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7
589 PPE Awareness EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1
590 PPE Awareness EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42
591 PPE Awareness EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20
592 PPE Awareness EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3
593 Enviromental Awareness EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7
594 Enviromental Awareness EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1
595 Enviromental Awareness EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42
596 Enviromental Awareness EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20
597 Enviromental Awareness EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3
598 Basic Electrical Safety EPC-C PT. Rekayasa Industri 19-Des-19 Ofiice Rekind 7
599 Basic Electrical Safety EPC-C PT. Rekayasa Industri 20-Des-19 Ofiice Rekind 1
600 Basic Electrical Safety EPC-C PT. Rekayasa Industri 21-Des-19 Ofiice Rekind 42
601 Basic Electrical Safety EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 20
602 Basic Electrical Safety EPC-C PT. Rekayasa Industri 24-Des-19 Ofiice Rekind 3
603 Confined Space EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 17
604 Refresh DDC EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 1
605 Training WAH EPC-C PT. Rekayasa Industri 23-Des-19 Ofiice Rekind 7
![Page 43: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/43.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 45
6.5 Awareness Level of Contractors’ Field Personnel
On the job training has been conducted in the form of direct coaching, pre-job meeting, use of
display boards, and banners.
EPC and Drilling contractors have SHE induction and training courses conducted by their internal
SHE personnel.
EPC Personel are also expected to adhere to the B-15 and B-16 documents as stated in
their contract. The B-15 and B-16 documents are guidelines for both national as well as
international standards for all contractors to follow.
![Page 44: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/44.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 46
7. Social Management Capacity
This Chapter discusses staff capacities in social management, degree of awareness, training
conducted, needs assessment of social management capacity and awareness level of contractors’ staff trained.
7.1 SERD’s Relations Team
7.2 Number and Adequacy of Staff to Monitor Labour and Working
Conditions
To monitor labour and working conditions, SERD employs 1 (one) experienced managerial levels (Site
Support Manager) and 3 (three) Site Representatives.
7.3 Training Conducted
Training of CSR and Stakeholder Engagement for Field Relations Officers was conducted on 31
October 2019.
7.4 Designation and Signature of Person Responsible
Head of Community Relations is responsible for preparing the social safeguards monitoring reports,
while Manager of Field Relations and Business Relations Manager are the responsible persons for
reviewing the reports.
![Page 45: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/45.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 47
8. Issues, Status of Implementation of Mitigating
Measures in the Environmental Management Plan
This Chapter discusses status of implementation of mitigating measures in the environmental
management plan, and if such issues arise, corrective actions and recommendations, would be act
upon.
See attachment for latest laboratory analysis results. The samples were taken by consultant experts
and analysis was conducted in a laboratory approved by the Ministry of Environment and Forestry
(MoEF / KLHK).
8.1 Pollution monitoring
Summary of Air Quality Monitoring as follows:
Measurement Period A. [Construction Phase]
Two Times for:
Noise
Ambient Air Quality
B. [Operation Phase]
1. Every 6 months for:
Noise
Air Ambient Quality
Odor
Emission for Geothermal Power Plant
2. Yearly (Every One Year) for:
GHG emissions
Excess of standard for
Contract (Yes/No)
If yes, please describe the
outline of planned
mitigation measures.
Air and noise quality has for
the most part has been in
good condition at SERD. 24-
hour H2S monitoring at
sensitive receptor areas are
implemented on a 3
monthly basis (as agreed
with MMD) as well as 48 hr
noise monitoring is also
implemented. The results
also show that the closest
receptors are relatively
unaffected. PM2,5 and PM10
had a slight exceedance at
AQN-7 in 1H19, however it
has stabilized during 2H19.
Measurement Method Indonesian National Standards (SNI) guidelines or other standards as
follows:
Noise : Measurement method and equipment used are based on
Decree of MoE No. 48/1996
Emission of Geothermal Power Plant : Measurement method and
equipment used are based on Decree of MoE No. 21/2008
Green House Gas
Odor Standard: Measurement method and equipment used are
based on Decree of MoE No. 50/1996
Parameter Measurement
Method Equipment
Ammonia (NH3) indophenol method spectrophotometer
Methyl
Mercaptan
(CH3SH)
gas absorption gas chromatography
Hydrogen Sulfide
(H2S)
a. mercury thiocyanate
b. gas absorption
spectrophotometer
Methyl Sulfide
((CH3)2)S
gas absorption gas chromatography
Styrene
(C6H8CHCH2)
gas absorption gas chromatography
![Page 46: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/46.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 48
Ambient Air Quality: Measurement method and equipment used are
based on Government Regulation PP No. 41/1999
Parameter Analysis Method Equipment
SO2 (Sulfur Dioxide) Pararosanalin Spectrophotometer
CO (Carbon Monoxide) NDIR NDIR Analyzer
NO2 (Nitrogen Dioxide) Saltzman Spectrophotometer
O3 (Oxide) Chemiluminescent Spectrophotometer
HC (Hydrocarbon) Flamed Ionization Chromatography Gas
PM10
(Particle < 10 μm) Gravimetric Hi-Vol.
PM2,5
( Particle < 2.5 μm) Gravimetric Hi-Vol.
TSP (Dust) Gravimetric Hi-Vol.
Pb (Lead) Gravimetric Hi-Vol.
Measurement Points No Code Location Long / Lat
1 AQN-1 Sukarami Village 103’25”52,90/4’4” 04,90
2 AQN-2 Padang Panjang 103’26”12,01/4’6” 41,01
3 AQN-3 Tunggul Bute Village 103’26”12,01/4’9” 49,05
4 AQN-4 Yayasan Village 103’27”16,07/4’12” 20,40
5 AQN-5 Wellpad B 103’24”31,20/4’12” 39,01
6 AQN-6 Wellpad E 103’22”59,05/4’12” 26,07
7 AQN-7 Represent the new
wellpads (L, M, N)
103’22”49,30/4’14”22,80
No Emissions From Geothermal Power Plant due to Project being still in pre-construction phase
Measurement Point Parameter Unit Measured Result
National Standard*1
Power Plant Cooling Tower Stack
Hydrogen Sulphide (H2S) mg/Nm3 N/A 35 mg/Nm3
Ammonia (NH3) mg/Nm3 N/A 0.5 mg/Nm3
Notes : NA= Not Applicable During Pre-Construction
No GHG emission due to still in pre-construction phase
Measurement Point Parameter Unit Measured Result
Power Plant Cooling Tower Stack CO2 tonnes of CO2 /year N/A
CH4 tonnes of CO2 equivalent /year N/A
Notes: NA= Not Applicable During Pre-Construction
Odor Measurement base on Indonesia Ministry of Environment Decree No. 50/1996
No Parameter Unit TLV
*)
Ds.
Tunggul
Bute
Kp.
Yayasan
Wellpad
I
Wellpad
C
Wellpad
B
Wellpad
E
Wellpad
L,M, N
Power Plant
Access
Road
1 Ammonia (NH3) **) ppm 2.0 0.02 0.07 0.2 0.2 0.2 0.09 0.08 0.2
2 Methyl Mercaptan (CH3SH) ppm 0.02 0.003 0.004 0.004 0.004 0.003 0.003 0.003 0.004
3 Hydrogen Sulphide (H2S) **) ppm 2 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017 <0.0017
![Page 47: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/47.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 49
4 Methyl Sulphide (CH3)2S ppm 0.01 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008
5 Styrene (C6H5CHCH2) **) ppm 0.1 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02
Notes : Location for odour testing may vary each semester depending on project activity
24-hour H2S Measurement Based on WHO Standard
No. Parameter WHO
Threshold Unit
1 Hydrogen Sulphide (H2S) **) 2 ppm
Reference: WHO Air Quality Guidelines for Europe, 2000
Ambient Air Measurement Results
No Parameter TLV *) IFC Unit AQN-1 AQN-2 AQN-3 AQN-4 AQN-5 AQN-6 AQN-7
1 SO2 900 500 µg/Nm3 32 33 30 29 25 32 34
2 CO 30,000 NR µg/Nm3 3,891 4,025 3,853 3,784 3,674 3,914 4,067
3 NO2 400 200
guideline µg/Nm3 28 28 27 26 22 30 28
4 O3 235 100 µg/Nm3 28 24 35 33 28 30 33
5 HC 160 NR µg/Nm3 94 123 59 56 61 104 154
6 TSP - 25,000
(1 yr) µg/Nm3 44 60 25 23 28 50 75
7 PM10 (Particle < 10 µm) - 50 µg/Nm3 22 29 12 12 14 26 35
8 PM2,5 (Particle < 2,5 µm) - 25 µg/Nm3 0.1 0.1 0.1 <0.1 <0.1 0.1 0.1
9 Pb - NR µg/Nm3 9 11 9 7 7 11 11
Reference: IFC EHS General Guidelines, dated 30 April 2007; Baku Mutu Kualitas Udara Ambien PP 41 Tahun 1999
0
0.5
1
1.5
2
2.5
1 3 5 7 9 11 13 15 17 19 21 23
H2
S R
esu
lts
(pp
m)
H2S (24 hr) Monitoring at Wellpad
M
19 December 2019
H2S (ppm)
Threshold
![Page 48: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/48.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 50
Summary of Noise Monitoring Results:
No. Criteria Noise Level dB(A)
Threshold AQ-1 AQ-2 AQ-3 AQ-4 AQ-5 AQ-6 AQ-7
1. Working Area - - - 48 46 45 - 70
2. Settlement Area 47 48 48 - - - 46 55
Additional Noise Monitoring (48 Hrs)
Closest Settlement area Yayasan Village
Date Interval Noise (dB (A))
Leq LAFmax LAFmin LCpk LAeq T. LAE
13-Des L1 07 00 80.0 39.5 100.6 60.4 88.2 52.8
L2 10 00 75.1 47.7 94.3 55.3 83.1
L3 15 00 86.5 40.4 103.9 58.3 86.1
L4 20 00 60.3 38.3 - 44.7 3.0
L5 23 00 76.9 36.5 94.2 46.4 74.4 43.5
14-Des L6 01 00 63.2 35.6 87.4 42.7 70.6
L7 04 00 63.3 34.9 88.1 41.1 68.9
L1 07 00 75.2 49.3 90.1 59.9 87.7 53.9
L2 10 00 82.6 42.0 96.4 52.8 80.7
L3 15 00 78.9 42.4 97.9 54.7 82.5
L4 20 00 74.7 36.9 93.8 48.3 76.1
L5 23 00 72.6 36.3 86.5 49.2 77.1 4.2
15-Des L6 01 00 61.6 34.6 83.6 40.6 68.5
L7 04 00 55.2 34.0 39.8 67.7
Closest Settlement area Yayasan Village
Date Interval Noise (dB (A))
Leq LAFmax LAFmin LCpk LAeq T. LAE
14-Sep L1 07 00 85.7 44.5 105.3 63.6 91.4 56.9
L2 10 00 83.9 43.4 95.9 61.0 88.8
L3 15 00 93.6 45.0 104.1 67.7 95.5
L4 20 00 67.7 27.1 87.7 42.1 70.0
L5 23 00 59.3 24.3 78.5 33.5 60.9 38.9
15-Sep L6 01 00 72.5 23.9 101.4 42.4 70.6
L7 04 00 68.6 23.9 97.8 40.8 69.0
L1 07 00 83.2 47.5 94.2 62.4 90.2 64.1
L2 10 00 84.9 36.0 105.7 62.8 90.7
L3 15 00 97.0 38.1 107.4 70.2 98.2
L4 20 00 84.6 38.3 101.0 61.0 88.8
L5 23 00 61.4 33.0 83.6 42.9 70.7 45.3
16-Sep L6 01 00 68.9 37.9 85.1 47.0 75.7
L7 04 00 75.0 32.8 92.6 46.1 74.0
![Page 49: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/49.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 51
8.2 Water Quality
Summary of Water Quality Monitoring as follows:
Measurement Period A. [Construction Phase] Two Times for:
Surface Water Quality
Domestic Waste
B. [Operation & Post Operation Phase]
Every 6 months for: Surface Water Quality
Active Water Pond (Produced Water) Community Shallow Ground Water
Domestic Waste
Excess of national standard (Yes/No)
If yes, please describe the outline of planned mitigation measures.
While no complex chemicals were found within the water bodies surrounding the project, parameters such as: pH, BOD, COD and DO suffered a bit of a decline. This is most probably due to the accumulation of both natural occurences such as high movement of particles due to high rainfall rate as well as impact from construction activity. During the first half of 2019, a case of minor landslide and mudflow caused some disturbance in turbidity. This has since been dealt with and cleaned up. 2H19 also saw PT SERD improve road condition and slopes at a number of project area and access roads (shortcut). PT SERD also closed out cases involving slope failures. High rainfall rate in SERD area is a very recurring issue. Thus, SERD aims to improve on stabilizing and preventing landslides and issues as such.
