Environmental Assessment Field Projects: 2015
![Page 2: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/2.jpg)
Who are we?� Independent political subdivision of the state,
created by court order in 1972� Serves all or part of 62 communities� Approximately 650 employees� Five locations: EMSC, GJM, Easterly, Westerly,
Southerly
![Page 3: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/3.jpg)
Wastewater Treatment Plants
Westerly
Southerly
Easterly
![Page 4: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/4.jpg)
![Page 5: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/5.jpg)
Water Quality and Industrial Surveillance (WQIS)
� Industrial Surveillance� Surcharge� Emergency Response� Environmental Assessment
![Page 6: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/6.jpg)
Post-Construction Monitoring Program (Consent Decree)
� To determine bacteria and nutrient loading during wet weather events (greater than 0.25 inches of rain) in order to analyze the effectiveness of the Long Term Control Plan Projects.
� Sample collection may occur multiple times per month at any of the sites between May 1 and October 31.
![Page 7: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/7.jpg)
Rain Gauge Locations
![Page 8: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/8.jpg)
Consent Decree Monitoring Sites� Some of the sites
overlap with current monitoring sites, however these samples will be their own event due to the wet weather requirement.
![Page 9: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/9.jpg)
CSO Permit Required Sampling
� Stream monitoring shall be conducted at each of the 14 sites at least once during the 5 year permit cycle.
� We are doing 10 this year. 7 CSO sites (different from above) will be sampled twice during Wet weather events, April -November.
![Page 10: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/10.jpg)
CSO Permit Sampling Sites1) Cuyahoga River upstream of Mill Creek confluence (RM 12.1/11.95)2) Cuyahoga River downstream Big Creek confluence (RM 7.0)3) Big Creek at Memphis/Tiedeman Park (RM 4.4)4) Big Creek downstream Jennings Road (RM 0.15)5) Doan Brook upstream Lee Road (RM 6.7)6) Doan Brook downstream of St. Clair Avenue (RM 0.75)7) Euclid Creek upstream of St. Clair Avenue (RM 1.65)8) Euclid Creek downstream of Lakeshore Boulevard (RM 0.55)9) Mill Creek upstream of S. Miles Road (RM 8.3)10) Mill Creek upstream of Canal Road (RM 0.12)11) West Creek downstream I-480 (RM 2.1)12) West Creek between Granger and Schaaf Roads (RM 0.2)13) Rocky River upstream of Mastick Road (RM 8.3)14) Rocky River upstream of Hilliard Boulevard (RM 2.5)
![Page 11: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/11.jpg)
Wetland Monitoring
![Page 12: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/12.jpg)
Wetland Monitoring
� May and August� Sediment and water� Photos of all the sites � Bratenhal, Nine-Mile, and Southerly
![Page 13: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/13.jpg)
![Page 14: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/14.jpg)
Integrated Planning
![Page 15: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/15.jpg)
Integrated Planning
� Working with Michigan Tech to collect data for designing models
� Models are meant to show which projects are most effective and financially the best choice
� Last year 1 wet weather event was sampled and a dry weather was done
![Page 16: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/16.jpg)
Beach Sampling and Lake Erie Nutrient Study
![Page 17: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/17.jpg)
Beach Sampling
� Villa Angela Beach, Euclid Beach, Edgewater Beach, Euclid Creek RM 0.55
� E. coli densities, field parameters, visual observation� May 1 through October 30th
![Page 18: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/18.jpg)
Beach Sampling Sites
![Page 19: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/19.jpg)
Lake Erie Monitoring
� Determine spatial trends in algal densities and nutrient concentrations in Lake Erie.
![Page 20: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/20.jpg)
Environmental Assessments for Watershed Monitoring program
![Page 21: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/21.jpg)
Euclid Creek
1) RM 1.652) RM 0.55*3) RM 0.40, fish survey only
*Consent Decree SiteCSO Permit Sampling Required
![Page 22: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/22.jpg)
![Page 23: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/23.jpg)
Cuyahoga River Sites1) RM 16.202) RM 12.103) RM 11.304) RM 10.754) RM 10.105) RM 8.606) RM 7.007) RM 5.908) RM 2.759) RM 0.20 (RM 0.25*)
*Consent Decree SiteCSO Permit Sampling Required
![Page 24: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/24.jpg)
Big Creek1) RM 0.15*2) RM 4.403) RM 0.02, West Branch4) RM 0.03, Stickney Creek5) RM 0.20, Snow and Pearl Branch6) RM 9.80*Consent Decree SiteCSO Permit Sampling Required
2014: 2 sites on Big Creek
![Page 25: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/25.jpg)
Big Creek RM 0.15, 2014
![Page 26: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/26.jpg)
![Page 27: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/27.jpg)
Mill Creek1) RM 0.122) RM 0.703) RM 2.754) RM 8.30
2014: 7 sites on Mill CreekCSO Permit Sampling Required
![Page 28: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/28.jpg)
![Page 29: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/29.jpg)
West Creek
1) RM 0.202) RM 1.603) RM 2.10 (RM 1.95*)4) RM 3.655) RM 5.306) RM 0.20, Unnamed Tributary (south)*Consent Decree SiteCSO Permit Sampling Required
2014: 4 sites on West Creek
![Page 30: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/30.jpg)
West Creek RM 0.20, 2014
![Page 31: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/31.jpg)
![Page 32: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/32.jpg)
Hemlock Creek
1) RM 0.10, Lower Branch 2) RM 0.153) RM 1.154) RM 2.50
NEORSD hasn’t sampled this creek before.
![Page 33: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/33.jpg)
Hemlock Creek RM 1.15
![Page 34: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/34.jpg)
![Page 35: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/35.jpg)
Illicit Discharge Detection & Elimination (IDDE)� Program focuses on finding the
sources of illicit discharges to local water ways� Identify an outfall with high E. coli� Outfalls are placed on a list for
investigation� Verify high E. coli and flow
measurement� If E. coli is high, begin source tracking� Some discharges may be intermittent
and require additional sampling
![Page 36: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/36.jpg)
Illicit Discharge Detection & Elimination (IDDE)
![Page 37: Environmental Assessment Field Projects: 2015 · 2015. 3. 12. · 5) RM 0.20, Snow and Pearl Branch 6) RM 9.80 *Consent Decree Site CSO Permit Sampling Required 2014: 2 sites on Big](https://reader036.vdocument.in/reader036/viewer/2022070216/611b37f52f2a581c2117146e/html5/thumbnails/37.jpg)
Environmental Assessment Group
Kelsey AmidonDonna FriedmanSeth HothemRon Maichle Mark MattesonDenise PhillipsEric SoehnlenTom ZablotnySupervisor: John W. Rhoades