environmental technology best practice …benzophenone and substituted benzophenones (uv curing,...

28
ENVIRONMENTAL TECHNOLOGY BEST PRACTICE PROGRAMME FR200 FUTURE PRACTICE RECOVERY OF ALUMINIUM TRICHLORIDE SOLUTIONS USING MEMBRANES Novel membrane bioreactor technology FUTURE PRACTICE: Tomorrow’s technology and techniques for profitable environmental improvement

Upload: others

Post on 29-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

ENVIRONMENTAL

TECHNOLOGY

BEST PRACTICE

PROGRAMME

FR200FUTURE PRACTICE

RECOVERY OF ALUMINIUMTRICHLORIDE SOLUTIONS USING MEMBRANESNovel membrane bioreactortechnology

FUTURE PRACTICE: Tomorrow’s technology and techniques for profitable environmental improvement

Page 2: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

RECOVERY OF ALUMINIUM TRICHLORIDE SOLUTIONS

USING MEMBRANES

Novel membrane bioreactor technology

FR200

© Crown copyright. First printed September 1999.This material may be freely reproduced in its original form except for sale or advertisingpurposes.

The Environmental Technology Best Practice Programme is a joint Department of Trade and Industry and Department of the Environment, Transport and the Regions programme managedby AEA Technology plc through ETSU and the National Environmental Technology Centre.

For more information on the Environmental Technology Best Practice Programme, contact the Environment and Energy Helpline on 0800 585794 (world wide web:http://www.etsu.com/etbpp/ and e-mail: [email protected]).

Prepared with assistance from Membrane Extraction Technology Ltd.

Page 3: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

SUMMARY

A new technology, the Extractive Membrane Bioreactor (EMB), can be used to recover aqueousstreams containing valuable inorganic salts polluted with low concentrations of organiccompounds. The technology, developed by Membrane Extraction Technology Ltd (MET), usesnon-porous elastomeric membranes to extract the organic contaminants and micro-organisms tometabolise the contaminants to harmless compounds. The use of non-porous elastomericmembranes allows streams which would preclude direct biological treatment to be cleanedwithout any pre-treatment (eg dilution or neutralisation). The specific case used in this projectinvolves the recovery of a 30% w/v aluminium trichloride solution polluted with benzene, 1,3-dichlorobenzene or toluene at Elf Atochem UK Ltd, Widnes. This material is generated throughFriedel-Crafts reactions used for manufacturing aromatic ketones.

The overall aim of the project was to construct an EMB pilot plant capable of treating 2 - 3 tonnesof solution/day over a six-month period, to generate long-term operating data and providesufficient material to explore commercial opportunities.

Over a nine-month period, the pilot plant was designed, built, installed and commissioned. Thiswork was carried out in parallel with modifications to Elf Atochem’s production facility toprovide the aluminium trichloride solution for the trial. Commissioning was carried out at a flowrate of approximately 3 tonnes/day. The results were very promising, with benzene levels belowthe measurement limit in the clean solution.

Following the commissioning period, the membrane modules had to be rebuilt with a newmembrane material (EPDM) due to corrosion problems. During the project, from May toOctober 1998, the modules showed no signs of chemical degradation. Typically 98 - 99% of thebenzene was removed from the solution, however, by the end of the project, improvements in thetechnique had resulted in a 99.9% removal with benzene concentrations in the treated solution<1 mg/litre. Elf Atochem has used this material in customer trials to verify the commercialpossibility of selling the clean solution to the water treatment industry. The market value isdependent on the solution specification and the end use.

Environmentally, the EMB has proved to be a cleaner technology than the state-of-the-arttechnologies for treating these wastes (steam stripping and carbon adsorption). The use of micro-organisms to biodegrade the contaminants results in elimination of the toxic contaminants and nogeneration of secondary toxic waste streams. Economically, the EMB is competitive with carbonadsorption and significantly cheaper than steam stripping in terms of both capital and operatingcosts.

In conclusion, the EMB has proved to be a reliable and easy-to-use technology for cleaningaluminium trichloride solution contaminated with benzene, toluene and other organiccompounds. The pilot plant built for this trial has achieved 99.9% removal of the benzene fromthe AlCl3 solution. The EMB is cost-competitive with the current state-of-the-art technologiesand also has less environmental impact.

Page 4: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

CONTENTS

Section Page

1 Introduction 11.1 Friedel-Crafts chemistry and aluminium trichloride 11.2 Extractive membrane bioreactor (EMB) technology 11.3 Aims and objectives of the ATOMET project 2

2 Description of the project 3

3 Project implementation 43.1 Stage 1 - design and hazard analysis 43.2 Stage 2 - construction 93.3 Stage 3 - installation and commissioning 93.4 Stage 4 - operation 11

4 Technical evaluation of the project 18

5 Environmental and economic benefits of the project 195.1 Environmental benefits 195.2 Economic analysis of the project 20

6 Conclusions 22

Page 5: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone
Page 6: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

1 INTRODUCTION

1.1 FRIEDEL-CRAFTS CHEMISTRY AND ALUMINIUM TRICHLORIDE

Friedel-Crafts reactions are used to manufacture many ring-substituted aromatic molecules1, eg:

■ benzophenone and substituted benzophenones (UV curing, sunblocks);

■ isobutylacetophenone (intermediate in Ibuprofen synthesis);

■ 2’,4’-dichloroacetophenone (agrochemical intermediate).

These reactions proceed via an aluminium trichloride (AlCl3) complex, which is subsequentlyde-complexed in water to yield product and aqueous AlCl3 solution. For each tonne of product,2 - 3 tonnes of 30% w/v AlCl3 solution is obtained. The untreated solution is contaminated withproduct and solvent and as such is classified as a hazardous waste. Disposal costs areapproximately £50/tonne AlCl3 solution. However, upon removal of the toxic organics, the AlCl3solution has value2 as a flocculant in wastewater treatment.

1.2 EXTRACTIVE MEMBRANE BIOREACTOR (EMB) TECHNOLOGY

Many toxic organic molecules can be readily biodegraded by naturally occurring, specialisedmicro-organisms under ideal conditions. However, the inorganic content (eg high acidity,alkalinity or salt concentration) of many hazardous waste streams precludes direct biologicaltreatment.