Measurement Method Indonesian National Standards (SNI) guidelines or other standards
Measurement Points
Surface Water s
Water Ponds (Active Water Ponds)
Domestic Waste Water Outlet Location
Code Location Coordinat E Coordinat NS
SW-1 Cawang Kiri River 103°24’ 41.80” 4°12’ 42.30”
SW-2 Asahan River 103°25’ 40.10” 4°12’ 08.80”
SW-3 Deduruk Lake 103°26’ 30.10” 4°12’ 09.40”
SW-4 Cawang Tengah River 103°24’ 43.90” 4°12’ 34.80”
SW-5 Endikat River 103°27’ 40.40” 4°12’ 03.50”
Quality of Surface Water Results as follows:
No Parameter Unit TLV SW-1 SW-2 SW-3 SW-4 SW-5
A. Physical
1 Temperature 0C Dev 3 26 24 22 25 27
2 Total Dissolved Solids mg/L 1,000 46 35 27 45 42
3 Total Suspended Solids mg/L 50 7 <2 5 4 5
B. Chemical
1 pH - 6 - 9 TBA TBA TBA TBA TBA
2 BOD **) mg/L 2 3 3 2 4 3
3 COD **) mg/L 10 13 44 11 20 12
4 Dissolved Oxygen (DO) **) mg/L 6 5.6 5.7 6 6.1 5.7
5 Total Phosphate sbg P **) mg/L 0.2 0.05 0.07 0.05 0.06 <0.03
6 Nitrate (NO -N) **) mg/L 10 0.06 0.07 0.1 <0.05 0.08
7 Ammonia (NH -N) **) mg/L 0.5 <0.01 <0.01 <0.01 <0.01 0.06
8 Arsenic (As) mg/L 0.05 <0.005 <0.005 <0.005 <0.005 <0.005
9 Cobalt (Co) **) mg/L 0.2 0.03 <0.0007 <0.0007 <0.0007 <0.0007
10 Barium (Ba) **) mg/L 1 0.03 0.002 0.005 0.005 0.003
11 Boron (B) **) mg/L 1 0.1 0.03 0.03 0.05 0.05
12 Selenium (Se) mg/L 0.01 <0.002 <0.002 <0.002 <0.002 <0.002
13 Cadmium (Cd) **) mg/L 0.1 0.03 <0.0006 <0.0006 <0.0006 <0.0006
14 Chromium Hexavalent (Cr VI) **) mg/L 0.05 <0.01 <0.01 <0.01 <0.01 <0.01
15 Copper (Cu) **) mg/L 0.02 <0.005 <0.005 <0.005 <0.005 <0.005
![Page 50: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/50.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 52
No Parameter Unit TLV SW-1 SW-2 SW-3 SW-4 SW-5
16 Iron (Fe) **) mg/L 0.3 0.5 0.02 0.2 0.1 0.1
17 Lead (Pb) **) mg/L 0.3 0.04 <0.009 <0.009 <0.009 0.01
18 Manganese (Mn) **) mg/L 0.1 0.04 <0.0007 0.003 0.001 <0.0007
19 Mercury (Hg) mg/L 0.001 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005
20 Zinc (Zn) **) mg/L 0.05 0.03 0.002 0.01 0.004 0.04
21 Chloride (Cl) **) mg/L 600 4 2 2 4 3
22 Cyanide (CN) **) mg/L 0.02 <0.005 <0.005 <0.005 <0.005 <0.005
23 Floride (F) **) mg/L 0.5 <0,01 <0.01 <0.01 <0.01 <0.01
24 Nitrite (NO -N) **) mg/L 0.06 <0.004 <0.004 <0.004 <0.004 <0.004
25 Sulphate (SO ) **) mg/L 400 2 0.5 0.8 0.7 0.6
26 Chlorine (Cl ) **) mg/L 0.03 0.01 0.01 0.01 0.03 0.01
27 Oil & Fat @g/L 1,000 <0.002 <0.002 <0.002 <0.002 <0.002
28 Detergent (MBAS) **) @g/L 200 <0.2 <0.2 <0.2 <0.2 <0.2
29 Phenol **) @g/L 1 <0.01 <0.01 <0.01 <0.01 <0.01
30 Sulphide (H S) **) mg/L 0.002 <0.001 <0.001 <0.001 <0.001 <0.001
C. Microbiological
1 Fecal Coliform **) MPN/
100mL 100 450 5,800 4,600 1,300 4,900
2 Total Coliform MPN/
100 mL 1,000 680 8,400 7,000 2,300 7,900
*) PerGub Sumatera Selatan no. 16 tahun 2005 Lampiran II. Kelas I
**) Parameter Terakreditasi oleh KAN no. LP-195-IDN
Summary of Geothermal Produced Water Results as follows:
No Parameter Unit TLV Waterpond Mudpond
RD-B RD-C RD-E RD-I RD-B RD-C RD-E RD-I
1 Dissolved Sulfide as H2S mg/L 1 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002
2 Ammonia as NH3-N mg/L 10 0.1 0.2 <0.01 0.4 0.1 0.06 <0.01 0.07
3 Total Mercury (Hg) mg/L 0.005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005
4 Total Arsenic (As) mg/L 0.5 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005
5 Temperature ˚C 45 30 30 31 22 29 34 26 22
6 pH (insitu) **) - 6-9 7 6.8 6.9 6.3 6.8 7.8 7 6.2
7 Boron (B) mg/L - 0.06 59 13 38 0.06 <0.02 0.2 26
8 Total Organic Carbon (TOC) mg/L - 9 7 5 4 8 19 15 6
9 Total Dissolved Solid (TDS) mg/L - 76 2,650 595 1,962 65 218 1,205 1,091
10 Salinity o/oo - 0.1 3 0.6 2 0.1 0.2 1 1
11 Oil and Fat mg/L - <1.8 <1,8 <1.8 <1.8 <1.8 <1.8 <1.8 <1.8
12 BOD5 mg/L - 6 4 2 4 4 23 10 4
13 COD mg/L - 24 24 11 21 18 86 38 16
*) PerMen LH no. 19 tahun 2010 Lampiran II
**) Parameter Terakreditasi oleh KAN no. LP-195-DN
Summary of Community Shallow Ground Water Wells as follows:
Monitoring Point
Community Shallow ground water wells
Code Location Coordinat E Coordinat NS
GW-1 Kampung Yayasan 103°27’ 21.11” 4°12’ 18.70”
GW-2 Tunggul Bute Village 103°26’ 12.63” 4°9’ 44.43”
GW-3 Camp Area SERD/ Drilling Camp 103°25’ 56.16” 4°11’ 37.65”
![Page 51: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/51.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 53
Ground Water Monitoring Result
No. Parameter Unit TLV *) GW-1 GW-2 GW-3
A. Physics
1. Odor **) - Odorless Odorless Odorless Odorless
2. Total Suspended Solid (TDS) **) mg/L 500 33 17 28
3. Turbidity **) NTU 5 < 1 4 3
4. Taste **) - Tasteless Tasteless Tasteless Tasteless
5. Temperature (insitu) **) 0C Water
temperature
+3
24 24 25
6. Color **) TCU 15 < 1 < 1 < 1
B. Chemical
1. Mercury (Hg) mg/L 0.001 <0.0005 <0.0005 <0.0005
2. Arsenic (As) mg/L 0.01 <0.005 <0.005 <0.005
3. Iron (Fe) **) mg/L 0.3 0.02 0.02 0.006
4. Flouride (F) **) mg/L 1.5 <0.01 <0.01 <0.01
5. Cadmium (Cd) **) mg/L 0.003 <0.0006 <0.0006 <0.0006
6. Chloride (Cl) **) mg/L 250 4 3 6
7. Chromium hexavalent (Cr VI) **) mg/L 0.05 <0.0006 <0.0006 <0.0006
8. Manganese (Mn) **) mg/L 0.4 0.02 0.008 0.04
9. Nitrate(NO3-N) **) mg/L 50 0,8 14 7
10. Nitrite (NO2-N) **) mg/L 3 <0.004 <0.004 <0.004
11. pH (insitu) **) - 6.5 – 8.5 6,6 6,3 6.47
12. Selenium (Se) mg/L 0.01 <0.002 <0.002 <0.002
13. Zinc (Zn) **) mg/L 3 0.008 0.04 0.06
14. Cyanide (CN) **) mg/L 0.07 <0.005 <0.005 <0.005
15. Sulphate (SO4) **) mg/L 250 10 0,6 0.6
16. Lead (Pb) **) mg/L 0.01 <0.009 <0.009 <0.009
17. Detergent (MBAS) **) mg/L 0.05 <0.01 <0.01 <0.01
18. Potassium permanganate (KMnO4) **) mg/L 10 1 2 1
C. Microbiology
1. Total Coliform **) MPN/100ml 0 0 0 0
2. E. Coli MPN/100 ml 0 0 0 0
*) PerMenKes RI no. 492/MenKes/Per/IV/2010
**) Parameter accredited by KAN no. LP-195-IDV
8.3 Wastes
Summary of Waste monitoring as follows:
Measurement Period and
[Construction Phase] Two times
[Operation & Post Operation Phase] Every 6 months
Any concerns and measures taken: Re-certification of Hazardous Waste Temporary Storage Building is ongoing. Administrative requirements and site verification have been completed. Waiting for the issuance of the permit from Muara Enim regency.
Measurement Method
Calculation of Waste quantity: Liquid Domestic Waste
Based on Ministry of Environment and Forestry Regulation No. 68/2016
Solid Waste
Solid Industrial Waste quantity
Solid Domestic Waste quantity
Hazardous Waste sent to Licensed Hazardous Waste Treatment Facility Company
Measurement Points 1. Outlets of Domestic Waste Water Treatment from accommodation area
2. Solid Waste
-Solid Industrial Waste Collection Area
-Solid Domestic Waste Collection Area
3. Temporary Storage of Hazardous Waste
![Page 52: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/52.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 54
Summary of Solid Waste Monitoring as follows:
Type Type of Waste Parameter/ Unit Measurement Result Remarks
Solid Industrial
Waste Collecting
Area
Metal Industrial Waste Weight/Tones 4 On 21 December 2019, sent 1
small dump truck of metal
industrial waste (scrap from
casing perforation) to CV. Muara
Steel (Lampung) for recycling.
Non Metal Industrial
Waste
Weight/Kg 6 For non metal industrial waste
mostly as casing protector at
warehouse. Some of this material
is being used for support of
signage leg, reebar protector at
GPP and ashtray. On 21 December
2019 also, 2 small dump trucks
were sent to CV. Muara Steel
(Lampung) for recycling.
Solid Domestic
Waste Collecting
Area
Domestic Waste Sent to
Government
Facility/ Trip
37 Domestic waste is sent from
temporary domestic storage at
open yard (Gate 1) to
government-owned final disposal
facility at Lahat. For 6 months
(July - December) of 2019 there
were 37 trips.
Summary of Hazardous Waste Monitoring as follows:
No Location Parameter Unit Measurement Result Remarks
1 Waste Oil / Oily Waste Quantity kg 2,835 This is the total hazardous waste
which has been hauling out from
SERD project to designated
disposal. This activity is handled by
third party (PT. Primanru) which
hired by PT. SERD. It has been done
2 times which are in July and
December 2019.
2 Medical waste Quantity kg 7
3 Used filter Quantity kg 100
4 Used rags Quantity kg 85
5 Contaminated packaging Quantity kg 53
6 Catridge Quantity kg 10
7 Contaminated sand Quantity kg 135
8.4 Erosions
Summary of Erosions Monitoring as follows:
Measurement Period [Construction Phase] Two Times
[Operation Phase] Every 6 months
Any concerns and measures taken:
The end of second half of 2019 had a constant high rate of rainfall and caused erosions and landslides. SERD and EPC-C conducted mitigation efforts on mud control / water turbidity. As of now corrective actions have been in place and is continuously being implemented. Certain areas were identified as having potential erosion/landslide potential, however are mostly light-medium category. Shortcut area was identified as having high potential of erosion/landslide and thus SERD and EPC-C perform regular maintenance of vegetation, drainage, gabion walls, and road repairs.
Measurement Method Land erosion measurement using small square method,
Rainfall measurement
Measurement Points Areas prone to erosion along access road, wellpad, and geothermal power plant area
![Page 53: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/53.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 55
Location Coordinate Type Erosion / Landslide
Category Lenght (m) Width (m)
Access Wellpad L 4 14 15 – 103 21 44 Landslide 25-<50 50-150 Medium
Wellpad L 4 14 25 – 103 21 29 Landslide 25-<50 50-150 Medium
Access Wellpad M 4 13 54 – 103 21 53 Landslide <10 >150 Low
Wellpad M 4 14 12 -103 22 11 Landslide <10 >150 Low
4 14 22-103 22 11 Landslide 25-<50 50-150 Medium
4 14 23- 103 22 10 Landslide 25-<50 50-150 Medium
Short cut 4 11 44 – 103 24 29 Landslide 50 - <100 50 - 150 High
Intersection Wellpad C -
Access Wellpad I
04 13 41,8 – 103 21 55,12 Landslide 1-25 <20 Medium
04 13 26,38 – 103 22 22,17 Landslide 25-<50 <20 Medium
04 13 08,00 – 103 22 36,2 Landslide 25-<50 <20 Low
8.5 Water Flow
Summary of Water Flow Monitoring as follows:
Measurement Period [Construction Phase] Two Times
[Post Operation Phase] Every 6 months
Any concerns and measures taken:
Water flow is maintained regularly. Drainage systems, sediment traps, settling ponds and cloth screen have been constructed and regularly maintained to control water flow and quality. Despite high rainfall, SERD and EPC-C continued their efforts to improve water flow and quality.
No major/significant issues were encountered with domestic waste water monitoring during 2H19.
Measurement Method Sediment charge sampling in inlet and outlet of the catch pond, and laboratory analysis for Total Suspended Solids (TSS) using SNI 06-6989.3-2004 method, as well as determine the effectiveness of catch ponds.
