environmental management plan (eyp) · going across transmission line 1 1 okv: 1 time. c....

116
VIETNAM ELECTRICITY . - - -- - - - - - - - . - - - - - SOUTHERN POWER PROJECT MANAGEMENT BOARD El148 VOL. 16 SECOND TRANSMISSION AND DlSTRlBUTlQN PROJECT - CREDIT 4107-Vq f SUB-PROJECT: / VINH LONG - TRA VINH 220KV TRAN~SS~ON LINE Code: 36006 ENVIRONMENTAL MANAGEMENT PLAN (EYP) March, 2009. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 06-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

VIETNAM ELECTRICITY . - - -- - - - - - - - . - - - - -

SOUTHERN POWER PROJECT MANAGEMENT BOARD

El148 VOL. 16

SECOND TRANSMISSION AND DlSTRlBUTlQN PROJECT - CREDIT 4107-Vq

f

SUB-PROJECT: / VINH LONG - TRA VINH 220KV T R A N ~ S S ~ O N LINE

Code: 36006

ENVIRONMENTAL MANAGEMENT PLAN (EYP)

March, 2009.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m
Page 3: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

VIETNAM ELECTRICITY

SOUTHERN POWER PROJECT MANAGEMENT BOARD

SECOND TRANSMISSION AND DISTRIBUTION PROJECT - CREDIT 41 07-VN

SUB-PROJECT:

VINH LONG - TRA VINH 220KV TRANSMISSION LINE

Code: 36006

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

Head of E&C Department : Duong Thi Thanh Truc ik- Member : Le Thi Ngoc Xuan

HCM City, ~fi'h'f2-h AO*, ,11009

POWER ENGINEERING CONSULTING

BAN QUAN L* DU A N C ~ C & JOINT STOCK COMPANY 3

'OR

-

Page 4: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m
Page 5: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Trans,nission and Distribu~ion (I 'D2) Credit 4 107-VS Vinh Long - Tra Vinh 320kV transmission line - _ - ________ . .-___ ____--._-_-. .. -.. . .--.

Section 1 :

Sectioll 2 :

Section 3 :

Section 4 :

Section 5 :

Section 6 :

Section 7 :

Section 8 :

Section 9 :

Section 10 :

Section 11 :

Section 12 :

liltroduction on the pro-ject

Project description

Legal framework

Environmental impact assess~nent

Public consultation

Mitigation measures

Chance finding procedures and emergency action plan

Environmental monitoring

Institutional development activities

Implementation arrangements

Monitoring and reporting system

Cost estimation for EMP implementation

- . ~ ~ ~.. -~ ~ .. .- ~ - - ~~ - -. ~- -~ -

1-.nvit-onii~cntal n lanugc lncn t plan I

Page 6: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second T~.ansmission and Distribution (I'D2) Credir 4 107-VS Vinh Long - 7'1.8 Vinh 730kV tl-ansmission line - - . -. . - - - - - _ -.____ _ -. - - . _ __

CPC

I'MP

EVN

DPC

I' AP

PAH

PPC

PECC3

PMB

PTC4

SPPMB

ROW

SIMC

VND

WB

: Commune People's Colnlnittee

: Ei~vironmcntal lnanageinent plan

: Vietnam Electricity

: District People's Colnlnittee

: Project affected pcrson

: Project affected household

: Provincial People's Colnmittees

: Power Engineering Consulting Joint Stock Company 3

: Project management board

: Power Translnission Company No.4

: Southern Power Project Management Board

: Right of way

: Safeguard Independent Monitoring Consultant

: Vietnamese Dong

: World Bank

ANNEXES:

Annex 1 : Decision of approval for Environmental impact assessment report of the project

Anncx 2 : Membcrs carried out this EMP report

Annex 3 : Drawing of pro-ject location

Anncs 4 : Drawing of environnlcnt in project area

Anncs 5 : Minutes of lnecting on public consultation

Anncs 6 : l'hotos oi'lllccting 011 public consultation and project location

Allncs 7 : Iiei'crenccs

Page 7: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond 'I'~.;insinission and Distribution (TD2) Credit 41 0 7 - V S Vinh Long -- 'l'ra Vil~ll 230kV transmission line

--- . -. .. . -. ~ . -~ ~~ - ~ - ..

SECTION 1: 1NTlIOI)UCTION ON THE PI<O,JECT

1. Target of the project

"Vinh Long - Tra Vinh 220kV transmission line" pro-jcct is proposed to be built to improve thc 220kV capacity source in order to ensure reliability and saf'cty in powcr supply for power network of Vinh Long and Tra Viilh provinccs.

2. Route of the transmission linc

rr. T~~nnsn~iss ion line 220k V:

- Section GI-G2: the length is 2261m

Beginning from gate tower 220kV of Vinh Long 220kV subsl:ation, the line turns left at G1 to avoid the planned area of Vinh Long township to G2 belonging to Tan Hoa commune, Vinh Long township.

The line goes through paddy field, some fruit-gardens and many canals, ditchs.

The line goes across a transmission line 1 lOkV: 1 time.

Number of houses in ROW: 3.

- Scction G2-G3: the length is 4110m

At G2, the line turns left a angle of 42'9' to G3 in Long 1-10 district.

The line goes through paddy field; some fruit-gardens and inany canals, ditchs.

The line goes across the medium-low voltage line: 4 tiines.

Number of houses in ROW: 18.

- Scction G3-G4: the length is 6550m

At G3, the line turns left a angle of 1 1°46', then it goes across National road 1A to G4.

The line goes through paddy field, some fruit-gardens and inany canals, ditchs.

Going across National road 1A: 1 time.

The line Sees across the medium-low voltage line: 4 tiines.

Nuinber of houses in ROW: 23.

- Section G4-G5: the length is 6103111

At G4, the linc turns left a angle of 2"9', thcn it goes across paddy field to G5.

'I'hc linc zocs through paddy field, somc li-uit-gardcns and nlany canals, di tchs.

Page 8: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccuild -1.1-ansmission and Distribution (TD2) Credit 4 107-VS Vinh Long - Tra Vinh 270liV transmission line - ~- ~ -. . - --

- Scction G5-(;6: the length is 6138m

At G5, the line turns left a angle of 5"36'. then it goes parallelly with National road 53 by a distance of 5001n to G6 in l'ain Binh district.

The line gocs through paddy field, some fruit-gardens and many canals, ditchs.

Number of houses in ROW: 10.

- Scction G6-G7: the length is 11301m

At G6, the line turns right to Vung Liein district, then it goes parallelly with existing Vinh Long - Tra Vinh 1 lOkV trans~nission linc to area of Vung Liem 1 lOkV substation. Froin that, it gocs straight to G7.

The line goes through paddy field, some fruit-gardens and many canals, ditchs.

The line gocs across the medium-low voltage line: 11 times.

Number of houses in ROW: 5 1.

- Scction G7-G8: the lcngth is 9413111

From G7, the line goes over Tra Vinh province to G8 belonging to Cang Long district.

The line goes through paddy field, soine fruit-gardens and inany canals, ditchs.

The line goes across the medium-low voltage line: 10 times.

Nuinber of houses in ROW: 55.

- Section G8-G9: the length is 8847m

At G8, the line turns left and goes over Cang Long district. It goes parallelly with a canna1 to G9.

The line goes through paddy field and many canals, ditchs.

The line goes across the medium-low voltage line: 5 times.

Nuinber of houscs in ROW: 42.

- Section G9-G10: the length is 4430m

At G9, the line turns right to GI0 belonging to Cllau Thanh district. Then, it connects to gate tower of Tra Vinh 220kV substation in Luong I-Ioa commune, Chau Thanh district, Tra Vinh province.

'The line goes through paddy iield and Inany canals, ditchs. ?

1 hc line goes acl-oss the medium-low voltage linc: 3 times.

Numbcr of houscs in ROW: 20.

I . Ter~11~orcrrj~ cartrleclirlg lirle 11 01i V irt VirlIl I,orlg pr.o~~irtce:

Page 9: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Secon~l 'I'rans~mission and Distrib1:tion ('I'D?) Crcdit 41 0 7 - V S Vinh Long - l'ra Vinh 120kV transmission line

~. ~ ~ .-. -...---p-p---..--. . -. .. -~~

Starting fi-om arca 01' (3 1 ( t o w s 02) of Vinh Long - Tra Vinh 220kV ~ransinission line, the linc goes parallelly with Vinh 1,ong - Sa Ilec 1 lOkV transinission line. Thcn. it goes under a temporary Vinh Long -- Vinh Long 1 10kV transmission line and connects to tower 9OA.

The line goes through fruit garderns and many canals.

Going across transmission line 1 1 OkV: 1 time.

c. Tenrporarjr con / I ecliizg line 11 Ok V in T m Viil h provirzce:

- Scction GIO-GlOA: 2905m in lcngth

Starting from gate tower 110kV of Tra Vinh 220kV substation, the line goes through National road 60 toward Hoa Lac B in order to avoid a pagoda to G10A.

The line goes across paddy field, some bamboo hedges and many cannals.

The line goes across the medium-low voltage line: 2 times.

Nulnber of houses in ROW: 2 1.

- Section GlOA-G11: 3184m in length

At GlOA, the line turns left a angle of 45'57' to GI 1.

The line goes across paddy field and many cannals.

~ u ~ k n di tren ruong 16a, tit nganp nhieu k&nh, rnuong.

The line goes across the medium-low voltage line: 2 times.

Nulnber of houses in ROW: 1 1.

- Section G11-G12: 1318m in lcngth

At G11, the line turns left and goes parallelly with a pathway connecting into between of towers 8-9 of Tra Vinh - Duyen Hai 1 lOkV transmission line.

The line goes across paddy field.

- . ~ ~ -- ~~ . ~ - ~.. . ,.~ . . ~ ~. --.. ~ ~ . . ~- ~

l i n \ ~ i ~ ~ o r ~ m c n t a l managcmcnt plan 5

Page 10: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second 'T~.alislnission and Distribution (7'113) Crcdit 4 107-VS Vinh Long -- 7'ru Vinh 220kV t r a n s ~ ~ ~ i s s i o n linc

- .-- . ---- - -- -- - ~~ - - ~

SECT1 ON 2 : I'IIOJECT I>ESCKII.'TION

i 1 . Project Saine Vinh Long - Tra Vinh 220kV transnlission line

1 2. Program same (e.g I1fiII. SLfEI?, 7-D/

I

j 3. S e w project or rehabilitation project

i - Projcct Location

I . Province (s)

4. Length and voltage of the transmission line

-

23 m and 16m

Sccond Transmission and Distribution (TD2) project - Credit 4 107-VX

- .-

Xcw 4 Rehabilitation

Provinces: / Districts: I C'oinmunes:

6. Numbcr of tower and its height

- Vinh Long

- Tra Vinh

-.

7. Constructioil commencelnent and conlpletion date (monthlyear)

Number: 190

- Vinh Long - r a n 11oa township - Tan Ngai - Long Ho I - Tan Hanh

Height:

from 20 to 46.5m

- Tam Binh - Vung Liem

- Cang Long

Length = 62.3 km

Duration: 0 112009 - 03/20 10

- Phuoc Hau - LongPhuoc - Phu Duc - Long An - Hoa Thanh - 'Tan An Luong - I-Iieu Phung - Wieu Thuan - I-Iieu Nhon - An Truong A

Voltage = 1 10 kV and 220kV

, ----- -- - -- -p

8. Construction in wet season .-

I y e s iJ/ KO [T .--A r-- -- ..

9. Sumbes of project affected 1 1,336 households (5,680 persons) 1 houscl~olds I

1 i , - -11 -- ------I--- I

i 10. Total arcn land required 1

rTemporary = 1,404,982 m : Pcr~nanent = 33,221 n12 i , - - - _ . . -- - - ~ - .

: Temporary = 685 111' I Pennancnt := 0 m 2 1 1 . Rcsidenrial land ~ecquircd !

I i

! - - - - ! 1

I 12. Paddy and crops land I-cquired 1-en~porary - 1.148.405 m' I'csinancnt - 29. I 84 111' 1 :- ----- -, - - - - - - . - - .. -~ ~ .~ ~- ~ .. -

7 I 13. Pcrc~~nial trcc land rccluircd I Fl'cinporxy - 245:2 15 111.- I'ermancnt - 4.037 in' i . - - - - -. - - . - - . . - . . ~- ~.~ ~ ..

- An Truong - Binh Phu - I'huong Thanh

- Chau Thanh - L,uong Hoa - Luong Hoa A - 1)a Loc

- ~ -. . . - ----- . - - - . - - ----. ~ ,

En\'ironnlcntal 111anagcn1snt plan

Page 11: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and I)ist~.ibution (I'D2) Crcdit 4107-VS Vinh Long - ?'ra Vinh 120kV transmission line - ~ .~ ~ ~ ~

7 -- - - -PA -- - - - - - - - --

14. Othcr land required I 7'emporal-y = 8.678 n ~ ' I'ermanent = 0 n~' --- . - - .- -- - -

Construction amount of the project -- -7---- -- -- - - - - - - -- - -

1 4 / Damages on paddy and crops /

Items

I 1 1 j Digging foundation holes 1 rn3 I t ' By Techi~ical

I 148,924 1

1 6 1 Maximum workers

Unit

Backfilling foundation holes

1 persons I

Design report

1. Natural condition and socio-economic status of the projcct area

1 Transmission

Concrete volume I

12,2008 I n1

a. Geog18aplzicaZ position

I line

Tra Vinh va Vinh Long are 2 provinces located between the lower section of Tien and Hau rivers.

Sote , 1

Tra Vinh province

Tra Vinh's geographical position limited by 9'3 1'46" to 10°04'5" northern latitude and 10j057' 16" to 106°36'04" longitude.

Tra Vinh province has a total natural area of 2,225 square kilometers, making up 5.63% of the Mekong Delta's area and 0.67% of the country's area. It has a population as more than 1 million.

Vinh Long provincc

Vinh Long's gcographical position liinitcd by 9' 52' 45" to 10" 19' 50" norlhcrn latitude and 104" 41' 25" to 106" 17' 00" longitude.

Viilh 1,ong province has a total natural area of 147,519ha. It has a population as 1.020 illilliorl persons.

. --- -- ~~~ . .~ ~~ ~ ~ ~ . ~ -

Environmenta l managcmcnr plan

Page 12: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second 'I'ransliiission and Distributiun ('1'113) Crcdit 3 107-VN Vinh Long - T1.a Vinh 320kV transmission line

-..- -- ~ ~

'l'hc pro-jcct arca is situated in tlic Mckong llclta and has thc conimon f;l\;ourablc meteorological conditions of the Dclta such as rich solar radiation. stable. high tcmpcrature.

b. 1 Telnpcrature

The Incan teinpcraturc is 2 6 . 6 ' ~ ; the differcncc betwcen day and night is 6 . 4 ' ~ . -1 cmpcrature in the area is rclativel>. cquable. 'Thcre is no obvious division of four seasons in the year, but that of two scasons, dry season and rainy season, is clear cut.

b.2 Sailor radiation

The area has a high proportion of sunny hours: 7.7 hours per day, and there is rich photosynthesis radiation: 82,800 cal/ycar, and this helps plants grow fist all the year round.

b.3 Humidity

The yearly average huinidity ranges froin 80% to 85%. The change tends to take place according to that of seasons nainely in dry season: 79% and in rainy season: 88%. The monthly average humidity in the year rcaches 90%.

b.4 Wind

There are two main directions of wind in the area:

- South western monsoon coming from the sea bearing a lot of water vapour thus causing a lot of rain during the period froin May to October.

- North-eastern or south-eastern inonsoon normally comes during the period froin November this year to March next year.

b.5 Hoarfrost

Hoarfrost often takes place during the period from December to February just because of the effect of the following factors: the high humidity at the end of the rainy season combined with the lowest temperature of the year, and the north- eastern or south-eastern monsoon.

b.6 Evaporation

'The amount of evaporation in the area is high, with an average of 1293 inm/year. In the dry season the evaporation is high, especially in sand dune and coastal areas and, about 130- 150 mm/north, often causing drought in this regions.

b.7 Rain

The average rainfall is low (1588 - 1227 inin) unstably and eason proportionally distributed.

71'lic economy ofthc area has grown cl~~ite fast. Thc GDP d u r i n ~ the period 01'2001- 2005 incrcascd 1 1.63% annually on average. It was estimated that such increase \vould grow bylin 2006.

In thc period of 1997 2004. thc ind~istrial production incrcascd 1 8.51i1%. scrviccs incrcascd 14.5 1 % and apriculturc incrcascd 7.9 1%): thc two li)r~ncr oncs proved to - - . .- ~- ~.~.- -. ~ .. - . ~ . --- - ~-

f invi~~onrnc~ital Inanagcmcnt plan S

Page 13: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second 7'rarismission and Distribution (71'D7) Credit 4 107-VS Vinh Long - T'ra Vinh 320kV transmission line . -- - - - - - -- - -. - - - - - . - - . - -. - . - -. - - -- - - - - - . . - - - . - - . - - - - - -- -

have had high increasc rates comparcd to those in rest of thc country and an avel-asc increase rate lor the lancr.

AS to the economic slructurc in 2005: asriculture increased 55.82%. trade-service 26.54% and industry 17.64%. Thus, the economic structure of thc area has bcen dcvcloping in both agriculture and trade-sen~icc but has not in industry over thc last few years.

2. Natural Reserve arca, sensitive area, cultural property, historical monument in project arca

There is not any natural area, sensitive area, cultural property and historical monument in the project area.