The Extractive Membrane Bioreactor (EMB)3 technology overcomes this problem, by usingmembranes to extract the toxic organic molecules from the waste stream into a separate aqueousphase where the toxic organic molecules can be biodegraded under ideal conditions4.

This process is made possible by using dense phase membranes (eg silicone rubber), as thesemembranes prevent ionic species (acids, bases, etc) from permeating through them and affectingthe micro-organisms5. A schematic diagram of the operating principle is shown in Fig 1.

The technology was developed by Membrane Extraction Technology Ltd (MET) and isdemonstrated in this project by Elf Atochem UK Ltd, Widnes.

1

1 Friedel-Crafts Reactions, Kirk-Othmer Encyclopaedia of Chemical Technology, Volume 11, pp 1042 - 1081, 4th ed, 1994.2 Polyaluminium Chlorides, Kirk-Othmer Encyclopaedia of Chemical Technology, Volume 2, pp 338 - 345, 4th ed, 1993.3 The EMB technology was invented at and patented by Imperial College, London (PCT/GB92/01719 Treatment of Aqueous

Media Containing Organic Material) and is being developed and commercialised by Membrane Extraction Technology Ltd(MET).

4 Livingston, A G (1994), Extractive Membrane Bioreactors - A New Process Technology for Detoxifying Chemical-IndustryWastewaters, J Chem Technol Biotechnol., 60(2), pp 117 - 124.

5 Basic Principles of Membrane Technology, 2nd ed, Mulder M, Kluwer Academic Publishers, 1996.

Page 7: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

Fig 1 Operating principle of Extractive Membrane Bioreactor technology

1.3 AIMS AND OBJECTIVES OF THE ATOMET PROJECT

The overall aim of the ATOMET project was to use the Extractive Membrane Bioreactor (EMB)technology to treat a minimum of 2 - 3 tonnes/day of an aluminium trichloride (AlCl3) solutionmade during a Friedel-Crafts acylation reaction at Elf Atochem, Widnes. Once it had beentreated, this solution was to be evaluated as a value-added product.

A number of technical and commercial objectives were set to achieve the project aims.

1.3.1 Technical objectives

■ Achieve consistent reduction of organic concentrations to acceptable levels for sales.

■ Determine the best EMB plant configuration for achieving these removal levels.

■ Establish membrane lifetime and durability in the face of acidic aluminium chloridesolutions and occasional upset periods in which pure organic phase may contactmembranes.

■ Demonstrate the robustness of EMB technology in the face of changing organic content inwaste.

1.3.2 Commercial objectives

■ Establish the suitability of treated AlCl3 solution as a water treatment chemical.

■ Demonstrate the potential of EMB technology for energy and capital plant savings overalternative technologies (steam stripping, carbon adsorption).

■ Establish the process economics of EMB technology as a recovery process.

■ Gain acceptance of the EMB process as an easy to operate and reliable unit operation.

2

������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

������������������������������������������������������������������������������������

Biomedium EffluentMembrane

Effluent contains toxicorganic molecules, acids/bases,salts, carried-over catalystToxic organic molecules

biodegraded by specialisedmicro-organisms

Inorganic species remain in effluent.The toxic organic molecules have been removed by membrane permeation.

Toxic organic moleculespermeate through themembrane into the biomedium

Page 8: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

2 DESCRIPTION OF THE PROJECT

The project was scheduled in five stages, as shown in Table 1. Stages 1, 2 and 3 form Phase I ofthe project and Stages 4 and 5 form Phase II.

Table 1 Project outline

3

Stage Tasks Steps taken

1. Design and Detailed design of pilot unit hazard analysis and connections to Elf

Atochem production plant.Hazard analysis followingElf Atochem’s hazard studyprocedures.

2. Construction Procurement and assemblyof pilot plant items.Preparation of serviceconnections, construction ofconcrete plinths and bunds,and installation of storagetanks and pipework atWidnes.

3. Installation and Installation of pilot plant on commissioning site. Connection of services

to pilot plant. Hydraulic andelectrical testing of pilotplant. Commission pilotplant with microbial cultureand AlCl3 solution.

4. Operation Operate unit on site andproduce saleable AlCl3solution.

5. Evaluation Evaluate total treatment costsbased on operating data andconstruction costs.

■ Establish pilot plant design.■ Prepare Process and Instrumentation Diagram

(P+ID) for pilot plant.■ Review and revise P+ID through MET in-house

hazard reviews.■ Elf Atochem and MET personnel to carry out

hazard study on final design.■ Prepare detailed mechanical drawings of pilot

plant.■ Prepare detailed mechanical drawings of location

for pilot plant.■ Prepare detailed mechanical drawings of service

connections to pilot plant and process connectionsto Elf Atochem’s production plant.

■ Get tenders for (a) construction of pilot plantframe and mounting of process equipment, and (b)electrical wiring and control panel.

■ Procure process plant equipment for assembly.■ Assemble pilot plant.■ Pipe services (air, steam and water) to pilot plant

location.■ Install AlCl3 solution storage tanks and process

pipework.

■ Ship pilot plant to site.■ Connect services (air, electricity, steam and water)

and process pipework.■ Check all sensor and control functions.■ Train site operators in system operation.■ Ship culture inoculum (micro-organisms) to site.■ When culture begins to grow, set pilot plant

running with continuous flow of AlCl3 solution.

■ Operate pilot plant at 100 litres/hour AlCl3solution or more.

■ Monitor removal efficiency and mass transfercoefficient.

■ Minimise added nutrient flow.■ Continuously maintain culture during trial for

rapid inoculation in case of process upset.

■ Use data on membrane lifetime, powerconsumption and manpower requirements torecalculate EMB costs.

■ Compare EMB costs with existing data foralternatives (steam stripping, carbon adsorption)generated by Elf Atochem design studies.

