![Page 1: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/1.jpg)
BACK
GROU
ND IN
FORM
ATIO
N D
OCUM
ENT
BACK
GROU
ND IN
FORM
ATIO
N D
OCUM
ENT
ENVIRODEFINIEUCALPROVIN
BACDOCINVIT
Due date
This docum
ONMENTION (E
LYPTUSNCE OF
KGRCUMETATIO
for comm
ment is avail
NTAL PREPDA) FS PLANTF MOZA
OUNNT A
ON TOment: 31 J
lable in Eng
RE-VIABFOR DETATION
AMBIQU
D INFAND O COJanuary 20
glish and Po
BILITY AEVELOPNS IN THUE
FORM
OMME010
ortuguese
Oct
AND SCPMENT OHE ZAM
MATIO
ENT
tober 200
COPE OF
MBÉZIA
ON
09
![Page 2: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/2.jpg)
IN
Project
Sappiand pZambcertifi
The p
Phaseknownschem
Phasepulp fgood.
This Bforest
The MSappiSappiimpacMinist
The fiThe penvirospecifInformwill alEPDA
SappiMozamregiste
PurpThis BprojecscopinESIA,
If you office
NTRODUC
t No:12379
i Manufactupaper compabézia Provinied forest pr
roposed proj
e 1: To estabn as gum trme.
e 2: To consfor the expor
Background ry.
Mozambique to conduct and the au
cts of the protry for the Co
rst phase of purpose of thonment, and fy the specia
mation providso be asses
A, then the sp
has appoimbique, to ered with MI
pose of tBackground Ict. It describeng study and stakeholder
would like toby letter, tele
EPDA
GoldePO Box 15
CTION
uring (Pty) Lany, Sappi Lce of Mozamroducts.
ject will take
blish, over threes, native
struct a modert market. Th
Information
Environmenan Environmthorities with
oposed projeoordination o
f the ESIA is he scoping s
a preliminaralist studies tded by the stssed by MICpecialist stud
nted Golderconduct theCOA.
this docuInformation Des the projecd provides stars will have fu
o comment, pephone or e-
A PUBLIC PA
Ms Mer Associad507 Avenida
3 andarTel: [+2Fax: [+2
Mobile: [E-mail: G
td (Sappi) isLimited. Sapmbique to p
place in two
he next 10 toto Australia
ern pulp millhis phase w
Document
ntal Impact Emental and Sh an unders
ect. Sappi maof Environme
an Environmstudy is to prry indication that will be rtudy will assiCOA in termsdies for the E
r Associatese EPDA. Th
ument Document prct and gives aakeholders wurther opport
please comp-mail.
ARTICIPATI
Misete Cossados Moçamb
Zedequias Mr, Jat IV-Map258] (21) 301258] (21) 301[+258] 82 92
GAML@golde
s the Southeppi is investposition the
o phases:
o 15 years, aa) in which
. The mill wiwill only go a
focuses on
Evaluation RSocial Impacttanding of thay only go antal Action (M
mental Pre-vrovide MICOof the poten
required, as ist Sappi to ds of Article 9
ESIA may pro
s Africa, anhe local Go
rovides stakean overview with an initialtunities to co
plete the enc
ION OFFICE
a bique LimitaManganhela puto 1292 1289 24 510 er.com
2
ern African tigating the company to
about 150 00local comm
ll use the wohead if Phas
Phase 1 o
Regulations (t Assessmenhe potential head with thMinistério pa
viability and SOA with a repntial environpart of the Edecide wheth9 of Decreeoceed.
n independeolder Office,
eholders withof the EPDA opportunity
omment on th
losed comm
ES AND RET
da no 267
division of Sfeasibility o
o meet the g
00 hectares ounities will p
ood from treese 1 is succ
of the projec
Decree 45/2nt (ESIA). Thpositive ande project if t
ara a Coorde
Scope Definport that desmental issue
ESIA, in ordeher to pursue number 45/
ent environm Golder As
h informationA process. Th
to commenthe project.
