    MUNDA DAM MULTIPURPOSE PROJECT

    LOCATION

    This project is proposed to be constructedon Swat River about 5 Km upstream ofMunda Head Works in Mohmand Agency(FATA), KHYBER PAKHTOONKHWA.

    OBJECTIVES

    i. Power Generationii. Flood Controliii. Irrigation

    KABU

    LRIVER

    CANAL

    KABULRIV

    ER

    PESHAWAR

    BARA

    TARU

    JABBA

    RIVER

    PABBI

    KABULRIVER

    CHARSADDA

    RIVER

    NOWSHERA

    TOISLAMABAD

    RISALPUR

    CANTONMENT

    UTMANZAI

    SHERPAO

    MUNDA DAM SITE

    PINJK

    OR

    A

    RIVE

    R

    MALAK

    AND

    CHAKDARA

    SWATRIVER

    SWATCANAL

    UPPER

    SWATRIVER

    LOWERSWAT CANAL

    AMBAHARRIVER

    NAGUMAN RIVER

    ABAZA

    IRIVER

    DOABACAN

    AL

    LeftBank

    Comman

    dArea

    RIGH

    TB

    ANK

    COMMAND

    AREA

    SHAHALAM

    A

    DEZAIRIVER

    SHABQADAR

    KHIALIRIVER

    N

    MUNDA DAM PROJECT

    SALIENT FEATURES

    Type of Dam Concrete Faced Rock fill Dam

    Height of Dam 698.820 Ft.

    Gross Storage 1.290 MAF

    Live Storage 0.676 MAF

    Dead Storage 0.314 MAF

    Flood Storage 0.081 MAF

    Power Houses Installed Capacity (Peak) 740 MW (Annual Energy 2407 GWh)Right Bank Culturable Command Area 15098 Acres

    Left Bank Culturable Command Area 10057 Acres

    Project Cost (Year 2000) Rs 57.450 Billion (US$ 1149 Million)

    Construction Period 7 Years

    PRESENT STATUS

    Feasibility completed in March 2000.

    Revised PC-II for developing the Feasibility Studies/Detailed Engineering Designamounting to Rs.652.000 million cleared for approval of ECNEC by CDWP in itsmeeting held on October 11, 2008.

    RFP documents for invitation of technical & financial proposals of consultants

  • 8/3/2019 EOIMunda

    2/12

    C:\Documents and Settings\Babar\Desktop\EOI Munda_NEW.doc

  • 8/3/2019 EOIMunda

    3/12

    Munda Dam Project Expression of Interest (EOI)

    MUNDA DAM PROJECT

    IMPORTANT INFORMATION

    1. Introduction

    Pakistan Water and Power Development Authority (WAPDA) intends to hire the

    services of Consultants for Detailed Engineering Design and Praperation of

    Tender Documents for Munda Dam Project.

    2. Objectives

    The project aims at:

    Irrigated agriculture development of 6,853 ha (16940 Acres),

    Hydropower Installed Capacity 740 MW (Annual Energy 2407 GWh).

    Flood Control.

    3. Location

    Munda Dam site is located on Swat River, about 5 km upstream of existing Munda

    Headworks at Abazai near Shabqadar Deri and 37 km north of Peshawar in

    Khyber Pakhtoonkhaw province. The dam site is situated approximately at

    coordinates 34o 21 N and 71o 32 E.

    Figure-1 shows project location map.

    4. Catchment Area

    The total catchment area of the Swat River basin is 13,650 km2 at the proposed

    dam site, lying between latitudes 34020 N to 35056 N longitudes 71020 E to

    72050E and is about 137 km long and 110 km wide. The proposed Munda

    Reservoir is extended from south to north in a steep gorge of the Swat River.

    The Munda Dam site is situated at the downstream end of the mountainous

    area of the Swat basin, from which the valley widens forming a fn configuration.