Page 9: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

3 PROJECT IMPLEMENTATION

3.1 STAGE 1 - DESIGN AND HAZARD ANALYSIS

Design work on the pilot plant started on commencement of the project (February 1997). Thedesign basis used for the project was:

■ 250 litres/hour AlCl3 solution;■ 50 mg/litre benzene in AlCl3 solution;■ 99% removal required.

During this initial period of the project, the design evolved through a process of informationgathering, design and hazard review. One of the key pieces of information that came to light wasthe viscosity of the AlCl3 solution. Information provided by Elf Atochem showed that viscositiesup to 20 cP could be expected (depending on concentration and temperature of the AlCl3 solution).

The primary concern with such a viscous fluid is the pressure drop in the membrane modules;the higher the viscosity, the higher the pressure drop. The elastomeric membrane tubes used inthe EMB technology have a maximum operating pressure which gives an upper limit to the flowrate. As the mass transfer coefficient is a function of the flow rate (Reynolds number), lowerflow rates reduce the rate of mass transfer attainable in the system.

In parallel with this project, MET was developing process-scale shell and tube membranemodules (denoted MET 200 series) as part of a DTI-sponsored SPUR through SMART award.The design of these modules allows either the wastewater or biological medium to flow throughthe tubes, with the other phase flowing through the shell.

The data obtained for these modules in trials on a caustic waste were convincing andperformance calculations based on published theory/correlations were verified at process-scale6.On the basis of these measurements, it became clear that for a given wastewater flow rate, highermass transfer coefficients and lower pressure drops could be obtained by flowing the wastewaterin the shell-side of the modules (see Table 2).

Table 2 Predicted mass transfer and pressure drop data for 250 litres/hour AlCl3 solution

4

Module Mass transfer coefficient Pressure drop/module(10-6 m/s) (bar)

MET 200 (flow in tube) 1 1.4

MET 200 (flow in shell) 5 1

6 Livingston, A G, Boam, A T, Marangon, M, Zhang, S F and Arcangeli, J P (1999), Extractive Membrane Bioreactors forDetoxification of Chemical Industry Wastes: Process Development, J Membr Sci, Vol. 151, pp 29 - 44.

Page 10: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

Design calculations showed that for a flow of 100 litres/hour of AlCl3 solution, a membrane areaof ~120 m2 is required to provide 99.9% removal (~50 mg/litre reduced to <0.05 mg/litre) of theorganic solvents. This corresponds to 12 MET 200 modules. The pressure drop in the shell-sideof the modules is high enough that the pressure must be ‘boosted’ every so often by intermediatepumps to prevent excessive shell-side pressures collapsing the membrane tubes. Flow sheet andgeneral layout diagrams of the design are shown in Figs 2 and 3. Following completion of theprocess and instrumentation diagram, a hazard review was carried out by MET which wassubsequently approved by Elf Atochem.

To provide a feed of AlCl3 solution for the project and a storage tank for processed material, ElfAtochem designed a system that connects the pilot plant to the production plant and solutionstorage tank. The feed system was designed to minimise the probability of large volumes oforganic solvent phase from entering the pilot plant. The system is shown in Fig 4.

The process plant installed by Elf Atochem separates carried-over organic phase so that it can berecovered. To promote phase separation, the AlCl3 solution (ex quench vessel) is passed througha heat exchanger. This reduces the solution temperature from ~80°C as it leaves the productionplant to ~40°C in the phase separation tank.

The phase separation tank design allows the AlCl3 solution to underflow into the AlCl3 feed tank(minimising disturbance of the organic layer) and recovery of the organic layer is possiblethrough overflow or drain arrangements in the tank. The AlCl3 solution is then pumped from thefeed tank through the membranes in the pilot plant, and the treated (pollutant-free) AlCl3 solutionis collected in the storage tank.