- -- ~ - ~ -~ . -. ~ ~ . . ~ . ~- -. ~ ~ ---. ~ - ..

F~nvironmelitd inanagelnerlt plan

Page 14: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (1'D3) CI-cdit 4 107-VX Vinh Long - Tra \;in11 220kV transmission line - ..~.~. -. .~ - ~ ~ .- -- - ~- --. . . .. -- - ---- ~ . ..- -

SECTION 3: LEGAL FIUMEWOIIK

1. Law and current stipulations of Vietnam - 1,aw 011 T;,nvironmental Protection dated Noveinbcr 29"'. 2005 of the Socialist

Rcpublic of Vietnam.

- Governincnt Dccree No.80MD-CP datcd August 9". 2006 on guidancc on implementing some items stipulated in the Law on Environinental Protection.

- Governincnt Dccree No.81MD-CI' dated August 91h, 2006 on administrative penalty concerning environinental protection issues.

- Governinent Decree No.2112008ND-CP dated February 28th, 2008 on adjustment and supplementation some articles of the Government Decree N0.80/2006/ND-CP.

- Circular No.08120061TT-BTNMT dated September Ogth, 2006 of Ministry of Natural Resource and Environinent on guidance on setting up strategic environment assessment, environlncntal iinpact assessment and environmental protection coininitment reports.

- Governinent Decree No.l06/2005/ND-CP dated August 17'~, 2005 on implementation guidelines for some items stipulated in the Electricity Law on protection of high voltage electrical networks.

- Government Dccree No.24/2000ND-CP on implementation guidelines of the Foreign Investment Law in Vietnain (article 82), mentions environmental protection.

- Current Vietnainese standards.

2. Kcquircmcnt of WB - OP 4.0 1 Environmental assessment;

- OP 4.04 Natural habitats; - OP 4.1 1 Cultural property;

- BP 17.50 Public disclosure.

Detailcd guidance on assessinent method and general iinpact of transinission line pro-jccts can be from: - World Bank, 1 99 1 . Book on Environlncntal assessincnt, third reprint. - l~rainework for applying cnvironinent safeguards to TD2 pro-ject.

~ ~ - ~ -. . . ~ ~- -. ~- .- . . ~~- ~ - - - - . - . .. . - -. . - . . -. - . - -- - - ..

~<nvirc~nln~'i l[; i l inanagcmcnt plan

Page 15: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Stcunci 'l'rans~nission and Ilistribution ('1.112) Crcdit 4107-VN \' i~li l I.ot~g .Ira Vinh 220kV transmission linc

~ ~ . ~ ~ - - -- -~ .- ~ ~ - ~ . .

SECTION 4: ENVIliONMENTAL SClIEENIN(;

- . - -

l3c able lo 1nini171izc

- .. - ..-- ~

Table 4.1: Impacts of the project T -- -- - ~~

i NO. ~ Impact ! 1,cvcl 'I'erm Impact dcscrip tion i . . i .--l I

. ~ ~.. - ~- --- ~~~ ~ ~ - .

I~:nviro~imcnlal management plan I I

I TI/]: /'I( I:-CONS77Z UCTION AND CONSTIC I . -- - - . - - - - - --

i I ' I<l'Sects on vcgctation or j c d i u r n habitat arcas as a rcsult o l I , clcaring ror ROW or

i ! towcr Ioundalion. i

UCTION

Short-tcrm

-k ~ , ~ ~ ~ - t ~ ~ ~

Short-term

+ ~ , ~ ~ ~ - t ~ ~ ~

1 I

!

j I I I i I

! I i

! i

I

i 1 1 !

I 1 !

I

I i

I I : !

I

I I

!

i , 1

1 4 . . , . - -- ! .- A

, . I i 2 I'cmposary and 1 Medium

pcsn~ancnt land I ! i

I I acquisition . .--- .~ .~~ - - - -- ---. i

I'lIASl~S .- - - -. - . . -

-'I -.

According to survcy rcsult, the projcct locatcs at paddy and crops land ollocal illhabibants. 'l'rccs in thc arca arc mainly paddy and fruit-trccs such as cocoilut, pomelo, mango, orange, ctc. Numbcr of trecs will be affcctcd by thc projcct as

i follow: I

Piee

Paddy

Cashew

Coconut

Eucalyptuslindigo

Mango

Uriit

m2

l'ree

- Tree

l'rcc

Trce

Antorrrtt

1,175,089

6

6,705

40 1

734

Jamun

Bamboo

Sniall bamboo

Orangc/custard applc

Lc~non

~Mangoslccn

In thc projcct arca, thcre arc no valuable and rarc or protcctcd spccics, so thcsc iypcs of spccies arc not affected by the projcct.

I - The project will impact to 1,438,204m2 in arca of land, in which mainly is I

teinporary impact (occupics 97.7%). Permanent impact is agricultural land i acquisition (33,221m2) for tower foundations. Detail is shown in tablc 4.2 and 4.3 '

- . -. .- -~ I -

Tree

Tamarind ~

Pomelo

Grapefruit

Plum I88

32

8,186

319

1,110

8 0

3 16

Tree

- 1 . r ~ ~

Trec

Tree

Trcc

Tree

217 Jackfruit

-

Longan

Banana -. -

Papaya 15 1

Page 16: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccood Iranstnission and [1is1ribution ('1.112) Crcdil 41 07-VN Vinh 1,ong I 'ra Vinh 220kV transmission linc

- ~ --- ~ - -- - - -- - ~ -

, So. Impact 'I'crm Impact description ( C o m ~ n c n t 1 - -- --- - - - -- -

I bclow. I I I

I I culii~rai property. historical monument and scnsi~ivc arca

I - -

I gcncration causcd by ; cal.tl~worl<s

1,ow lcvcl

'I'hcrc are 168 111-1s with houselstructurc affcctcd due to location in ROW, thcy arc not required to be relocatcd (according to thc Dccrec No. 106lND-CI' of thc

-- -- - -

Short-tcrm Thc earthworks of thc projcct includc:

- Digging foundation holes: 148,924m3 soil. - Backfilling foundation holcs: 99,24 1 m3 soil. -I

I

I

No impact -

Ko impact

GOV). Thcy will bc supportcd cost of fireproof materials and lightning arrestors i 1

! I I I I Total soil amount of digging and backfilling is 248,165m3. I I

andlor improverncnt.

In dcsign stagc, the location of thc projcct was considcrcd and chosc. 'Ihcrc is no any cultural property, historical nlonillncllt and sensitivc arca in thc projcct arca.

1

I

I

I

I

I

I Activities of construction and cxcavation only happcn in a short t i~nc at !

I 1 foundation holes along the transmission linc (ovcr 60km in lcngth). '1'11~ projcct

! I will apply successivc construction method. So risk of soil crosion is at low Icvcl. . - - - . ~ . .- , - ~ -~

I

i i 5 ilffects on air quality Thc air quality can bc cflcctcd by: 13c ablc to ~ : li-om vchiclc and k lkhaust gas (sucb as SO,, NO,, CO ...) : impacts o r cxhaust gas on thc lllillimizc

ccluiplncnt cxhausts and cnvironmcnt quality is insignificant sincc thc concentration of discharging sourccs 1 I dust gcncratcd by is not great and amount of exhaust gas dischargcd is not much. I

construction activities + Ilust: dust can be gcncratcd from cxcavation, backfilling and activities of 1 1 cquipmcnts. 'Ihc projcct arca is mainly paddy ficld and fruit trccs land. 'l'hus, this

impact is at low levcl, only significant in the dry scason. It is temporary and will I I I ! - - ! - . .~ .

' 6 1 Yoisc and vibration is li-om activities

, I and ccluip~ncnts it only occurs in the construction phasc and thc projcct will carry o i ~ t nlitigation / . . ~ ..~. - ..

- -

. . .- - . . - . -. -- -~ -- ~ - - ~ ~ - . - ~-

I-nvironmcntal managcmcnt plan 12

I

Page 17: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

So.

Second 'l'rai~srnission and 1)istribution (7'112) (:rcdi14107-VW Vilrll 1 ,ong '1'1-a Vinh 720kV transmission linc

- ~ - . - -- - --- -- - - ~ -

I~npact I I.evel / 'I'errn - - - . -. - - - - *-- - --

. - -

('ontamination of soil. or M atcr duc to oil I lcaltagc Si-om construction 1

Impact description I (:om~ncnt -- - ~p -. .- -. - - -

mcasurcs. I

-. . - ..- - -~ .

Oil lcakagc from vclliclcs and construction machincs can affect quality o S soil and 1 ilc ahlc lo water, cspccially in rainy scason. This lcakagc oil can affcct surrounding arca / minimizc

I

through thc overflow rain watcr. 1 1

) machincs and vchiclcs - - . - -- - - - - - - - - -- - -- - - - I 1:Sfkcts on environmental of constl-uction wastc and domcstic wastc can makc advcrsc cSSccts

' quality by discharging of quality. During construction stagc, construction wastc will bc i ' consuuction wastc and collectcd, sold and discharged appropriatcly (backfilling). Domcstic wastc will be doincstic waste I collcctcd or trcated in on-sitc trcatmcnt systcm. Howcvcr, it is ncccssal-y to

implement a crficicnt lnanagemcnt plan to cnsurc all of wastes arc collcctcd and trcatcd obcy thc rcgulation.

- -- .- .. - - .

- 1 I3c ablc to ~ i i i ~ i i ~ n i ~ c '

I I'ublic hcalth and safcty I Low lcvcl 1 Short-tcrin rlicrc are sornc storchouscs and grounds nccd to bc built tc~nporary in ordcr to

I I I cquipmcnts and thc conflict bctwecn workcrs and local inhabitants. 1 ! I

cf'l'ccts From construction I camps. ~uatcrials

I

I

I Conflict bct\vccn

to mcdium- contain inatcrials and cquipmcnts. Construction camp will bc built Sor workers. tcrm

construction workcrs and , local pcoplc

I '

- . . - - - - - - I , , I'raSlic disruption duc to construction activities

storclio~~sc and ground I

Workers will bc from the locality; thc construction camp will includc rcst room: all oS construction cquipmcnts and rnatcrials will bc placcd in appropriatc placcs which arc Scnccd around. Thcrcforc, thc conflict bctwccn workcrs and local inhabitants and impacts on public hcalth and safcty arc at low Icvcl.

-

Construction camp and materials storehouscs can affcct the hcalth and safcty of I local inhabitants and workcrs by thc unsafe kccping of construction matcrials and

1 A But this impact is as low impact becausc traffic dcnsity of thcsc roads is not-high,

.- the projcct will apply -- appropriate lncthods and this impact --- oilly -- happcns - in . - - the -

Short-tcrm

=[ Short-tcrm

-. -- . . - - - - - - - -- - - - -

1:nvironmcn~al managcmcnL plan 13

The largc numbcr of construction workcrs (128 pcrsons in maximum) in thu 1 llc ablc to ' 1 construction sites will causc a risk in conflict with thc local pcoplc. But. I minimix ,

construction contractors will mainly usc local workcrs for appropriate jobs, so this I I

impact is at low lcvcl and possible to mitigate. I I I - - - - 1 - - - - -

Thc Vinh 1-ong - I r a Vinh 220kV transmission linc gos across National road I*, lic ilblc to 'I

I i National road 60 and some other roads. 'I'hus, thc linc can causc traffic disruption. I minimize ,

Page 18: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccor~d ' l ransn~iss iun and Ilistribu~ion ('I'D2) Crcdit 4 107-VN Vinh I.ong - 'I'ra Vinll 220kV translnission linc

. - . - - ~-. . -. - - -- . -- -- -

I FO. , I Impact 1 1,evcl 4 l c r m 1 Impact description I - 4 - - - -- --- -- -- -- -

I I pcriod of strctching wirc at thc intcrscctions.

- - . -- .- - - - - - - - - , - - - -- --

' 12 1,ocal road degradation I 1,ow lcvcl Short-tcrm 'fhc project site is ncar from across National road l A , National road 60 and duc to constl.uction ) I ( asphaltcd roads bctwccn communcs, it is vcry adva~ltagcous in construction /

I activitics and inatcrials I I 1 materials transportation. 'Thcse roads arc wcll-proccssed foundation and arc , I

I

1 t~.ansportation I I 1 1 covercd by thick layer of bitumcn. In addition, lcvcl of transpoi-tation activities is

I 15 Inrcrfkrcncc with radio, / No I I No impact The location of thc project is far away Srom thc radio colninunication works.

'I'V or othcr / impact / '

I : / not high. The impast of local road degradation is at low lcvcl. i . ~ I . . - -

1 7'111: OI'I~RA TION lJIIASIi' I

, . - - .- __

I maintcnallcc activitics '

I --- .- 7--' - ~ - - -

I communications

lcvcl I and sal'cty, including I

I 1 intcrruptedly I

1 S ' Iinvil~onmcntal quality o 1 No impact In thc operation svagc, thc projcct docs not gcncralc wastcs. I I I i:npacts "om d s c h r g c os I i~npac"

\zrastc I - - - - - -- - - - -. -- - -- -- -- -- - - - -

I

Long-tcrm

- - . - -- - .

No iinpact

1 13 ; 1;sposurc to ! No I No impact I clcctrornagnctic iicld ! impact

1 I 1 thc standard I

(I'MI:) lcvcls cacccding 1 1 i 1 I 1 . - . - . _-- _ .-,-____

- - - -. - - - - -- - - . -

In dcsign stage, all safcty mcasurcmcnts wcrc considercd.

EIowcvcr, voltagc hazard and cffccts on safety of local inhabitants and opcratioll vol t a g hazard

~ -.- ~. ~ p~

17 l;lkcts on flora and fauna I idow level ~ ~ ~ ~ - t ~ ~ ~

i i

.~ i N o impact I

I

Based on existing 220kVll l0kV transmission lincs, the EM]: lcvcl is under thc I No i t 1 standard. 'l'hc Vinh Long - Tra Vinh 220kV transmission line is dcsigncd to j

I

I

workers when operating substation. Thcrcfore, thc impact due to EMF on p~iblic I

conform to safety standard. Safcty rcgulations will also bc applied strictly by

health is insignificant. i I --

workers can occur in case of no conform to safcty regulations. .

ROW ycarly rnaintcnance activities may causc cffcct on crops and trccs within

- -- - - - - - -- -- - - -- - -

I . n v ~ r o ~ l m c n t d lnallagcnicnt plan 14

I - - . j 14 Impacl on bird and I

No impact Thc hcight of powcr towers is bctwcen 201n and 46.5n1. 'Thus, thc projcct will not I K o ilnpact airplanc impact impact on brid spccics and airplanc.

I 1

, -~ ,~ - ~.~~ -- -- -- ~ ~ - I I I

lion1 vcgctation -1 I + 1 thc ROW. I-Iowcvcr, thc impact is at low lcvcl and intcrruptcd.

Page 19: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second ~I '~~ai~siniss ion i111d 1)istribution (TD3) CI-edit 4 107-VS Vinh Lon? - 'Tra Vinh 320kV trans~nission line

~ .- - .- - .- -..

Table 4.2 Pcrmancnt land acq~lisition for the project - - .. . . - - - - - -- - -. -- - - - - .- . - - .

I I'crmancnt land acquisition ! 1 I'rovincc/

s o . i ~ ) i s t l - i c t ~ ~ o m m u n e 1 1)adrlg and crops I'crcnnial trees ! Total ! I ! land land I I

1 I Vinh 1,ong province L-2- -- I I I

1. I 1 i t I ~ V I I I I I

I 1 . 1 . 1 1 Tan Hoa I 1,930 I 1,930 1 I 1 1.1.2 ( Tan Sgai

) 1.2 1 Long 110 rlistrict 1 I 1 I

an Hanh I 1,837

855 I I , 1.2.3 1 ~ o n g ~ h u o c 697 1 174 1 871 1 / 1.2.4 I Phu Duc

1 1.2.5 ( Long An 1 1,004 174 1 1,178 (

1.3.1 Hoa Thanh 2,090 1,192

Sub-total 1.3 2,090 1,192 3,282

Sub-fofnlI.2

1 1.3 1 Trm Birtlr rlisfrict

1 1.4.2 / Hieu Phung 1 1,030 / 1 1,030 1 I I 1.4.3 1 Hieu Thuan 845 i 676 I 1.521 I

5,745 1 697

1

1 1.4.4 1 Hieu Nhon I 2,058 1 188 1 2,246 1

6,442 ---I

2.1.2 ' An Truong I 2,017 / 164 ( 2,181 ( --

2,098

3,165

526

---. j 2.2.1 1 ~ u o n g tloa

j 3.2.2 1 Luong tloa A ------- ~ + --- i 2.2.3 ( Da Loc I 535 1 i I

Sub-foff112.2 3,267 i 759 / 4,016 i . - - -. . - - - .- - -- - 4

- - . - - -- - - .- - - . . . -- Total ; 29,184 I 4,037 ) -- -- - - -- - -- - -. - . -- - -. - . 33,221

Page 20: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Scconti Transinission and Distribution (TI)?) Crcclit 4 107-VS Vii:li Long - I'ra Vinh 720kV transmission line

~ - .. . ~ -. . ~.. . . .-. . . . - -

'I'able 4.3 Land affected in ROW - - - - -- - - -- - - - - -- - - - - - - - -

I Land affcctcd in HOW I -- I'rovincc/ f a d d y -'- ------1-- I

( Perennial Others 1 Total I

land / trccs land 1 I

I I

-- I 1 1 . 1 I Tan Hoa 1 1 48,7 14 I 1 1.730 1 60,444 1

-

I 1.1.2 ( an Ngai I I ( 49,887 1 1 1 49,887

I I Sub-total I . I I --- -up-

/ 110,331! 7-1 1 1.2 Lollg 110 rlistrict I 1 1 I

1 1.2.1 / Tan Hanh 56,281 ( 28,359 1 ,598 1 85,238 1 I .2.2 Phuoc Hau 36,570

Lono Phuoc L ? y 32,258 1 6,325 7 38,583

/ 1.3.1 1 HoaThanh 1 575 1 85,963 ( 52,655 ( 460 1 139,653 1

I .4.l Tan An Luong 34,275 1 6,818 1

ll I .4.2 Hieu Phung 40,135 -hj85- 46,920

1.4.3 Hieu Thuan 51,750 1 19,895 ki: 74,865

1.4.4 Hieu Nhon 74.578 12.880 88.838

L 200,738 46,378 4,600 / 2 . 5 1 4 -- - ---- I I

Tra Vinh province I 1

Sub-total 2.1 1 --

- 1 ( 2.2.2 i Luong 1 Ioa A

I

i 1 1 0 68,920 10,684 ) 79,714 1 1 . ~ - -- - -- -- -. I I 1 2.2.3 j Da Loc / 35,783 ; 1 .--- 35,783 1

~

I Slrh-fottrl2.2 1 i 11 0 ! 154,325 / 39,360 1 193,795 / I

2. I 1 C R I I ~ L O I ~ ~ (tistrict I 1 87,170 j 20,375 /

I 1 'I'otal 685 1 1,148,405 1 247,215 : 8,678 ' 1,404,983 / - - ~ .- ----- .- ~ ~ -.. -.