Measurement Points Please attach map(s) showing monitoring points including following locations:
Sediment loads from well pads of PLTP project sites,
Inlet and outlet of the catchpond, representing sediment that can be managed.
![Page 54: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/54.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 56
Summary of Domestic Waste Water Monitoring as follows:
Coordinate : S 04o 12’ 01,34” N 103o
24’ 11,34” ( domestic waste water at outlet of WTP)
No. Parameter Unit Threshold* Results from WTP Outlet
A. Physical
1 Turbidity NTU 25 2
2 Color Pt-Co 50 17
3 TDS mg/L 1.000 41
4 Temperature (insitu) °C Temperature ± 3 °C 21
5 Taste - No Taste Tasteless
6 Odour (insitu) - No Odour Odorless
B. Chemical
1 pH (insitu) - 6.5 - 8,5 7.9
2 Fe mg/L 1 0.06
3 F mg/L 1.5 <0.,01
4 CaCO3 mg/L 500 17
5 Mn mg/L 0.5 <0.0007
6 NO3-N mg/L 10 0.13
7 NO2-N mg/L 1 <0.004
8 CN mg/L 0.1 <0.005
9 MBAS mg/L 0.05 <0.01
10 Hg mg/L 0.001 <0.0005
11 As mg/L 0.05 <0.005
12 Cd mg/L 0.005 <0.0006
13 Cr VI mg/L 0.05 <0.01
14 Se mg/L 0.01 <0.002
15 Zn mg/L 15 0.0076
16 SO4 mg/L 400 <0.3
17 Pb mg/L 0.05 <0.009
18 KMnO4 mg/L 10 5
19 Total Pesticide Mg/L 0.1 <0.00004
C. Microbiological
1 Total Coliform CFU/100 mL 50 53
2 E. coli CFU/100 mL 0 0
Peraturan Menteri Kesehatan RI No. 32 Tahun 2017 Lampiran I Bab II A
8.6 Aquatic Biota
Summary of Aquatic Biota Monitoring as follows:
Measurement Period [Construction Phase]
Two times
[Operation & Post Operation Phase] Every 6 months
Any concerns and measures taken:
No concerns, plesase see results of Aquatic biota survey below.
Measurement Method Data analysis of number of types, composition, abundance, and diversity of plankton and benthos
Measurement Points
1. Code Location Coordinat E Coordinat NS
SW-1 Cawang Kiri River 103°24’ 41.80” 4°12’ 42.30”
SW-2 Asahan River 103°25’ 40.10” 4°12’ 08.80”
SW-3 Deduruk Lake 103°26’ 30.10” 4°12’ 09.40”
SW-4 Cawang Tengah River 103°24’ 43.90” 4°12’ 34.80”
SW-5 Endikat River 103°27’ 40.40” 4°12’ 03.50”
![Page 55: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/55.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 57
Phytohoplankton:
SW-1 SW-2 SW-3 SW-4 SW-5
Density (Ind/m2) 4 3 2 18 8
Number of taxon 3 3 2 11 6
Diversity index 1,50 1,58 1 3,31 2,50
Uniformity index 0,95 1,00 1,00 0,96 0,97
Note
The phytoplankton community around PT SERD's work area in Semester 2 of 2019 monitoring period is composed of 4 classes, namely
Chlorophyta (5 species) Chrysophyta (11 types), Cyanophyta (1 type), and.Euglenophyta (1 type). The number of taxa and the
abundance of phytoplankton at each monitoring location varies.
The abundance of phytoplankton in SERD's work area is quite low (2 - 18),
The diversity index of phytoplankton during this period shows low-moderate diversity ranging from1 to 3.31.
The uniformity index value of river phytoplankton uniformity in all monitoring locations in Semester 2 of 2019 ranges from 0.96
– 1.00. The range shows that the amount of phytoplankton species are spread equally with no specific species being dominant.
Zooplankton:
SW-1 SW-2 SW-3 SW-4 SW-5
Density (Ind/m2) 12 7 7 9 4
Number of taxon 8 4 5 6 3
Diversity index 2.86 1.84 2.13 2.5 1.50
Uniformity index 0.95 0.92 0.92 0.97 0.95
Note:
The Zooplankton community around PT SERD's work area in Semester 2 of 2019 monitoring period is composed of 4 classes namely
Actinopodes (1 type), Cilliata (4 types), Flagellata (6 types), and Rhyzopodes (4 types).
The abundance and number of zooplankton taxa in Semester 2 of 2019 monitoring period shows that abundance of river
zooplankton at each monitoring location ranges from 4 - 12 Ind/L, while the number of zooplankton taxa ranged from 3 - 8 taxa.
The diversity index of zooplankton during this period shows low-moderate diversity ranging from 1.5 to 2.86.
The uniformity index value of zooplankton in all monitoring locations in Semester 2 of 2019 ranged from 0.92 – 0.97. The range
of values is in the category of high uniformity.
Benthos:
SW-1 SW-2 SW-3 SW-4 SW-5
Density (Ind/m2) 14 182 42 14 14
Number of taxon 1 5 1 1 1
Diversity index 0.00 2.20 0.00 0.00 0.00
Uniformity index 0.00 0.95 0.00 0.00 0.00
Note:
The Benthos community around PT SERD's work area in Semester 2 of 2019 monitoring period is composed of 2 groups, namely
Diptera (3 types), and Coleoptera (2 type).
The density and number of benthic taxa around PT SERD in the Semester 2 of 2019 monitoring period vary at all locations.
Benthos abundance density is between 14 - 182 Ind/m2 and between 1 - 5 taxa.
The diversity index of benthos during this period shows low diversity ranging from 0 - 2,20.
The uniformity index value of benthos in all monitoring locations in Semester 2 of 2019 ranges from 0 – 0.95. The range of
values is in the category of high uniformity.
![Page 56: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/56.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 58
8.7 Flora / Fauna Summary of Flora / Fauna Monitoring as follows:
Measurement Period [Construction Phase] Two times
[Post operation Phase] Every 6 months
Any concerns and measures taken:
Flora and fauna monitoring is done on a regular basis. Camera traps, fauna sightings, and and flora inventory are done. 6-monthly monitoring is done by PT Radiant Utama (RKL-RPL consultant). Drone surveys are also conducted in preparation for biodiversity offset and routine patrol for possible illegal land clearing around project area/offset area.
Measurement Method Data collection method through Inventory /direct observation of the area to be cleared and re-vegetated.
Data analysis through vegetation analysis.
Measurement Points
1. Code Location Coordinat E Coordinat NS
FF-1 PLTP Facility Area 103°25’ 28.50” 4°11’ 42.87”
FF-2 Wellpad B 103°24’ 25.42” 4°12’ 36.82”
FF-3 Shortcuts Area 103°24’ 33.94” 4°11’ 35.38”
FF-4 Wellpad D 103°23’ 25.25” 4°12’ 8.31”
FF-5 IP-1 103°24’ 11.74” 4°10’ 37.12”
FF-6 Wellpad I 103°21’ 39.43” 4°13’ 42.91”
Table of Land Cover at Sampling Location
No Land Cover Lokasi
FF-1 FF-2 FF-3 FF-4 FF-5 FF-6
1 Forest + + + + +
2 Moor/ field +
3 Mixed Garden + +
4 Coffee Farm + + +
5 Scrub + + + + +
Table Flora Inventarization Result in All Area Semester 2 Year 2019
No Latin Name FF-1 FF-2 FF-3 FF-4 FF-5 FF-6 IUCN
1 Quercus sp ++ + + + + LC
2 Quercus sundaica + LC
3 Ficus gibbosa + LC
4 Dilleniaceae + ++ ++ + -
5 Dacrycarpus imbricatus ++ ++ +++ + LC
6 Cinnamomum spp + VU
7 Litsea spp + + VU
8 Podocarpus neriifolia + LC
9 Schima spp ++ ++ ++ ++ ++ LC
10 Litsea spec + VU
11 Neolamaerckia spp ++ ++ -
12 Scorodocarpus ++ -
13 Toona spp + LC
14 Cyathea contaminans ++ + ++ LC
15 Exbucklandia sp + + -
16 Ochthocharis bornensis + -
17 Litsea sp + + LC
18 Alstonia spp + + + LC
![Page 57: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/57.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 59
No Latin Name FF-1 FF-2 FF-3 FF-4 FF-5 FF-6 IUCN
19 Santiria spp ++ LC
20 Myrtaceae + -
21 Mimosa + ++ LC
22 Lantana camara ++ LC
23 Macaranga + + + VU
24 Piper spp + -
25 Melastoma ++ LC
26 Glichenia linearis ++ + ++ -
27 Imperata cylindrica ++ ++ ++ -
28 Dillenia + -
29 Bambusa ++ LC
30 Mollotus + + -
31 Vatica + ++ ++ -
32 Vitex pubescens + -
33 Hopea + VU
34 Intsia + VU
35 Cassia alata + -
36 Litsea + LC
37 Artocarpus elastica + + -
38 Dryobalanops + ++ + LC
39 Dioscorea + LC
40 Hopea sp + VU
41 Cyperus + LC
42 Eugenia + -
43 Peronema canescens + -
44 Hibiscus sp + -
45 Lagerstroemia speciosa + -
46 Pithecellobium jiringa + -
47 Syzygium zolingeriana + -
48 Cofea spp + +++ -
49 Musa spp + ++ LC
50 Cocos nucifera + + -
51 Mangifera spp + LC
52 Albizia chinensis + + LC
53 Cordyline + -
54 Manihot esculenta + + -
55 Hibiscus tiliaceus + + -
56 Disambiguasi + -
57 Pterospermum sp + -
58 Nephelium lappaceum + LC
59 Antidesma neurocarpum + -
60 Litsea spathulata + -
61 Casuarina spp + ++ + ++ -
62 Litsea ++ ++ ++ ++ LC
63 Pennisetum purpureum +++ ++ LC
64 Moducha spp + + -
65 Meliaceae + -
66 Cinnamomum spp + -
67 Styrax + LC
68 Eugenia sp + + + -
69 Lithocarpus + + + + + -
70 Syzygium + -
71 Neobalanocarpus + -
72 Pogostemon cablin + -
73 Litsea firma + LC
74 Macaranga spp + VU
75 Ficus spp ++ ++ VU
76 Schima ++ + ++ -
![Page 58: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/58.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 60
Table Ecological value of plant communities in the PT SERD work area in Semester 2 of 2019
No Ecology Value FF-1 FF-2 FF-3 FF-4 FF-5 FF-6
Tree Sapling Tree Sapling Tree Sapling Tree Sapling Tree Sapling Tree Sapling
1 Number of Type 9 14 18 21 13 13 12 16 12 16 5 9
2 Number of Individu 15 26 37 48 30 30 26 25 21 25 8 19
3 Density 93,75 650 231,25 1200 187,5 750 75 625 131,25 625 50 475
4 Diversity 2,14 2,37 2,69 2,56 2,42 2,36 2,32 2,60 2,40 2,68 1,77 2,17
5 Uniformity 0,97 0,90 0,93 0,84 0,94 0,92 0,93 0,94 0,97 0,97 1,09 0,99
Vegetation analysis at PLTP locations (FF1)
No Local Name Latin Name Tree Sapling
FR KR DR NP FR KR DR NP
1 Medang cabe Litsea spp 8.70 6.67 7.10 22.47 8.33 16.67 5.78 30.78
2 Medang putih Litsea sp 13.04 10.0 10.25 33.29 4.17 3.33 2.10 9.60
3 Pasang babi Quercus sp 4.35 10.0 5.20 19.55 4.17 3.33 1.80 9.30
4 Lengkanai Dacrycarpus
imbricatus
13.04 13.33 30.10 56.47 8.33 6.67 15.15 30.15
5 Kapas Exbucklandia sp 4.35 6.67 7.25 18.27
6 Seru Schima spp 17.39 13.33 9.25 39.97 12.5 13.33 12.30 38.13
7 Kelat Dilleniaceae 13.04 13.33 9.75 36.12 12.5 10.0 9.10 31.60
8 Kapur Dryobalanops 4.35 6.67 4.15 15.17 4.17 3.33 6.35 13.85
9 Medang cantik Litsea spp 4.35 6.67 2.75 13.77 8.33 6.67 25.17 40.17
10 Pasang Quercus sundaica 4.35 3.33 4.10 11.78 4.17 3.33 2.75 10.25
11 Temalun Hopea sp 4.17 3.33 3.10 10.16
12 Pakis tiang Cyathea contaminans 12.5 10.0 6.20 28.70
13 Medang perangwas - 4.35 3.33 3.25 10.93
14 Cemara gunung - 4.35 3.33 3.75 11.43
15 Sapat - 8.33 13.33 9.15 30.81
16 Kirinyuh - 8.33 6.67 1.05 16.05
17 Asam-asam - 4.35 3.33 3.10 10.78
Notes:
FR = Relative Frequency;
KR= Relative Density;
DR= Relative Dominance;
NP: Important Value
Vegetation analysis at Wellpad B (FF-2)
No Local Name Latin Name Tree Sapling
FR KR DR NP FR KR DR NP