5

Page 11: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

6

Fig

2

Flo

w s

heet

of A

TO

ME

T p

ilot

plan

t

P

P

P

P

P7

������������������������������������������

Stea

m S

T1

Air

GA

1

V1

SV1

AC

1B

A1

NU

1

V3

RG

1

RG

2R

G3

R1

V2 V

4

V5

V7

V8

V9

RV

1V

10V

11V

6

See

A

GA

3

GA

2

GA

4

GA

6

BM

1

P6

V13

V14

GA

4

RG

4V

12

V16

V15

A D

etai

l of

aera

tio

n in

tan

k T4

V18

V17

GA

5

To v

ent

LS1

VD

1

To d

rain

To d

rain

To d

rain

To d

rain

SP1

O2S

1

pH

S1

TS1

pH

C

TC1

P3

P5P4

P2P1 T1 G

rou

nd

leve

lT2T3

T4

R2

R3

Air

/w

ater

BM

3B

M4

BM

5

BM

2

BM

6B

M7

BM

8B

M9

BM

10B

M11

BM

12B

M13

BM

14

MM 1

MM 2

MM 3

MM 4

MM 5

MM 6

MM 7

MM 8

MM 9

MM 10

MM 11

MM 12

P8 Ove

rflo

wto

bu

nd

AlC

l 3 s

olu

tio

nfr

om

day

tan

kA

lCl 3

so

luti

on

to s

tora

ge

T5

Silic

on

e tu

be

con

tain

ing

org

anic

po

lluta

nt

atta

ched

to

ste

el p

ipe

pro

tru

din

g t

hro

ug

h li

d o

f T4

'Bu

bb

lele

ss' a

erat

ion

th

rou

gh

silic

on

e tu

be

atta

ched

to

air

lin

ep

rotr

ud

ing

th

rou

gh

sid

e o

f T4

Ove

rflo

w t

o T

4

T4 w

all

NU

1

Item

Des

crip

tio

n

TTa

nk

PPu

mp

VV

alve

RV

Rel

ief

valv

eSV

Sole

no

id v

alve

MM

Mem

bra

ne

mo

du

le

Item

Des

crip

tio

n

RR

ota

met

erR

GPr

essu

re r

egu

lato

rLS

Leve

l sw

itch

pH

Cp

H c

on

tro

ller

pH

Sp

H s

enso

rTC

Tem

per

atu

re c

on

tro

ller

Item

Des

crip

tio

n

TSTe

mp

erat

ure

sen

sor

O2S

Oxy

gen

sen

sor

GA

Air

lin

eB

MB

iom

ediu

m li

ne

AC

Aci

d li

ne

Item

Des

crip

tio

n

BA

Bas

e lin

eN

UN

utr

ien

ts li

ne

SPSa

mp

le p

oin

tV

DV

entu

ri d

evic

eST

Stea

m

Key

Page 12: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

7

Fig

3

Gen

eral

layo

ut o

f AT

OM

ET

pilo

t pl

ant

200

0 m

m

200

0 m

m

700

0 m

m

P1 P2 P3 P3

P4

P6

P7P8

T4

MM

4

MM

3

MM

2

MM

1

MM

8

MM

7

MM

6

MM

5

MM

12

MM

11

MM

10

MM

9

T4

Key

:T

Tan

kP

Pum

pM

MM

emb

ran

e m

od

ule

Page 13: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

8

Fig

4

Con

nect

ions

fro

m e

xist

ing

prod

uctio

n fa

cilit

y to

AT

OM

ET

pilo

t pl

ant

3 m

ab

ove

ro

of

line

Aci

d r

esis

tan

t lin

ing

Co

nse

rvat

ion

ven

t (f

utu

re)

SP

S.P.

Pilo

t ri

g(b

y o

ther

s)

S.P.

S.P.

25 P

P25

PP

50 P

P

25 P

TFE/

CS

25 P

TFE/

CS

50 P

TFE/

CS

50 P

TFE/

CS

50 P

TFE/

CS

Rel

ief

line

50 P

TFE/

CS

V13

5

V13

6

V13

7

V10

9

V10

4

V10

3V

102

V11

1V

114

NC

V11

8N

CV

117

NC

V11

2N

C

V11

3

V11

6

V11

9

NC

4040 40

C.S

.V1

V3

V2

V12

1V

120

V10

0

V10

1

V11

5

V10

7

V10

9N

C

NC

NC

HS

TIS

Co

ole

rm

2

carb

on

(To

co

ol 2

0 m

3 /h

rfr

om

50°

C t

o 3

0°C

015H

E100

)

L1

L1C

WS

CW

S

NC

V12

2

015T

200

sep

arat

or

der

akan

e47

0

015T

300

org

anic

sre

ceiv

er(2

00 lt

s)d

erak

ane

470

(Ø 0

.66

m x

0.6

6 m

h)

015T

100

feed

tan

k(8

m3 )

der

akan

e 47

0(Ø

2 m

x 2

.5 m

h)

2% s

lop

e

2% s

lop

e

2% s

lop

e

(6 m

3 )(Ø

2 m

x 2

m h

)

Wild

en M

4p

um

p P

TFE

dia

ph

rag

m

019R

500 01

9P50

1Fr

om

sp

ent

wat

er t

ank

SG

SG

Wild

enp

um

pFr

om

No

.2sc

rub

ber

50 P

TFE/

CS

S.P.

50 P

TFE/

CS

019R

200

Ben

zop

hen

on

ew

ash

/qu

ench

vess

el

Toat

mo

sph

ere

Fro

m H

OU

solv

ent

tan

k

To Q

31S0

05

To O

31S0

06

15 B

uild

ing

19 B

uild

ing

Key

:N

ew p

ipew

ork

Exis

tin

g p

ipew

ork

Page 14: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

3.2 STAGE 2 - CONSTRUCTION

Before ordering equipment to be used in the pilot plant, engineering standards were agreed withElf Atochem. The location of the plant is in a Zone 1 hazardous area and consequently onlyflameproof electrical equipment and intrinsically safe instrumentation were used. Industrialgood practice was adhered to where no formal standards were available.

The size of the pilot plant made it difficult to assemble in MET’s facilities, so it was assembledin situ at Widnes; the largest individual item was the steel frame for the membrane modules andprocess plant. This was fabricated as a single piece, of overall dimensions 7 m (l) by 2 m (w) by2 m (h).

Contracting out the assembly work was considered. However, this was beyond the projectbudget, hence the pilot plant was assembled by MET engineers. The MET 200 series membranemodules are a proprietary technology and were manufactured by MET for the project. MET 200SR (silicone rubber) membrane modules were used, as a laboratory feasibility study and materialcompatibility tests had shown silicone rubber to be an appropriate membrane material. A totalof 14 modules were manufactured; 12 modules for installation in the pilot plant plus two spares.Membrane module manufacture took place during August and September 1997 and assembly ofthe pilot plant was carried out between mid-September and mid-November 1997.

The feed tank system was designed by Elf Atochem engineers and construction was contractedout. The construction was carried out in five stages. Stage one was the preparation of the plantarea which involved creating a bunded area and concrete plinths for the tanks, heat exchangerand pilot plant. The second stage involved erecting steelwork for mounting the AlCl3 solutionphase separation/feed tank system. Installation of the tanks and heat exchanger constituted stagethree. Piping the new tanks and pilot plant into the existing process plant pipework was stagefour. The final stage was to provide service utilities to the pilot plant (low pressure steam,electricity, air and water). This work was carried out from September to December 1997.

3.3 STAGE 3 - INSTALLATION AND COMMISSIONING

Following construction, commissioning of the AlCl3 solution feed system and pressure testing ofthe process pipework was completed in mid-December 1997.

3.3.1 Hydraulic commissioning

Connection of the utilities and electricity to the pilot plant was completed during mid-lateNovember 1997. This was followed by a period of hydraulic (water) commissioning during lateNovember/early December 1997. The aim of this was to ensure that all parts of the pilot plantoperated satisfactorily and were correctly calibrated prior to commissioning the plant with AlCl3solution and micro-organisms. No major problems were encountered and it was completed bythe second week of December.

3.3.2 AlCl3 commissioning

The bioreactor was inoculated with benzene/toluene-degrading micro-organisms from existingEMB pilot plants three weeks before commissioning started with the AlCl3 solution. During thisperiod the bacteria were acclimatised to the operating conditions of the bioreactor (30°C, pH 7)and were maintained on benzene/toluene. Rapid bacterial growth was noted within two days ofinoculation.