I

/ 2.1.2 An Truong i- j 3.1.3 Binh Phu

/ 1.1.4 1 Phuong Thanh 4

1

~ ~. .- ~~.~ ~. - ~ ~ . ~- ~ . . - --- - - .. .

l ~nv i ro i i~ l~c~~ t i l l 11l;lna~cmcnt plan

83,375 / 17,365 1 83,880 1 460 1 84,340 1

133,600 / 9,660 1- 1 143,260 1

Page 21: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond -1.1-ansinission and Distribution (TD7) Credit 4107-VS Vinh Long - Tra Vinh 770kV transl~iission line

~ -~ -- - - ---. - . - . - . ~ - --

SECTION 5: I'UBLIC CONSULTATION

a Ion Consult t' method

1)ctails of activities Consultatioil outcomes

Public Kotice Date(s) of 30 days S o feedbacks notice (04/03/2008 - 04/04/2008)

Location of All related communes noticc

Newspaper Datc(s) of Not implementcd d a

newspaper ,-- -. . ~ 1 - . . . - - - . . . - . - _ - - _ - - - . -

Public I Date(s) of : Xot implemented , d a 1 announcement I radio

announcement ; - - ~~ . ~ - -.. --- ~

~~ 7 Time(s) of ~

I announcement L. . ~. . 1 . .-- ~ - - ~ .

Newsletter 1 Date(s) sent ,Not implemented Number .

i : I questionnaire 1 I ~ -- .~ - -. .. -- - ~- . I . - --

'received .. . ..... - , - ~ -~ ~ - . ~ .. - ~~ ~-

I j Number sent

I I ! Main issues I

I - - -- 1 ~ - . -- ~

I raised Area of ! l distribution ' I I . - - - . - . L . - _ - ~ . -~ . - - ' !

I 1 Feedback I

1 I

1 sought (Yes 1 ! !

! - ~ - -~ - ~ ! - ~ -- -- - . -~

Public meeting ; Date(s) held From 06/03/2008 to I i 19/03/2008 I i 1 attached: I I 1 Yes I !

I

1 i ! I ~ I

economic activities - Mitigation I measurements ' - Recorded feedbacks i

I 1 - Representation of ! i Women's Association

I - Dl's 1

Location(s) People's Committee of Attendees

Women's Association

r

- Reprcselltation of i i

l : an~~cr 'S Association PAI's

hcld related comlnunes I Commune People's 1 i 1 Comnlittec

1

Page 22: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second 'f~.arisniission and Distribution (TD2) Credit 4 1 0 7 - V S Vinh Long -- 'I'ra Vinh 720kV transmission line

. . - - .~ ~ .- -. . -~ -- -

Consultation 1)etails of activities Consultation outcomrs methocl

.Methods of Letter of invitation

Agcnda Ycs

Public Location o r Offices of related DPCs, Date held 09/200S (cspected) a~lnounccnlcnt all~lounccment (Vietnamese version) (proposcd) after the EMP approved ,

I

I Vietnam Develop~nent 1

I Information Center of World Bank (VDIC), 63 ,

I Ly Thai To street, Ha Noi '

I city (English version)

' World Bank Office in I

Washington (WB I

I

i 09/2008 (expected) I I I

! 09/2008 (expected)

) inforshop) (English I I i I 1 version)

Summarization o f attendees' o~in ions:

- Local government and local people agree with the investor on the construction of the "Vinh Long - Tra Vinh 220kV transmission line" project.

- Proclaiining the project in the locality to local people give related infor~nations.

- Compensating and supporting satisfactorily for DPs.

- Clearing houses and structures in ROW of the line and assisting local people on power safety.

- Tower foundations of the line do not locate at houses of local people to mininlize the losses.

- In the construction phase, the project needs to combine with local government and local people to minimize losses on trees, crops and harvest.

- Considering the construction period to avoid impact on cultivation and harvest of local inhabitants.

- The pro-ject needs to consider electro~nagnetic field level and carry out mitigation measures.

- Clearance at the construction site after complction of the cons~ruction.

- In ~ h c construction phasc. thc projcct docs not ilnpact to health of thc inhabitants.

- 'I'hc pro-icct nwds to minimizc impacts to lifc. land. crop and housc of local inhabitants.

Page 23: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond 'Iransmission and Il is tr ibution (1.112) Credit 4107-VN V i n h I,ong '1.1-a Vinh 220kV transmission line

- .- --- ~ ~

SECTION 6: MITIGATION MEASUIiES

Table 6.1: Table of mitigation measures

So. i 1 Comlncnt I ; on impact

Mitigation measure ! I 1 Cost I I<esponsibiiitp I i I

1 ! . - . . . - - - - - - I I .- --- - -- - - . - i

( 7'111:' I'RI:'-CON,Y'I'K UCTION AND CONSTRUCTION I~IIASIS ! I , . , - . . . -- ~~ -- . --_ 7- - - - :- ~ - -~~~ ~~ . ,

i ; 1 , IiSfcc~s on vcgctation or 1 Uc a b l c - - c b o not cut trees if unilccessary (trccs oufsidc the substation sitc a i d lncludcd in o i r c t s i

1 3 , 1 cmporary and pcrinancilt

1 1 land acquisition I t

, cultural property, I / historical monument, i

pagoda and sci~sitivc arca

rniniinizc 1 trees do excccd safcty hcight of transinission linc) I construction 1 I

Bc ablc to 1 minimize

No impact

I Dispose at cstablishcd dump site I 1

Utilize hand clcaring of vcgctation if possiblc, avoid mcchanical clearing or herbicidc usc, save as much vcgctation as possible

Cost

Arrangc thc construction work appropriately to rninimizc thc tcmporary land acquircmcnt.

I Selcct construction tiines to avoid or minimizc crop loss.

Includcd in 1 Cuotnctors costs for 1 S1~l1M13 construction, I

Rccovcr thc land which is affectcd tcmporarily in thc construction phasc.

Compcnsation conforms to policy and regulation of Victnam and

.- . -- - .- - - ~

I invironmcntal managemen t p lan I9

compcnsation and rcsettlcmcnt 1

, World Dank.

- -

It is not ncccssary to apply mitigation measures.

FIowcvcr, in the construction stage, if any cultural and historical propcrtics arc discovercd, thc construction contractor and PMB have responsibility to announcc as soon as possible to thc relatcd agcncics

i - - . . --- I-- - - - 1 Contractors

I s1'PM13 I

in ordcr to carry nut tin~e!y appropriate actions. 1

The arca of thc find and immediately surrounding it will bc cordoncd I

off and work stoppcd in the arca until thc sitc has bccn cxainincd by a I compctcnt authority and writtcn clcarance to procccd has been givcn. 1 - -- - - - -

Page 24: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

I So. Issuc - - -- - - - - - -.

4 I:rosio~~ or scdiincnt gcncration caused by

, cartllworl<s.

I

I Comment 1 1 on impact 1 - i -

Mitigation mcasut-c Cost ! Rcsponsilrilitj~ ;

Restore thc land after thc construction.

Areas likely to bc contaminated by crodcd soil shall have sufficient barriers around them, cithcr tcrnporary or pcrmancnt as nccdcd and 1 drains on them capablc of being kept clcar that soil cntcrs them.

' Includcd in 1 Contractors / construction 1 I cost 1 1

1 Low level I At areas easy to bc crodcd, activities such as cxcavation and soil 1

I I i I Usc mcthods or cquipmcnts that gcneratc low noise or vibration. / I

i i i

/ Managcn~cnt arrangcinents for clcan-up of soil crosion shall bc in I i

transportation will bc done with a shortest pcriod in the dry scasoil and aAcr harvcst.

1 I - - ~ 2

5 i(ffcc1s on air quality fi-orn I Idow lcvcl vchiclc and cquipi~icnt

, cxhausts and dust I gcncratcd by construction I activities I

, . ~ * - - 1--- ~

1 6 Soisc and vibration is i Low l c ~ ~ c l i Srom activities of vchiclcs I : and ccluipi~~cilts 1 I

- - I - I

Includcd in I Contractors

I

place during the construction and operation phases. I --I - 1 ,--- .~ - -

Insure all machines using combustion cngincs has and Ii~ciudcd in Contractors valid operating pcrrnits throughout thc projcct schcdule. construction i Insure all trucks transporting dusty materials tolfrom the site are covered.

1 Spray water for dusty arcas (construction site, roads etc.) during hot, dry, windy conditions.

--

I I -1 - . - . -

All construction activitics arc done dilring daytiinc hours. Includcd in / Contractors construction is rcquircd, it is neccsarry to notify to inhabitants and reduce noise gencration. cost 1 I

I

Transpoi-tation vchiclcs must kccp low noisc lcvcl. Thc drivcrs only I , - -- -- - - - -

honk if ncccssary. 1- -- ---

7 , Containination of soil, air Frequently chcck vehicles, machines to detect oil lcaking if any. 1 ,,.. .,.,. 4,, -

ul W ~ L L ~ 3uc io oil Icakagc I

In case 01 oil leaking, arca whcrc oil lcaking occurrcd must bc , li-om construction

I scgrcgated and trcatcd promptly in order to prcvcnt sprcading oil that cost

I machines and vchiclcs I I

I

- ~ - .- --.. ~ ~ . . ~

Ilnvi~.on~ncntal rnanagcmcnt plan 2 0

can take advcrsc cffcct to thc surrounding arca.

Page 25: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond I'l~ansrnission and Ilistribution ('1'132) Crcdit 4107-VN Vinh 1,ong i'ra Vinh 220kV transmission linc

- - ~.~ ~- ~ ~-

so. Issuc - - - - - . - -

8 1:ffccts on cnvironinciital quality by discharging of construction wastc and domcstic cvastc

-- - --- - - I

9 ' Public hcalth and safcty 1 cflkcts from construction , camps, 111atcrials

i ( storchousc and ground

I

Cornmcnt on impact

-- - - - - -

I3c able to n~iniinizc

13c ablc to minin~izc

Mitigation mcasurc - - - - .- -

Construction wastcs will bc uscd to backfill (brick, stonc, sand, ...) in othcr placcs or rcuscd, sold to scrap dealers (scrap iron, scrap stccl, ...). Exccss soil and rock shall bc takcn out or put in designcd locations. Surrounding arcas should bc clcancd and shall bc rcinstatcd during and aftcr construction.

A11 wastcs discharge shall comply with Vietnamese regulations. Scwage watcr shall bc discharagc to common pit and scdimcnt shall bc dumpcd at allowcd disposal area. Grcy watcr shall bc trcatcd by scptic tank and lollow up to mcct standard 'TCVN 6772:2000 bcforc go into strcam. Sedimcnt shall be dumpcd in allowcd locations.

Domcstic solid wastc 111ust bc collected and disposcd at appropriate placc.

Aftcr construction, thc camp sitcs and facilitics shall bc clcancd up and rccovcrcd.

--

Arrange construction camp and materials storchousc outside cultivation land of local pcople.

Maintain fcncc around camp and storchousc to kccp animals and non workers from cntering.

Storc all materials (particularly danger materials) in lockcd facilitics, guardcd if ncccssary. Rcmovc all materials upoil projcct completion.

Avoid acquiring land for building camps.

IJsually checking sanitary condition of the area.

Ensurc that all safcty cquipmcnts arc at the rcady for any cmcrgcncy problcms.

Cost ) I<csponsibility I

~- ~ - !

Illcludcd i l l Contractors construction 1 cost \

i

I I

I ' I

Includcd in / Contractors 1

construction I I I

cost 1 I

- - - - - - - - - - .- - - -- - - -- - -. - - - -- -- - -- -

13nvironmcntal managcmcnt plan 2 1

Page 26: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

S c c o ~ ~ d '1'1.anslnission and 11istribution (TI12) Crcdit 4107-VX Vinh 1.ong 'l'1.a Vinh 220kV transmission linc

-~ - ~ -- ~

1 So. ' Issue I Comment / on impact

, ~ - -- . -.

' 10 ; Conllict bct~.vccn I ' I3c ablc to i 1 coostructioo workcrs and I minimizc 1 1 local pcoplc

! i

- - - - - - - - - - - - - - -- i , - - -- -- 1 I I l.raS!ic disruption duc to / Uc able to

1 construction activities 1 rnini~llizc I i

I 1

Mitigation measure -- -. - - -

Usc local pcoplc for appropriate jobs during thc construction phasc to mitigatc conflict bctwecn local pcoplc and construction workcrs.

Proinulgatc intramural rcgulations for activities of the workcrs and iilcrcasc workcr's awarcncss of saScty to prcvcnt any conflict bctwccn workers and local pcoplc.

-- - - -- --

Illstall noticc-board system, ... Minimize pcriod of traffic discruption and cnsure safety whcn stretching the wire over the road.

I Cost ' Ilesponsibility 1

1

- - -, - -- - I

Includcd in Con1raclo1-s construction cost I

I I

- .- - - - , - - - -- I

Includcd in ! Contractors I

1 construction 1 cost I

Operation workcrs, inaintcnancc workers must strictly conform to safety rcgulations for managcmcnt, opcration and rcpairmcnt. To comply with safcty rulcs as follows:

work sensibly, ... j I

I

I 1 - SaScty rncasurc~ncnt for gctting in touch with electrical dcviccs. I I

I I

. . . . ~- -~ -

I2 1 J.ocal road degradation ovcrsizc and ovcrload cquipments should bc followcd 1 I duc to co~lstruction

! existing regulation and rcsponsiblc authorities to ensure safety for

I activitics and materials people and cxisting infrastructure system. ' i i transportation I In case of local road damages duc to construction matcrial

1 ; 1 transportation or abnormal loads rcsponsiblc contractors should

I I compcnsatc and repair thc road with thc quality good at lcast thc same bcfore. I I - - - _ . _ - - . -

1 1 I

i 1 - Safcty rncasurcment ibr managcmcnt, opcration and repairmcnt.

. . - . -.- - - - - ~ . -- I . - -..- ~. - -

. , -. _ -. _- .- -- .

lncludcd in I Contractors ( construction : I

I cost

i

i I

i I I

I ~ ~- -

1 1

- - - - - -. - - - - .

I .nvi~.ontncntal nianagcmcnt plan 23

TIJI: OI'I<I~A TION PIIASE i ! - .- ~ - - ~ -- -- -. - j

16 / 1:Slkcts on public hcalth at placcs whcre voltage hazard is probable. Includcd in 13'1'C4 I

i and saScty, including cquipments in order to dctcct and rcpair ycarly i voltagc hazard damagc if any. maintain cost I ,

i I

Page 27: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

I I 2 ' L u 1 E E C)

I sn I S ? I Z 7 C - CJ , + C

? c r e .- > 5 -

Page 28: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccontl 'l~ransniission and 13istribution ('1'112) Crcdit 4107-VN Vinli I,ong - '1.1-a Vinh 220kV transmission linc

-- - . --- - - -- -.

SECTTON 7: CHANCE FINDING I'IXOCEDUHES AND EMERGENCY ACTION I'LAN , -.- - r ~ -- ~ - - ~ - ~.