ent sheet or
TURN ADDR
Gold
Halfway TeFa
e-mail:
N
South Africaof establishigrowing glob
of Eucalyptuparticipate a
es in the newcessful and e
ct, namely t
2004 of 29 She purpose od negative ehe ESIA is a
enação de Ac
ition study (Escribes the pes. In additier to better ue the project/2004. Sho
mental consussociados M
n about the phe documentt on the propo
contact the
RESS FOR C
Vassie Mahder Associat
P O Box 60House 1685
el: +27 11 25ax: +27 11 31
vmaharaj@g
a-based glong a projectbal demand
us plantationsas part of a
w plantationseconomic co
the propose
September 2of the ESIA environmentaapproved by cção Ambien
EPDA) or scproject and tion to this thunderstand tht further. Theuld MICOA
ultant with aMoçambique
roposed plant forms part oosed project
public partic
COMMENTS
haraj tes Africa 001
5, South Afric54 4806 15 0317 golder.co.za
obal pulp t in the for
s (commonlyn outgrower
s to produceonditions are
ed plantation
004) requireis to provide
al and socialMICOA, the
ntal).
coping study.he receiving
he report willhese issues.e informationapprove the
an office inLimitada is
ntation of the t. During the
ipation
ca
y r
e e
n
e e l
e
. g l . n e
n s
![Page 3: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/3.jpg)
Project No:12
MotivatiThe world-wsuch as papcontinuouslopportunity in southern The companyMozambiqueforestry, beca
It has sgrowing
It is cloand
The progrowth that Sa
Project In 2008, Sapidentified theDistricts of Zafor fast-growi
Sappi then coMozambicanwithin these afor the propo
The NationalCadastre (DIportions of la
Sappi then aRural Consulthese areas aland.
The next stepacquire the riprocess startfrom Rural Csteps:
desktopportionsQuelim
reconnaRural C(SPGC2009 toidentifieleaders
commuConsulto make
identificEucalyp
trial ploto test t
2379
ion for thwide demand per and packay. This providto expand itsAfrica.
y identified thee as a suitable ause: suitable growing plantations; se to its opera
oject will contrin southern A
appi supports.
history pi conducted Gurué, Alto Mambézia Proving Eucalyptus
onsulted with authorities toareas would psed 150 000 h
Directorate oNAGECA) ga
and that could
ppointed a Molt Lda to consuand to confirm
p in the procesights to use thted in Februaronsult, and ha
p identifications with the Cadane (SPGC); aissance work
Consult, provinC) and District oo confirm the aed areas with s; unity meetingst to determinee land availabcation of areasptus trees; and
ots are now bethe response o
he projecfor forest pro
aging, increasdes Sappi wis forestry ope
e Zambézia P area for plant
ng conditions f
ations in South
ribute to econoAfrica, which is
initial studies Molόcue, and vince as suitabs plantations.
the relevant o establish whipotentially be ahectares of pla
of Geography ave an initial inbe available.
ozambican coult the commu
m the availabili
ss is for Sapphe available lary 2009, with aas included th
n of potential ladastral Service
k by field teamncial Cadastraofficials in midavailability of tinput from com
s facilitated by e community wble for the projes suitable for pd
eing establisheof the selected
ct oducts, ses th an erations
rovince in tation
for fast-
h Africa;
omic s an ideal
and Gilé
ble areas
ich land available antations.
and ndication of
mpany, unities in ty of the
i to nd. This
assistance e following
and es in
ms from al Services d-April the mmunity
Rural willingness ect; planting
ed in order d tree speciess to the growin
Sappi is aforest prodlisted on th
The compahas 39 offiover 100 cof timber p
Sappi prodproducer omagazinespharmaceugraphic an
Sappi emp
Sappi is a programme
Forestr
Sustain
Progra
These progrsound enviro
All wood grois FSC certifforest certificNature (WWResource NeZambézia Pr
In addition torelated activproviding a c
Coate
3
ng conditions,
a global pulp ducts companyhe Johannesbu
any manufactuces around th
countries. It alslantations in S
duces 6.9 millof coated fine s. Its productutical productsd business pa
ploys 17 400 p
RESPONSIB
member of ses, such as:
ry Stewardshi
nable Forestry
amme for the E
rammes ensuonmental and
own on Sappi fied. The FSCcation schem
WF), Greenpeetwork (FERNrovince of Moz
o this, Sappi wvities can concarbon sink (ca
ed fine paper
and about 40
WHO IS S
and paper cy. It started in urg and New Y
ures wood fibrhe world and so manages aSouth Africa a
ion tonnes of paper, which ts are also s. Other produaper and pack
people in its op
LE PLANTAT
several interna
p Council (FS
y Initiative (SF
Endorsement o
re that Sappisocial practice
owned and mC is recognise
me supported eace and theN). The forestrzambique will
will investigatentribute to rearbon seques
BACK
hectares will
Sappi?
ompany and South Africa
York Stock Ex
re products onsupplies pap
and owns ovend Swaziland
paper per yeis used in booused in plas
ucts include naging.
perations arou
TION MANAG
ationally reco
SC);
FI); and
of Forest Cert
’s products aes.
managed landed internationaby the World Forests andry plantation palso be FSC
e how these pducing globatration).