9

Page 15: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

Treatment of the AlCl3 solution started on 16 December, and the plant was run for over 130 hoursto provide commissioning data. During this period, the plant treated over 20 tonnes of AlCl3solution (approximately 3 tonnes/day). Samples of the AlCl3 solution entering and leaving thepilot plant were taken daily and analysed for the presence of benzene and benzophenone(reactant/solvent and product of the acylation reaction), and samples of the biomedium weretaken for chemical oxygen demand (COD) analysis. These results are shown in Figs 5, 6 and 7.

10

Fig 5 Benzene concentrations in the AlCl3 solution entering and leaving the ATOMET pilot plant during the commissioning period

160

140

120

100

80

60

40

20

0 20 40 60 80 100 120 140Time (hours)

Ben

zen

e co

nce

ntr

atio

n (

mg

/litr

e)

Inlet

Outlet

Fig 6 Benzophenone concentrations in the AlCl3 solution entering and leaving theATOMET pilot plant during the commissioning period

40

35

30

25

20

15

10

5

0 20 40 60 80 100 120 140Time (hours)

Ben

zop

hen

on

e co

nce

ntr

atio

n (

mg

/litr

e)

Inlet

Outlet

Page 16: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

Throughout the commissioning period the benzene concentration in the AlCl3 solution leavingthe pilot plant was below the detection limit of the analysis (Fig 5), which suggests that removalefficiencies in excess of 99.9% (with respect to benzene) were achieved. Also, the variation inthe inlet concentration of benzene did not appear to have any effect on the removal efficiency.Significant amounts of benzophenone were also removed from the AlCl3 solution (Fig 6); below10 mg/litre benzophenone at the inlet, the outlet concentration was below the detection limit, andwhen the inlet concentration peaked at 36 mg/litre a removal efficiency of 90% was stillachieved.

The relatively low COD concentration in the biomedium of approximately 200 mg/litre (Fig 7)suggests that the biomass yield (per kg benzene) is low and that conversion of benzene to carbondioxide is high. This means that the biomedium overflow does not constitute a significantsecondary waste stream.

Overall, the results obtained during the commissioning period were promising. They showedthat by using the EMB system it is possible to reduce the concentration of dissolved toxicorganics in the AlCl3 solution to less than 1 mg/litre. This allows the solution to be recoveredwithout generating any secondary pollution. The pilot plant operated successfully duringcommissioning without any major problems occurring.

3.4 STAGE 4 - OPERATION

After the commissioning period (Phase I), the pilot plant was mothballed for a month while theoperational results were reviewed with the Environmental Technology Best Practice Programme.When Phase II began, one month later, the pilot plant was re-tested and it was found that severalof the membrane modules had developed leaks. By ‘sacrificing’ two modules it was found thatthe membrane tubes had been severely corroded.

11

Fig 7 COD concentrations in the biomedium during the commissioning period

250

200

150

100

50

0 20 40 60 80 100 120 140Time (hours)

CO

D c

on

cen

trat

ion

in b

iom

ediu

m (

mg

/litr

e)

Page 17: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

Laboratory trials prior to the ATOMET project had not revealed any such problems, yet thechemical attack on the silicone rubber membrane material was severe and of a type notpreviously seen by MET. The attack by the AlCl3 solution resulted in the presence of discreteblisters on the membrane surface, which weakened the membrane (as measured by the tube’sburst pressure) and small pinhole leaks were seen.

In an attempt to replicate this damage in the laboratory, a number of trials were carried out. Itwas subsequently found that the chemical attack was promoted by compounds containingcarbon-oxygen double bonds (particularly benzoyl chloride, one of the reactants), and this wasalso reproduced in experiments carried out in Elf Atochem’s development laboratory. It ishypothesised that an AlCl3-benzophenone complex, formed as part of the reaction, remains stableduring quenching and is present in the solution to be treated.

This complex is sufficiently hydrophobic that it can permeate into the membrane and hydrolysewithin the membrane itself. This liberates hydrochloric acid, which breaks down the siliconerubber. Such a complex would have a finite half-life (possibly a few hours or less), which mayexplain why the chemical attack was not observed in the original laboratory trials. Thus, areplacement membrane material had to be located.

A review of the literature provided a list of elastomers that are resistant to AlCl3 solutions (egViton, EPDM (ethylene-propylene-diene monomer), nitrile rubber)7. Any of these materials maymake suitable membranes, however testing was carried out on EPDM as it is readily availablecommercially in tubular form and it is known in the literature to be selective for aromatichydrocarbons8.

Material compatibility tests on EPDM were carried out in parallel with determining the cause ofthe silicone rubber corrosion. These tests showed that there was no change in burst pressure ofEPDM tubing under conditions which corroded the silicone rubber tubing (it could not be burstat >6 bar - the maximum pressure of the compressed air system). These tests suggested thatEPDM is significantly more chemically resistant than silicone rubber and should stand up to theoperating conditions of the pilot plant. Measurement of mass transfer through the EPDM tubingin a measurement cell showed good correlation with theoretical predictions with values up to 4.5 x 10-6 m/s obtained for benzene at Reynolds numbers comparable with pilot plant operation.This is greater than the mass transfer coefficient used as a basis for pilot plant design. Prior toinstalling EPDM membrane modules in the pilot plant, tests with both benzene-containing andtoluene-containing AlCl3 solutions were carried out using a laboratory-scale shell and tubemembrane module (nominal 1 inch, as opposed to 2 inches at pilot plant scale). An average masstransfer coefficient (based on inlet and outlet concentrations from the module at a specific pointin time) of 2.5 x 10-6 m/s was obtained, see Fig 8.

12

7 Chemical Resistance Guide for Elastomers II, Compass Publications, (1994).8 Boom J P, Punt I G M, Zwijnenberg H, deBoer R, Bargeman D, Smolders C A, Strathmann H (1998), Transport Through

Zeolite Filled Polymeric Membranes, J Membr Sci, 138(2), pp 237 - 258.