KO. , - - -

llis I< ~ , - - Action llcsponsibility .. . . .- ~.

i 1

1 1 Artcl'acts Sound shall protcct the sitc and report to thc Construction Contractor, coi~struction excavation worlcs SupervisorII'MB and local rnuscurnl cultural rnanagemcnt authority supcrvisor to coordinatc I

i

, - - - -- - - - .-

2 ' Rcmains Sound during cxcavation works

. + -.-. -

3 'l'herc arc colnplaints from commuility about cnvironmcntal

1 problc~ns relatcd to constructio~l 1 activities

Delivc the objcct found to local muscum/ cultural managcmcnt authority

Dctcrminc whcthcr construction can bc continucd or halted for furthcr investigation

Thc Directors of thc provincial Department of Cultural and Information and local Muscunl shall bc rcsponsible for the subsequent handling of the objccts found in accordance with Articlc 21 of the Dccrce no. 9212002 guiding thc Ilnplemcntation of thc Law on Cultural Mcritage -- --

Protect the sitc and rcport to local authority

Dctcrmine wholwherclhow to address and propose ncxt actions

Implement the proposed actions

Fix the problem immediately if possible

Takc note in log book

Discuss with thc Grnploycrllocal authority whcre conflicts occur

Contractor Contractor

A11 rclcvant authoritics

- -- - - - . . - -- - - - - -

Contractor All rclcvant authoritics Tl~osc who arc assigncd to

- - - -. -- - - - . - - -

Contractor Contractor, SPPMB and local aulhority

, - - - - --

- t -- ---. -- - -- - - - -- ._- I

5 1 Workcr accidcnts dusing the Carry out first aid wherc possible and transfer thc victim the ncarest Workcrlpcoplc at thc sitc construction and operation phascs hospital as soon as possible and if neccssary

1

I I

I 1 Protcct the site and placc warning sitc

, - - - -- . - - - - - - - -- - 6 Ijncxplodcd ordinances is found

Prcpare incident notes

I'rotcct thc sitc

Rcport to local authority

Contractor I

Contractor and local authority , - -

ont tractor i Contractorllocal authority 1

I

k n t a c t the most rclcvant local army base and ask for hclp I

-. ~ - .. -- - -- L J

- . . .~ ----~---.up. . -~

linvironmcntal managcmcnt plan 24

Page 29: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccontl I'r;~ns~nission and Ilistribution 0 2 ) Crcdit 4107-VN Vinii 1,ong T1.a \'in11 220kV translnission linc

. - ~ ~ -- - - -- -

SECTION 8: ENVIItONMENTAL MONITOIXIN('J

Table 8.1: Environmental monitoring table

I . ~ - -- ~-.---~..-.-- ~~. - -

-- - - - -. - -- - - -- - - -

I.nviron~ncntaI managcmont plan 2.5

I 30. I S S U C i l'aramctcr / d , t i o n I , -~ ~

I I houscholds having ---- - L

i measuring / complaints I - -

I

itlcthod Frcq~icncy r RcsponsiiI i~it l , - - _. - - .- -- ~~

j Ti f I: PK I:'- CONS TK UCTZON A NI) CONSTK UCTION PZIASZ<S , - -, . ; - _ - ~. -

1:f'i'ccts on b r n o u n t of cut down trcc Along ROW o l the line Observation \>cgctation ! Clearing tccllniquc At disposal sitc

I ! Ilisposal oS cut vcgctation i

.~ - . I - - - - - . + -- - I

I

I

SIMC ~-

1 3 'l'cniporary and i Ainount of acquircd land and 1 Along IlOW of thc line. Survcy PAPS Whcn Supervisor oi' : pcrmancnt land ccoiloinic activities on it implcmcnt S IWvl 13

1 1 accluisition ( Coinpcnsation for PADPs I,

I , -- .. ~ -- I and rcsettlcmcnt - - -

I 3 1:rosion or / Construction activities near I Construction sitc 0 bservation W hcn Contractors

