Page 1: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

1

Page 2: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

INTRODUCTION

‘Deconstruction’ is the selective dismantling of buildingcomponents, specifically for re-use, recycling, and wastemanagement – “construction in reverse”,

It differs from demolition where a site is cleared of its building by themost expedient means

Contributes To Sustainability By;

giving materials a new lifecycle,

lowering the need for virgin resources, thus reducing energy andemissions from the refining and manufacturing process of new materials,

reduces the need for transportation of raw and new materials both formanufacturing and post product delivery,

provides local jobs, - 3 to 6 workers for every 1 employed in a comparabledemolition project, 2

Page 3: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

But the prime benefit of this innovation is that solidwaste from conventional demolition is diverted fromlocal landfills.

construction and demolition (C & D) waste accountsfor approximately 20% of the solid waste stream at theLethbridge landfill,

A landfills basic commodity is selling cubic meters of‘air’ which is especially relevant as C & D wastecompacts less than normal mixed stream waste, thusconsuming up to 25% more area.

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

3

Page 4: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

ECONOMIC POTENTIAL

Varies from project to project.

The amount of time and cost of labor can be a drawback.Harvesting materials from a structure can take weeks, whereasdemolition may be completed in roughly a day.

Some of the costs, if not all, can be recovered.

reusing materials in future projects,

selling reclaimed materials,

donating materials for income tax write-offs,

avoiding transportation and landfill “tipping fees” ,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

4

Page 5: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

As the City of Lethbridge continues with this innovation we have found that the local

contractor’s ingenuity in finding new uses for reclaimed materials is ever increasing and the City

is benefiting greatly

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

5

Page 6: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

PROCESS

Hazardous materials are identified and properlyabated to render a safe and clean site.

A ‘waste streaming’ specialist is engaged,

assess achievable goals,

further aid the contractor in the successful diversion ofC & D materials,

monitor and record the disposal of all materials,

prepare a detailed report of the projects success,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

6

Page 7: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

‘Waste Streaming’ process,

involves identifying and assessing various buildingelements so that prearranged ‘homes’ can be found forusable materials prior to even starting work.

Quantifying waste material is based on a percentageof the C & D material weight of all; building materials,

furnishings,

equipment,

site elements, such as parking lots, swimming pools,sidewalks, driveways,

The successful contractor is awarded salvage of allmaterials,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

7

Page 8: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

SUCCESS STORIES The City’s first waste streaming project was the 2007

deconstruction of a hotel constructed in 1889.Deconstruction was found to be a new method ofbuilding removal in the area and some project‘growing pains’ were experienced.

However through time, the local industry has gaineda better understanding of this process and while eachproject is different, the percentage of successfuldiversion of materials has significantly increased.

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

8

Page 9: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

BRIDGE INN HOTEL

9

Page 10: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

BRIDGE INN HOTEL1350 m2 (14,530 sf) - 3 story, 50 patron rooms,

Deconstruction time frame:

May 2007 to June 2007

Project Costs totalled:

$497,700

Haz Mat Abatement: $314,500

Deconstruction: $183,200

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

10

Page 11: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

11

Page 12: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Interesting accounts of salvage include; 125 pallets of brick and 6 pallets of sandstone were

salvaged,

a local resident bought 3000 bricks to finish the exteriorof his garage,

a resident bought miscellaneous wood and sandstonepieces to build a bedroom suite,

a local antique shop bought cast iron radiators andwooden door frames for resale,

Ducks Unlimited used concrete for an erosion controlproject near Stirling Alberta,

the City retained 9 pallets of sandstone and 1 pallet of600 bricks for future projects,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

12

Page 13: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Bridge Inn Hotel Project

55.4%

C & D Waste Diverted

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

13

Page 14: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

VILLAGE INN MOTEL

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

14

Page 15: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

15

Page 16: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

VILLAGE INN MOTEL1,114 m2 (11,990 sf) - 2 story, 32 patron

Deconstruction time frame:

November 2008 to April 2009

Project Costs totalled:

$277,000

Haz Mat Abatement: $142,200

Deconstruction: $134,800

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

16

Page 17: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

17

Page 18: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Interesting accounts of salvage include;

methods of sale included, on-site signage, phone-ins;drive-bys;,

a resident removed 2”x 4’’s manually for reuse inbuilding a residential garage.

a resident salvaged most of the windows to construct a54’ x 9’ x 10 ft high green house on his acreage.

a local Hutterite colony dismantled and salvaged theroof joists, mechanical units and industrial washer &dryer for use on their colony,

the contractor salvaged exterior metal handrails to bereused as deck railings,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

18

Page 19: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

flagstone and brick was sold for residential projects,

the contractor salvaged halogen yard lights for reuse intheir yard,

bathtubs were sent to a local reuse store for sale andsome were taken by local farmers for use as wateringtroughs,

asphalt was recycled as resurfacing material for a localparking lot,

Lafarge used the majority of the concrete and concreteblock to build a base structure and breakwaterstructure,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

19

Page 20: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

ADDITIONAL PROJECT BENEFITS

Cooperated with a Local Housing Authority to offer low cost temporary housing for employed

homeless over winter months,

Motel bed mattresses offered to departing patrons,

Motel furnishings were auctioned providing additional proceeds,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

20

Page 21: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Village Inn Motel Project

90.3%

C & D Waste Diverted

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

21

Page 22: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

COMMERCIAL

WAREHOUSE

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

22

Page 23: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

23

Page 24: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

COMMERCIAL WAREHOUSE

1,160m2 (12,490 sf) - farm implement dealership

Deconstruction time frame:

March 2009 to April 2009

Project Costs totalled:

$18,800

Haz Mat Abatement: minimal

Deconstruction: $18,800

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

24

Page 25: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

25

Page 26: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Interesting accounts of salvage include;

aluminum overhead door panels were reused for signbanners by a local sign company,

large steel sign was reused for a new sign elsewhere,

chainlink fencing reused by a local contractor,

weathered “barn boards” and some beams weresalvaged to build a deck,

“barn board” roof decking was salvaged to finish a smallbarn interior, and for mounting trophy animals at ataxidermy shop,

the majority of the timber columns and rafters weresalvaged to build a large camp kitchen facility,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

26

Page 27: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Commercial Warehouse Project

95.5%

C & D Waste Diverted

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

27

Page 28: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

MULTI-FACILITY PROJECTCommercial Shop / Dealership - 351 m2 (3,779 sf)

Single Family Residence - 131 m2 (1,410 sf)

Pump House & Water Storage Tank - 155 m2 (1,670 sf)

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

28

Page 29: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

29

Page 30: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

7 Bay Heavy Vehicle Shop – 783 m2 (8,433 sf)

Metal Sand Storage Quonset - 590 m2 (6,350 sf)

Concrete & Metal Salt Storage Shed - 67 m2 (720 sf)

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

30

Page 31: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

31

Page 32: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

MULTI FACILITY PROJECT

total building area: 2,077 m2 (22,360 sf)

Deconstruction time frame:

September 2009 to January 2010

Project Costs totalled:

$247,100

Haz Mat Abatement: $129,700

Deconstruction: $117,400

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

32

Page 33: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

33

Page 34: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Interesting accounts of salvage include;

A local Hutterite colony dismantled and salvaged a over half of the 7 Bay Vehicle Shop,

the majority of mechanical fixtures were also salvaged for reuse by a local Hutterite colony,

glu-lam beams, purlins and some roof decking was salvaged for City of Lethbridge reuse in a Leed Gold Project,

metal beams were salvaged for reuse by the contractor,

chainlink fencing was reused by a local contractor,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

34

Page 35: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Multi Facility Project

92.1%

C & D Waste Diverted

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

35

Page 36: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

IGA BUILDING &

JUDGES BOOTH

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

36

Page 37: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

IGA BUILDING & JUDGES BOOTH

total building area: 2,370 m2 (25,510 sf)

Deconstruction time frame:

September 2010 to December 2010

Project Costs totalled:

$224,200

Haz Mat Abatement: $92,500

Deconstruction: $131,700

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

37

Page 38: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

38

Page 39: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Interesting accounts of salvage include;

a local farmer purchased the roof system including steelbeams to build a new equipment shop,

a local farmer purchased heating units and theindustrial capacity hot water tank,

salvaged concrete was broken up and used as base fillmaterial to build up low areas at other local projects,

ADDITIONAL PROJECT BENEFITS

Building was used as a temporary archives storage facility until completion of another project,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

39

Page 40: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

IGA &Judges Booth Project

90.6%

C & D Waste Diverted

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

40

Page 41: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

16 HOUSE RESIDENTIAL NEIGHBORHOOD

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

41

Page 42: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

42

Page 43: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

16 HOUSE RESIDENTIAL NEIGHBOURHOOD

total building area 1,063 m2 (14,440 sf)

Deconstruction time frame:

Residence Removal - March 2010 to March 2011Basement Clean-Up - March 2011 to June 2011

Project Costs totalled:

Profit of $72,050

Income from sale of houses: ($86,000)

Basement Clean-Up: $13,950

(Remaining foundation & site cleanup works included in road project)

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

43

Page 44: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

44

Page 45: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

45

Page 46: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Interesting accounts of salvage include;

all houses were sold to three Building Movers and threeprivate citizens, and relocated throughout SouthernAlberta, (Lethbridge, Taber, Grassy Lake, Raymond,Coaldale, Stirling, Calgary),

hard surface site elements are slated to be recycled onsite and used as clean fill for a local road project,

miscellaneous site elements were reclaimed for reuse bythe City, (street lights, fire hydrants, catch basin covers,electrical transformer,)

Contractor salvaged misc. items (wood deck,underground copper from transformer, steel fenceposts,fence boards,)

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

46

Page 47: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

16 House Residential Neighborhood Project

93.8%

C & D Waste Diverted

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

47

Page 48: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

With a further

100%of the remaining hard surface

C & D Waste Diverted

(residential and City sidewalks, patios, driveways, road surface & curb and gutter) to be processed into clean

fill for the new road project

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

48

Page 49: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

ADDITIONAL PROJECT BENEFITS

Cooperated with a Local Housing Authority to offer low cost temporary housing,

Police K-9 & Tactical Team Training,

Police Training exercises increased a police presence in the neighborhood which helped mitigate

concerns of vandalism and unauthorized entry,

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

49

Page 50: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

CONCLUSION

In adopting deconstruction as a responsible means of building disposal,

to date Lethbridge Facility Services has successfully diverted 9,478 tonnes of C & D waste or the

equivalent volume of 70 average 2000 square foot houses from entering local landfills,

in turn resulting in only 1038 tonnes or the equivalent volume of only 7.7 houses being

landfilled.

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

50

Page 51: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

AWARDSThe City of Lethbridge Facility Services is honored to have

been recognized and receive local, provincial and international awards due to their deconstruction

initiatives.

ALLIANCE FOR INNOVATION –OUTSTANDING ACHIEVEMENT IN LOCAL GOVERNMENT

INNOVATION AWARD 2011

RECYCLING COUNCIL OF ALBERTA –R’s OF EXCELLENCE - MUNICIPAL LEADERSHIP AWARD 2010

LETHBRIDGE ENVIRONMENT WEEK –GREEN LIST 2010 AWARD - ORGANIZATION

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

51

Page 52: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

Detailed project report outlining all projects is available at:

www.lethbridge.ca

Search: “Deconstruction”

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

52

Page 53: ENVIRONMENTAL DECONSTRUCTION INITIATIVE · The City of Lethbridge ENVIRONMENTAL DECONSTRUCTION INITIATIVE INTRODUCTION ‘Deconstruction’ is the selective dismantling of building

www.lethbridge.ca

QUESTIONS

[email protected]

The City of Lethbridge

ENVIRONMENTAL DECONSTRUCTION INITIATIVE

53