Page 18: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

On the basis of these results in the laboratory, four of the pilot plant membrane modules wererebuilt with EPDM tubing. Using EPDM membranes required a change in the modulemanufacturing process which reduced the available membrane area by 25%. These modules wereoperated on the pilot plant for six weeks with both benzene-containing and toluene-containingAlCl3 solutions provided from 800-litre intermediate bulk containers. There was no sign ofmembrane degradation. Fig 9 shows the results obtained over this period expressed as masstransfer coefficients. As can be seen, the results are consistent with those obtained in thelaboratory (Fig 8).

13

Fig 8 Mass transfer data from laboratory-scale EPDM membrane module

0.00003

0.000025

0.00002

0.000015

0.00001

0.000005

0 200 400 600 800 1 000 1 200

Time into laboratory trials (hours from 9:00 7/3/98)

Mas

s tr

ansf

er c

oef

fici

ent

(m/s

)Benzene

Toluene

Fig 9 Mass transfer data from pilot-scale EPDM membrane module

0.00003

0.000025

0.00002

0.000015

0.00001

0.000005

0 200 400 600 800 1 000 1 200

Time into field trials (hours from 10:30 12/3/98)

Mas

s tr

ansf

er c

oef

fici

ent

(m/s

)

Benzene

Toluene

Page 19: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

It was observed with these EPDM modules that the pressure drop/module on the pilot plant waslow, <0.1 bar/module, compared to 0.6 bar/module in the laboratory. The original silicone rubbermodules averaged a 1 bar/module pressure drop. The difference in pressure drop suggested thatthe AlCl3 flow in the pilot plant modules was channelling and by-passing the membrane surface.So, to achieve the design mass transfer coefficient (3 x 10-6 m/s), the flow through the membraneshell was modified by inserting inert packing inside the module shell. This reduces the flow area,so increasing the fluid velocity over the membrane tubes, which increases the mass transfercoefficient but also increases the module pressure drop. In early May 1998, six improved EPDMmodules were installed in series with the original silicone rubber membrane modules andperformance was compared.

Installation of the improved design modules allowed organic-free AlCl3 solution to be generatedfrom benzophenone- and p-chlorobenzophenone-derived AlCl3 solutions by a single passthrough the membranes. During May, material was processed and stored for use in customertrials. The process was operated at 30 litres/hour for 10 days (~245 hours), at 80 litres/hour for5.5 days (~130 hours) and at ~200 litres/hour for 2 days (~50 hours) until production of the AlCl3solution stopped. The data obtained during this period is summarised in Figs 10 and 11 forbenzene and benzophenone respectively. During this period p-chlorobenzophenone was alsoproduced, which did not affect the bacteria as no accumulation in the biomedium was observed.

14

Fig 10 Data for benzene removal during May 1998

250

200

150

100

50

0 50 100 150 200 250 300 350 400 450

Time (hours)

30 litres/hour 80 litres/hour200

litres/hour

Ben

zen

e co

nce

ntr

atio

n/b

enze

ne

rem

ova

l

Inlet (mg/litre)

Outlet (mg/litre)

% removal

Page 20: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

During June 1998 there was no production of AlCl3 solution and the pilot plant and membranemodules were modified in preparation for restarting the AlCl3 solution treatment. The plant wasstarted up on 10 July (t=0 hours). Due to the nature of the production process, variations insolution strength, density, viscosity, organic contaminant concentrations and solids content haveoccurred, and brief production shutdowns occurred in mid-July and mid-August. Graphssummarising the data gathered during July and August 1998 are shown in Figs 12, 13, 14 and 15.

15

Fig 11 Data for benzophenone removal during May 1998

125

100

75

50

25

0 50 100 150 200 250 300 350 400 450

Time (hours)

30 litres/hour 80 litres/hour200

litres/hour

Ben

zop

hen

on

e co

nce

ntr

atio

n/b

enzo

ph

eno

ne

rem

ova

l

Inlet (mg/litre)

Outlet (mg/litre)

% removal

Fig 12 Benzene concentrations during July/August 1998

300

250

200

150

100

50

0 200 400 600 800 1 000 1 200

Time (hours)

Ben

zen

e co

nce

ntr

atio

n (

mg

/litr

e)

Inlet

Outlet

Page 21: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

16

Fig 13 Removal efficiency for benzene during July/August 1998

100

90

80

70

60

50

40

30

20

10

0 200 400 600 800 1 000 1 200

Time (hours)

% B

enze

ne

rem

ove

d

Fig 14 Benzophenone concentrations during July/August 1998

140

120

100

80

60

40

20

0 200 400 600 800 1 000 1 200

Time (hours)

Ben

zop

hen

on

e co

nce

ntr

atio

n (

mg

/litr

e)

Inlet

Outlet

Page 22: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

The benzene inlet concentration was variable, with concentration peaks in excess of 250 mg/litre and an average inlet of concentration of ~180 mg/litre. Despite this, the outletconcentration averaged 2 - 3 mg/litre (high of 5.6 and low of <0.1 mg/litre). The exceptions tothis occurred during start-up, when the biomass in the system was building up and minor changesto the operation of the plant were being made, and when solids (crystalline aluminium chloride,benzoic acid (reaction side-product) and/or benzophenone) were present in the solution flowingthrough the system. It is hypothesised that the solids ‘trap’ benzene such that it cannot readilydissolve in the AlCl3 solution and hence is not extracted through the membrane. Apart from theseperiods, the percentage of benzene removed has been consistently high - in the range 97 - 99.5%, averaging 98+%. By the end of the project, further modifications to the pilot plantallowed 99.9% removal of benzene to be achieved consistently.

The inlet concentration of benzophenone is also variable; inlet concentrations between 2 - 120 mg/litre were measured. However, the concentration is typically 20 - 30 mg/litre. Duringthis period an average benzophenone removal of 70 - 80% was recorded, and typical outletconcentrations of 5 - 10 mg/litre were measured (high of 130 mg/litre and low of 0.5 mg/litre).The large variation in concentrations is reflected in the percentage removal, which showssignificant scatter around a mean of ~75% removal.