I : scdimcnt duc to 1 cannal, ditch. ' carthwoslis. ( Rctorc thc land after

I I j construction activities I

1 I ! 1 j I I . . . ~ - . - - ~ !

4 ISSfccts on air ; l'ropcr covcring of trucks : cluality duc to i Chcck unpavcd surlaccs for

transportalion / welling

Construction sitc and along transportation road passcs crowdcd

I / population arca. I

~~~ .- I ! 5 : Nojsc I i Noise lcvel 1 At position of

1 SlMC -~ .. -- - .- -- .

Noisc mctcr IS thcrc-&c-1 (:ontractors

Observation

wind coilditioil s p p ~ ~ j

construction / Supcrvisor of ncar thc rivcr

Alicr construclioil of towcr and substation -

S P ~ ' M I ~

SI.MC

~~ .- --

Oncc a month, i n d r ~ s c a s o n ,

Contractors

SupcrvisoroP

Page 30: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Scconri ~l'ra~ismission and 1)istl.ibution (1'D2) Crcdit 41 07-VN Vinl~ 1.ong - - '1'1.a Vinh 220kV translnission linc

- ~ ~- - - - -- - -- ~-.- - -

- . -- .-- I

1 30. ! Issue i l'arametcr , ~ , - . - . - .~ .. -. -- --

I i .. - ~ - ~ . - ~ -- - ,-~.;--- - . . - -

6 i ( ~ 0 l l ~ ~ l l l ~ l 1 ~ ~ i O l l of , (),I leaking level on the surfacc 1 1 soil, air or water : lalld 1 I duc to oil lcakagc 1

I i I

. - - I - -- - - - .. - . --

! 7 Wastcs I Wastc collcction and trcatincnt I systcn1

-. - , _ - ___-----

8 I'ublic hcalth and Sanitary condition and safcty at 1 salcty cl'l'ccts from , thc camp arca. Kccping of

construction 1 construction materials and 1

I camps. inatcrials i cquiprncnts. storcliousc and I 1 :quipmcnt for rcplying ground I cmergcncy problcm

/ 1,evcl of conflict occurrcd ' bctwccn workers and local I

. - , - - - - - -- - 1 inhabitants -4 -

I 9 'fral'fic disruption Install noticc-board systcm. I I , and quality of local Put lip scaffolds when stretching

tralfic I thc wirc over the road.

--

At construction camp sitc and matcrials storchousc

1,oca tion --

complaints

At construction site

At construction site and temporary construction camp

At intcrscction sites

/ SlMC

I ----

Observation a illonth Contractors Supuvisor 01'

I s1'1'M13 1 SlMC

I

7--- - - - --

Method ~rc~ucnc; - - l Rcsponsihilily --- - -

d w A ) _-I - -- - -- - - -

Observation Once a month 1 Contractors

L 1

Obscrvation

- - - - -- -,

Observation Oncc a month

1

Supcrvisor of' S 1'1'M 13

SIMC - - - - -

Contractors

Supervisor 01 S1'1'1M13

! - - , I ransportation of matcrials and Along the road i I I i SIMC I

I 1 cquipmcnts I i 1 _ - .. . .- . .~ . .~ - . - - -.- ----p---pp I

Whcn stretching the wire OVCr thc road

- - - - ~ - ---- ~ ~

linvironmcntal managcmcnt plan 76

- -

Contractors

Supervisor Sl'l'M13

Page 31: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m
Page 32: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second T1,ansmission and Distribution (-i'I13) Credit 41 07-VS Vinh L,ong - Tra Vinh 7-10kV transmission line -- - - - . . - -- .- - - - -. . -- . . . - - . - - - ... - . .- -. -. . . - - -- . .- - - . . - .- - .. .. - -. - - - -

Table 8.2: l'arties involving in cnvironmcntal monitoring plan

So . I'art ics ' Content and format

,Main responsibility I for report I -

I Coi~~slrz~ctior~ ' - Apply proposed initigation mcasures - Rcfer to Table 8.3 , I ('ontrnclor / - Ikport to SPPMB the application of I

I

I mitigation measures. I -- .-- 1

1 Environm~?ntcrl 1 - Monitor (by observation) and assess - Refer to Table 8.4 1 I suyervi,yol. of SppkfB of the environmental paran~eters

) suggested by this EIMP report in the , I I

construction phase; - Report to SPPMB

Safeguard Independent Monitoring Consultant (SIMC)

- .Monitor (by observation) and assess environmental quality based on parameters suggested by this EMP report. - Conduct public consultation to received comment, assessment of local people on environmental management of the Project.

- Refer to Table 8.4

- Refer to Table 8.4 I 4

,

+ Safeguard Indcpcndcnt Monitoring Consultant (SIMC)

Environmental supervisor of PTC4

DONRE and local governn7ent

SIMC will be hired by the Project owners to monitor the implementation o f the EMP. The SIMC will report its environmental results every s ix months during the construction period. An example Terms of Reference for the SIMC during construction period is provided in the text box below.

I G T P L E ENVIROSMEXrI'AI. 1.EIIMS OF REFEIIEXCK FOR SIMC 7

I

- Monitor (by observation) and assess of the environmental parameters suggested by this EiMP report in the

- Monitor and control all

I The Safeguard Independent Monitoring Consultant will: !

1 operation phase; I - Report to PTC4

'I environmental protection activities of the project i

-- I ----- A

I 1 . Visually look at the construction sitcs and make notes related to thc following ' i cnvironrnental issues, but not linlited to: I

I I

- General clean up after construction works, , I

! 1 - Excessive clear cutting of trees beyond ROW in conllnunal or forest land.

I

- hlcasuses taken by the contractor for clcaning up woody rcsiducs aftcr tscc cutting I

- Status ol'acccss roads (have thcy bccn closed if'in a protcclcd arca, arc they stil I bcing uscd and to what cvtcnt. how arc thcy bcing contsollcdImanagcd and by

- - - - - - - - - - - -

1;nvironlncnid n:anagcment plan :! 8

Page 33: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond Transniission and Distribution (TD7) Credit 4 107-VS Vinh 1,orig - Tra Vinh 930kV trans~nission line

~ . ~ ~ - - . . ... . , - ..

7- - - - A - - - -- - - - ~\.ho~n). Application of mitigation mcasurcs fbr or sign of'soil crosion along 'l'/L duc

I

I to trce cutting andlor around towcr foundation I I

- Status of re-vegctatiou in the ROW and towcr foundation I \

- Iinpacts on construction works (lc\lcl of noisc. dust, and damage to roads duc to carthwosks and transportation of building materials)

- Status of construction worker cainps and sanitation facilities for them

- Proper distance between the houses and 17/L,

- Status of implementation of safety measures (signboards, restricted zonc, fences, isolation etc.)

3. Conduct public consultation to:

- Assess the level of involvement by the local authorities in dealing with environmental issues (dust, noise, and damage to roads due to the transport of construction materials, tree cutting on public lands and protected areas).

- Identify any other environmental issues and record environmental complaints from the PAPS.

- Report on responses (if any) from appropriate local authorities on environmental complaints or non-compliance

I~~nvironmenta1 nianagctncrit plan 2 9

Page 34: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond 'I'ransn~issioii and Distr-ibuiion (TO') Credit 4 107-VS Vinh Long - Tra \'in11 720kV transmission li~ic -. . ~~ ~ ~ - ~ .. - ~ ~ . - - - - - - .. - - - - - - -

'I'able 8.3: Example of site cnvironmcntal management monitoring report (this examplc can bc used for contractors)

Project name: Project location:

Name of Contractor:

Co~nmenceinent of Project report or monthly repofl:

1 Life and agricultural production

Date of report: - ------ yp--- - Impact - Mitigation measures Comment I

I implemented -7- I i I I

due to relocation and agricultural land acquisition

Solid waste generated from soil -- excavation

( Environmental impacts caused

A-7. L I

1

I I by construction worker

Construction phase

Effect on fauna system due to site clearance

i Conflict betwcen construction worker and local people

9 / Health and safety

1 2 1 Surface water contamination

Name of person prepared this report:

- 3

-

4

Title:

Noise and vibration

Air pollution

Address: Telephone:

Page 35: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second .frans~nission and Llistsibution ('fD2) Clxdit 41 07-VS Vinli Long - Tra Vinh 720kV t:.ansmission line

~ ~ ~ ~

'Table 8.4: Exainple of environmental performance monitoring report (this exa~ilple can be used for technical supervisor of SPI'NI13/PTC4 and STMC)

Projcct name:

I'rojcct location: Provincc: Dislrict: Comlnune:

Type of Kcport:

Morzlhly report (Yes/No): Quarterly Report to Ii VN (YesiNo):

Qzlurterly Report to the WB (Yes/No): SIMC reporl (Yes/No):

Date of report:

Parameter Asscssmcnt of Consultant1 community I complaints

1 2 1 Noise level around construction sites and ad-jacent residential areas

Comments/ Recommendations

, I

1 3 Dust

! 1

I

I Tree cutting and access roads management / 1 4 1 and control I

During Construction

Amount of cut down tree

Solid waste and site cleaning up after the

Oil leaking and level of impact environment

Workers' sanitation facilities and safety , management

I 8 Status of application of safety measures , Construction material management I I

L________1___--- I I During oper;ition 1 I i

10 / Clearance and maintain the ROW I I

I L

1 Level of impacts on flora and fauna due to 1 I ! I ROW clearance acf vities.

L___ I i -i

L

Report prepared by:

Envi~ .on~i~cn t ;~ l ~nnnagcmcl~ t plan 3 1

Page 36: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Seconti ~1'1.ansrnission and Distribution (1'D2) Credit '1 107-VS Vinh Long - 'l'ra Vinh 330kV tralisniissiori line

. - . . ~ --- - ~ . . -

Tablc 8.5: Cost estimation for environment monitoring

) So . Itcm Unit cost I mount Subtotal i !

~ 4

! 1 Supelvision by

I I I

i - 1 - i Included in I Co~ltractor ! I j construction cost I

pa---------- ---.

! I

1 man-inontldproject I prvlect j Included in supervision of PMB management cost 1 , i i Supervision by SIMC

1 supervision of PTC4

1 TOTAL

l ~ n v i r o n m c n ~ d m:inagenicn! plan 32

50,000,000 VKD/project I project - - ! 50,000,000 VKD

1 man-monthlprojcct / 1 project I Included in 1 operation cost I

j0,000,000 VKD 1

Page 37: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Seccrriii -1.1-ansrliission and Distribution (TD?) Crcdit 4 107-VS Vinli Long - Tra Vinh 230kV transmission lint --- - ..- .. . - ..-. ~ ~ - . .~ . .. - . .~. . -. ~~ -- -- --

SECTION 9 - INSTITUTIONAL IIEVELOI'MENT ACTIVITIES

*3 I<VSts training: Internal training coursc on how to nlonitor EMP and how to rcport environmental results as part of quarterly and annual projcct reports.

+:* Training of SPPMB: The following training will be provided for the environmental staffs and some people of local authority.

+ Safcty training: Regular training on safcty issues related to the distribution network maintenance;

+ Monitoring and reporting of environmental management plan for stakeholders of the Project's district or communes: The training will give guidance to the local stakeholders about the participation of local peoplcs during implementation of EMP. The training will also include the inethodology for site observation and monitoring check sheet filling.

Table 9.1 Cost estimation for capacity building plan (*)

T Y P ~ sf training

-----

I.:nvil-olimcntal m:ilirrgcmcnt plan 3 3

Ntlnz ber sf

students

Training location is chosen by EVhT

i n l a i

I

3 days Before project implementation

Environmental LManagement Training Course (En's training)

Duration of

training

I

E V S combines with speciaiized organization.

3

SPPlMB 15,000,000 I

Stnrting date/Ending

1 environmental implementation, location is combines n T D management after finish chosen by with (training of Environmental SPPlMB specialized

1 I SPPMB) I Management (in consultant I 1 Training Course Hochilnillll

I I

I i- -- -- . city) -- -.-

I

Total I

I I VND I

- - - _

city)

i Seminar of

I student) Abroad)

10

ing , .fo'eign)

Venue o f training

dutv for each (Domestic or

Institz~te or 01-ganization Cost (local

to pl.ovide and

Page 38: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond -1'sanslnission and 1)istl-ibution (TD2) Credit 4 107-VS Vinh Long - T1-a Vinh 270kV transmission l ine .- -. - ~ - ~ ~ ~

SECTION 10 - TMI'LEMENTATTON AI<lUN(:EMENTS

- -- - - 7-- -----

--a-

Role Responsibilities .- -7 , Organization I

i Project Orvner , - Ultimately responsible for overall project managen~ent. tiVX I including en\~ironn~ental management. 1

-

; Environmental - Specific responsibility and point of contact for I Officer , cnvironrnental issues.

I SPPMB

r - ~ - - I

j Project 1 I - Responsible for coordination and management of I SPPMB 1 Implcrnentation i overall project implementation, including guiding and 1 1 and management ( supervising implementation of the EMP. I

I Agency i I

I - Planning and implementation of environmental I management activities during construction i

- Coordinating with other parties in relation to environmental management activities.

- Carrying out internal monitoring and supervising , independent monitoring

- Supervising and providing budget for monitoring activitics.

I I i. Applying construction-phase mitigation measures. 1

- Reporting on environmental information to concerned A- parties Project Operator 1 - Responsible for operation of the project including

1 operation stage environmental management and monitoring activities.

Consultant 1 - Responsible for preparation of EMP doc~~mentation.

Contractor 1 - Responsible for supervision of civil works contractors Supervision 1 during construction, including implementation of 1

environmental management activities under the EMP

I I ii. Ensuring safety of construction workers and local

I people during construction. I I

P'TC4

PECC3

Supervisors of SPP-MB

I I 1 iii. Followiiig Vietnam and World Rank policies on 1 I

environmental protection during construction. 1 1 Safeguard , - Respunsible for independent monitoring of EMP I C11osen and

! Independent ( implementation 1 . I guaranteed by . I Moi~itor (SIMC) I 1 - - - -_____- - - ~ -~

: SPPMB or EVN

Civil Works - Responsible for construction works and following 1 Contractor chosen by Contractor contractor specifications outlined in the EMP. This 1 includes:

Page 39: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m
Page 40: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond T~.ails~nissinn ancl Distribution (I'D2) credit 4 107-VS Vinh Long - 'Tra Vinh 22OLV tra~ismission line -- - ---- - -.- -- ~ . -~ -

SECTION 12 - COST ESTIMATION FOR EMP IMPLEMENTATION

Tablc 12.1 Summary of cost cstimaticn for in~plcmcntation of EM]'

ltcms I Implcmcntation cost (VXD) I I I I

I 1 Construction phase -- Operation phasc 1 j 1 I Cost for i I information

I Mitigation measures

3 Supervision cost I for environmental 1 supervisor of 1 SPPMB

Included in contract with construction contractors

Included in management cost of the project

Included in yearly operation cost

1 4 i Supervision cost for SIlMC

5 1 Supervision cost or environmental

i i , I f supervisor of

I PTC4

Included in operation cost of the project

1 1

I 1 TOTAL I 85,000,000 VXD

1 6 i Capacity building 1 (training cost) L / 7 1 Contingency cost

I

- - . . . - - ~ ~ ~~ ~ . . -~ ~ .-.- . . . ~ - ~ . .~ -. ~-

I~:n\;i:onmc~;t~il tnanagcnrcnt plan

30,000,000

Included in contingency cost of approved total estimate cost for the project's i~nplementation

-

Page 41: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond TI-ansmission and Distribution (I'D2) Credit 14 1 0 7 - V S Vinh Lony -- Tra Vinh 7 3 0 k V tl.ans~nissio~l line

~ ~~ - ~ - - ~ .- ~.

ANNEXES

Annex 1 : I)ccision of approval for Environmental impact assessment rcport of the projcct

Annex 2 : Member performed this EMP report

Annex 3 : Drawing of project location

Annex 4 : Drawing of environment in project area

Annex 5 : Minutes of meeting on public consultation

Annex 6 : Photos of meeting on public consultation and project location

Annex 7 : References

. - - - p - - - . - - - - - . - - ~ .- ~ - - - - - - ~

linviron~ncntnl i~lan:~gerncnt plan 3 7

Page 42: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Sccond .I'rans~llission ant1 Distribution (TD2) Crtdit 41 07-VS Vinh Long - Tra Vinh 17-0kV translnission line _ _ _ - . . - . --__ _ -

ANNEX 31

IIECISION OF AI'PKOVAL FOR ENVTIXONMENTAL IMPACT ASSESSMENT REPORT OF THE PROJECT

. _ -. ~ - . . .- . .. ~ _ . -. . ~ ~ - - ~~. -

