Environmental Engineering Group 1Area: Lower West Side
Raising Manhattan Waterfront Greenway by 6 Feet
PRO
DU
CED
BY
AN
AU
TOD
ESK
STU
DEN
T VE
RSI
ON
PRODUCED BY AN AUTODESK STUDENT VERSIONPR
OD
UC
ED B
Y AN
AU
TOD
ESK STU
DEN
T VERSIO
NPRODUCED BY AN AUTODESK STUDENT VERSION
-
PE STAMP DISCLAIMER LOGO PROJECT NAME DATE
SCALE
REVISION NO.
SHEET NO.
SHEET DESCRIPTION
TEAM NAME AND ADDRESS
IT IS A VIOLATION FOR ANY REASON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OFA LICENCE PROFESSIONAL ENGINEER,ARCHITECT, LANDSCAPE ARCHITECT, OR ALAND SURVEYOR, TO ALTER AN ITEM IN ANYWAY. IF AN ITEM BEARING THE STAMP OF ALICENSE PROFESSIONAL IS ALTERED, THEALTERING ENGINEERING, ARCHITECT,LANDSCAPE ARCHITECT, OR LAND SURVEYORSHALL STAMP THE DOCUMENT TO INCLUDETHE NOTATION "ALTERED BY" FOLLOWED BYTHEIR SIGNATURE, THE DATE OF SUCHALTERATION, AND SPECIFIC DESCRIPTION OFTHE ALTERATION.
Spec Sheet Table ofContents
Sheet 1 Title title.dwg
Sheet 2 Table ofContents
table ofcontents.dw
gSheet 3 Existing
Conditionsexisting
conditions.dwg
Sheet 4 ProposedDesign
design.dwg
Sheet 5 Schedule schedule(excelsheet)
Raising Manhattan Waterfront Greenway by 6 feet
Group 1 New York City
Table of Contents
7/20/20
2
PRO
DU
CED
BY
AN
AU
TOD
ESK
STU
DEN
T VE
RSI
ON
PRODUCED BY AN AUTODESK STUDENT VERSIONPR
OD
UC
ED B
Y AN
AU
TOD
ESK STU
DEN
T VERSIO
NPRODUCED BY AN AUTODESK STUDENT VERSION
-
8448'
10.0000'
PE STAMP DISCLAIMER LOGO PROJECT NAME DATE
SCALE
REVISION NO.
SHEET NO.
SHEET DESCRIPTION
TEAM NAME AND ADDRESS
IT IS A VIOLATION FOR ANY REASON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OFA LICENCE PROFESSIONAL ENGINEER,ARCHITECT, LANDSCAPE ARCHITECT, OR ALAND SURVEYOR, TO ALTER AN ITEM IN ANYWAY. IF AN ITEM BEARING THE STAMP OF ALICENSE PROFESSIONAL IS ALTERED, THEALTERING ENGINEERING, ARCHITECT,LANDSCAPE ARCHITECT, OR LAND SURVEYORSHALL STAMP THE DOCUMENT TO INCLUDETHE NOTATION "ALTERED BY" FOLLOWED BYTHEIR SIGNATURE, THE DATE OF SUCHALTERATION, AND SPECIFIC DESCRIPTION OFTHE ALTERATION.
Raising Manhattan Waterfront Greenway by 6 feet
Group 1 New York City
ExistingConditions
7/20/20
3
1'':5'
From 14th St. to 42nd St., along the waterfront, the Manhattan Waterfront Greenway is 8448 ft long (1.6 miles) and 10 ft wide.
PRO
DU
CED
BY
AN
AU
TOD
ESK
STU
DEN
T VE
RSI
ON
PRODUCED BY AN AUTODESK STUDENT VERSIONPR
OD
UC
ED B
Y AN
AU
TOD
ESK STU
DEN
T VERSIO
NPRODUCED BY AN AUTODESK STUDENT VERSION
-
3.0000'
8448'
Fence (on walkway,made of steelSurface ofwalkway(concrete)
6.0000'
Dirt
Walkwaysupport(concrete)
PE STAMP DISCLAIMER LOGO PROJECT NAME DATE
SCALE
REVISION NO.
SHEET NO.
SHEET DESCRIPTION
TEAM NAME AND ADDRESS
IT IS A VIOLATION FOR ANY REASON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OFA LICENCE PROFESSIONAL ENGINEER,ARCHITECT, LANDSCAPE ARCHITECT, OR ALAND SURVEYOR, TO ALTER AN ITEM IN ANYWAY. IF AN ITEM BEARING THE STAMP OF ALICENSE PROFESSIONAL IS ALTERED, THEALTERING ENGINEERING, ARCHITECT,LANDSCAPE ARCHITECT, OR LAND SURVEYORSHALL STAMP THE DOCUMENT TO INCLUDETHE NOTATION "ALTERED BY" FOLLOWED BYTHEIR SIGNATURE, THE DATE OF SUCHALTERATION, AND SPECIFIC DESCRIPTION OFTHE ALTERATION.