Benzophenone is difficult to treat consistently, as it appears that small variations in theproduction process allow varying amounts of both dissolved and solid benzophenone to enter thepilot plant. Dissolved benzophenone is readily extracted, however, due to the nature ofbenzophenone (it crystallises at 50°C and is highly hydrophobic) it dissolves extremely slowlyfrom its solid form and can pass through the system before it is extracted.

17

Fig 15 Removal efficiency for benzophenone during July/August 1998

100

90

80

70

60

50

40

30

20

10

0 200 400 600 800 1 000 1 200

Time (hours)

% B

enzo

ph

eno

ne

rem

ove

d

Page 23: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

4 TECHNICAL EVALUATION OF THE PROJECT

Throughout the period May to October 1998, the ATOMET pilot plant generated clean AlCl3solution. The benzene concentration in this material was reduced by over 98%, and removals of99.9% were achieved consistently by the end of the project.

Since the problems with the silicone rubber membrane have been overcome, no problems havebeen observed with the EPDM membranes despite the corrosive nature of the AlCl3 solution andthe presence of the organic compounds. Since the EPDM membranes were installed in May 1998, test samples of the membrane tubes have been periodically removed and tested. Aftersix months there is no loss of strength of the material (as measured by burst pressure).

During the project, products based on the solvents benzene and toluene and the acid halidesbenzoyl chloride and 4-chlorobenzoyl chloride have been made. The switch from one productto another has not affected the EMB system. Observations of the removal of benzene/tolueneand the biological performance suggest that the micro-organisms coped with these changes. Inthe laboratory, micro-organisms have been enriched to biodegrade 1,3-dichlorobenzene, the onesolvent not used during the project.

Process plant at Elf Atochem’s Widnes site

18

Page 24: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

5 ENVIRONMENTAL AND ECONOMIC BENEFITS OF THEPROJECT

The number of direct alternatives to EMB technology for recovering AlCl3 solutions is limited.For example, the relatively low level of organic contaminants and high inorganic content makesit uneconomic to incinerate the material. The state-of-the-art treatment technologies for cleaningthis type of material are steam stripping and carbon adsorption. Also, carbon adsorption is awell-established technology for polishing gas or liquid streams. It is either installed as aregenerative system or used as ‘disposable’ containers.

5.1 ENVIRONMENTAL BENEFITS

A major advantage of the EMB technology over the alternatives is that it eliminates the organiccompounds at source rather than concentrating them. The use of micro-organisms to biodegradethe contaminants means that harmless materials such as carbon dioxide, water, chloride ion andmore bacteria are generated from the toxic contaminants.

Both steam stripping and carbon adsorption work on the principle of concentrating the pollutantto provide smaller volumes of material for disposal. In both cases, residues are generated thatrequire additional treatment or disposal: condensate contaminated with organics is generatedthrough steam stripping, and carbon adsorption generates saturated carbon which has to bedisposed of or cleaned (which in turn generates more waste). The amount of toxic wastesgenerated by each of these technologies, as well as waste generated by disposal, is summarisedin Table 3.

Table 3 Environmental burden of AlCl3 disposal and recovery options

1 Data calculated from pilot plant operation.2 Depends on volume of condensate generated and how this is treated.3 Based on steam consumption.4 Assumes at saturation 100 g of benzene adsorbs on 1 kg of carbon.5 Assumes carbon can be regenerated 10 times before it must be disposed of.6 Includes energy consumption and secondary waste generation associated with off-site disposal/regeneration of

carbon.7 Assumes fluid pumped through bed with 2 kW pump.

19

Option Toxic waste generated Energy consumed(kg/m3 AlCl 3 solution) (MJ/m3 AlCl 3 solution)

Off-site disposal 1 300 -

EMB 0 401

Steam stripping 0 - 102 7563

Carbon adsorption (regenerative) 0.54,5 963

Carbon adsorption (container)6 54 507

Page 25: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

Another major contributor to the environmental burden of the technologies is the amount ofenergy consumed by the treatment process. In the case of the EMB, the energy consumed is inthe form of electricity for pumps and steam to heat the bioreactor. The majority of the energyconsumed by regenerative carbon adsorption is in the form of steam to recover the used carbon.Steam stripping requires large quantities of steam to heat the AlCl3 solution to drive off thevolatile organics. The energy required for carbon containers includes the energy to manufactureand dispose of the carbon as well as the energy to pump the solution through them. These valuesare summarised in Table 3.

A more precise picture of the environmental burden would be provided by performing a Life-Cycle Analysis on each technology, which is beyond the scope of this project. Nevertheless, thevalues outlined in Table 3 provide a crude analysis of the environmental burden. As can be seenin the Table, the energy requirement of the EMB system is low, comparable with activated carbonadsorption and much less than steam stripping. In addition, because the toxic contaminants arebiodegraded in the EMB there are no secondary toxic wastes generated. All the other treatmenttechnologies and off-site disposal generate significant secondary wastes. Thus, on the basis ofthis analysis the EMB offers significant environmental benefits over the state-of-the-arttechnologies.

5.2 ECONOMIC ANALYSIS OF THE PROJECT

The pre-project base case was disposal of 3 000 tonnes/year of contaminated AlCl3 solution viaa licensed waste disposal outlet at a cost of £50/tonne.

Table 4 summarises the cost comparison between EMB and alternative treatments for recoveryor disposal of AlCl3 solution. In Table 4 the disposal costs have been calculated for 3 500tonnes/year (compared with the 3 000 tonnes/year of the pre-project base case) to reflect thesubsequent developments.

Table 4 assumes 30% AlCl3 solution containing 180 g/m3 benzene and 20 g/m3 other organicsand assumes that the basic infrastructure in terms of pipework, storage tanks, etc for all thetechnologies is the same. All the assumptions made in Table 3 remain the same.

Steam stripping is a well-established technology which works well for volatile solvents.However, the elevated temperatures and highly corrosive nature of the AlCl3 solution mean thatlined or exotic materials such as hastelloy and titanium alloys have to be used for construction.This requires a large premium in capital investment (see Table 4).