I.hvironrnci~tnl maiiqcnicnt plan 3 S

Page 43: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

FRBN :UU THQM DINH UQ DTM BO TNLMT FQX NO. :04 7736194 Sep. 09 2008 09: 55AM Pi ----.

I '

BQ T)J NGUY~N VA ~ 6 1 T R ~ ~ G CQNG BOA X.k HQI C!HfJ NGH~A V@T NAN £I@ Qp - Ty do - Hqnh ph6c

s6: .r l.j!dh.. /QD-BTNMT ' . : . , . .

Hh Ndi, ng&fl thdng 8 niim 2008

Q U ~ T BgNH ~6 vibc ph6 doyet b.b d o dinh gY the dong mdi trvimg

Dv i n duhg dHy 220kV Mnh Long -TrA Vinh

BO TRZTCSNG BQ.TAI NGUY&N VA M ~ I TRUONG Can c& Lu$t Bio ve m8i tnrbng ngAy 29 thing 11 n h 2005; CHn oir Nghi dinh sd ~ O / ~ O ~ / N O - C P ngAy 09 W g 8 n h 2006 cira Chinh

phS vk viec quy dw chi ti6 +$ h u h g din thi hhnh mot s6 diau cfia ~ u @ t B&o ,

ve m6i trulmg; !

Can cir NgN dinh sb 2 1 / 2 0 0 8 ~ ~ - ~ ~ nghy 28 thting 2 2nHm 2008 v6 vigc sua dbi b& sung met ss6 d i h cSa Ngbi djnh s6 80/2006/ND-CP ng& 09 t h h g 8 n&n 2006 c h Chinh phG vb vi(c qby Gnh chi tidt va h u h g din thi hilnh m@ $ d i h c h LGt Biio vb m8i trubng; !

Cih cir Nghi dinh r6 2 5 / 2 0 0 8 / N ~ - ~ ~ ngiy 04 thing 3 n h 2008 cria C h i d phu quy d'* chuc nang, nhiem vy, quy$ hgn va ca c8u t6 chirc cta B6 TAi nguyh v& M8i tmhg;

CHn cir Th6ng tu 9 6 0812006lTT-BTNMT nghy 08 thing 9 n&n 2006 B@ Tai ngny6n vB M8i truhg h u h g d b vb denh gii m6i tnrimg chidn luqc, danh gii the dong ng6i b i h g cam kkt bHo ve m6i t n ~ h g ;

A- Gin cir ~ u ~ 6 t d@ sb ~~@OO~/QD-BTNMT ngiy 08 t hhg 9 n8m 2006 eta $&'- . ::

Bb ~ h g BO TAi npyen vh Mbi tmhg ve vi& ban h m Quy ch& vi ch~l-:":!..' , - ' , : . . #. ,' vh hoqt dQng &a Hiji 8611~ tlih dinh bb cia d h h gi6 m6i tn rhg c h i b luq&T 1 ... : i.: ,: . ,.'"" . Hoi d6ng,thih d a bb cb &inh gki t8c dong m6i tmang; \ .,.I.; ., .:,!:.,lL.,. ?.,..it. -

Ciin c~ ~ u ~ i t djnh s6 ~~$~/QD-BTNMT n@y 20 t hhg 8 n h 2007 cfia Bi) , ,;;..;:!,::.:-. t r u h g . B ~ Tai nguyBn vA Mdi pubng v6 viec uq quy&n i j v8n b C cho Vy t r u h g ,%-..

VIJ ?'hh dinh va D b h giB tbc-jd&tg mBi truung; CHn c u j kiin chi dao c& Thii tudng Chinh phG Nguyb ~ $ 1 Diing tqi VHn

b h $6 2346NPCP-TCCV ngay 11 thing 4 n h 2008 cSIa V h phbng Chinh phi v i viec cho phkp mQt s5 don vi ciut B(I TAi oguyen vii Mdi tnrbng dupc ti$ tyc duy tri t6 chfic, hopt deng vii sir dung con d$, tAi khohn hien co;

Xkt noi dung bho c b dinh gi6 thc dong m8i tmhg cca Dy bn duimg diiy 220 kV Vinh Long - Trri Vinh da duqc chinh sira, b8 sung klm the0 Van ban gili trinh s6 4138/CV-AMN-PDB ngay 08 thang 8 niun 2008 cfia Ban quk 19 Dv hn cb cbng trinh Dien ~ i B n Nam;

Page 44: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

FWll :UU THRN DINH W DTU BO TmMT FRX W. :04 7736194 Sep. 09 2808 09 : 55FIM P2

Thee d& nghi ,cQa Vy t;nrhg Vy ~ h b d i h va Ddnh gi$ t8c dang m6i tmhg,

Q ~ T DJNH: ~ i b u 1. Phi3 duy$t nai d6np bio d o d h h gi8 tic dbg mdi t&mg Dv h

b u h g &y 220 kV Wnh Long - Td Vhh c h Ban q& 1y Du An c$c c6ng Ditn rnib Nam (sau &y g$gi la Chir dy &I).

~ i k u 2. Ch6 du in co t&h nhiern t& hi& dfmg nhwg niji dung dvgc n6u trong bdo cbo danh gih the d& m6i trubng vA nhbg y&u chu bbt bu@ S ~ U dBy: f 1. ~ i d n himh thu gom, xu ly rtic thiii sinh h o ~ t va c4c lo$ chit hii r h &y dyng trong quri trinh thi can4 xiiy dwg cac hang myc tuy& duhg day, t i b hdnh nhu gom, x~ ly chit Mil do viec chat phA thkn thvc vet bong h h b lang myen thu4c c b tinh Vinh Loqg, Tla V i b80 d h c6c yyfu ciu v& v+ sinh mdi s u h g hien h h h ;

2. ~ h d i hgp vui chchi quyin dja phucmg thvc hien c6ng t8c din bb d h$ d i n b! inh huimg theo &rig quy djnh hign hanh vii g i h s i t ch@t chi? vi@c chat ha t h h thgc vdt trong hanh l&g tuy& phai chuy6n ddi myc dfch so dyng &bq ti& hM h o b tha mst b h g tap cic dien tich tipn chiern dpng dit thu$c chc dia phucmg c4 tuyh duhg diiy di Qua;

3. Thyc hitn cb quy dinh vk an toin wng qui triah x8y dmg tuy& dvhg diy, d@c bidt 1P tgi cac diim vugt s6ng, vuqt qu6c I$, giao giaa hai duhg dfiy, hu vqc din cu dang duc.. .; thuc hien cac bien phap giim thiau difn tir mhg din tong &Ang dHn cu dm wng hinh lang myin vh khu vqc xung qua& trong quh trinh v;jnihihh c6ng trinh;

4. Tht)ng bho cho cGng dbng dh cu v i chinh cpy6n dia phucmg thugc 2 tinh Vd Long vA Tra Vinh, nai c6 tuyhn dubng diiy bi qua v6 thfri gian thi c6ng vh v$n hanh tuy& A r h g diy; I& k6 hoach img ciru c8c sy cb tmng thi cdng v i v& hanh c8ng trinh d6 b&o dBm img phb kip thiri c L sq c6 xiy ra;

5 . ~ h d i hqp vbi chi& p y & n si3 @i vB chc cco qvan lien quan thuc hien c8c n$i dung quh 19 v& g i h siit mfi t r u h g nhu neu trong bio c60 d4nh gid tic dang m6i t n r h g dvqc phi duyet vir luu giP s( l$udk cdc cc quan quin 19 nhii nu* v6 b b v$ m8i t r u h g tikn hhnh k i h tra khi ch hilt;

6. T& thi~ nghiern ~c chk 66 thbng tin, b8o cho v& viec thvc hi& cb nQi dung cua bbo c40 danh giA t8c dong m6i t n rhg d dupc pM duyet vA c4c ySu ciu neu tai ~ u y i t dbh nhy theo quy dinh c6a Nghj d* $6 80/2006/ND - CP ngay 09 t hhg 8 d m 2006 cua Chinh phh v& viec quy dinh chi ti& va h u h g dan thi hanh met scf diku ciia Lusr Bdo v$ m6i tnrhg, Th6ng tu s6 08/2006/TT-BTNMT ngiiy 08 hang 9 n8m 2006 c5a B4 Trii nguyGn v2t Mbi truhg h u h g d8n v6 danh gia m6i tmhg chiin iuqc, d h h giii tac dong m8i m r h g vh cam kit biio v$ m6i t r t rhg;

Page 45: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

FROM :UU THQM DINH UQ DTM BO TN&MT FQX NO. :04 7736194

! !

Sep. 09 2008 09: 55QM P3

~ i k n 3. B B ~ cio d~ gib t ~ c dong rnai tmtmg cca DU ~n vii nhtmg y ~ u bit buac ~i ~ i h 2 eta ~ h ~ b t djnh niy lh co sb d6 cac CCY qua. q u h ly nha

nu& v& bio v$ m8i tnrimg iikn h h h kilm tra, thanh tra, gi6,rn sat viec thqc hien c6ng tic bbo v t mbi truthg cia Dq h.

I 3 i h 4. Tnrbng hpp c6 hhiing thay d6i vk n$i dung cfia bbo cho danh gii t&c d?ng m6i trubng duqc p h ~ ~ u e t trong qu8 trlnh t r i h khai thvc hien Dg &I, 7 ChS dy An phei c6 v8n b b b o cb vh chi dugc thuc h iC nhimg ngi dung hay 7 d6i d6 sau khi c6 vHn bb chip thub cfia BO Tai nguyEn vvB M6i trubng.

~ i 8 u 5. Uf nhiem CIJC iio ve m6i trulmg chO tri hpp vbi Sb F& nguysn va M8i t m h g 2 tinh Long vh Tra Vinh, c8c don vi c6 lien quan thuqc Ba Tai nguyCn vh M6i ki&m tra, giam sat vA xttc nhgn viec thpc hien cbc ni)i dung bio ve m trong bio d o danh gii t& dong m6i t r u h g h duqc phe duyet vB nSu tgi ~ d u 2 c6a ~ u ~ k t dinh nhy.

~ i & u 6. Q U ~ & ~ djnh nay thi hihb k6 tir ngay I@./.

Nal nhgn: I

Ban qulln Iy cic c h g trinh di4n mi&n - Tbp dcin Didn IVC Vi4t Nam; - BQ Cbng thumg (dh chi @o); - UBND hai tinh Vinh Long va Ti

dao);

(d phbi hqp thin: hien); - S& TN & MT hai tinh Vinh Long vB ~4 Vinh

I - Cyc B b VI$ mdi t ruhg; T h m h hi Bo; 1 . V h phbng tiep nhgn va tr6 k6t quP; - LUU VT, HS, TD. H24

/w ! i

Page 46: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m
Page 47: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (TD2) Credit 4 107-VN Vinh Long - Tra Vinh 220kV transmission line

ANNEX 3

DRAWING OF THE PROJECT LOCATION

Environmental management plan

Page 48: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (TD2) Credit 4 107-VN Vinh Long - Tra Vinh 220kV transmission line

ANNEX 4

DRAWING OF ENVIRONMENT IN THE PROJECT AREA

Environmental management plan

Page 49: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (TD2) Credit 4 107-VN Vinh Long - Tra Vinh 220kV transmission line

Existing and proposed protected amas in T n Vinh and Vinh Long province ChckhubQk+ h g n d d & d a & h T i V i n h v a V i n h b n g

Vogtrtion t y p I Kiiu rimg E * r p m n brql I R f q I k u t ~ q mnh

D C o ~ ~ c P m l l R l ~ U l r i n acidWlp bmIl mng Nng U (Lw) ~ u o u r h l l W q d a r u n g @ L i m l o n t a w l l R l n g n u d i B m b o o I R r n g h d a i Ptan(.(ion brq~ I FUW tdng

Q w ~ n d a n d r a l r b l ~ Wng *gicJcwd lmnd 1 OTl n6ng ngb*p WJSWbod*rllplNOC h v f R f n g n e @ * n

I I l euouu1wng*m

Lognd I Chu gui

- PloCcCdmwlKhuDiov)

---- Rouimd b d r I R.nh gi& Inh 02.MbordnlR.nhgk% hy)n - \mL I rur I r u \ mb lrr~s.n~.\o.a I tar

Environmental management plan

Page 50: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (TD2) Credit 4 107-VN Vinh Long - Tra Vinh 220kV transmission line

ANNEX 5

MINUTES OF MEETING ON PUBLIC CONSULTATION

Environmental management plan

Page 51: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

f i ~ BAN NHAN DAN 4 - -

..-.-.-.-....-I &.. . -T_&.~M.-.-. -.-.-. ...

/ PECCJ

CONG HOA XA H ~ I c ~ f i NGHIA V I ~ T NAM

Dac liip - TV do - Hanh phdc

N6i dung: v/v ~ i & u t ra , xPc iQnh mdc dij i n h hd6ng de8n mai trdb'ng, d l n sinh kinh td ciia d ~ $ Pn Duirng d5y 220kV Vlnh Long - TrB Vinh.

BIEN BAN LAM V I ~ C

H6m nay, ngiy ...... th6ng ...... niim 2008.

Tai v2n p h h g UBND .................................

Lfin bh : 01 1

Ngay bh:

1. Phia UBND

MS: BM-MT-42

5

3. Phrb: cdc h@ bj Znh h ~ a n g (danh srich dinh k2m)

-

Kf ten

11. Niji dung

C h e c vu m. I IRHP

STT 1 2 3

Kf t en STT 1 2 3 4

Sau khi nghe dai di&n PECC3 trinh bly, phd bie8n th6ng tin V& dy Bn v i sq can thigt phai tign hhnh di$u tra m8c do rinh hu'dng dgn m6i tnlang, de"n dbn sinh kinh t6 ciia dg i n Dsrirng diiy 220kV Vihh Long - TrA Vinh. CBc b&n dP trao d6i vh c6 cBc jr ki6n sau:

4

H o v h t e n

................................. 1. UBND holn toin nh2't tri vdi chii tru'dng c6a NhA nu'dc v$ viec x i y dqng dg i n DsrZmg d8y 220kV V?nh Long - TrB Vinh.

Ho vh t e n

3. KhAo s i t chi ti& khu vgc dg in:

Dai dien PECC3 vA c ic cd quan ch8c nang cfia dia phu'dng kgt hdp tisn hAnh di$u tra, khio s5t mGc do inh h~fang m6i tru'ang, d2n sinh kinh tS'khu v1.f~ dl! Bn

C h e c vu

Page 52: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

.:j 111. Y kie'n ce3a dja phddng v& Hnh htfang m8i trdang, bdi thdh'ng - t6i djnh cd: .... .,,Y I / 4

.. -., :! 2 ..... ........ ..... .... ...... .... ................. d5 ....... J-A ...... td.Ltii.5 , ZG Cd L.~;Y. 9 i i f.L%.5 ...A r..

L 4-

Dai di$n Dai di$n

Trang 313

- ' ,gcc3 - , - BIEN BAN LAM VIEC Lan bh : 01

Ngay bh: MS:!BM-MT-42

Page 53: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

' ,'I 3 - .................................. ... ... .... ....... . =.;," Ngiy ..... thang n5rn tai b. . 2 b .I.&. d2..

- . - .,. STT HQ vii ten Dja chi -- Kf t&n /

1 I L .... ' ; / vavl nl ,, ,& Q, .Q~,: . . . I

. . . . . , 2

I ,f

Page 54: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CY BAN NHAN DAN .I

I' So: ..............................................................

\-

C ~ N G H ~ A XA H ~ I CHC N G H ~ A V I ~ T NAM D6c l$p - TIJ do - Hanh phdc

N6i dung: v/* Di6u tra, xPc qnh mdc dij Hall h d n g de'n m6i tru'ilng, dgn sinh kinh tb c6a dd Pn D u h g d2y 22OkV VInh Long - TrA Vinh.

H6m nay, ngly 1.C.. thbng ..O$ n2m 2008.

Tai van phbng UBND ... @xt ....... /LW .... N - d I. Thhnh phdn tham dg .

I . Phia UBND

PECC3

- - - -

2. Phia C6ng ty Cd' phih Td vh xily dgng Z$n 3 (PPFCC3)

- BICN BAN LAM VIEC

LSn bh : 01

Ngay bh:

5

3. Phia cdc hg bj rinh hdang ( d ~ n h sdch dinh k2m)

MS: BM-MT-42

11. NQi dung

Sau khi nghe dai dien PECC3 trhh bay, phd bikn th6ng tin v6 dy i n v i sy c$n thigt phii ti& hinh dibu tra rnec 66 Hnh hd3ng de'n m6i truang, d h dPn sinh kinh ti5 c3a dq bn D u h g diiy 22OkV Vinh Long - Tri Vinh. Cic ben ddH trao d6i v2 c6 c ic 9 kign sau:

J

1. UBND .m? .Y;d..&&... hoin toin nhgt tri viri ch6 tnrdng c3a Nhl nude v6 viec xPy dqng dq i n d b n g dPy 22OkV Vnh Long - TrA Vinh.

2. ,.g= d m c

3. Khio s i t chi ti6t khu vp'c dp' in:

Dai dien PECC3 vB clc cd quan chat niing cfia dia ph~fdng kg't hdp ti& hinh bi$u tra, khio s i t mifc do ;jnh hd8ng m6i trdicng, d2n sinh kinh te'khu vvc dtf An

Page 55: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y kign cda dia phrfdng v& Pnh hd6'ng m6i trulilng, b6i thrfang - t8i Qnh cd: C C - - \ ..... , ...... ..ad$.. . ...& 44 ..... A%.. ...... h4.. . ,. ................................................................................................. .

....... w;. ....... n& ....... $21 ..... 2ny ............................................. ........................ + ..... p ...... 9 ..... .................. .- ............ ..w?: ... .R 4.. ...&...............j............. d. l~ l........ ..A[. ..&i ....... ,, ....... J. &.. .... dLddLj ....... &?-..+$$ ..... a 7- .... yy2b.t .... &ih..... ...... .-- .& ..... ~'6s ...... czn..~~n ..... di* .... ........................... ..,................ ....................... *. ....... pe;ci?'i. ... A% ......... hi," ...Etip. ..... ...Pwy.. ...p Ac.. .... .Ad&) ...... *:.,cq.. - P .- r C nr'c... A d ..... ax. ..... $I& .... .ALL!%...)...% ...... dj ...... .pC@x'....4df3 ......... bcj11 ..... v~n'kf!...I ........ ..atzib. di? ~..~m:: ..~I-R~...&..J~I++.:. ..!....UL~Z A ~ G Z R kc;;) . ..... ........ ..... ..... ......... ...

rr - \ .......................................................................................................... ........ ...... ..... ..... %.. .........CGd .ah .kl.............

LZin bh !: 01

Ngay bh: PECC3

Dai di$n Dai dien

. .

B I E N BAN LAM VIEC

Page 56: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

GY BAN NHAN DAN 2 ..-.-.-.-.-.-.25'-.-. ~.&L:d.ab .-.-.-.-

Sd: ......................................... : .....................

* ,

B I ~ N BAN LAM V I ~ C

CONG H ~ A XA HOI c ~ l j NGHIA VI$T NAM D6c 18p - Tq do - Hanh phlic

L i n bh : 01

Ngay bh: MS: BM-MT-42

N6i dung: vlu Didu tra, xic Qnh milc 64 inh h&ng d b m6i trdang, d&n sinh kinh td ciia d@ i n Dwhg day 220kV Vinh Long - TrB Vinh.

...... ...... H8m nay, nghy th$ng niim 2008.

Tai v8n phbng UBND .... a&.%.d.ckb . .

i':,I. Thhnh ph$n tham d ~ $ / .

I . Phrb UBND r STT

1 2

3 4

3. Phia ca'c he bj a'nh h&ng (danh sa'ch dinh k2m)

STT 1 2 3 4

II. NQi dung

Ho vh t2n

3 t u , z b v;~ d n k ~

Sau khi nghe dai dien PECC3 t rhh bay, phd bi& th6ng tin v6 d q dn v l sq c8n this't phdi ti& hhnh di$u tra miic do Anh h&ng deb m6i tntang, de"n diin sinh kinh t6 c ia d g i n D u b g dPy 220kV Vinh Long - Trh Vinh. Cdc bSn dB trao ddi v i c6 cdc 9 kieh sau:

1. UBND ................................. hoin toln nhii't ttri vdi chfi trddng cfia Nhh nu'dc v& viec x2y dqng dv sin D u h g d2y 220kV Vinh Long - TrB Vinh.

Chsc vg

'Pcr uR ~b Y'

Kf ten Ho vh ten

2 UBND ..................... & .,*..' 328 ,. - ii*;

j q .

Kf ten

C h ~ c vl;l

3. KhAo sdt chi tie't khu vqc dg fin:

Dai di$n PECC3 vB c8c cd quan chti'c nfing cfia dia ph~fdng ke't hap tie'n hinh di$u tra, khio s i t mdc do Anh hddng m8i tr~fiing, diin sinh kinh tg'khu v;fc dy' i n

Page 57: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. r;' lii& clia dja phu'o'ng v6 Hnh h&ng rn6i truliSng, b6i thdb'ng - t8i dfnh cd: i

. . . . . . ,'

. . . ..; ::.: ...... .:.! .-;+*E :.d CC3

., ".' .:,;;:+:;;:+y ., . . . . . . . . . . . . . . . . . . . . . . '.,, .::'

Dai di$n Dai dien

Trang 313

. . . . . - Ngay bh: . . ' . . ' :',:- .. ;.

B I E N BAN LAM VIEC Lan bh : 01 MS: EM-MT-42

Page 58: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

SACH NGU'OI DAN THAM GIA HOP THAM VAN

Page 59: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

I

DANH SACH NGZTOI DAN THAM GIA HOPTI-IAIVI (/&J

Page 60: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

6~ BAN HANDAN ...2G... &~ZC:~.~X@! .-.-.-. .. .-..

-

CONG HOA XA H ~ I c ~ f i NGH~A VIET NAM DGc l$p - Tq do - Hanh phlic

N6i dung: vlv ~ i 6 u tra, x8c dinh mrYc dQ a'nh h&ng dgn m6i trtfang, d5n sihh kinh ti$ c6a dq8n Dlrirng d l y 220kV Vihh Long - Tra Vinh.

PkCC3 I B ~ E N BAIV LAM V I ~ C

H6m nay, ngiy 14.. thing .i ... nHm 2008.

Tai v8n phhng UBND

I. Thhnh phhn tham dq

,L~II bh : L r

I . Phia UBND -

Ngay bh:

2. Phia C6ng ty ~6 p h h Tu'vik xi?y dgng &@n 3 (PECC3) d'

MS: BM-MT-42

5

3. Phia ca'c h@ bj hnh h h g (danh sa'ch dfnh k2m)

11. Nai dung

Sau khi nghe dai dien PECC3 trlnh bay, phd bi& th6ng tin v6 dg i n vh sq can thie't phi i ti& hhnh di6u tra m3c do inh h h g d2h m8i W n g , de"n diin sinh kinh tC cila dd i n Duhg diy 220kV Vinh Long - TrB Vinh. Cdc bEn dP trao d6i v i c6 c ic kis'n sau:

1. UBND ./&.3.d.~...rf(61/. ....... hohn tohn nhi't tri vdi chli tnrdng cda Nhh nlrdc v& viec xiiy dgng dg dn D u h g diiy 220kV Vinh Long - Trii Vinh.

3. Khio s i t chi ti& khu vdc dg in :

Dai dicn PECC3 vh clic cd quan ch3c n2ng cda dia ph~fdng kgt hdp ti& hinh di$u tra, khBo s i t m3c do Bnh h~1'3ng m6i tru'dng, d8n sinh kinh tdkhu vtfc dg cin

Page 61: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

- -- .. I L B ~ , : 01

. L A .;:c - ~ , iE t \ 1 Ngay bh: - - T i : EM-MT- , L ' I

111. Y kie'n c6a dia phddng v6 Hnh h d n g m6i tru'ang, b6i th&ng - trii djnh ed:

Dai dien Elai dien

Trang 3/3

Page 62: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

DANH SACW NGU'Q'I DAN THAM GIA HOP THAM ~ h i N

Page 63: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

GY BAN NHAN DAN 2

,.-.-,- X? -.-. Lm l . h d i ~ . ; -.-.-.-.-.. -8 S 6': .............................................................

Xa,,

CONG HOA XA H ~ I C H ~ N G H ~ A V I ~ T NAM DGc l$p - Tq do - Hanh phfic

N6i dun^: vlw ~ i 6 u tra, x i c dinh mi?c do 6nh h&ng d6'n m6i trdang, dan sinh kinh te" c6a dg Qn Duhg day 220kV V'inh Long - Tra Vinh.

~ 2 n bh : 01 Ngay bh: MS: BM-MT-42 PECC3

H6m nay, ng ly thing niim 2008. .' ...... ......

! B I E N BAN LAM VIEC

p:; Tai v8n phhng UBND .d ...... bJ...1bk .,,. ,,,? C-. .,-

.. 2*:: I. Thhnh ph$n tham d ~ $ . e -, $$.$ A;[ . . ..;<id .. .. '. -2 ,. ..... 1 ..-; I . Phia UBND . k,.;+

. . '. <:+.-, > -,. ., ?, ..-< ..... b ... .̂, . .

2. Phia C6ng ty Co' phdn TII v8;r xi?y dgng &tn 3 (PECC3)

5 3. Phia ca'c ho bj dnh h&ng (danh sdch dinh kkm)

11. Niji dung

STT 1 2 3 4

Sau khi nghe dai dien PECC3 trinh bay, ph6 bie'n thbng tin v& dq sin v l su c t n thie't phdi tign h lnh dieu tra mlPc do Hnh h h g d6n mbi t r ~ a n g , d b dPn sinh kinh te' ciia dg An Dubng dPy 220kV Vinh Long - TrA Vinh. Cbc b8n dH trao d6i v l c6 csic y ki6n sau:

Ho vh ten

NA-& - . vd -$&&q Kh.

J

Chat vu - PC ,' ICW

1. UBND ................................. holn tohn nhgt trt v6i chfi tru'dng c6a NhA nUdc v$ vi$c x2y dqng dg i n Dubng dfiy 220kV Vinh Long - TrB Vinh.

KQ tCn

3. Khio s i t chi tie't khhu vqc d q i n :

Dgi dien PECC3 v l c i c cd quan chir'c nZng cba dia ph~fdng kgt hdp ti6n h i n h di$u tra, kh io si t mbc da Bnh h~fdng m6i tru'ang, d i n sinh kinh t$ khu vvc dcf An

Page 64: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y kis'n c6a dia ph~fo'ng v6 Hnh h d n g m6i truirng, b6i thllb'ng - t6i djnh cd:

Dai dicn

r!=cUd

Dai dien

B I ~ N irr\i\i 1Atl'a ' ~ ' I E C ILin bh : 01 . .

~~a~ bh: -

Trang 313

MS: EM-MT-42

Page 65: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

' 1 P E W 3 Lan bo : 01

B I E N BAN LAM VIEC Ngay bh: MS: BM-MT-42

UY BAN NHAN DAN r' A ................. ..... 2 r A .... RLLL.&I'L.~ -- So: ...............................................................

CONG HOA XA H ~ I C H ~ NGHIA VIET NAM Ddc 14p - Tg do - Hanh phdc

N6i dung: v/V ~ i 6 u tra, x i c anh m$c bij Bnh hd6ng den m8i trdang, diin sinh kinh te'clia du iin Dlrirng d iy 220kV V'inh Long - Trh Vinh.

Hem nay, nghy ...... thing ...... nfim 2008.

Tai v2n phbng UBND ..M<...J$L&~L I. Thhnh ph&n tham d$

I. Phia UBND

. 2. Phia CGng ty ~ 6 ' phan Tu'vh xriy dgng &gn 3 (PECC3) 1

a 3. Phia ciic h4 bj rinh h d h g (danh sdch dinh kBm)

11. Niji dung

Kf tCn a l'-/ STT

Sau khi nghe dai dien PECC3 tr'hh bay, ph6 bie'n th6ng tin v6 dq 6n vh s v c6n thi6t phi i ti& h&nh di6u tra mbc d6 Anh h&ng d6n m6i truang, den d5n sinh kinh t 6 cfia dg bn D u h g dPy 220kV Vinh Long - Tra Vinh. C i c b8n dB trao ddi v i c6 c6c 9 ki6'n sau:

................................. 1. UBND hokn tohn nhgt trtri vdi chli tru'dng cfia NhB nddc v$ viec xiiy dqng dIJ Bn D u h g diiy 220kV Vinh Long - Trh Vinh.

H o v i t8n

3. Kh2o s i t chi ti6t khu vqc dq An:

Dai dien PECC3 v2 c6c cd quan chBc nfing cfia dia phudng k2't hdp ti6n hinh bi&u tra, khio sAt mifc ctQ i n h h~fdfig m6i trudng, d in sinh kinh tdkhu vgc d!i i n

Chiitc vu 1 d l & 2 3 4

Plw'7~F.rrElT

Page 66: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y kie'n ceda dia phllo'ng v6 Hnh hd&ng m6i trdb'ng, b6i thllb'ng - tAi Gnh cd:

I ,. 7

E. ' :' P BA[\ L ~ h , V J i c r ~ i u

Dai dien Dai di$n

.. , ,

-

I ! bh : 01 i MS: BM-MT-42 Ngay bh:

Trang 313

. . .

Page 67: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

. j'

b'l 7 , - / . . .

,! , DANH SACH NGU'&I DAN THAM GIA HOP THAM VAN

Page 68: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

.......... . . . . DTJ AN: .-D.GtL .AL?\. XDL~. .\i(:b. .Luc ;. .TG. .yir.b.. 8 Z

J . NgBy ..... t h h g .... niim ....... tai .... :~.IC{. JhL. .ad ......................................

I STT 1 Hg v i tgn Dja chi Kf tGn -

Page 69: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

i r ~ BAN NHAN DAN > ..,.,.-..... xA...b -.Ah., .,...,.-.-.. 2 S 0": ...............................................................

'1 '

C ~ N G HOA XA HOI C H ~ N G H ~ A VI$T NAM Dijc 16p - Tq do - Hanh phcc

NBi dung: V/V ~ i s u ' t r a , x9c &nh mlPc 86 Bnh h&ng d&n m8i trtiang, d ln sinh kinh te'cda dQ 6n Dlrivng d9y 220kV Vinh Long - TrB Vinh.

.

... Hem nay, ngiy dk. thing a n a m i008.

Lsn bh : 01

N2ay bh: '

T@i van phbng UBND .. &a'.... k~~.. lh, % h- &k vd ,,L I. Thhnh phdn tham dq .%

MS: EM-MT-42 P E C C ~

1. Phia UBND

BIEN BAN LAM VIEC --

- I

2. Phia C6ng ty ~d phdn Tztv& xdy dgng &in 3 (PECC3)

5 3. Phia cdc he bj cinh h&ng (danh sa'ch dfnh k2m)

11. Noi dung

Sau khi nghe dai dien PECC3 t rhh biy, ph6 bie'n th6ng tin v& dq An vh s$ c&n thi6t phHi ti6n h lnh dieu tra mlPc 86 Pnh hlrang den m6i truang, de'n dgn sinh kinh te' cda dq Bn D u h g dky 220kV Vinh Long - TrB Vinh. CAc b$n 66 trao ddi v i c6 c i c kie'n sau:

1. UBND ................................. hohn toin nhi't tri vdi chfi trudng cfia NhB nu'& v$ vi$c xgy dgng d$ in D u h g day 220kV Knh Long - TrB Vinh.

..

3. Khio s i t chi tie? khu vvc ~ I J ' An:

Dai dicn PECC3 v2 c8c cG quan ch3c n5ng cfia dia ph~idng kg-t hdp ti& h2nh bi6u tra, kh io sit miPc dQ inh h ~ i h g m6i tru'i;rig, diin sinh kinh te'khu vgc d$ An

Page 70: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y kis'n cfia dia phu'dng v6 Hnh h d n g mbi trdb'ng, b6i thdang - tiii dinh ed:

. . ............ ." . >, .>, . ::: ..., .:,...;::,. ,:,:.?,:" ....... ,..? , . a , . . . . ~ . , . # .

. .

Dai dien Dai di$n

Trang 313

:?/

P E C C ~ BIEN BAN LAM VIEC Lin bh : 01

Ngay bh: MS: EM-MT-42

Page 71: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

.... . . . . , , . . . . . !

DANH SACH NGLJ'~I DAN THAM GIA HOP THAM VAN DU AN: .............................................................

. ............................... . ... NgAy ~ g . . thing .4.3 ngrn .M tai .u.WR .I&. hss. .-Ah..

STT 1

$ 2

3

4 6 8: Ir

\ '. ::,) .. .. !

.. i

. I

:i 2'

D ~ Y chi

T; HL ?hi: R.

I/

11

HQ vh tEn

,,fjwp>k d;;

k'Tft: c$"5 J

Trrh '& Tf-4 'G

Kf t6n

~ Q s r JL

Page 72: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG HOA XA HOI C H ~ NGHIA VIET NAM DGc lqp - Ttj do - Hanh phdc

!

N6i dun?: v h ~ i b u tra, xPc q n h mdc di) i n h hd 'ng dbn m6i trttang, diln sinh kinh te' cda d d Bn D a h g dly 220kV Vlnh Long - Tra Vinh.

H6m nay, ngiiy A3.. thdng ..@I niim 2008.

...... Tai van phbng UBND ~h?.......$6%..&+&

I

BIEN BAN LAM VIEC

I , Thlnh ph6n t h a m d u

1. Phia UBND

Lan bh : 01

Ngay bh: -

2. Phia CGng ty CG9 phkn T U V S ~ xdy dmg ii@n 3 (PECC3)

a 3. Phia ccic h4 bj clnh h&ng (danh sdch dinh kBm)

MS: BM-MT-42

II. Niji dung

!

Sau khi nghe dai dien PECC3 trhh bAy, ph8 bi6n ththsng tin vd dq in v l s$ cBn thigt phAi tidn hlnh di6u tra rnirc d@ Hnh hlrang de'n m6i tnlang, d e h d8n.sinh kinh tii' cda dl( an Dubng d2y 220kV Vi Long - Tr& Vinh. Cdc ben dB trao d6i v i c6 ciic 9 ki6h sau: -

1. UBND .h? .h .&k9 hoiin toiin nhgt tri vdi ch6 t r m g cJa Nhh nude v6 vigc x$y dung dg i n D u h g diiy 220kV V'inh Long - TrB Vinh.

3. Khio s5t chi ti6't khu v$c d@ iin:

Dqi dien PECC3 v i c i c cd quan chcic n2ng cfia bia phu'6ng k~'t hdp ti6n hhnh di6u tra, khso s6t rnirc 66 Bnh h~idng rn6i tniang, diin sinh kinh ts'khu v;fc du i n

Page 73: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. k kie'n ciia dia phddng v6 Hnh hu'dng m6i trdang, bdi thu'ang - t6i djnh cd:

/ MEN BBN LAM V I ~ C I + ;/

Dai dien Dai dien

#, L , L /$;: /%;.,'' Trang 313

. , /

L6n bh : 01

N g a y bh:

-

MS: BM-MT-42

Page 74: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

- ' J ' I /

DANH SRCH N ~ b 6 ' 1 DAN TPAM GIA HOP THAM VAN

Page 75: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

  an bh : 01 -. [ P E C C ~ ' BIEN BAN LAM VIEC N g i y bh: MS: BM-MT-42

CY BLN NHAN DAN C ~ N G H ~ A XA H ~ I C H ~ NGHTA VI$T NAM .%:. ~ & Q . - ~ I . - ~ u c & . ~ .-.-.. D6c 13p - TU do - Hanh phuc

A' so: ............................................. d .............. , .

NBi dung: v h ~ i 6 u tra, xic djnh milc do 6nh h&ng de"n m6i trdang, d ln sinh kinh t2' cfia d~$ Qn Du&ng dPy 220kV Vinh Long - Trh Vinh.

H6m nay, nghy ...... th8ng ...... niim 2008.

Tai viin phbng UBND ................................. I. Thhnh ph6n tham dg

1. Phia UBND

,5' :: .,% :)' ;,: I -.- ; .:. !i

i! ... , I 2. Phia CGng ty ~6 phdn Tzi v& x6y dgng bifn 3 (PECC3)

J

" 3. Phia cdc hQ̂ bi dnh h&ng (danh sdch dinh k2m)

It. Noi dung

Sau khi nghe dai dien PECC3 trinh bhy, ph6 bie'n thbng tin v6 dq Bn v2 SI$ cdn thigt phi i ti& h2nh di6u tra miYc di$ inh hu'6ng d&n m6i tru'ang, d2.n ddri sinh kinh t6 ciia dg 5n D u h g diiy 220kV Vinh Long - Tra Vinh. CBc bCn dH trao d8i vh c6 c8c 9 kie'n sau:

1. UBND ................................. hohn toin nh2.t tri vdi chii tru'dng cfia N h i nude v6 vi$c x2y dung d$ Bn D ~ ~ b n g ddy 220kV V'inh Long - TrA Vinh.

3. Kh5o s i t chi tie't khu vvc d q Bn:

Dai dien PECC3 v i cbc cd quan chdc nang cfia dja ph~fdng ke't hdp tie'n h inh di6u tra, kh5o s i t mBc do dnh hddng m6i tru'trng, d2n sinh kin11 te'khu vkr'c dv a n

Page 76: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y kie'n ccda dia phlldng v6 6nh hddng mSi trdang, b6i thdang - tiii Gnh cd:

PECC3

Dai dien Dai dien

&EN BAN LAM VIEC ~ 5 n bh : 01

Ngay bh: MS: BM-MT-42

Page 77: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG HOA XA H()I C H ~ NGHIA VIET NAM D6c l$p - Tq do - Hanh phdc

\

N6i dung: ;/u ~ i d u tra, x l c dinh mlPc dij &nh h&ng dg'n mm8i tr~b'ng, dlin sinh kinh ts'cda dg Bn Dviung d iy 220kV Vinh Long - Trh Vinh.

.- Hbm nay, ngiy &.. thing .u n5m 2008.

Tqi v8n phbng UBND ..d ..... tk;:...% I. ThPnh ph&n tham db

1. Phia UBND

L s n bh : b , Ngay bh: PECC3 BIEN BAN LAM VIEC

3

3. Phta cdc he bj a'nh h&ng (danh sdch dinh k2m) p II. NQi dung ;: 1% Sau khi nghe dai dien PECC3 trinh bay, ph6 bie'n th6ng tin v6 du i n vh sy c8n th ik phii ti& hhnh di$u tra mac do Anh hddng d6n mbi trdang, de'n dbn sinh kinh te" cca'du

v \ i n D u h g diiy 220kV Vinh Long - Trh Vinh. Cic ben d l trao d8i vvh c6 cAc 9 kign sau:

1. UBND ................................. hohn toin nhgt tri vdi chfi trddng ciia Nhvh nu'dc v$ vi$c xiy dung dy' An D u h g d5y 220kV Wnh Long - Trh Vinh.

!&, .> . ;;

i 5wkd+. .

2 UBND .x............I........... ... ;. d- tag di^'uki A d ' $ ~ ~ & $ ~ @ ~ & ~ $ B Q @ ~ ~ ~ , ~ ~ . . . kw%p;~& Li..;:sp:-~4~B~9GM~41r~T~~$;,Gw;~LL :.$&c.ll:Q:. -& py. ,, . *.' .. ,

,',:;A:, "\':.,*%.. l' , d ~ c giao. " :va:*

STT 1 2 3 4

3. Kh5o s5t chi ti6.t khu vqc dq An:

Dai dien PECC3 v i c i c cd quan chec n2ng cca dla ph~idng k2't hqp t i ~ n h inh disu tra, khdo s5t miYc da i n h h~fdng m6i tr~itfng, diir? sinh kinh te'khu vkfc dq An

Ho vB ten 6 &e. T&;, .& @uLy Cw d r\

Ch8c vu eb . KBk N-

cs 1. ti~v1.4

Ky ten

Page 78: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111.9 kic'n ccda dja phddng v6 Bnh hu'ang m6i trdb'ng, b8i thllirng - t6i Gnh cd: I / 3

................... ....... dii .....-.. lJ.LA3q ..... h ...... LL .... .... .il;...-hx .... l?.q ....... w ....

I ,,'

Dai dien Dai di$n

P E W 3

Trang 313

BI€N EAN LAM VI€C L6n bh : 01

Ngay bh: MS: EM-MT-42

!

Page 79: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

DANH SACH NGZTQ'I DAN TNAM GIA HQP THAM VAN

Page 80: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

!

DANH SACW NGU'OI DAN THAM GIA HOP THAM VAN .- 2 v- DU AN': . .3 . r l . 2 . . R ~ D ~ Y .. .v;.*?&. . - .. im. h h . . ............. 3 -

..... .... ....... Ngiy thing niim tai ............................................................... STT 1 Hg, vZI tEn Dha chi Kf ten

I I

Page 81: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

C ~ N G I ~OA XA MOI C H ~ N G H ~ A VIET NAM DOC I$p - Tq do - Hanh ph6c

N6i dung: v/v ~ i 6 u tra, x6c Gnh m& d6 rinh h d n g d6'n mm6i tnlllng, d9n sinh kihh te'cda dl! bn Dvang d8y 220kV Vinh Long - Tri Vinh.

L6n bh : 01 Ngay bh: MS: BM-MT-42

\ ,. 1 P E C C ~

H6m nay, ngiy -4.2. thing .Dl).. niim 2008. . Tqi vZn phbng UBND ...d .... H~.&L .... 3-

BIEN BAN LAM V I ~ C

I. Thhnh ph6n tham dl!

1. Phia' L7BND

2. Phia CGng ty C$ phan T d v h x&y dgng ditn 3 (PECC3)

3. Phia ca'c h6 bi inh h&ng (danh sa'ch dinh kBm)

11. Noi dung

Sau khi nghe dai di$n PECC3 trinh bhy, phd bi6'n thbng tin ve dg i n v l SI$ c6n thigt phii ti& hhnh di6u tra milc dg Anh hudng be'n mbi truang, de'n d3n sinh kinh te" cda dg gn D u h g diiy 220kV V-kh Long - TrB Vinh. C i c ben dZ trao d6i v i c6 cdc 9 kign sau:

1. UBND ................................. hoin toin nhgt tri vdi ch6 trudng c6a Nh2 nddc v6 viec xiiy dqng dq i n Duimg diiy 220kV VTnh Long - Tra Vinh.

1 2. UBND .................................. b2 tao di$u kien d g dohn khio sdt hoin thlnh nhiem vu

I 3. Khio s i t chi ti& khhu vuc dq in:

Dai dien PECC3 vii c8c cd quan chat n2ng cda dia ph~fdng ke't hdp ti6n hiinh di6u tra, khAo s i t m8c do Anh h~fang m6i tru'ang, d8n sinh kinh te'khu vtfc dp' i n

1 Trang 1/3

Page 82: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

i' /

111. Y kiSOn cda dia phdo'ng v6 Hnh hd8ng m8i trdang, b6i thdang - t6i dinh cu:

. . ../ . . ,-.';f . ' : I ' , j bECc3 . . .

7 1 . ...

Dai dien Dai dien

' ' . ;;,t., - BIEN BAN LAM VIEC

Trang 313

L i f l bh : 01

' ~ g ! & ~ bh: MS: BM-MT-42

Page 83: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

!

r\ 'I 3 L C -

* v I rn I I

Page 84: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Dai di$n KoAn khio sit

Ngiy ..... thing . . .. nBm . .. . ... tai .... ....... . .. ..... ... . .. . . .. . .. . . . . .. ..... . ........ . .. .. ...... STT

1

H9 vii ten . L -7 2 $'h Iddm

2 a

Dja chi ---

I - a V - -

I f 73

Page 85: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG HOA XA H ~ I C H ~ NGHIA V I ~ T NAM Dec IGp - T$ do - Hanh phdc

N6i dung: v/u ~ i 6 u tra, xiic anh m8c dij dnh hdang dC'n m6i trdang, d9n sinh

LBn bh : 01

Ngay bh: MS: BM-MT-42

kinh te'cfia d@ i n Dwang-&iy5~V VbkLong -. - Tra Vinh.

! BIEN BAN LAM VIEC -

Tai v8n phhng UBND .~??...-kk..&a, kr k& &k Y$L %

-PECC3

I. Thhnh ph6n tham dg ..

1. Phia UBND

2. Phin Cdng ty ~ d ' phin TT v~"nx$y d m di@n 3 (PECC3)

Kf tCn

/

'>,I"/

STT 1 2 3 4

a 3. Phia cac h6 bj cinh h&ng (danh sdch dinh kkm)

STT 1 2 3 4

II. NOi dung

HQ vB ten T&y VZ- aL - - 76 $& .-I&

"

Sau khi nghe dai dien PECC3 trinh biiy, phd bie'n th6ng tin v6 d g An v l s g c8n thi& ph i i ti& h inh di6u tra mgc dd S n h h ~ d n g d6n m6i truang, dean d5n sinh kinh tG'cfia d v bn Dlrtmg d5y 22OkV Vinh Long - Tra Vinh. Cbc bCn dB trao d6i v l c6 cbc 9 kiCh sau:

Chat vy ckL -&& ' U&

a 4% &J.L, e& kk~. CIWR

Ho v B tGn 'Ts & 7 6 42 QIO..y L<t.

.I

1. UBN~~x.d..-k!~.d/!b... holn to ln nhgt trel vdi chd tnrang cda N h l nudc v6 vibc x i y dung d g fin Dubng diy 220kV Vinh Long - Tra Vinh.

Chttc vu c9 4Lw; \*%E& - -A

3. K h i o sAt chi tis't khu vgc ~ I J An:

Dai di$n PECC3 v l cbc cd quan chir'c n2ng ciia dia phu'dng ke't hdp ti& hhnh di6u tra, k h i o sAt rnec do i n h hddng m6i tru'ang, ddn sinh kinh ts'khu vqc d g in

Kf tCn