Raising Manhattan Waterfront Greenway by 6 feet
Group 1 New York City
Existing Conditions
7/20/20
1":5'
3
PRO
DU
CED
BY
AN
AU
TOD
ESK
STU
DEN
T VE
RSI
ON
PRODUCED BY AN AUTODESK STUDENT VERSIONPR
OD
UC
ED B
Y AN
AU
TOD
ESK STU
DEN
T VERSIO
NPRODUCED BY AN AUTODESK STUDENT VERSION
-
3.0000'
8448'
Fence (on walkway, made of steel)re-added after being removed
6.0000'
Dirt
Already existing concrete that isfoundation of the walkway
6.0000'
Surface of walkway (concrete)
Added concrete
PE STAMP DISCLAIMER LOGO PROJECT NAME DATE
SCALE
REVISION NO.
SHEET NO.
SHEET DESCRIPTION
TEAM NAME AND ADDRESS
IT IS A VIOLATION FOR ANY REASON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OFA LICENCE PROFESSIONAL ENGINEER,ARCHITECT, LANDSCAPE ARCHITECT, OR ALAND SURVEYOR, TO ALTER AN ITEM IN ANYWAY. IF AN ITEM BEARING THE STAMP OF ALICENSE PROFESSIONAL IS ALTERED, THEALTERING ENGINEERING, ARCHITECT,LANDSCAPE ARCHITECT, OR LAND SURVEYORSHALL STAMP THE DOCUMENT TO INCLUDETHE NOTATION "ALTERED BY" FOLLOWED BYTHEIR SIGNATURE, THE DATE OF SUCHALTERATION, AND SPECIFIC DESCRIPTION OFTHE ALTERATION.
Raising Manhattan Waterfront Greenway by 6 feet
Group 1 New York City
Design7/20/20
4
1":8'
PRO
DU
CED
BY
AN
AU
TOD
ESK
STU
DEN
T VE
RSI
ON
PRODUCED BY AN AUTODESK STUDENT VERSIONPR
OD
UC
ED B
Y AN
AU
TOD
ESK STU
DEN
T VERSIO
NPRODUCED BY AN AUTODESK STUDENT VERSION
-
23.0000'
6.0000'
6.0000'
6.0000'
6.0000'24.0000'
PE STAMP DISCLAIMER LOGO PROJECT NAME DATE
SCALE
REVISION NO.
SHEET NO.
SHEET DESCRIPTION
TEAM NAME AND ADDRESS
IT IS A VIOLATION FOR ANY REASON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OFA LICENCE PROFESSIONAL ENGINEER,ARCHITECT, LANDSCAPE ARCHITECT, OR ALAND SURVEYOR, TO ALTER AN ITEM IN ANYWAY. IF AN ITEM BEARING THE STAMP OF ALICENSE PROFESSIONAL IS ALTERED, THEALTERING ENGINEERING, ARCHITECT,LANDSCAPE ARCHITECT, OR LAND SURVEYORSHALL STAMP THE DOCUMENT TO INCLUDETHE NOTATION "ALTERED BY" FOLLOWED BYTHEIR SIGNATURE, THE DATE OF SUCHALTERATION, AND SPECIFIC DESCRIPTION OFTHE ALTERATION.
Raising Manhattan Waterfront Greenway by 6 feet
Group 1 New York City
Design7/20/20
4
1":8'
These are models of the ramps (from different views) to be added so that people can access the updated greenway. They should be added approximately every street
PRO
DU
CED
BY
AN
AU
TOD
ESK
STU
DEN
T VE
RSI
ON
PRODUCED BY AN AUTODESK STUDENT VERSIONPR
OD
UC
ED B
Y AN
AU
TOD
ESK STU
DEN
T VERSIO
NPRODUCED BY AN AUTODESK STUDENT VERSION
-
MonthWeek 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4Removal of steel fenceRemoval of trees and lamp postsBuild wooden box for concreteApply rebar to sides and bottom of boxMix concrete and pour in moldWait for concrete to dry and solidifyRe-add steel fenceCreate mold for concrete rampsPour in concreteWait for concrete to dry and solidifyRe-add lamp posts and wiringCheck concrete for stability and weight supportAdd dirt and trees
SeptemberAugustMarch April May June July