Packa
GROUND
be planted.
is Africa’s lein 1936. Toda
xchanges.
n four contineper to customer 550 000 hec.
ar. It is the leoks, brochurestics, fabrics,ewsprint, unco
und the world.
GEMENT
gnised certific
tification (PEF
are produced
d in southern Aally and is thed Wildlife Fund European Uproject proposcertified.
lantations andl warming thr
aging
D
ading ay it is
nts. It ers in ctares
ading s and , and oated
cation
C).
using
Africa e only nd for Union sed in
d their rough
![Page 4: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/4.jpg)
PR
Project
LocFigurethat ar260 00
Variousuitabland pbe nee
Most omaizearea.
ROPOSE
t No:12379
ation e 1 shows there being inves00 hectares. T
us studies wille 150 000 he
portions at otheded for this.
of the area is , and rice) an
ED EUCA
e location of thstigated for thThese areas
l be conducteectares of lanher areas with
currently usend charcoal m
ALYPTUS
he land portiohe proposed Shave suitable
ed on these land required fohin the larger
ed by local comaking. There
FigureareasMozam
S PLANT
ons (blue areaSappi plantate soils and en
and portions tor the plantati
project area
ommunities foe are also tea
e 1: The prop) being invesmbique
TATION P
4
as on the mations. Togethenough rainfall
to find the moons. It may a(shown by th
or small-scaleplantations a
posed projectstigated for E
PROJECT
p) within Gurer these areal for fast-grow
ost environmealso be neces
e purple outli
e farming (beaand other fore
t area (purpleEucalyptus pla
T
rué, Alto Molόas total approwing Eucalypt
entally, socialsary for Sappine on the ma
ans, cassavaestry plantatio
e line) and lanantations in Z
όcue, and Giléximately tus plantation
lly and technipi to look outsap). Further s
, tobacco, baons in the larg
nd portions (bZambézia Pro
é Districts
ns.
ically side of these studies will
nanas, ger project
blue ovince,
![Page 5: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/5.jpg)
Project No:12
How wilproject wOf the 150 0Sappi propo(75 000 hectoutgrower sccommunities
Participants provide the lwill provide ttechnical supthe plantatioharvest. Aftethe timber fr
The other 75established Sappi on langovernmentcarried out aoperating pr
How commthe outgrow
Community mone of three
As individ5 to 10 he
As commhectares
As comm1000 hec
EstablisEucalyp
Photograph Eucalyptus t3 to 6 month
2379
ll the plawork?
000 hectares oses to establtares) will be cheme in pars in those are
in the outgroland and growthem with seepport to estab
ons until the trer harvesting,rom the farme
5 000 hectareand managed
nd leased from. All forestry o
according to Srocedures and
munities canwer scheme
members will boutgrower sch
dual or family fectares of thei
munity groups, of their own la
mercial farmersctares of their o
shing theptus plan
1: A typical ntree seedlingh old seedling
P
ntation
of plantationsish, at least 5managed as
rtnership with eas.
ower scheme w the trees. Sedlings and blish and mairees are read, Sappi will buers.
es will be d directly by m the operations wiSappi’s best d standards.
n participatee
be able to choheme options:farmers, proviir own land; providing 5 to
and; s, providing 10own land.
e ntations
nursery in whgs will be growgs.
PROPOS
s that 50% an the
will Sappi
intain dy for uy
ll be
e in
oose ding
o 100
00 to
hich the wn, also show
Sain Sua fseThplahapeSapriOuproproThhaouto
SED EUC
SpTheEucclimto b
TreTheSousee
wing
HOW THappi has a sucSouth Africa.
ubsistence farmfarming loan, ll their trees w
he growers reantations for tarvested. In aercentage of thappi buys thece, less the a
utgrowers benofits of the timovides employhese photosarvested timutgrower sch
Project Gro
SappSchem
entre
CALYPTU
5
pecies to be species of trcalyptus gran
mate of Zambébe fully grown
e seedlings we nursery will uth Africa andedlings per ye
HE OUTGRccessful outgroThe project stmers who partechnical adv
when they are eceive an advthe 8 to 10 yaddition, outghe expected pre harvested tidvance paymenefit by beingmber sales. Tyment for coms show comber from the
heme proposw in South A
pi’s Outgroweme encourageepreneurship
US PLAN
be plantedree that will mdis x urophyllézia Province
n to about 25
will be grown be designed
d will be able ear.