1 Kelat Dilleniaceae 6.67 9.52 27.10 43.29 5.0 4.0 3.10 12.10
2 Kelat arang/medang Sp-1 20.0 14.29 18.15 52.44 5.0 8.0 4.70 17.70
3 Pasang Quercus sundaica 6.67 9.52 5.70 21.89 5.0 8.0 6.60 19.60
4 Bekegung Sp-2 13.33 14.29 5.10 32.72 5.0 4.0 5.10 14.10
5 Pasang babi Quercus sp 6.67 4.76 3.15 14.58 5.0 4.0 4.75 13.75
6 Medang sirei Litsea spec 6.67 4.76 6.75 18.18 5.0 4.0 3.80 12.80
7 Punggung kijang Scorodocarpus 6.67 4.76 6.28 17.71 5.0 4.0 4.45 13.45
8 Jambu-jambu Myrtaceae 6.67 4.76 3.10 14.53 5.0 4.0 10.15 19.75
9 Seru Schima spp 6.67 19.05 13.15 38.87
10 Seru berubah/
medang gatal
Schima Litsea 6.67 4.76 5.10 16.53
11 Jabon Neolamaerckia spp 5.0 12.0 4.15 21.15
12 Cengkelung/ angrum/
cendelung
Sp-3 15.0 12.0 18.50 45.50
13 Sapat Vatica 10.0 8.0 11.69 29.69
14 Mahang d kecil Macaranga 6.67 4.76 3.20 14.63 5.0 4.0 4.12 13.12
![Page 59: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/59.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 61
15 Sengon Albizia Chinensis 6.67 4.76 3.22 14.65 10.0 8.0 6.10 24.10
16 Sikejut - 5.0 4.0 4.79 13.79
17 Anggrum - 5.0 8.0 4.25 17.25
18 Tilam - 5.0 4.0 3.15 12.15
Notes:
FR = Relative Frequency;
KR= Relative Density;
DR= Relative Dominance;
NP: Important Value
Vegetation analysis at Shortcut (FF-3)
No Local Name Latin Name Tree Sapling
FR KR DR NP FR KR DR NP
1 Kelat Dilleniaceae 20.00 20.00 12.5 52.5 5.00 3.85 9.30 18.15
2 Pasang putih Quercus sundaica 20.00 20.00 28.18 68.18
3 Surian - 5.67 5.67 12.10 10.55 15.00 15.38 8.15 48.53
4 Bekulung Sp-1 5.67 5.67 10.55 21.89 10.00 7.69 5.25 22.94
5 Cemara gunung Casuarina spp 20.00 20.00 18.15 58.15 5.00 7.69 10.20 22.89
6 Pasang babi Quercus sp 5.67 5.67 8.10 19.44
7 Medang basah Litsea 5.67 5.67 4.70 16.04
8 Cendelung Sp-2 5.67 5.67 3.28 14.62 15.00 11.54 19.70 46.24
9 Seru Schima spp 5.67 5.67 2.65 13.99 5.00 7.69 9.15 21.84
10 Medang cabe Litsea spp 5.00 3.85 3.10 11.95
11 Sapat Vatica 15.00 15.38 25.30 55.68
12 Pisang - 5.00 7.69 2.15 14.84
13 Anggrum - 10.00 11.54 3,.5 24.69
14 Merdeka - 10.00 7.69 3.45 21.14
Notes:
FR = Relative Frequency;
KR= Relative Density;
DR= Relative Dominance;
NP: Important Value
Vegetation analysis at Wellpad D (FF-4)
No Local Name Latin Name Tree Sapling
FR KR DR NP FR KR DR NP
1 Kelat Dilleniaceae 5.26 7.69 9.35 22.3 5.26 4.0 8.10 17.36
2 Seru Schima spp 15.79 15.38 15.10 46.27 5.26 8.0 7.20 20.46
3 Lengkanai Dacrycarpus
imbricatus
15.79 15.38 12.05 43.22 5.26 8.0 8.40 21.16
4 Pasang babi Quercus sp 10.53 11.54 11.05 33.12 5.26 4.0 3.50 12.76
5 Cemara gunung Casuarina spp 5.26 3.85 4.60 13.71 5.26 4.0 4.15 13.41
6 Medang putih Litsea sp 10.53 19.23 23.75 53.51 5.26 4.0 2.10 11.36
7 Kelat arang Sp-1 10.53 7.69 4.80 23.02 5.26 4.0 1.18 10.44
8 Punggung kijang Scorodocarpus 5.26 3.85 3.70 12.81 10.53 8.0 8.10 26.63
9 Balam Palaquium 5.26 3.85 3.80 12.91
10 Bernai Antidesma
neurocarpum
5.26 3.85 4.20 13.31
11 Sapat Vatica 10.53 12.0 30.25 52.78
12 Paku tiang Sp-3 10.53 20.0 10.20 40.73
13 Tilam Sp-4 5.26 4.0 2.60 11.86
14 Medang cabe Litsea spp 5.26 3.85 3.50 12.61 5.26 4.0 2.10 11.38
15 Pasang Quercus sundaica 5.26 3.85 4.10 13.21 5.26 4.0 2.25 11.51
16 Asam-asam Santiria spp 5.26 4.0 1.85 11.11
17 Kirinyuh - 5.26 4.0 3.12 12.38
18 Balik angin - 5.26 4.0 4.90 14.16
Notes:
FR = Relative Frequency;
KR= Relative Density;
![Page 60: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/60.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 62
DR= Relative Dominance;
NP: Important Value
Vegetation analysis at IP-1 (FF-5)
No Local Name Latin Name Tree Sapling
FR KR DR NP FR KR DR NP
1 Cemara gunung Casuarina spp 14.29 12.50 25.75 52.54
2 Seru Schima spp 28.52 37.53 25.15 91.25 13.33 10.53 15.75 39.61
3 Pasang Quercus sundaica 28.52 25.20 20.25 73.62 6.67 5.26 5.15 17.08
4 Cendelung Sp-1 6.67 15.79 17.25 39.71
5 Semantung Sp-2 13.33 10.53 20.10 43.96
6 Bambu betung Bambusa 6.67 5,.6 5.10 17.03
7 Kayu manis - 13.33 15.79 10.75 39.87
8 Cempedak - 14.29 12.50 18.75 45.54
9 Kirinyuh - 13.33 10.53 10.15 34.01
10 Anggrum - 13.33 15.79 7.12 36.17
11 Lengkanai - 14.29 12.50 15.10 41.89
12 Mahang daun kecil - 13.33 10.53 8.70 32.56
Notes:
FR = Relative Frequency;
KR= Relative Density;
DR= Relative Dominance;
NP: Important Value
Vegetation analysis at Wellpad I (FF-6)
No Local Name Latin Name Tree sapling
FR KR DR NP FR KR DR NP
1 Kelat Dilleniaceae 3.70 5.41 4.25 13.36 3.23 2.08 3.75 9.06
2 Kenari Canarium ovatum 14.81 13.51 17.98 46.3 3.23 2.08 5.10 10.41
3 Lengkanai Dacrycarpus
imbricatus
14.81 13.51 22.15 51.47 3.23 8.33 9.20 20.76
4 Seru Schima spp 11.11 18.92 22.48 52.51 9.68 25.00 15.30 49.98
5 Medang cabe Litsea spp 3.70 2.70 2.10 8.50 12.90 8.33 3.15 24.38
6 Punggung kijang Scorodocarpus 7.41 5.41 4.15 16.97 6.45 4.17 7.10 17.72
7 Medang cantik Litsea 3.70 2.70 1.13 7.53 6.45 14.58 10.15 31.18
8 Cemara gunung Casuarina spp 3.70 2.70 1.18 7.58 3.23 2.08 3.10 8.41
9 Simpur Dillenia 3.70 5.41 5.10 14.21 6.45 4.17 6.75 17.37
10 Asam-asam Santiria spp 3.70 5.41 1.75 10.86 3.23 2.08 4.10 9.41
11 Medang pelawas Cinnamomum spp 3.70 2.70 2.10 8.50 3.23 2.08 3.15 8.46
12 Pasang Quercus sundaica 3.70 2.70 1.25 7.65 3.23 2.08 4.10 9.41
13 Kayu aro Ficus gibbosa 3.70 2.70 2.30 8.70 3.23 2.08 3.25 8.56
14 Pasang babi Quercus sp 3.70 2.70 3.55 9.96 3.23 2.08 2.15 7.46
15 Medang putih Litsea sp 3.70 5.41 2.18 11.29 3.23 2.08 2.30 7.61
16 Balam Sp-1 3.70 2.70 3.35 9.75
17 Cengal Dipterocarpaceae 3.70 2.70 2.75 9.15
18 Kapur Dryobalanops 3.70 2.70 2.63 9.03 3.23 2.08 2.10 7.41
19 Balik angin Mollotus 6.45 4.17 2.35 12.97
20 Jabon Neolamaerckia spp 6.45 4.17 2.75 13.37
21 Pakis tiang Sp-3 3.23 2.08 2.85 8.16
22 Sikejut - 3.23 2.08 3.70 9.01
23 Mahang - 3.23 2.08 3.60 8.41
Notes:
FR = Relative Frequency;
KR= Relative Density;
DR= Relative Dominance;
NP: Important Value
![Page 61: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/61.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 63
Important Value Index distribution> 15% at the level of trees and saplings
No Local Name
Species Latin Name
FF-1 FF-2 FF-3 FF-4 FF-5 FF-6
tree sapling tree sapling tree sapling tree sapling tree sapling tree sapling
1 Medang cabe Litsea spp 6 5 3
2 Medang putih Litsea sp 1 4 3
3 Pasang babi Quercus sp 6 2 7 6
4 Lengkanai Dacrycarpus imbricatus 3 3 1 3 1 4
5 Kapas Exbucklandia sp 3 6
6 Seru Schima spp 6 1 2 1 4 2 1 2 1 4 5
7 Kelat Dilleniaceae 3 5 5 5 4 5 1
8 Kapur Dryobalanops 9 8
9 Medang cantik Litsea sp 2 9 2
10 Pasang Quercus sundaica 1 5 8
11 Pakis tiang Sp-1 2 - 6
12 Sapat Vatica 1 1 - 7 1
13 Kelat arang Syzygium 6 2
14 Beke Sp-2 5 3 7
15 Punggung kijang Scorodocarpus 7 3 4 5 5
16 Medang sirei Litsea spec 5
17 Kelat gulandah Syzygium 6
18 Seru berubah Schima spp 6
19 Cengkelung/
angrum/ bangkirai
Sp-3 2 3 2
20 Sengon Albizia chinensis 3
21 jabon Neolamaerckia spp 4
22 Mahang kecil Macaranga 6
23 Cemara gunung Casuarina spp 2 4 2 7 6
24 Simpur Dillenia 4
25 Surian Disambiguasi 4 3
26 Medang basah Litsea 7
27 Semantung Sp-4 1
28 Bambu betung Bambusa 4
![Page 62: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/62.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 64
9. Permit Compliance
9.1. Compliance with AMDAL Documents
Summary of AMDAL Document compliance as follows:
Monitoring Item Monitoring Results during Report Period
Conditions attached to AMDAL
approval (Conditions shown in
the Articles of AMDAL Approval
letter dated 15 March 2017)
1. Please confirm if you have achieved all conditions attached to AMDAL approval. : [Yes / No]
2. Describe the situation and measures taken if delays/complications in implementation of the
conditions/ obligations are identified.
AMDAL Approval has been obtained.
9.2. Compliance with Environmental Permit
Summary of environmental permit compliance as follows:
Name Competent Authority Status
Renewal of Permit for
Hazardous Material
Temporary Storage Building
(Izin Tempat Penyimpanan
Sementara Limbah B3)
Regent of Muara Enim
(Bupati Muara Enim)
Has the permit been approved/ issued? : Yes / No
If "Yes", please provide the approved/issued date (17/Nov/2014). Please
also submit a copy of the permit together with this monitoring form. (See :
Attachment : ---
If "No", please provide the expected approval/issuance date
(DD/MM/YYYY).
Soonest from Muara Enim regency. All administrative requirements and
site inspection have been completed.
Any issues regarding
Monitoring Item mentioned
above
Reasons/ Background
Information
No
Measures: -
![Page 63: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/63.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 65
10.Biodiversity Action Plan Summary
Summary of Biodiversity Action Plan as follows:
Monitoring & Action Item Monitoring Results during Report Period
Completion of Biodiversity Action Plan Has Biodiversity Action Plan (BAP)(including Supplemental Report) been completed? : Yes/No If "Yes", please provide the information of the completion date. (9 Jan 2018)
Please submit a copy of the final BAP together with this monitoring form and share the
information about the modified contents from the draft plan that is issued on 16 January
2018.
If "No", please provide the expected completion date of the final BAP: MM/YYYY. For each action item detail the actions taken and the current status and outcomes.
BAP document has been finalized in 2018. Please see the table below for action plan status. Impacts on biodiversity in/around the
project site Are there any problems regarding impacts on biodiversity pointed out by the National / Local
authority? Yes/No If yes, please describe the outline of the problems and measures taken.
Any issues regarding Monitoring Item
mentioned above
Reasons / Background Information Mitigation Measures
No aissue - -
10.1 Biodiversity Action Plan Details
BAP Status
No Action Plan Status Date/Reference
1 Appoint a Site Support Manager to
supervise SHE aspects at site
SHE is now under Site SHE Manager.
Biodiversity Officer directly reports to
Senior Manager SHE.
Site SHE Manager (Marc Blondeel), Site
Support Manager (Franky Tungka), and KTPB
(Ridha Mulia) are located at site.
Biodiversity Officer is Muhammad Hendra.