Carbon adsorption can be implemented either in the form of a regenerative system, or as‘disposable’ containers. The regenerative system requires installation of fixed adsorption bedswhere the carbon is used and once saturated is recovered in situ. The container system requiresminimal plant items to be installed, as the containers are replaced as a whole once they are usedup. The regenerative system has a much lower usage of carbon, as it is re-used many timesbefore being replaced. Thus, the capital cost of a container system is minimal compared with aregenerative system (it requires some civil work but no major plant items). The operating costof a regenerative system may be much higher as it requires high pressure steam (see Table 4).

20

Page 26: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

Table 4 Summary of cost comparison for disposal options

1 Imminent European legislation will limit or remove the landfill option.2 Data provided by equipment vendors or service suppliers.3 Operating costs are £1 500 for nutrients, £4 000 for membranes and £4 500 for utilities.4 In Elf Atochem’s case the costs of using a carbon adsorption (regenerative) system would be high because of the

need for high pressure steam, which is not generated as a by-product at the site.5 Estimated as cost of concrete plinth, bund wall, pipework and pump.6 Includes carbon canisters at £3 000/tonne (data provided by carbon suppliers), estimated rental fee and cranage

and transportation of saturated beds.7 The operating cost of the carbon adsorption (container) system for Elf Atochem is particularly low because of the

type of contaminants and their concentration. In other situations costs could easily rise to £250 000/year.8 Assumes capital cost charged out over five years.

In addition, there are considerable technical unknowns with activated carbon which makeeconomic analysis difficult. For this comparison, a saturation adsorption of 100 g organiccompounds per kg carbon has been assumed (this is consistent with data obtained in MET’slaboratory). However, it is known that competitive adsorption of organic matter and poreblockage can occur in practice, which reduces adsorption efficiency9,10 and increases thefrequency with which beds must be changed. Another factor which is difficult to predict,therefore, is the pressure drop through the carbon beds and the likelihood of the beds becomingblocked. Many hazardous wastes contain fine solids (organic or inorganic) which can lodge inthe carbon beds increasing the pressure drop and ultimately blocking them. To counteract this,filtration equipment can be installed (though this is expensive for removing fine solids), or ahigher than predicted turnover of beds can be accepted. Such costs are not included in Table 4.

Given the cost of disposing of the material to landfill, considerable cost savings can be made bytreating the solution, even allowing for the capital cost of each technology (see annualised costcolumn in Table 4). From Table 4 it is clear that the most cost-effective solution is the EMB.Carbon containers are the next most cost-effective. The cost of activated carbon is also muchmore sensitive to process variations than the EMB, eg if a process upset occurs and solid materialenters the EMB it passes through the system without causing any major damage, however, thesame material may block a carbon bed making it unusable and hence needing replacement.

During the course of this project, Elf Atochem has confirmed that there is indeed a market forrecovered AlCl3 solutions. The market value is dependent on the solution specification and onthe end use. Therefore, the economic benefit is £50/tonne (avoided disposal costs) plus themargin from the sale of the purified solution (after costs of treatment).

21

Option Capital cost Operating cost Annualised cost8

(£000) (£000/year) (£000/year)

Off-site disposal1 - 1932 193

EMB 60 103 22

Steam stripping 4002 132 93

Carbon adsorption 6002 1002,4 220(regenerative)

Carbon adsorption 155 276,7 30(container)

9 Sorial, G A, Cerminara, P, Papadimas, S P, Suidan, M T and Speth, T F (1994), Competitive Adsorption of VOCs, JournalAWWA, 86(3), pp 80 - 90.

10 Snoeyink, V LAdsorption of Organic Compoundsin Water Quality and Treatment, ed Pontius F W, pp 781 - 875, McGraw-Hill Inc, 1990.

Page 27: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

6 CONCLUSIONS

The key conclusions of the ATOMET project are that:

■ the EMB has proved to be a reliable, easy-to-use, low maintenance technology;

■ EPDM membranes are compatible with the AlCl3 solution and show no signs of chemicalattack after more than six months’ service;

■ the EMB can cope with large changes in inlet conditions (ie organic and inorganic content,flow rate and solids) which do not significantly affect the process performance;

■ benzene removal efficiencies of 99% can be readily obtained with 25% less membrane areathan originally designed;

■ the use of micro-organisms to biodegrade the contaminants results in negligible dischargesof organic pollutants;

■ by the end of the project, 99.9% benzene removal was achieved consistently;

■ the EMB has a lower overall environmental burden than its rival technologies;

■ the EMB is more cost-effective than alternative technologies.

22

Further help and advice is available from the Environment and Energy Helpline (0800585794) which can:

■ Send you copies of relevant Environmental Technology Best Practice Programmepublications.

■ Tell you about environmental and other regulations that could affect your operations.

■ Provide free advice and up-to-date information on environmental and energy issues,equipment suppliers and technologies.

■ Arrange for a specialist to contact your company if you employ fewer than 250 people,at the discretion of the Helpline Manager.

Page 28: ENVIRONMENTAL TECHNOLOGY BEST PRACTICE …benzophenone and substituted benzophenones (UV curing, sunblocks); isobutylacetophenone (intermediate in Ibuprofen synthesis); 2’,4’-dichloroacetophenone

The Environmental Technology Best Practice Programme is a joint Department of Trade and Industry

and Department of the Environment, Transport and the Regions programme. It is managed by

AEA Technology plc through ETSU and the National Environmental Technology Centre.

The Programme offers free advice and information for UK businesses and promotes

environmental practices that:

■ increase profits for UK industry and commerce;

■ reduce waste and pollution at source.

To find out more about the Programme please call the Environment and Energy Helpline on

freephone 0800 585794. As well as giving information about the Programme, the Helpline has

access to a wide range of environmental information. It offers free advice to UK businesses on

technical matters, environmental legislation, conferences and promotional seminars. For smaller

companies, a free counselling service may be offered at the discretion of the Helpline Manager.

FOR FURTHER INFORMATION, PLEASE CONTACT THE ENVIRONMENT AND ENERGY HELPLINE

0800 585794world wide web: http://www.etsu.com/etbpp/

e-mail address: [email protected]