    5. Geology

    Bedrock of the Munda Dam site is proposed mainly of crystalline schist, party

  • 8/3/2019 EOIMunda

    4/12

    Munda Dam Project Expression of Interest (EOI)

    Soil cover is very limited and the bedrock, apparently not seriously weathered,

    is widely exposed. The rock in the surface zone, however, is slacked and show

    high water permeability in borehole water test. The foundation has a general

    condition that the seepage potential from 25 Lugeon unit up to higher values

    over 100 prevails in the zone from zero to 15 m of depth and the medium

    seepage not exceeding 25 Lugeon unit in the zone from 15 m to 35. Deeper

    than 35 m, the Lugeon values are not more than 5, in the upper part of the

    slope for the dam abutment, the slacking of the bedrock deepens, and the

    topographic and geologic conditions are poor and less stable in the higher part

    above elevation 560 m, the thin limestone layers intercalated in the schist near

    the dam site, which strike at nearly right angle to the river channel and are notdeeply karstified, will not cause visible under seepage.

    The reservoir area stretches to the area of Permian to Cretaceous metamorphic

    rocks with variety of crystalline schists and granite or granitic gneiss. Limestone

    is also included in those strata with signs of karst solution at places. The

    karstification or the formation of cavities in the limestone is limited within the

    depth of several tens of meters as was seen in the drilling of the Sapparelimestone or within a reach of underground circulation of the rain water with

    carbon dioxide. As seepage water would have to travel far, there is no

    possibility of substantial water loss occurs from the reservoir. Slopes are

    generally stable and no large land slide is envisaged.

    6. Seismicity

    The Project area is located in a high tectonic zone of the Himalayan foothillsand between two major thrust faults. The seismic risk was estimated form the

    earthquake record of 2,259 events obtained from an international earthquake

    data of USGS. For dam design, a design earthquake acceleration of 0.15g is

    proposed.

    7. Project Components

    The feasibility study of the project was prepared with the technical assistance of

    JICA in March 2000. According to the study, the project comprises the following

    components.

    12 1 Main Dam

  • 8/3/2019 EOIMunda

    5/12

    Munda Dam Project Expression of Interest (EOI)

    12.2. River Diversion and River Outlet

    The tunnel type river diversion was designed considering the topography with

    steep abutments. At least two river diversion tunnels are required so that the

    river outlet facilities can be installed on one of the tunnels while the other

    tunnel continues to divert the river flow. The diversion tunnels are 12 m in

    diameter, and 975 m and 964 m long, respectively, both being laid out on the

    left bank.

    The river outlet facilities constructed in the left diversion tunnel will function to

    release river water downstream for meeting irrigation and other waterrequirement during reservoir impounding as well as to release reservoir water

    to draw down the water level in an emergency case. The river outlet has a

    morning glory type intake, a shaft of 4.5 m diameter and 100 m long, and 2

    sets of gates.

    12.3. Spillway

    The combined type spillway consisting of gated spillway and non-gated weir

    was laid out on the left abutment to suit the topography. The designed

    spillway has 4 sets of gates, each being 15.5 m wide and 18.4 m high, with a

    80 m long non-gated overflow weir accompanied with a 60 m wide chuteway,

    a flip bucket, and a plunge pool.

    12.4. Waterway and Power House

    A power intake, an intake gate shaft, a headrace tunnel, a surge tank,

    penstock tunnels, open penstock, a surface type powerhouse, and an open

    switchyard were laid out on the right abutment. The powerhouse will be of

    conventional surface type, and constructed on the right bank of the narrow

    gorge of Swat River.

    The headrace tunnel diameter was set at 12 m and penstock diameter at 7.4

    m based on the optimization study. The restricted orifice type surge tank was

    designed, of which the upper and lower chamber diameters are 25 m and 15

    m, respectively.