2 Implement adaptive management measure Establishing site specific procedure Site Specific Procedures are constantly
updated (as necessary).
3 Develop protocols for the management of
injured wildlife
Done -
4 Establish an incident reporting mechanism Done -
5 Identification of Wildlife Crossing Points Installation of Camera traps and
hourly manpower to observe
Upon discovery, none have been identified
so far
6 Assess the need for the installation of
artificial crossing for endangered arboreal
mammals
No wildlife crossing has been
identified to intersect with project
roads
-
7 Conduct a flora and fauna survey prior to
construction of wellpad
Done by Rekind and Sriwijaya
University
6 times during pre-construction before land
clearing
Current update:
No land clearing by SERD occured during
2H19.
8 Wildlife shepherding activities Have already been socialized to
company employees
-
9 Ensure clearing has been limited to the
identified area
Done by Project and EPC Contractor Cross country brine line clearing monitoring
and ensuring the area openings do not
exceed the provisions set by the government
or other regulations.
![Page 64: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/64.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 66
10 Brief all involved personnel on wildlife
shepherding activities
Procedure has been socialized to all
SERD and EPC-C workers
During induction and prior to work,
employees will be given induction/toolbox
meetings that include socialization of
biodiversity protection and management.
11 Establish a site nursery Established near Wellpad C area and
at access to WP-B (jalan Badak)
Has been established since exploration
phase.
Current update:
Expansion and maintenance of nursery
facility.
12 Develop a comprehensive Offsite
Biodiversity Offset Design
Final draft issued. Document is continuously being improved
and improvements are regularly
communicated with related parties.
Note : BOMP v 3.4 was issued to ADB on 23
January 2020
![Page 65: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/65.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 67
13 Conduct a water extraction pre-feasiblity
assessment
Conducted by FODD. Done -
14 Collect native flora seed before land
clearance
Conducted by Site SHE. Done Prior to land clearing (Seeds used for nursery
establishment and revegetation programs).
Native seeds are also collected regularly to
support the establishment of the site
nursery.
15 Local community engagement to raise
awareness of the conservation value of
forest
Socialization on forestry
management protection (signs,
campaign, etc.)
Conducted regularly by Biodiversity Offset
team (installation of signs, community
outreach and campaigns are done as
necessary)
16 Undertake daily monitoring of PT SERD
access roads to secure them from poaching
activity
Joint patrols with local forestry police Conducted regularly by Site SHE and
Biodiversity team with support from local
forestry and police.
Investigation of potential animal sighting
near the cross country brine line area
Drone survey around WP-B access
17 Company drivers to receive internal
defensive driving training
Done on a regular and as needed
basis
Conducted on a regular and as needed basis
(see list of training).
DDC instructor has been recruitted.
18 Conduct speed check Done on a regular basis Conducted on a regular basis
![Page 66: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/66.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 68
19 Lighting management Being conducted during drilling /
construction activities
Regularly monitored by Project, Drilling, and
SERD SHE teams.
20 Ensure night works will not disturb wildlife SERD SHE and EPC-C’s SHE have been
conducting surveys, socialisation with
workers and nearby settlers, creating
signs, award campaigns, discussions,
etc. to ensure the sucess of
Conducted and monitored by Site SHE on a
regular basis during construction period.
Current update:
- Night works are currently minimal, but is
regularly monitored by site SHE and
Project team
- Biodiversity team regularly monitors and
reports as well as conduct patrols with
relevant officers
- Biodiversity awareness is socialized
regularly by site SHE and Biodiversity
team
- Biodiversity campaign is continuosly
improved, addition and maintenance of
signs are updated as necessary
- RKL-RPL monitoring is conducted on a 6-
monthly basis to ensure all regulated
environmental protection policy is within
the regulated threshold
- Signs and biodiversity campaigns are
installed at construction and sensitive
areas
21 Conduct regular monitoring of flora and
fauna in Project areas
22 All construction personnel and PT SERD
staff will undertake biodiversity awareness
training
23 Put up and maintain information posters
and literature on ecological awareness
24 Monitor compliance with PT SERD
environmental protection policy
25 Monitor construction areas for signs of
potential wildlife conflict, illegal logging
and poaching
26 Workers to be trained in noise-reduction
behaviours
A number of workers and SHE
personel equiped with Noise
detectors
Conducted and monitored by Site SHE on a
regular basis.
Current update:
Noise monitoring is conducted regularly
![Page 67: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/67.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 69
27 Crossing points/ arboreal crossing bridge is
retained in good functional condition
Will be installed if necessary. None of
wildlife crossing has been identified /
required.
Will be reassessed and installed when
necessary.
28 Measure long term population changes and
trends for key species
Camera trap results and fauna
sightings are recorded for future
habitat databse mapping
Will be reassesed with experts in the future
29 Consultation relevant stakeholders to
determine the composition and type of
planting to be achieved
Consultation with local and provincial
forestry agencies
Types of plants have been approved by DAS
Musi and provincial foresty.
30 Develop a community based forest
restoration project
Community will be engaged during
forestry restoration project
Community will be engaged in the planting
and maintenance of the revegetation within
the PT SERD Biodiversity Offset area.
Socialization of Foresty status to Segamit
Villagers regarding forest clearing and
socialization of Police Head Announcement
to ban forest burning.
Contributed to KPH 8 Semendo 6 manual
portable water pump for fighting forest fire
in a remote area.
Discuss offset location and farmers’ involvement with official from Muara Enim
regency
![Page 68: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/68.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 70
Discuss offset location and farmers’ involvement with officials from Semendo
sub-district.
31 Install warning signs regarding hunting and
poaching at the border of the buffer area of
the Protection Forest.
Several have been installed. Will be a
continuous effort and additional
signs will be added if necessary
Banner installation for wildlife conflict,
illegal logging, poaching awareness is added
as necessary.
Currently:
Addition of 20+ signs and banners at the
Protection Forest and villages nearby project
site. have been installed at project site.
32 Establish a communication system with the
local forestry office and report illegal
hunting / logging.
PT SERD has a routine patrol not only
with local forestry agency but also
with Provincial forestry agency
Consultation with relevant parties is
regularly conducted and
Current update:
Consultation and discussion with the South
Sumatra provincial forestry service
(government) regarding land clearing and
forest fires by the planters and residents
![Page 69: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/69.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 71
Confiscation of 3 motorbikes by
environmental and forestry law enforcement
and pieces of wood as evidence of illegal
logging.
33 Develop and update habitat mapping
database
Will be conducted every 3 years Camera trap results and fauna sightings are
recorded for future habitat databse
mapping.
Will be reassesed with experts in the future.
34 Construct security gates to restrict access
of vehicle
Already installed in several areas: for
example : Post-0 at Block-0 ; Post-1
at Warehouse ; Post 2 at near Talang
Tinggi Accomodation.
35 Conduct regular patrols of the project
boundary
Regularly conducted by PT SERD
security, and often accompanied by
local and provincial forestry agency
Conducted on a regular basis
Conducted joint patrol with forestry
enforcement team, following up on PT.
SERD’s report regarding land clearing and
burning of land.
36 Conduct regular drone flight On a weekly basis. Drone monitoring of Access B area
Drone Utilization for joint patrol; Monitoring
of landfire and clearing at Junction B project
site, opened by coffee planter
![Page 70: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/70.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 72
37 Conduct invasive species survey of WP-
L,M,N and X and injection brine pipeline
route.
Has been conducted prior land
clearing
Current Update:
Invasive species monitoring is regularly
maintained.
38 Educate local people and restrict clearing
by local people
PT SERD has routine socialization not
only with local forestry agency but
also with provincial forestry agency
Is done as necessary. Regular consultations
are done between PT SERD Biodiversity
manager with local forestry and community
on a daily/weekly basis.
Conducted a socialization program for the
Musi Catchment Rehabilitation with the
head of Yayasan village.
39 Interviews with local people on their
ecosystem service use within Project Area
and AoI
Has been Done by ERM Document was composed in November
2017.
40 Monitor land clearing and assess feasibility
of providing alternative income
Land clearing is monitored by
Security Patrol and Drone flying.
CSR is also meant to improve the likelihood
of the farmers and reduce new illegal
farming within the protection forest.
For example : intensification of coffee farms
(with local Universitas Sriwijaya, contribute
barley seeds to farmers.
Delivered of barley seeds to farmers as an
alternative crop for a source of income.
![Page 71: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/71.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 73
10.2 Biodiversity (endangered species) Summary of Biodiversity (endangered species) Monitoring as follows:
Measurement Period [Construction Phase]
Regularly (At least every 3 years) [Operation Phase]
Regularly (At least every 3 years)
Any concerns and measures taken:
Various actions for biodiversity protection have been taken, such as Direct Observations (fauna sighting) by workers at SERD project area and recording them, camera trap installation and data logging on a monthly basis, as well as surveys prior to land clearing for wellpad purposes. Joint patrols are conducted on a regular basis. The patrols involve instances from the local forestry, consultant, SERD security, SERD SHE and biodiversity team. Drone surveys are also conducted to monitor changes in land cover. Induction and biodiversity campaigns are conducted regularly. Forestry and biodiversity protection signs are installed within and outside project area.
Measurement Method Direct observation
Camera Trap
Joint Patrols
Measurement Points Number of locations will be determined later based on analysis of the observation data. The below are the previous locations during biodiversity study.
Fauna Monitoring Result Semester 2 Year 2019
No Local Name Scientific Name
Location
Status IUCN
WP-B Power
Station WP-I
Access
Road
WP-D
IP-i Shortcut
A MAMALIA
1 Bear Helarctos malayanus + - - + - - P VU
2 Deer Cervidae unicolor + - + - - P VU
3 Monkey Macaca fascicularis + + + + + - LC
4 Beruk Macaca nemestrina + + + - - VU
5 Chimpanzee Presbytis melalophos + + - + - + P EN
6 Boar Sus scrofa + + + + + + LC
7 Siamang Symphalangus syndactylus. + + + + + P EN
8 Weasel Mustela nivalis + - - + - - LC
9 Mountain Cat Felis (Prionaliurus) spp + - + - - - P LC
10 Bat + - + - - - LC
B HERPETOFAUNA
1 Lizard Mabouya sp + + + + + + LC
2 Monitor Lizard Varanus salvator + - - - - - LC
3 Ular sendok Naja sp + + + + - - LC
4 Ular tikus - - + - - - LC
C AVES
1 Cinenen gunung Orthotomus cuculatus + + + + - + LC
2 Prenjak Prinia atrogularis + - + - + + LC
3 Tekukur Streptopelia chinensis + - - - + - LC
4 Layang-layang Hirundo tahitica + + + + + + LC
5 Butbut Centropus sinensis + + - + - - LC
6 Cekakak Todirhamphus chloris + + + + - + P LC
7 Burung madu belukar Hypogramma sp + - + - - - P LC
8 Srigunting Dicrurus + - + + - + LC
9 Elang hitam Ictinaetus malayensis + - + - - + P LC
10 Cabecabean Dicaeum spp + + - + - - LC
11 Kijoan Chloropsis sp + - - - - - LC
12 Punai Treron sp + - - + - - LC
13 Kutilang Pygnonotus - - - - + - LC
14 Walet dada putih Colocalia linchi + + + + + + LC
![Page 72: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/72.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 74
No Local Name Scientific Name
Location
Status IUCN
WP-B Power
Station WP-I
Access
Road
WP-D
IP-i Shortcut
15 Sriti Colocalia esculenta - + - - - - LC
16 Elang putih Elanus caerulens + - - + - + P LC
17 Percici Trichoglos sp + - - - - + LC
18 Elang brontok Spizaetus cirrhatus. + - - - - + P LC
19 Rangkong/ Kangkareng hitam Anthracoceros malayanus + - + + - - P VU
Jumlah 29 13 19 20 8 14
Notes : P = Protected
Species Monitoring by Camera Trap Summary
Note: See Lender’s Monthly Report for each month for detailed camera trap results
Camera
Trap No. Month Species Documentation Status
CT-03
(WP-L)
July
Unidentified Bird
N/A
Marbled Cat
(Pardofelis marmorata)
Near threatened
Weasels
(Mustela)
Least concern
August
Unidentified Bird
Martes Flavigula
Least concern
![Page 73: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/73.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 75
Marbled cat
(Pardofelis marmorata)
Near threatened
September
Martes Flavigula
Least concern
Tapir
(Tapirus indicus)
Endangered
October
Deer
(Cervidae)
Least Concern
Marbled cat
(Pardofelis marmorata)
Near threatened
Martes Flavigula
Least concern
Mydaus Javanensis
![Page 74: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/74.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 76
December
Sumatran Cocoa
Vulnerable
Sus Scrofa
Least concern
CT-02
(WP-C)
July Wild Boar
(Sus scrofa)
Least concern
August
Civet
(Paradoxurus
hermaphroditus)
Least concern
September
Martes Flavigula
Least concern
Marbled Cat
(Pardofelis marmorata)
Near threatened
![Page 75: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/75.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 77
Dhole
(Cuon Alpinus)
Endangered
Badger
(Mydaus javanensis)
Least Concern
Civet
(Viverra tangalunga)
Least Concern
Deer
(Cervidae)
Least Concern
Golden Cat
(Catopuma temminckii)
Near Treatened
Sun Bear
(Helarctos malayanus)
Vulnerable
October Sumatran Cocoa
Vulnerable
![Page 76: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/76.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 78
Martes Flavigula
Least Concern
Marbled Cat
Near Theatened
Prionodon linsang
Least Concern
Sus Scrofa
Least Concern
December Sumatran Cocoa
vulnerable
CT-04
(WP-M) July
Marbled Cat
(Pardofelis marmorata)
Near threatened
![Page 77: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/77.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 79
Civet
(Viverra tangalunga)
Least concern
Wild Boar
(Sus scrofa)
Least concern
August
Paguma larvata
Least concern
Sun Bear
(Helarctos malayanus)
Vulnerable
Deer
(Cervidae)
Least Concern
CT-1
(around
labour
camp 1)
July Wild Boar
(Sus scrofa)
Least concern
![Page 78: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/78.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 80
Civet
(Viverra tangalunga)
Least concern
August
Martes Flavigula
Least Concern
Civet
(Viverra tangalunga)
Least concern
October Tapirus Indicus
Endangered
CT-05
July
Dhole
(Cuon Alpinus)
Endangered
Tapir
(Tapirus indicus)
Endangered
September Wild Boar (Sus scrofa)
Least concern
![Page 79: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/79.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 81
Endangered Species Encounter during July - December 2019 Reporting Period
Species Name Scientific Name IUCN CITES Indonesia Encounter
Observation
Method
Dhole Cuon alpinus EN II P √ Camera Trap
Sumatran Tiger Panthera tigris sumatrae EN I P - -
Asian Elephant Elephas maximus EN I P - -
Sunda Pangolin Manis javanica EN II P - -
Smoky Flying Squirrel Pteromyscus pulverulentus EN P - -
Agile Gibbon Hylobates agilis EN II P √ Sighting
Sumatran Surili Presbytis melalophos EN P √ Sighitng
Siamang Symphalangus syndactylus EN I P √ Sighting
Note: IUCN: EN = Endangered, CR = Critical Endangered, CITES: I = Appendix I, II = Appendix II, Indonesia: P = Protected
10.3 Biodiversity Offset Strategy (BOS)
Status of BOS as follows:
• Submitted final draft of Biodiversity Offset Management Plan (BOMP) v 3.1 in September 2019 to ADB
• Joint socialization to all farmers of Offsite Area on SERD Biodiversity Offset Program to Community by
Provincial Forestry Office, Head of Muara Enim Regency, Muara Enim forestry Office and Head Semende
Darat Ulu District to Community in Muara Enim on 16 July 2019
• Socialization to farmers by door-to-door method is conducted regularly
• Recruited one (1) biodiversity officer, provided light vehicle, office space and work equipment
• Continue discussions with Forestry of South Sumatera, KPHD Semendo, DAS Musi, Muara Enim district
• Biodiversity Offset Technical Meeting among SERD, Forestry Office Regency Muara Enim and Consultant in
Jakarta on 20 September 2019
• Joint patrols are conducted on regular basis (see BAP table)
• Social census was conducted and revalidation of census data is being conducted.