Page 86: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y ki2.n cda dia phddng v6 Hnh hddng m6i trdang, bdi thdang - t9i djnh cd:

Dai dien , Dai dien

Trang 313

Page 87: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

. . . I

I ,i

I . . . .'. , . , ,.?' . . . . :. ., . '

. . , ' ' .4' . ' . . I , ! . 1 l . .

, . . . , .. . .

, . ' , . . ,.. . . DANH SACH NGU& DAN THAM GIA HQP THAM VAN ' .,

- .

---

18

l9

2o

2 1

+ +I,- -

l raYl

2

,,lyu,,&,- u& hk - /- <I

b \ o ~ - ~ ~ ~ & - q d ' 1 3Y

I1

i l

1

7G5-

x,

Page 88: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG H ~ A X A HOI C H ~ N G H ~ A VIET NAM Doc lap - TIJ do - Hanh phlic

+ '\

N6i dunn: v/$ ~ i 6 u tra, x6c Gnh milc dij Hnh hd'ng de'n m6i trrlilng, diin sinh kinh te" cfia d@ 6n Dlrirng d9y 220kV Vinh Long - Trh Vinh.

Hem nay, nghy d% th8ng .3... n8m 2008. \

Tgi van phbng UBND dk7...Tfldb.l$..d

I. Thlnh ph&n tham d@

1. Phia UBND

-

a 3. Phia ciic ho bi hnh hu'ang (danh sa'ch dinh khm)

11. Niji dung

Sau khi nghe dai dign PECC3 tilnh bly, phb bidn th6ng tin v6 dI$ dn vA sI$ cgn thi& phHi ti& hhPh di8u tra milc do Hnh hu'dng dgn m6i tniang, de'n d l n sinh kinh t 6 cda dg ;in D u h g d$y 220kV Vinh Long - Trii Vinh. Cdc ben dB trao d6i vvh c6 cdc 9 kie'n sau: -

PECC3

. 1. ~ ~ ~ ~ - h 2 . 1 ? ) . ~ & . . f i ...... hoPn toPn nh2't tri vdi chd tru'dng c6a NhA nu'dc v6 viec

x6y dgng dp' i n D u h g d$y 220kV VTnh Long - Tri Vinh.

BIEN BAN LAM VIEC

-- L i n bh : 01

Ngay bh:

3. Khio sdt chi tist khu vp'c dp' in:

Dai dien PECC3 v B c ic cd quan chtiic n2ng cfia dia ph~idng kgt hdp tign hPnh di6u tra, khio s8t m8c d6 inh h ~ i a n g m6i tr~ir';-cng, d211 sinh kinh ts'khu vtic dg i n

MS: BM-MT-42

Page 89: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y liie'n c6a din phd6ng vi! Bnh hd6'ng m6i tru'ang, b6i thdb'ng - t6i Gnh cd:

I

, /PECCS

Dai dien Dai dien -

L 13.1-/~t&-'

Trang 3/3

BIEN BAN LAM VI!EC Lan bh : 01

Ngay bh: MS: BM-MT-42

Page 90: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

U N ~ B ~ / ? L . .. thlng .d? n5rn .L..dr d tqi ... ?icr:. . .A. CO.. ......................................... 1 STT I. Hq va t8n Dja chi Ky t6n

Page 91: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

PECC3 MWU BIEN BAN THAM VAN bh :

CONG D ~ N G Ngay bh: 10/12/2005 MS: EF?!.MT-45

.N UY BM NHAN DAN CONG HOA fi H01 CHU NGHPA WET NAM

.?(&. ..A*: 1 \1~= $.. ... ................ DQc Igp - Tu do - Hanh phdc -------------

s8: ........................................

Nbi duns: ' Vlv P ~ B bien th6ng tin v i "KB hoach bhi thrrimg t i i djnh cu" v i "Tic dong m6i tnrbng" c i a dy i n Tr+m bien i p 220kV TrP Vinh v l dubng di2y 220kV Vinh Long - TrB Vinh. -

A( - 7 . Hbm nay ngiy A d thing .03 nZim 2008, tgi.. . Afl .. .@. . .dZ. .:&. . ! .dof ly . . ..............

.+ .G? .h!. ,.*A. T& .u,&. : ................. .... .. .. . .................... . ............ dZ dign ra bu6i hop vtri cic noi dung c h i d nhu sau:

I. ThSnh phkn tham dg

Phia Chin h qia pharmg

Phin n g d i drin bi cinh hlr6ng (Dan h sa'ch d h h k2m)

Phin C6ng ty ciPh6n Tar vkn xriy d &#n 3 (PECC3)

11. NQi dung ph6 biin th6ng tin

STT 1 2 3 4

- Dai di@n PECC3 trinh bby, ph8 bi&n th6ng tin chung v& du bn vh cbng b6 cho ngubi d8n bia phuung v6 phgm vi h u h g cfia du &I, cbc thbng tin v& tic dang mbi tnrbng c h g nhu k& hoach b8i thubng tii djnh cu cfia du i n (n&u c6).

hoach b6i thubng.

-- . - - -. . .

Trang 114

Kf ten I ,

Hg v i t2n tdCCCcui"Y1 %$ vd

!b ( \5fif . ~ k ' , / .

Chirc vl;l

Page 92: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

'

PECCJ MWU BIEN BAN THAM VAN . " O1 CONG D ~ N G Ngay bh: 10/12/2005 MS: BM-MT-45

I 1 I I

111. Y ki&n cila chinh quyin dai phuong vB ciia c8c h@ bf Pnh h v h g b6i d ~ b n

Trang ?-I4

Page 93: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

$2 : PECCS 1 MAU BICN BAN THAM VAN zi;kh; :;I,2 1200 MS: BM-MT-a5

CONG DONG

Dai dien Chinh quy&n dja phucmg

-773. p9.627 4 Dfm- -

Dai dien

C6ng ty c6 phih Tu v h xiiy dung dien 3

Page 94: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

.- . . . . a . ' i.' . ,"

, . ' , , .?

DANH SACH HO DAN HOP THAM VAN

- - - .- Trang 414

Page 95: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

." / .-nfi,u E!. ': -:;:,:.pdqv/' / [.An bh : 01

CONG DONG I-Gyay bh: 1 OI~IL!..-~LJC)

, . i . . . ,

DANH SACH HO DAN HOP THAM VAN

Trang 4/4

- ' : Ngay ..... thing .... n&m ....... tai ... ... ... ... ........ . ......... . ................................. Kf tSn . .

. . . .

STT I 2

Hg va tGn ~ + ~ c V& 4;

",k I.PP I- f - F

Dja chi CCT, rf /LA-

Page 96: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG HOA fi HOI CHU NGH?A VIET NAM Doc I$p - Tu do - Hanh phuc

N6i dunp: Vlv ~ h 8 biin thSng tin v$ " ~ 6 hoach bhi thuirng t6i dinh cu" vh "T6c BQng m6i trvimg" c i a dp- An Tram bihn ap 220kV Tra Vinh vh d u h g . diy 220kV Vinh Long - Trh Vinh.

3 ................... .... ... H6m nay ngiy .g. t h k g DK. n h 2008, tai.. V!ND.. .* BICL. .du;. ...

dB dign ra busi hop vdi cic noi dung chinh nhu sau:

I. Thhnh phkn tham dl?.

Phin Chinh quy$n Gaphlctmg

5 6 7 8

P h h ngwai d6n bj rinh hw&ng (Danh sdch bri2 h kzm)

Phia C6ng ty cBph6n Trr vbn xiiy d p g bitn 3 (PECC3)

Kf t6n STT 1 2

11. NQi dung ph6 bi&n th6ng tin

- Dai dien PECC3 trinh bAy, ph6 bi6n th6ng tin chung v6 du An v i c6ng b6 cho ngubi d h dja phucmg v& phqm vi B n h hu6ng c6a du in, cic th6ng tin v& t ic dong m6i

HQ vh t6n s'

$~&LV& &fm rC .

KJi t6n STT 1 2 3 4

dien cic ha bj A n h huhng bja phutrng v& c6c t ic dong c6a d u C h d6ng thbi v& k6 hoach b6i thuhg.

Chuc p ?hd CT 0 3 d D

Hq vh t6n Chuc vu

Page 97: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

PFCC3 1 MAU BIEM BAN THAM VAN CGNG D ~ N G

111. Y kiin c i a chinh quy$n dai phuong vB c i a cic he bi hnh h u h g bbi d v 6n

Trang 21.1

Page 98: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

. . . I . . . . .

. . . . ;' /

. : ~ - ! Q I ~ ~ ~ ~ ~ M T H ~ . : , . ' , . " l L h b h I , CQ,& +J(~NL I Ngay b l . , L: ,::20C.;

.. - -7 S , I - I

. . . : : , . '_ I, I

DANH SACH HO DAN HOP THAM VAN

7 !'

. Trang 414

Page 99: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG HOA HOI CHU N G H ~ A VIETNAM Doc I$p - Tu do - Hgnh phGc

sa: .......................................

L'" bh Ngay bh; 10/12/2005 PECC3

' B I ~ N BAN HOP THAM VL&N CQNG DONG

Nbi dung: Vlv ~ h 8 bikn thbng tin v6 L L ~ & hoqch b8i t h u h g tPi djnh cw" v i "Tic deng m6i truhg" ciia dv i n Trgm bikn Bp 220kV TrP Vinh vh d v h g &y 220kV Vinh Long - TrP Vinh.

\

. Hbm nay ngiy .4.8 t h h g b?. niun 2008, $i. .. ..$.. .d.&. !?JL% - A2 ~ . . ? d d-" "" . . . . ""

.................. .... ................................ *. . .... 1 ' . - 3 . . L -4 &...m~ di.15.. : !..

bB di%n ra bubi hop vai cac noi dung chinh nhu sau:

I. ThPnh p h b tham d q

Phia Chhh quyjn @a ph w n g

MAU BIEN BAN THAM VAN CONG DONG

PIzia ngw&i d f i ~ bj dnh h d n g (Danh sa'clz dinh k2m)

Phia C6ng ty c8phhn Tu vdn xhy dyng bien 3 (PECC3) a

11. NGi dung ph8 bi&n th6ng tin

STT 1 2 3 4

- Dai dien PECC3 trinh bay, ph8 bi&n thbng tin chung v& du 5x1 vA c6ng b6 cho ngu4i dgn dia phuung v& phqm vi inh hutrng cda du in, c ic th6ngtin v& tic d6ng m6i tnrbngcing nhu k6 hoach bbi thubng tii djnh cu cba dy in (nku c6).

dien c$i% hQ bj Anh hubng dia phuung v6 cic tAc dijng cda dy an d8ng th4i v& k&

. HQ vii ten # Lw&< & d PC&

hoach b6i thubng.

--

Tray l/d

ChiYc vg Kv tan O L

Page 100: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. Y kien c i a chinh quyPn dai phuong va c i a cac hij bj Bnh hu6mg biri dg i n

PECC3

.... ....... . E Q$. .. U.. . !h.bb.. ... & ! . ..h i-29 o&. .... .Miid.

Trang 214

M,&U BIEN BAN THAM VAN COlVG D ~ N G

bh : Ngay bh: 10/1212005 MS: BM-MT-45

Page 101: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

- - . - - - - .. -- .- - . -- .-- - Trang 414

Page 102: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG HOA HOI CHU NGH~A VIET NAM ....... .. .:. ......... Doc l i p - Tu do - Hanh phQc

1 PECC3

BIQN B& HOP THAM VAN CONG DONG

MAU BIEN BAN THAM VAN CONG D ~ N G

1

Ndi dung: V/v P ~ B bi6n thbng tin v& & ' ~ 6 hoach bbi thlvimg ti i djnh cu" vP bbTic dijng mSi trwhg" cPa d v i n Tram bikn ap 220kV Tri Vinh vP d u h g dfy 220kV Vinh Long - TrP Vinh.

3 ... ................ ... ~ d r n nay ngiy -8. thing 3.. n h 2008, tai .V.b.'d. .p.. .?LA. Ld9.&...

. . . . ...............................................................................................................

55 disn ra bu6i hop v6i cic nai dung chinh nhu sau:

I. Thanh phin tham dy

Phia Chinh guyin djaphrrong

bh : Ngay bh: 10112/2005

Phia ngz6i diin bj 2nh h z h g (Danh s(ich dinh kZm)

Phia C6ng ty cBph61 T z vkn xiiy d p g dign 3 (PECC3)

5

MS: BM-MT-45

11. N$i dung ph6 bi&n thbng tin

- Dai di@n PECC3 trinh biy, ph6 biin thbng tin chung v& du i n v i cbng b6 cho ngubi ddn dia phucmg v& pham vi imh hu6ng cba du Qn, c6c thdng tin v& tic dQng mdi t n r h g cting nhu k& hoach b6i thubng t5i djnh cu cba du fin (n&u co).

hoach b8i thutmg.

Trang 114

Page 103: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

111. k ki6n cila chinh cjuy$n d;;li phuomg vB cfia chc ha bj Hnh h u h g bbi dl?. an

1

...................................................................................... .........7......... .... . .. .. o., gl L.. PF.. .At;;, .: .La. .u6: $9.. ............................... .........

1 PECC3 IMWU BIEN BAN THAM VAN

CONG D ~ N G I

Trang 214

. L" bh ' O1 Ngay bh: 1011 212005

I

Page 104: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

. . , . . . . . .. . ,

5 ' /'

. , MAU BIEN BAN TEAM VAN L a n bh : 01 . . . . . ~ P E C L ~ 1 . . . . * COMG DONG ! Ngay bli: 1011212~05 ) MS: BM-MT-45

, . . ,. . . .. . <

DANH SACH HO DAN HOP THAM VAN

-- - .-

Trang 414

Page 105: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

DANH SACH HO DAN HOP THAM VAN

XBc nhan ciia dia phhluong: UY BAN NHAN DAN

- -- P - Trang 414

Page 106: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

UY BAN NHAN DAN CONG HOA XA HOI CHU NGH~A VIET NAM .......... .s,'ii.. .I;.$& 4 wF. .* .......... ??.-. Doc I@p - Tu do - Hanh phhc

BIQN BAN HOP THAM VAN CONG DONG /

Ndi dung: . Vlv ~ h ; bi&n thbng tin v& L L ~ & hoach bhi t h u h g t i i djnh cu" vA LbTbc dong mbi trwhg" cSla dy i n Tr?m bi4n iip 220kV TrA Vinh vA d u h g : diy 220kV Vinh Long - TrA Vinh.

PECC3

H6m nay nghy .h. thing .a. nim 2008, tai ...d$.+.h. A .,.. M& ..&... 0. ........... . . .

'IeN BAN THAM VAN CONG D ~ N G

� in bh : 01 Ngay bh: 1011212005

d2 disn ra bu6i hop viri cbc noi dung chinh nhu sau:

I. Thhnh phin tham dy

Phia Chinli guyin @nphwung

MS: B M - M T - ~ ~

Phia ngw&i:dfin bi hn h h w h g @an h srich dinlz k2m)

Phia C6ng ty ~ 2 ~ h d n Tw vdn xciy d p g di$n 3 (PECC3)

11. NQi dung ph8 bi&n thbng tin

- Dai dien PECC3 trinh b e , phd b i b th6ng tin chung vk dq i n vA cdng bb cho ngubi d&n dja phucmg vd pham vi Ah hubng cfia dq An, CBC th6ng tin vd t6c dGng m6i tm$ng c h g nhu k& hoach b6i thubng tiii djnh c u cfia du An (n&u cb).

hoach b6i thubng.

Trang 114

Page 107: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

. ?

PECC3 MAU BIEN BAN THAM VAN L" "

CONG DONG NgPy bh: 10/1212005 b1S: BM-MT-45

................................................................................................................

...............................................................................................................

Dai ditn Chinh .- quy&n dia phuang Dai di$n

Trang 314

Page 108: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

X6c nh$n cila dja phumg: UY BAN NHAN DAN

Trang 4/4

Page 109: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

CONG HOA HOI CHU NGHTA VIET NAM DQc l$p - Tu do - Hanh ph6c

BIBN BAN HOP THAM ~h CONG DONG /

Ndi.dung: Vlv P ~ B biin thBng tin v6 "K& hoach b8i thlrhg t l i djnh cu" vP "Tic dong mbi trlrimg" ciia d p i n T r ~ m bi&n l p 220kV TrP Vinh vh d v h g .. dfy 220kV Vinh Long - TrP Vinh.

nT - Hdm nay ngiy . t h h g .3. n h 2008, tqi.. . .-. . .- . .Tn: .. . ,X6= .. M2.. ..

C - # . . . . . #,. .dm. .Ud. TT&. r/'d. ... . .:.. ..............................................................

d3 dizn ra bubi hop v6i cic nei dung chinh nhu sau:

I. ThPnh phan tham d q

Phia Chinh quy6n &a ph uung

Phia nguai dfin bj linh hu3ng (Danh skclt dinh kkm)

Phia C6ng ty co*phin T u vkn xfiy dyng ditn 3 (PECC3)

11. NQi dung phb biin thbng tin

- Dai dien PECC3 trinh bhy, ph6 biin thbng tin c h u g v& du in vh c6ng b6 cho nguiri d2n dja phucrng v& phqm vi inh hubng c h du in, cic thdng tin v& tic dGng rn8i tnrimg cting nhu k& hoach b6i thubng tii djnh cu clia du itn (niu c6).

A

di$n cac h6 bf inh h u h g dja phucmg v& cic t ic deng cia du i n d8ng thbi vk k6 ' ' v. hoach b8i thubng.

Trang 114

Page 110: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

. ,

PECC3 MAU BIEN BAN THAM VAN L" " ' O' CONG DONG Ngaj? bh: 10/12/2005 MS: BM-MT-45

dja phucmg Dai di$n

C6ng ty c6 p h h Tu vih xby d w g dien 3

- 7 ~ ~ 1- q 3

Page 111: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Xic nhgn ciia dja phwcmg: UY BAN NHAN DAN

Trang 414

MS: BM-MT-45

' . . ,#; : .: '\ . . ,, . . . . .. : ..

*-. . . . . . .;:, <<, Y; r,' .. ..-'.,... 3 ,.

' . ;;.:.:: !:

DANH SACH HO DAN HQP THAM VAN

an bh : Dl Ngay L; 1: 10/12/2035

1

. . I ECC3

. . . . - ; q\.

!' 4 . l ~ BIEN BAN TH,alVI VAN CONG DONG

Page 112: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (TD2) Credit 41 0 7 - W Vinh Long - Tra Vinh 220kV transmission line

ANNEX 6

PHOTOS OF MEETING ON PUBLIC CONSULTATION AND THE PROJECT LOCATION

P

Environmental management plan

Page 113: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (TD2) Credit 4107-VN Vinh Long - Tra V i 220kV transmission line

Status and paddy field in ROW of the line Status and trees in ROW of the line (06/03/2008) (1 1/03/2008)

Status and trees in ROW of the line Status and house in ROW of the line (1 1/03/2008) (1 1/03/2008)

Photo of the meeting on public consultation Photo of the meeting on public consultation (07/03/2008) (08/03/2008)

Environmental management plan

Page 114: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m

Second Transmission and Distribution (TD2) Credit 4107-VN Vinh Long - Tra Vinh 220kV transmission line

ANNEX 7

REFERENCES

In Vietnamese:

1 ~ h u ~ d t minh Du an dhu tu cua du an; PECC3 0512007.

2 Tai lieu h u h g dgn vv& m6i tnrbng Dy an ~ r u ~ & n tii va phin DLVN va NHTG 26/03/2004.

3 K& hoach q u h ly m6i tnrbng c6a du an Duimg diiy 220kV Tiin Djnh - Binh Long; PECC3 2006.

4 K& hoach quin 19 m6i tnrbng cha du an Dubng diiy 220kV Ham Thu& - Phan ~ h i k t ; PECC3 2006.

5 K& hoach quin ly m6i tnrbng cda du an Tram bidn ap 110kV Binh Long; PECC3 2006.

6 KB hoach quin 19 m6i tnrimg cfia du in Tram bikn ap 1 1 OkV Phuirc Long; PECC3 2006.

7 K& hoach q u h 19 m6i t n r h g c6a du an Duimg diiy 1 lOkV Xuiin Lac - ~ b m My va tram 1 1 OkV ~ b r n My; PECC3 2007.

8 Web site ciia UBND tinh Vinh Long: www.vinhlong.gov.vn

9 Web site c6a UBND tinh Tra Vinh: www.travinh.gov.vn

In English:

10 Framework for Applying Environment Safeguards to TD2 Project.

11 Environmental assessment template; EVN and WB 0512004.

12 Environmental Management Plan of Tan Dinh - Binh Long 220kV transmission line project; PECC3 2006.

13 Environmental Management Plan of Ham Thuan - Phan Thiet 220kV transmission line project; PECC3 2006.

14 Environmental Management Plan of Binh Long 110kV substation project; PECC3 2006.

15 Environmental Management Plan of Phuoc Long 1 10kV substation project; PECC3 2006.

16 Environmental Management Plan of Xuan Loc - Cam My 1lOkV transmission line and Cam My 1 1 OkV substation; PECC3 2007.

Environmental management plan

Page 115: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m
Page 116: ENVIRONMENTAL MANAGEMENT PLAN (EYP) · Going across transmission line 1 1 OkV: 1 time. c. Tenrporarjr con /I ecliizg line 11 Ok V in Tm Viil h provirzce: - Scction GIO-GlOA: 2905m