ROWER SCower tree-farmtarted in 1983 rticipate in thevice from Sapharvested. vance paymeyears it takes growers also rofits. imber from thents. paid for the
The communitmmunity membmmunity mem
e Project Grsed in ZambAfrica.
er es p
TATION
d most likely be la. It is most se and takes am in height.
in a nursery (based on stato produce a
CHEME CANming scheme c
and is still rune scheme receppi, and a gua
nt to be ablefor the trees receive upfro
he growers a
use of their y benefits be
bers. mbers in Sorow outgrow
bézia Provinc
PROJEC
planted is suited to the
about 8 to 10 y
(see Photograandards usedbout 20 millio
N WORK?called Project nning. eive free seedaranteed mark
e to maintain to mature an
ont payment
at a market-re
land and fromcause the sc
outh Africa wer scheme.ce will be si
CT
years
aph). in
on
Grow
dlings, ket to
their nd be
of a
elated
m the heme
with . The milar
![Page 6: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/6.jpg)
PR
Project
PrepAreas clearebulldoand shavailatimber
PlanTeamsholes and plPhotogmethowill be
PlanmanaApprocontrowill bechemiinfrastroads each p
HarvOnce (see Pbe harbest pPhotogbe sto
TranThe hatranspstoragmill. Tknown
HowrequThe nu170 00litres) the sesourceboreho
ROPOSE
t No:12379
paring the earmarked fo
ed using largezers, as well hrubs will be cble to local per or to make c
ting the ses of people weither mechaant the seedlgraph). Stand
ods and smalle used.
tation maagement priate chemic
ol termites ande controlled bycal means. Ftructure like wand airstrips
plantation are
vesting fully grown, a
Photograph), trvested mech
practice methograph). The h
ored in depots
sport arvested timb
ported by roadge depots to the location o
n at this stage
w much wuired? ursery will req00 cubic metrof water per y
eedlings. Thised from streaoles.
ED EUCA
sites or plantations
e machines likas by hand. Tcut down andeople to be ucharcoal.
eedlings will dig individuanically or malings (see dard manual amounts of f
intenance
cals will be usd other pestsy mechanical
Fire fighting water points, a
will be providea.
after 8 to 10 ythe plantation
hanically accoods (see harvested tims.
ber will be d from the timhe proposed f the mill is no
e.
water wil
quire approxires (or 170 myear to irrigat water will bems and rivers
ALYPTUS
s will be ke Trees d made sed as
ual anually
planting fertilizer
e and
sed to . Weeds l and
access ded in
years ns will ording to
mber will
mber pulp ot
l be
mately million
te e s or
S PLANT
Teams of peseedlings
Fully growtrees
Harvested befor
TATION P
6
eople ready to
wn 8 year old s, about 25 m
trees in the pre transportat
PROJECT
o plant
Eucalyptus metres high.
plantation tion to the
depot.
Dsto
T
These seemonths o
Mechanical grown Euca
Depot where hstored before o the pulp mi
edlings are abld
harvesting oalyptus trees.
harvested timbeing transp
ill.
bout three
f fully
mber is ported
![Page 7: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/7.jpg)
Project No:12
What infThe main inf
a large
three to(chemi
depots
roads,
waste m
water s
fire figh
staff ho
EmployBased on cutime senior f
An additionaestablished. project.
Sappi expecrequired by t
In line with itcarry out plaand agricultuaddition, ind
ProposeThe broad e
2008 toand So
2011 toand pla
2012 to
2020 o
2379
frastructfrastructure re
e nursery to go four forestrycal store, oil
s to temporariand bridges amanagementstorage facilithting facilitiesousing.
ment anurrent plans itforestry opera
al 2200 – 250It may also b
cts that there the plantation
ts commitmenantation work.ural colleges ividuals and c
ed projecestimated time
o 2010 – Associal Impact A
o 2023 – Shoantations up t
o 2014 - Fulfi
onwards – Co
P
ture will equired to es
row the Eucay stations, eastore and equly store timbeacross streamt facilities for ies;
s; and
d trainint is expected ational and te
00 permanentbe necessary
will also be an operations.
nt to skills de. Sappi wouldso that peoplcommunities
ct schedeframes for th
sess the feasiAssessment.
ould the ESIAto harvesting
ill all legal req
onstruct and o
PROPOS
be requitablish and m
alyptus seedliach with a smuipment storeer before it is ms; general wast
ng that once the
echnical staff.
t operational jy to employ so
a significant n
velopment and also supporle interested will be traine
duling he overall pla
bility of the p
A be approvedof the first cr
quirements fo
operate pulp
SED EUC
ired? manage150 00
ngs; all office come), vehicle paloaded onto t
te from forest
e project is ful
jobs will be crome seasona
umber of indi
nd training, Srt the developin a career in
ed and suppor
ntation and p
roject, apply
d by MICOA arop.
or establishme
mill.