• The location biodiversity offset location is within the red and blue lines in the picture below:
![Page 80: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/80.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 82
Joints Socialization on Biodiversity Offset Program to Community in Muara Enim on 16 July 2019
![Page 81: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/81.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 83
Biodiversity Offset Technical Meeting among SERD, KPH Semendo, and Forestry Consultant in Jakarta on 20
September 2019
![Page 82: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/82.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 84
11.Information Disclosure
Are the results of environmental and social safeguards monitoring
disclosed? ( Yes / No )
If yes, please provide URL or Monitoring reports.
・URL :
Environmental documents such as AMDAL/RKL-RPL reports are
disclosed for the public (should they want to review the
documents, they are available at the local environment office
and Supreme Energy office). The ESIA document has been
submitted to the lenders and is disclosed by them in their
websites.
JBIC,ADB, and NEXI will disclose URL or Monitoring reports on
their websites, unless disagreement expressed.
![Page 83: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/83.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 85
ATTACHMENTS
Attachment 1 : Environmental Activities
Attachment 2 : Safety Health Activities
Attachment 3 : Social Activities
Attachment 4 : Form 4 Facilities Agreement
Attachment 5 : Environmental & Biodiversity Monitoring Maps
Attachment 6 : Grievance Log
Attachment 7 : Environmental Monitoring Trends
Attachment 8 : Summary of Hazardous Waste Temporary Storage Inspection
![Page 84: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/84.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 86
ATTACHMENT 1 – ENVIRONMENTAL ACTIVITIES
Dust Control
Wheel Wash Facility Maintenance Camera Trap Monitoring
Invasive Species Clearing Housekeeping
Revegetation Hazardous Waste Storage Building Maintenance
Maintenance of Silt / Sediment traps
![Page 85: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/85.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 87
Noise Monitoring H2S Monitoring
Soil Erosion / Landslide Prevention
Housekeeping & Maintenance at Domestic Waste Storage Area
Nursery Maintenance and Inventory Update
Joint Forestry Patrol / Socialization
![Page 86: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/86.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 88
ATTACHMENT 2 - SAFETY HEALTH ACTIVITIES
SHE Training from Marubeni Distribution of Wheel Chock for Light Vehicle
SHE Coordination with Contractors Defensive Driving Course Refresher Training
Training of First Aid Level 2 ENGIE Site Visit (Management Walkthrough
First Aid Awareness : participants were from SERD,
CMD and DKB) Hazmat Handling Inspection
![Page 87: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/87.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 89
Hygiene Inspection
SERD Ambulance Inspection Conduct SHE Induction to Dump Truck Drivers
![Page 88: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/88.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 90
ATTACHMENT 3 - SOCIAL ACTIVITIES
Coffee Production Monitoring & Revalidation Survey to PAP
![Page 89: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/89.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 91
CSR Programs & Grievance Mechanism
![Page 90: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/90.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 92
ATTACHMENT 4 – FORM 4 FACILITIES AGREEMENT
Name of Project Rantau Dedap Geothermal Power Plant Project
Completion Date of This Form 2019/07/29
Monitoring Period (From)2019/06/30 (To)2019/12/31
Progress of Project Construction Phase / Operational Phase
Progress of Project Category required by JBIC
Construction Phase ESIA and Environmental Permits / Ecosystem and biota
Operational Phase ESIA and Environmental Permits / Ecosystem and biota
Notes ( e.g. Any comments made by the relevant authorities, and grievances from local people/NGO)
None
ESIA and Environmental
Permits
Compliance with ESIA Conditions
Monitoring Item Monitoring Results during Report Period
Conditions attached to the
ESIA( AMDAL) approval
( Conditions shown in the
Third Article and
Fourth Article of AMDAL
Approval letter dated 15
March 2017 )
1. Please confirm if you have achieved all conditions attached to the ESIA (AMDAL) approval. : [Yes / No]
2. Describe the situation and measures taken if delays/complications in implementation of the conditions/obligations are
identified.
Monitor the compliance of AMDAL is conducted regularly and reported every 6 months to the parties through RKL/RPL reports.
So far there is no feedback that have been received from the government.
Monitor the E&S compliance of ESIA is reported monthly (monthly E&S report) and MMD as LESC conducts a site visit every 6
months and submits a 6-monthly report to Lenders.
If there was any delay / complication in implementation, it will be reported, a corrective action plan is developed and followed
up to completion.
Ecosystem and biota
Monitoring Item Monitoring Results during Report Period
Status of several documents
related to the
Biodiversity※
※
Critical Habitat Assessment
(CHA),
Biodiversity Action Plan (BAP),
Biodiversity Offset Strategy
(BOS),
Biodiversity Offset
Management Plan (BOMP)
Have the documents related to the biodiversity been completed? : Yes / No
If "Yes", please submit a copy of the final version of the report together with this monitoring form and share the information
about the modified contents from the draft plan.
If "No", please share the information about the current status.
The CHA, BAP, BOS, and BOMP have been completed in this stage and will be updated based on relevant changes and progress.
- Critical Habitat Assessment (CHA) v13, dated 16 January 2018
- Biodiversity Action Plan (BAP) v6, dated 16 January 2018
- Biodiversity Offset Strategy (BOS) v5, dated 16 January 2018
- Biodiversity Offset Management Plan (BOMP) v 3.1, dated 23 September 2019.
Note : Update of BOMP has been submitted to Lenders (v 3.5, dated 23 January 2020).
Status of the Forest
Management Plan
( Conditions attached to the
IPPKH 115 ha )
Has the Forest Management Plan been completed and approved by Forestry Office of South Sumatra Government? : Yes / No
If "Yes", please provide the information of the completion date (DD/MM/YYYY).
If "No", please provide the expected completion date of the final report and current status.
Approved on 21 September 2018.
Approval Letter no : 522.053.331/3326-III/Hut
Impacts on biodiversity in/
around the project site
Please share the current status of the ecosystem conservation activities from the viewpoint of forest management and
biodiversity.
The location for biodiversity offset has been approved by Ministry of KLHK in 2018 (Approval Letter no. SK 7155/Menlhk-
PDASHL/KTA/DAS.1/10/2018). The location is adjacent to project facilities, the status is Protection Forest but has been
degraded as coffee farms. Currently in progress to free the land form farmers, with provincial forestry acting as the
Coordinator. The last public consultation was conducted on 16 July 2019 in Muara Enim district, attended by approximately
![Page 91: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/91.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 93
100 participants from farmers, local leaders, NGO, Deputy District Head, local government officers, and forestry officers.
Are there any problems regarding impacts on biodiversity pointed out by the National/Local authority? Yes / No
If "Yes", please describe the outline of the problems and measures taken.
Any issues regarding
Monitoring Item mentioned
above
・ Reasons/ Background Information ・ Mitigation Measures
Information Disclosure
Are the results of
environmental monitoring
disclosed? ( Yes / No )
If yes, please provide URL or Monitoring reports.
・ URL :
Environmental Monitoring reports are not disclosed in any URLs but can be disclosed by request. Should a copy of the
document be needed, the requestor may obtain the report directly from Governmental Environmental Office. Latest
monitoring report is for Second Semester of 2019.
JBIC will disclose URL or Monitoring reports on our website, unless disagreement expressed.
ASIA-DOCS\10129473.14
![Page 92: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/92.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 94
ATTACHMENT 5 - ENVIRONMENTAL AND BIODIVERSITY MONITORING MAPS
Code Location's Name Coordinate
Remarks E S
Camera Trap 3 Around Well Pad L 103°21'44.95"E 4°14'23.97"S
Camera Trap 2 Around Well Pad C 103°22'51.15"E 4°13'20.66"S
![Page 93: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/93.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 95
Camera Trap 5 Around EPC-C Labour
Camp
103°22'54.53"E 4°12'3.35"S
![Page 94: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/94.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 96
![Page 95: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/95.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 97
Biodiversity Monitoring (Camera Trap Placement)
![Page 96: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/96.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 98
ATTACHMENT - 6 GRIEVANCE LOG
No.
Complaint
Date
Reported
Complaint Description
Proposed
Corrective
Action
Date of
Proposed
Corrective
Action
Response Sent
to Complianant
Complaint
Closed Out
Date
Response of
Complainant
after
Complaint
Closed Out
Status
1 5 July 2019 Ali Sadikin complaint and
block the road (Anoa
road) and ask SERD to
recruit them, they have
several time visited to
site and ask recruit them
as landowner
attended also
by Rekind, SERD
and Rekind
comdev will
make them
priority and
record all
landowner and
recruit them
gradually as
previous SERD
promises
5 July 2019 Ali Sadikin CS
open the
blockade and
will waiting
Rekind and SERD
promise
15-Jul-19 Still Waiting
vacancy
Closing
Ali
Sadikin
already
work
2 5 July 2019 Gunawans family put the
wire peg at CH 3.500
before at 23 Juny 2019
they put stake at CH
6.500, Edo who has been
work as daily labour ask
to be contract worker,
Radius ask to be driver
and 2 others want to
work
SERD relation
and Rekind do
negotiation
with Gunawan,
Pak Agus
Sutarno from
SCM also do
negotiation
because
Gunawan want
get project and
supply material
8 July 2019 SERD will recruit
them because
Gunawan is
landowner at 3
areas and there
is an agreement
between SERD
and Gunawan
9 July 2019 Radius work
and there is
good
coorporation
between
Gunawan
and SERD
complaint is
closed
Closing,
radius
already
work as
driver
3 14 July 2019 Complaint from Lawang
Agung head village
regarding drainage
channel damage due to
mobilization Lawang
Agung villagers ask SERD
repair that drainage
SERD survey at
that area and
will propose to
management
15 July 2019 SERD approve to
repair drainage
at Lawang Agung
and ask local
supplier to
repair that area
On process On
process
4 16 July 2019 Some people (Womens)
from Tunggul Bute stop
the cars they complaint
to PT.SERD and
contractors to watering
road they village
regularly so many thick
dust on the road it can
cause the disease
SERD will ask
Rekind to do
regular
watering and
handle this
case/complaint
seriously
17 July 2019 Rekind has 4
watertank who
will do watering
regularly and
some of
watertank is
operating
01-Aug-19 SERD still
waiting
watering
until block 0
Closing
SERD do
watering
by water
tanker
5 30 July 2019 Blockade road by Samri
and Kamri at Padang
Panjang Ilir on Sunday 30
July 2019 at 23.00 PM
Sandri and Kamri charge
an SERD appointment to
recruit them several
months ago
SSM will
prioritize Kamri
son's at next
labor demand
31 July 2019 One of them will
recruit soon
5 August
2019
Kamri son's
is called to
work,
complaint
closed
Closing,
Samri
son's
already
work
![Page 97: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/97.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 99
No.