    12.5. Re-regulation Weir

  • 8/3/2019 EOIMunda

    6/12

    Munda Dam Project Expression of Interest (EOI)

    The maximum water level in the normal condition and flood water level were

    estimated to be EL.381.8 m and EL.372.2 m, respectively.

    12.6. Power Station Facilities

    The Munda power station is planned as a peaking station with daily peak

    duration of 4 hours. The total available output of the power station from the

    operating water head (162.5 m) and discharge (505 m3/sec) is 740 MW. The

    power station will be provided with four 185 MW units of water turbine

    generators.

    12.7. Transmission System

    A 220 KV double-circuit transmission line, about 35 km long with 2-bundled

    rail conductors (494 MCM) will be required between the outdoor switchyard

    and the planned New Shahi Bagh substation (main substation for supply to

    Peshawar) to connect with the 220 KV network in the area. The New Shahi

    Bagh substation needs to be designed taking into account receiving of 740

    MW Munda power.

    12.8. Irrigation Facilities

    Irrigation facilities for the Project were designed as a newly established

    system. Layout of the irrigation system would be taken into consideration the

    deployment of beneficial farm lands and location of rivers and water courses

    so as to apply proposed on-farm development system. A tunnel system at theleft bank area and a lifting system with pump at the right bank area are

    selected for the feeder system.

    12.9. Environmental Assessment

    An Environmental Impact Assessment (EIA) was carried out for the project,

    which identified the possible impacts, and proposed mitigation measures, with

    the objective to maximize the benefits and minimize the undesirable impacts

    on the environment and the surrounding local community. In the feasibility

    report 2000, it was concluded that overall the Project is not going to have any

    major negative environmental impacts.

  • 8/3/2019 EOIMunda

    7/12

    Munda Dam Project Expression of Interest (EOI)

    Clean Development Mechanism (CDM) projects. An Operational Strategy has

    been developed to fulfill the requirements of establishing a Designated

    National Authority (DNA) and ensuring transparent, participatory and effective

    management of CDM process in the country.

    Carbon Credits are applicable in certain cases of hydropower projects, where

    a demonstrable reduction in greenhouse gas emissions can be claimed as a

    result of the Project.

    In order to qualify, a project has to cross a number of barriers; in particular by

    providing additionally i.e. measure of the benefits that the project brings thatwould not have been available in its absence and quantifying the benefits in

    terms of avoided emissions. Once credits are confirmed, it is necessary to

    trade them through one of the Carbon Funds to convert them into a hard

    currency revenue stream from the start of the commercial operations.

    9. Salient Features of the Project

    The Salient Features as proposed in the feasibility studies prepared by JICA

    are presented below:-

    Description Feasibility Study by JICA

    Dam height 213 m

    Dam Type Concrete Face RockfillMax. Conservation level 555 m

    Min. Conservation level 510 m

    Tail water level 369 m

    Mean annual flow 206 m3/s or 5.27 MAF

    Gross storage 1.29 MAF

    Live storage 0.67 MAF

    Flood discharge 19390 m3/s

    Free board 8 m (555 m to 563 m)

    3

  • 8/3/2019 EOIMunda

    8/12

    Munda Dam Project Expression of Interest (EOI)

    Description Feasibility Study by JICA

    Power 740 MW

    Annual energy 2407 GWh

    Transmission Line 220 kV, 30 km long

    Base Cost 888 Million US$

    Total Project Cost 1149 Million US$

    10. Mode of Implementation

    The study will be implemented through Chief Engineer, Planning and

    Investigation (P&I) under the administrative control of General Manager (P&D).

    11. Duration of Consultancy Contract

    The estimated duration of consultancy services will be 24 months.

    12. Evaluation Criteria

    1. The Quality Based Selection Method (QBS) will be adopted for selection

    of Consultants.

    2. The expression of Interests (EOIs) are invited from local and foreign

    consultancy firms/ Joint Ventures/ local and foreign consultancy firmslead by reputed foreign firms registered with Pakistan Engineering

    Council for prequalification / short listing.