CALYPTU
7
00 hectares o
mplex, a worksrking facility atrucks and se
ry stations an
lly operationa
reated for local workers, es
irect jobs crea
appi would trpment of a plan forestry can rted technica
pulp mill proje
for rights to u
and the proje
ent of pulp m
US PLAN
of timber plan
shop for servand fuel statioent to the pulp
nd staff reside
al, it will provid
cal people oncspecially durin
ated as a res
rain all emploantation base
receive formlly to participa
ect are:
use the land,
ct is found to
ill, including E
TATION
ntations are:
icing vehicleson; p mill;
ential areas;
de employme
ce the projectng the initial s
sult of the goo
yees so that d curriculum al training in ate in outgrow
and conduct
be feasible,
ESIA.
PROJEC
s, store rooms
ent for up to 6
t is fully stages of the
ods and servic
they are skilleat local univeMozambique
wer schemes
an Environm
establish nur
CT
s
64 full-
ces
ed to ersities e. In .
ental
rseries
![Page 8: ENVIRONMENTAL PRE-VIABILITY AND SCOPE DEFINITION (EPDA ... · In 2008, Sap identified the Districts of Za for fast-growi Sappi then co Mozambican within these a for the propo The](https://reader033.vdocument.in/reader033/viewer/2022042208/5eac2ae88ac5c636d46efa0d/html5/thumbnails/8.jpg)
PR
Project
PubThe pulocal kcontrib
TechThe eninformaffectithrougof incrand th
The finavailaand Sa
The st
Figur
Se
A
Noto
ROPOSE
t No:12379
blic consurpose of pubknowledge, anbutions will as
hnical stnvironmental
mation and preng the propos
gh clearing of reased demanhe effect of the
ndings will beble to stakehoappi find that
teps in the EP
e 2: The ste
August toptember 20
Approximatdates
ovember 20o March 20
April 2010
May 2010
May 2010
ED EUCA
ultation blic consultatind to receive ssist to define
tudies and social st
eliminary fieldsed plantatiomiombo woo
nd for surfacee project on t
e collated intoolders for comt the project is
PDA process
eps in the EP
S
To g
P
F
Au
Eo 009
te
009 10
0
ALYPTUS
ion during theissues of con
e the terms of
tudies that ard visits, to aidn project. Asp
odlands, loss e and groundthe local and
o an EPDA Remment befores feasible, the
are shown in
PDA proces
Submit EPMICOA fo
Scoget issues
EPDAPresent dra
com
inalise E
uthority with
EPDA
S PLANT
e EPDA is to ncern and suf reference fo
e prepared fo the professiopects that wilof agriculturawater resourcnational econ
eport which we being submey may proce
n Figure 2.
ss
PDA Repoor a decisi
opingand sugge
A Reportaft findingsmment
EPDA Rep
consultaMICOA
A proc
TATION P
8
create awareggestions for
or the Special
or the EPDA wonal team to dl be consider
al land for fooces, the effecnomy.
will define the mitted to MICOeed with the E
rt to ion
estions
s for
port
ation
cess
PROJECT
eness of the pr enhanced beist Studies th
will consist prdevelop an ured include, aod productioncts of the proj
terms of refeOA for consideESIA.
Consuintereshelp pfinding
MeetAdmiMolocthe p
If MICprojemay The the f
ConsGoveNGOs
Finalicommstake
T
proposed projenefits from s
hat will be con
rimarily of a renderstandingmong others,, resettlemenect on cultura
erence for theeration. If MIC
ultation meested and aff
people commgs of the EP
ings with Ministrators incue and Gilroject.
COA approect is feasgo ahead ESIA will c
final projec
ultation meernment, cos, large ind
ise report bments and ineholders.
ject, benefit frstakeholders.nducted after
eview of exisg of potential i, loss of naturt issues, the al traditions a
e ESIA and wCOA approve
etings with affected partiment on thePDA.
MICOA and n Gurue, Alle, to introd
oves and sible, Sapp
with the Econtributect design.
eetings with mmunity leustry.
ased on nputs from
rom people’s These the EPDA.
ting issues ral resourcesimplications
and heritage
which will be es the EPDA
all ies to e
District to uce
if the pi ESIA. e to
aders,