Complaint
Date
Reported
Complaint Description
Proposed
Corrective
Action
Date of
Proposed
Corrective
Action
Response Sent
to Complianant
Complaint
Closed Out
Date
Response of
Complainant
after
Complaint
Closed Out
Status
6 29 July 2019 Complaint from
Izharudin/Isudin family
regarding water tanker
supply propose of CV.
Danau Deduruk which
was rejected by Rekind
and Rekind still uses
Stenly who has
experienced fatality
Relation
propose to
Rekind to
consider
submission
from Izharudin
if there is a
need for
additional
water tanker
because
Izharudin is
landowner
along Air Tupai
so we can reach
smooth
mobilization
30 July 2019 Rekind still
waiting their
management
regarding
addition of
water tanker and
will prioritize
Izharudin if there
is additional
water tanker
needed
Still waiting
additional
water tank
request
Closed,
Rekind
use his
water
tank
7 30 July 2019 Heldi's complaint
landowner of CH 2.600
who want get Gabion
and channel repairing
project trough
Dermawan's CV
Relations is
working with
Management
regarding this
complaint
31 July 2019 That's area is
include
PU.Binamarga
contract so it
can't do by local
supplier
Heldi still
waiting
decision
from SERD
Closing
Sapturi
already
work in
Yin
8 30 July 2019 Rudy and Hasan Ibnani
complaint about dust
they ask 1 m hose, speed
bump and sign
Rekind give
hose to them.
Speed bump
and sign will be
installed by
SERD
31 July 2019 Management
approve and will
put speed bump
and give signs at
that area
31-Aug-19 On process SERD
already
give
pump
machine
but they
reject
9 16 August 2019 Complaint from Aldi
(Ndan land) about
priority work for
landowner he ever install
the stake three months
ago, enter the job
application 1 year ago,
and install stakes again
on July 2019
Check
landowner
acqusition data
and confirm
with committee
18 August
2019
Still Waiting
vacancy
OPEN
10 16 August 2019 Cable of electricity hit by
MTU trailer at 06.00 WIB
on 16 August 2019, 100
meter cable can't use
and 1 soundsystem is
broken
Calling MTU
transporter
coordinator and
confirmation
about damage
that cause by
MTU, and give
direction to
MTU to be
careful
19 August
2019
Transporter
through SERD
responsible and
pay
compensation
accordance with
damage caused
23 August
2019
Closed CLOSE
![Page 98: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/98.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 100
No.
Complaint
Date
Reported
Complaint Description
Proposed
Corrective
Action
Date of
Proposed
Corrective
Action
Response Sent
to Complianant
Complaint
Closed Out
Date
Response of
Complainant
after
Complaint
Closed Out
Status
11 23 August 2019 13 Worker from KTA
complaint to PT.TPI
regarding temporary
dismissal of work by
EBTKE as suspended to
Rekind due to fatality
incident, TPI ask them to
work as usual from 07.00
Wib - 17.00 Wib, but
they ask to TPI can work
just untill 16.00 Wib
doesn't approve by TPI
Ask to TPI
regarding this
complaint and
give info to TPI
that they must
wait EBTKE
decision
24 August
2019
October
2019
Waiting
EBTKE
decision.
Revoked the
suspension
on October
CLOSE
12 26 August 2019 Complaint from
Akhirman he not working
until now, thick dust
covered coffee plant at
his Galang Tinggi
Plantation
Coordination
this complaint
with committee
and regarding
watering road
among
suspended by
EBTKE SERD will
try find solution
for this problem
26 August
2019
Still waiting
vacancy and
waiting
decision
from
managemen
t regarding
watering
road while
watertank
can't
operation
OPEN
13 22-Sep-19 Complaint Munawir to
Rekind regarding
payment of watertank
three month have not
been paid.
SERD convey to
Rekind and ask
to resolve that
complaint
23-Sep-19 Rekind Comdev
still coordination
with competent
part
Still waiting
info from
financial
department
open
14 25-Sep-19 Complaint from Samrun
regarding land acqusition
for drainage chanel he
had give his land with
cheap price with hope he
can work soon
SERD will
priority him if
suspension of
Rekind has over
26-Sep-19 This case has
been
coordinated with
committee and
Rekind
Still waiting
suspension
of Rekind
has over
open
15 15 October
2019
Complaint from Jumari
landowner CH 8.100
regarding land
acquisition CH 8.100 at
2012
SERD find all
document at
2012
17 October
2019
Mediation with
landowner, Kota
Agung Police,
Kota Agung head
village
20 October
2019
Case closed close
16 16 October
2019
Blockade from
landowner at Padang Ilir
, all landowner ask SERD
recruit them
SERD will note
their name and
find vacancy for
them because
for land
acquisition at
Padang Ilir
there is
comitment for
recruit them
17 October
2019
Find vacancy for
them
21 October
2019
CIP recruit
them, case
closed
close
![Page 99: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/99.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 101
No.
Complaint
Date
Reported
Complaint Description
Proposed
Corrective
Action
Date of
Proposed
Corrective
Action
Response Sent
to Complianant
Complaint
Closed Out
Date
Response of
Complainant
after
Complaint
Closed Out
Status
17 1 November
2019
Road blockade at CH
5000 by Bpk Zulkifli
Karang Endah
SERD visit
Zulkifli and ask
reason why he
put the peg, he
want Ari his son
work at
contractor
06 November
2019
SERD and police
Kota Agung
convey to Zulkifli
SERD already
recruit their
family and help
them to be local
vendor and ask
him not to
inhibit SERD
operational
07
November
2019
Zulkifli
dismantle
his peg, case
closed
close
18 4 November
2019
Road blockade at CH
3.900 by Misno ask his
son work at SERD
SERD contact
and visit Pak
Bakti & Misno,
Pak Bakti ask
regarding when
Jepi can start
work and ask at
his area he will
determine
which vendor
will do drainage
chanel
06 November
2019
After
confirmation
with PT. YIN,
Relation convey
that his son will
work after
additional car
come to site and
give him adving
to coordination
with CIP directly
12
November
2019
Misno
dismantle
his peg, case
closed
close
19 11 November
2019
Complaint from
Gunawan landowner CH
4.030 piled up material
at his land
SERD survey to
location
23 November
2019
A lot of material
piled up at his
land 150x3 M2
with total
compensation
and amount of
compensation is
unknown
Under
negotiation
20 12 November
2019
Road blockade at CH
4.100 by Dani ask his son
in law work at SERD and
compensation letter
replaced in the name of
Dani not Gintan
Held meeting
with Dani and
Kota Agung
police SERD
replace
compensation
letterwith his
name and SERD
and committee
will recruit Aka
Efran if there is
vacancy
14 November
2019
Dani agree and
will dismantle
his peg
14
November
2019
Dani
dismantle
his peg, case
closed
Close
21 15 November
2019
Blockade road by
motorcycle at Danau
Dedorok by 11 people
from Aramantai,
Segamit, and Fajar Bulan
(Irsan Bandi CS) start
from 12.00 until 14.05
Wib all of them demand
to work they already
send aplication letter
since a long time ago
Relation,
security and
BKO go to
location and ask
why they block
the road they
convey that
they want to
work and
already waiting
for long time
15 November
2019
All the names
are noticed and
committee also
relation will
evaluate and
choose deserves
priority
15
November
2019
Block the
road is open
and they
wait SERD
and
committee
call and
recruit them
Close
![Page 100: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/100.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 102
No.
Complaint
Date
Reported
Complaint Description
Proposed
Corrective
Action
Date of
Proposed
Corrective
Action
Response Sent
to Complianant
Complaint
Closed Out
Date
Response of
Complainant
after
Complaint
Closed Out
Status
22 18 November
2019
Road blockade by wood
and stone at CH 2500 he
want his nephew can
work at SERD
Relation visit
Irul and he
convey that his
nephew want
to work
23 November
2019
Under
management
consediration
01-Dec-19 Considering
a lot of
mobilization
and peg is
tighter and
Irul is one of
landowner
so SERD will
give a
chance for
Irul, case
closed peg is
dismantle
close
23 20 November
2019
Road blockade by wood
and stone at CH 10.500
start from 17.00 Wib ask
to work Ishar/Tomy
Relation,
security and
BKO go to
location and ask
why they block
the road they
convey that
they want to
work and
already waiting
for long time
20 November
2019
All the names
are noticed and
committee also
relation will
evaluate and
choose deserves
priority
20
November
2019
Road
blockcade is
open, case
closed
close
24 21 November
2019
Complaint from Mami
landowner CH 4.000
regarding piled up
material at his land
SERD survey to
location
23 November
2019
A lot of material
piled up at his
land 3x30 M2
with total
compensation
IDR 1.6 Million.
Mami approve
proposed value
Waiting
decision
open
25 21 November
2019
Road blockade by stake
at Padang Ilir ask to
work by jacky dkk
Relation and
security visit
Jacky and ask
why his install
the stake
24 November
2019
Do negotiation
between SERD
and Jacky
landowner, SERD
notice his name
Waiting job
vacancy
open
26 29 November
2019
Blockade roan at 4
intersection of Yayasan
by wood and motorcycle
(Safriansyah DKK)
protest their motorcycle
detained by Semende
police and ask again for
centainty when they will
work
Relation,
security and
BKO go to
location and ask
why they block
the road they
convey that
they want to
work and
already waiting
for long time,
and they angry
because 3
motorcycle
detained by
SDU police
29 November
2019
They can take
their motorbike
at Semende
police office and
their name
already noticed
by committee
29
November
2019
Case closed,
blockade
road is open
close
![Page 101: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/101.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 103
No.
Complaint
Date
Reported
Complaint Description
Proposed
Corrective
Action
Date of
Proposed
Corrective
Action
Response Sent
to Complianant
Complaint
Closed Out
Date
Response of
Complainant
after
Complaint
Closed Out
Status
27 29 November
2019
Blockade road by Ilmani
and Karmi ask to work
and ask assistance for
pool excavation work at
his pool which has been
buried by material
SERD visit Karmi
he ask SERD
help him to
diging his pond
as request
when meeting
at Kota Agus
district office
with PU
Binamarga, and
he also ask 2
peoples work
3 December
2019
SERD will help to
digging the pond
and his family
will recruit
3 December
2019
Peg is
dementle
close
28 3 December
2019
Road blockade by
Khalisin & Dedi
(landowner) at Anoa
Road looking for job
oppurtunity from 09.00
wib - 09.30 wib
Relation team,
security do
negotiation at
location and
invite them to
Gate 1 office
3 December
2019
All the names
are noticed and
committee also
relation will
evaluate and
choose deserves
priority
Waiting job
oppurtunity
open
29 13 December
2019
Blockade road by
Akhirman (landowner at
Galang tinggi) at security
test 11 December 2019
SERD, committee and
rekind didn't give him
information, this test
seem closed and unfair,
blockade start from
07.30 wib and open at
08.35 wib
BKO SERD from
police open
blockade and
ask to do
negotiation at
office, security
test will be
repeated or
canceled
13 December
2019
BKO SERD from
police open
blockade and ask
to do
negotiation at
office, security
test will be
repeated or
canceled
Waiting job
security
vacancies
open
30 17 December
2019
Demonstation and
blockade road by driver
and job seeker at Batu
Surau, Padang Ilir,
Pengentaan, Yayasan,
Sukarami and gate 1 with
demand dismissed Mr.
Ralph Hoellmann & Tony
curran and other as to
work start from 06.00
Wib untill 13.00 wib
Resolve by Pak
Ridha, Adi,
Relation team,
BKO and
security
17 December
2019
Will report to
Management
Jakarta
Waiting
result
open
31 19 December
2019
Complaint from
Gunawan regarding
accumulate material at
coffee land due to bad
road condition
SERD relation
survey to
location
26 December
2019
FPP and
grievance for
compensation
that already
approve will
send to Jakarta
Waiting
routing
approval
open
![Page 102: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/102.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 104
ATTACHMENT 7 – ENVIRONMENTAL MONITORING TRENDS
Note: Results are taken from the last 5 years RKL-RPL Monitoring results
Ambient Air
Consentration Variation of SO2
Consentration Variation of NO2
Measurement results for ambient air quality parameters such as Sulfur Dioxide (SO2), Carbon Monoxide
(CO), Nitrogen Dioxide (NO2), Oxidant (O3), Hydrocarbons (HC), Total Suspended Particulate (TSP), PM10,
and PM2,5 overall have results that still meet the required quality standards. All parameters also show a
constant/stable tendency. PM10, and PM2.5 had a slight exceedance (however, still under the regulated
threshold) during 1H19, possibly due to the ongoing construction of wellpads (L, M and N). The results of
0
200
400
600
800
1000
SO
2 L
ev
els
SO2
Threshold
SO2
0
50
100
150
200
250
300
350
400
450
No
2 L
ev
els
NO2
Threshold
NO2
![Page 103: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/103.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 105
PM10 and PM2.5 have shown a decrease again during Semester 2 of 2019. Thus it can be concluded that
ambient air quality parameters is not in critical value in the monitoring of Semester 2 of 2019.