    The evaluation criterion for pre-qualification is as follows:

    Sr. No. Item %age

    1. Firms Experience

    a) Overall Experience 12%

    b) Experience of Projects of similar nature 18%

    Sub-Total -1 30%

    2. Key Professional

  • 8/3/2019 EOIMunda

    9/12

    Munda Dam Project Expression of Interest (EOI)

    12.2. The firms experience will be evaluated as given below:-

    Where Maximum Number of Project is fixed as 10

    Number of Projects Proposed Criteria

    1 50%

    2 75%

    3 85%

    4 95%

    5 100%

    12.3. The Key Personnel will be evaluated on the basis of the following detailed items

    of qualification as demonstrated in their C.Vs:-

    i) Academic Qualification 20 %Sub-Total i) 20 %

    ii) Professional Experience Specific 55% General 15%

    Sub-Total ii) 70%iii) Experience of working environment

    Nationally 6% Internationally 2% Specific Area within the Country 2%

    Which is based on the following:i. Specific Province 1.5%ii. Regional Language 0.5%

    Sub-Total iii) 10%

    13. Required Submissions by Firm/JVs

    1. Copies of registration of the Firm/Joint Venture with Pakistan Engineering

  • 8/3/2019 EOIMunda

    10/12

    Munda Dam Project Expression of Interest (EOI)

    5. Names and short CVs of Principals, Managing Directors, Partners and

    Directors (Annexure-A) including their individual PEC registration, if

    applicable alongwith updated renewal.

    6. Financial statement summary for the past three years.

    7. National Tax Number(s) of the Firms, if applicable.

    8. List of Key Personnel with disciplines relating to Design of mega dam/

    hydropower projects.

    9. List of other similar assignments undertaken by the Firm(s) during the last

    10 years (Annexure-B) with the following pertinent details:-

    i. Name of the Project(s)

    ii. Estimated cost(s)

    iii. Name and address of the Client(s)

    iv. Consultancy services rendered including duration

    v. Terms of reference (TOR) for consultancy services.

    vi. Cost of consultancy services (with % age share among the partners),

    if applicable.

    10. List of key technical personnel with qualification in permanent / regular

    employment of the Firm/Joint Venture, for the last one year.

    11. Total personnel strength of the staff of Firm/Joint Venture deployed on

    various projects during the last one year.

    12. Status of litigation / arbitration by the Firm(s) or by any member of the Joint

    Venture against the Client(s), if any.

  • 8/3/2019 EOIMunda

    11/12

    Munda Dam Project Expression of Interest (EOI)

    Annexure-A

    FORMAT OF SHORT CV OF PRINCIPAL STAFF

    1. Name :

    2. Profession/Expertise :

    3. Date of Birth :

    4. Years with the Firm :

    5. Nature of experience in this firm and others :

    6. Membership of Professional Societies :

    6. Education :

    8. Other Training

    9. Knowledge of Languages :

    10. Key Qualifications (Maximum of a page) :

  • 8/3/2019 EOIMunda

    12/12

    Munda Dam Project Expression of Interest (EOI)

    C:\Documents and Settings\Babar\Desktop\EOI Munda_NEW.doc

    Annexure-B

    MUNDA DAM PROJECT)SUMMARY LIST OF PROJECTS HANDLED BY THE FIRM

    Sr.No.

    Name of theProject

    LocationProvince/Country

    Client Cost ofthe

    Project

    ImplementationStart

    Completion

    Handled as: Single Firm/ : S Lead Firm/ : L Joint Venture :JPartner

    TotalCost of

    Services

    Cost ofServices

    provided bythe Firm

    Scope of Services Feasibility : F

    Survey &Investigation : S

    Quality Control : Q

    Project Monitoring: M

    O & M :O Design :D

    Procurement :P

    ConstructionSupervision :C

    Scope ofProject

    Components/Volume of

    Work etc.