Surface Water
Concentration variation TSS
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = -0,0179x2 + 0,9107x + 1,4821
0
10
20
30
40
50
60
TS
S (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi TSS di Sungai Endikat
TSS Baku Mutu Trend TSS
y = 0,4178x2 - 3,0764x + 8,125
0
10
20
30
40
50
60
TS
S (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi TSS di Sungai Cawang
Tengah
TSS Baku Mutu Trend TSS
y = 0,1337x2 - 1,6666x + 7,8083
0
10
20
30
40
50
60
TS
S (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi TSS di Sungai Asahan
TSS Baku Mutu Trend TSS
y = -0,0606x2 + 0,2818x + 4,0333
0
10
20
30
40
50
60
TS
S (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi TSS di Sungai Cawang Kiri
TSS Baku Mutu Trend TSS
y = 0,2946x2 - 2,1254x + 6,27
0
10
20
30
40
50
60
TS
S (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi TSS di Danau Deduruk
TSS Baku Mutu Trend TSS
![Page 104: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/104.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 106
Concentration variation BOD
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = -0,053x2 + 0,25x + 6,7667
0
3
6
9
12
15
18
BO
D5
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi BOD5 di Sungai Asahan
BOD5 Baku Mutu Trend BOD5
y = 0,1071x2 - 0,8452x + 6,5714
0
3
6
9
12
15
18
BO
D5
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi BOD5 di Sungai Endikat
BOD5 Baku Mutu Trend BOD5
y = -0,1402x2 + 1,4932x + 4,9833
0
3
6
9
12
15
18
BO
D5
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi BOD5 di Sungai Cawang
Tengah
BOD5 Baku Mutu Trend BOD5
y = -0,1023x2 + 0,8947x + 5,6167
0
3
6
9
12
15
18
BO
D5
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi BOD5 di Sungai Cawang
Kiri
BOD5 Baku Mutu Trend BOD5
y = -0,4464x2 + 3,0679x + 1,7
0
3
6
9
12
15
18
BO
D5
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi BOD5 di Danau Deduruk
BOD5 Baku Mutu Trend BOD5
![Page 105: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/105.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 107
Concentration variation DO
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = 0,0394x2 - 0,3212x + 4,44
0
2
4
6
8
DO
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi DO di Sungai Cawang
Tengah
DO Baku Mutu Trend DO
y = 0,0439x2 - 0,3652x + 4,5867
0
2
4
6
8
DO
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi DO di Sungai Cawang Kiri
DO Baku Mutu Trend DO
y = 0,0477x2 - 0,3911x + 4,7233
0
2
4
6
8
DO
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi DO di Sungai Asahan
DO Baku Mutu Trend DO
y = 0,0435x2 - 0,2613x + 4,7554
0
2
4
6
8
DO
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi DO di Sungai Endikat
DO Baku Mutu Trend DO
y = -0,0143x2 + 0,32x + 3,58
0
2
4
6
8
DO
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi DO di Danau Deduruk
DO Baku Mutu Trend DO
![Page 106: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/106.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 108
Concentration variation Nitrate
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = -0,0023x2 + 0,0069x + 0,1892
0
0,2
0,4
0,6
0,8
Nit
rat
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Nitrat di Sungai Cawang
Tengah
Nitrat Trend Nitrat Baku Mutu = 10 mg/L
y = -0,006x2 + 0,0508x + 0,0916
0
0,2
0,4
0,6
0,8
Nit
rat
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Nitrat di Sungai Cawang
Kiri
Nitrat Trend Nitrat Baku Mutu = 10 mg/L
y = 0,0002x2 - 0,0079x + 0,128
0
0,2
0,4
0,6
0,8
Nit
rat
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Nitrat di Sungai Asahan
Nitrat Trend Nitrat Baku Mutu = 10 mg/L
y = 0,0007x2 - 0,0097x + 0,1052
0
0,2
0,4
0,6
0,8
Nit
rat
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Nitrat di Sungai Endikat
Nitrat Trend Nitrat Baku Mutu = 10 mg/L
y = 0,0018x2 - 0,011x + 0,0735
0
0,2
0,4
0,6
0,8
Nit
rat
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Nitrat di Danau Deduruk
Nitrat Trend Nitrat Baku Mutu = 10 mg/L
![Page 107: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/107.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 109
Concentration variation Phosphate
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Perio
y = 0,0004x2 - 0,0005x + 0,0348
0
0,05
0,1
0,15
0,2
0,25
Fo
sfa
t(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi Fosfat di Sungai Cawang
Tengah
Fosfat Baku Mutu Trend Fosfat
y = 0,0001x2 + 0,0008x + 0,0469
0
0,05
0,1
0,15
0,2
0,25
Fo
sfa
t(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi Fosfat di Sungai Cawang
Kiri
Fosfat Baku Mutu Trend Fosfat
y = 0,0001x2 + 0,0006x + 0,0303
0
0,05
0,1
0,15
0,2
0,25
Fo
sfa
t(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi Fosfat di Sungai Asahan
Fosfat Baku Mutu Trend Fosfat
y = -0,0034x2 + 0,0321x + 0,0046
0
0,05
0,1
0,15
0,2
0,25
Fo
sfa
t(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi Fosfat di Sungai Endikat
Fosfat Baku Mutu Trend Fosfat
y = -0,0018x2 + 0,0093x + 0,041
0
0,05
0,1
0,15
0,2
0,25
Fo
sfa
t(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi Fosfat di Danau Deduruk
Fosfat Baku Mutu Trend Fosfat
![Page 108: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/108.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 110
Concentration variation Oil & Fat
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
Based on the monitoring carried out on river water quality within 5 locations, it is known that the organic
matter content in river water (shown in BOD5 and COD values) in the first and second semester of 2019
exceeds the limit. The high organic matter is suspected because river water has been polluted by dead
plants, coliform bacteria originating from the feces of wild animals and carcasses of decaying wild animals
and carried by river currents from upstream to downstream areas of the river. While no complex
chemicals were found within the water bodies surrounding the project, parameters such as: pH, BOD,
COD and DO suffered a bit of a decline. This is most probably due to the accumulation of both natural
occurences such as high movement of particles due to high rainfall rate as well as impact from
construction activity. During the second half of 2019, SERD performed maintenance to the road and slope
along its side at the project area to prevent erosion, landslide and mudflow that can cause some
disturbance in turbidity. SERD has since closed out all cases involving slope failures. High rainfall rate in
SERD area is a very recurring issue. Thus, SERD aims to improve on stabilizing and preventing landslides
and issues as such.
y = -6E-17x2 + 9E-16x + 0,19
0
0,2
0,4
0,6
0,8
1
1,2
Min
ya
k d
an
le
ma
k (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Minyak dan lemak di
Sungai Cawang Tengah
Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak
y = -6E-17x2 + 9E-16x + 0,19
0
0,2
0,4
0,6
0,8
1
1,2
Min
ya
k d
an
le
ma
k (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Minyak dan lemak di
Sungai Cawang Kiri
Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak
y = -6E-17x2 + 9E-16x + 0,19
0
0,2
0,4
0,6
0,8
1
1,2
Min
ya
k d
an
le
ma
k (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Minyak dan lemak di
Sungai Asahan
Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak
y = 3E-17x2 + 4E-16x + 0,19
0
0,2
0,4
0,6
0,8
1
1,2
Min
ya
k d
an
le
ma
k (
µg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Minyak dan lemak di
Sungai Endikat
Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak
y = -6E-17x2 + 4E-16x + 0,19
0
0,2
0,4
0,6
0,8
1
1,2
Min
ya
k d
an
le
ma
k (
mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi Minyak dan lemak di
Danau Deduruk
Minyak dan Lemak Baku Mutu Trend Minyak dan Lemak
![Page 109: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/109.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 111
Produced Water
Concentration variation Dissolved Sulphate (H2S)
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = -4E-19x2 + 5E-18x + 0,0019
0
0,001
0,002
0,003
H2S
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi sulfida terlarut (H2S) di
Water Pond Well Pad RD-E
Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L
y = 3E-18x + 0,0019
0
0,001
0,002
0,003
H2S
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi sulfida terlarut (H2S) di
Water Pond Well Pad RD-C
Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L
y = 3E-18x + 0,0019
0
0,001
0,002
0,003
H2S
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi sulfida terlarut (H2S) di
Water Pond Well Pad RD-B
Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L
y = 3E-18x + 0,0019
0
0,001
0,002
0,003H
2S
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi sulfida terlarut (H2S) di
Water Pond Well Pad RD-I
Sulfida Terlarut (H2S) Trend H2S BM = 1 mg/L
![Page 110: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/110.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 112
Concentration variation Dissolved Ammonia
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = 0,0074x2 - 0,0553x + 0,1619
0
0,1
0,2
0,3
0,4
0,5
NH
3-N
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi amoniak total (NH3-N) di
Water Pond Well Pad RD-C
Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L
y = -0,0011x2 - 0,0049x + 0,1628
0
0,1
0,2
0,3
0,4
0,5
NH
3-N
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi amoniak total (NH3-N) di
Water Pond Well Pad RD-E
Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L
y = 0,0128x2 - 0,1336x + 0,4298
0
0,1
0,2
0,3
0,4
0,5
NH
3-N
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi amoniak total (NH3-N) di
Water Pond Well Pad RD-B
Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L
y = -0,0002x2 + 0,0565x + 0,1426
0
0,5
1
1,5
2
2,5
NH
3-N
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi amoniak total (NH3-N) di
Water Pond Well Pad RD-I
Amoniak Total (NH3-N) Trend Amoniak BM = 10 mg/L
![Page 111: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/111.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 113
Concentration variation Mercury
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = -1E-19x2 + 2E-18x + 0,0005
0
0,002
0,004
0,006
Hg
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi air raksa (Hg) di Water Pond
Well Pad RD-E
Air Raksa (Hg) Baku Mutu Trend Hg
y = 1E-19x2 + 9E-19x + 0,0005
0
0,002
0,004
0,006
Hg
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi air raksa (Hg) di Water Pond
Well Pad RD-B
Air Raksa (Hg) Baku Mutu Trend Hg
y = 1E-19x2 + 9E-19x + 0,0005
0
0,002
0,004
0,006
Hg
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi air raksa (Hg) di Water Pond
Well Pad RD-C
Air Raksa (Hg) Baku Mutu Trend Hg
y = 1E-19x2 + 9E-19x + 0,0005
0
0,002
0,004
0,006
Hg
(m
g/
L)
Periode pemantauan
Kecenderungan konsentrasi air raksa (Hg) di Water Pond
Well Pad RD-I
Air Raksa (Hg) Baku Mutu Trend Hg
![Page 112: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/112.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 114
Concentration variation Arsenic
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
y = 9E-19x2 + 7E-18x + 0,0049
0
0,002
0,004
0,006
0,008
0,01
As
(mg
/L)
Periode pemantauan
Kecenderungan konsentrasi arsen (As) di Water Pond
Well Pad RD-C
Arsen (As) Trend As BM = 0,5 mg/L
y = 9E-19x2 + 7E-18x + 0,0049
0
0,002
0,004
0,006
0,008
0,01
As
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi arsen (As) di Water Pond
Well Pad RD-B
Arsen (As) Trend As BM = 0,5 mg/L
y = 7E-18x + 0,0049
0
0,002
0,004
0,006
0,008
0,01
As
(mg
/L
)
Periode pemantauan
Kecenderungan konsentrasi arsen (As) di Water Pond
Well Pad RD-E
Arsen (As) Trend As BM = 0,5 mg/L
y = 9E-19x2 + 7E-18x + 0,0049
0
0,002
0,004
0,006
0,008
0,01
As
(mg
/L)
Periode pemantauan
Kecenderungan konsentrasi arsen (As) di Water Pond
Well Pad RD-I
Arsen (As) Trend As BM = 0,5 mg/L
![Page 113: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/113.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 115
Concentration variation pH
Reference: Baku Mutu = Legal Threshold; Periode Pemantauan = Monitoring Period
Based on monitoring conducted on produced water in the water pond and Wellpad RD-B mud pond, RD-
C, RD-E, and RD-I in the second semester of 2019, it is known that most parameters of produced water
quality parameters meet the quality standards so it is not in a critical condition. Drilling program during
the period occured but do not have a significant impact on produced water quality.
y = -0,028x2 + 0,2192x + 7,2833
0
3
6
9
12
pH
Periode pemantauan
Kecenderungan nilai pH di Water Pond Well Pad RD-E
pH Baku Mutu Baku Mutu Trend pH
y = -0,0315x2 - 0,1315x + 9,8339
0
3
6
9
12
pH
Periode pemantauan
Kecenderungan nilai pH di Water Pond Well Pad RD-B
pH Baku Mutu Baku Mutu Trend pH
y = 0,0982x2 - 1,1708x + 10,677
0
3
6
9
12
pH
Periode pemantauan
Kecenderungan nilai pH di Water Pond Well Pad RD-C
pH Baku Mutu Baku Mutu Trend pH
y = -0,125x2 + 0,8512x + 7,0821
0
3
6
9
12
pH
Periode pemantauan
Kecenderungan nilai pH di Water Pond Well Pad RD-I
pH Baku Mutu Baku Mutu Trend pH
![Page 114: Environmental and Social Monitoring Report...The consortium composed of PT Rekayasa Industri (‘Rekind’) and FUJI Electronics has been selected in 2017 and the fixed price EPC contract](https://reader035.vdocument.in/reader035/viewer/2022062605/5fd2906747b2b320df7762c2/html5/thumbnails/114.jpg)
Environment & Social Monitoring Report-2H19 Rev 1 Page 116
ATTACHMENT 8 – SUMMARY OF HAZARDOUS WASTE TEMPORARY STORAGE INSPECTION