Page 1: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

Quality System – What’s changing?

EPA Requirements for Quality Management PlansAnd

Quality Assurance Project Plans

Ray Terhune, QAS

Page 2: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

Why do we have A Quality Assurance System??

To increase the reliability of the data we use in environmental decision making

Page 3: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

What drives EPA’s Quality System?

Page 4: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

A quality system is the sum total of the policies and procedures that are developed and implemented to ensure that quality is built into programs and work products.

A quality system covers both policy and process.

What is currently built into this requirement for a Quality System??

Page 5: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

EPA Organizations

Non-EPA organizations funded by EPA including:

◦ Contractors (48 CFR 46 )

◦ Assistance agreement recipients (40 CFR 30, 31 and 35) ; and

◦ Other mechanisms, such as consent agreements in enforcement actions.

Who is covered by this order?

Page 6: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

1. Characterization of environmental or ecological systems and the health of populations

2. Direct measurement of environmental conditions or releases, including sample collection, analysis, evaluations and reporting of environmental data

Applicability to Environmental Programs

Page 7: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

3. The use of environmental data collected from other sources (“secondary data”), including literature, industry surveys, compilation of data from computerized databases and information systems, results from computerized models…

4. The collection and use of environmental data relating to occupational health and safety of personnel in EPA facilities..

Applicability to Environmental Programs (cont)

Page 8: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

The primary documents of a Quality System are:

• Quality Management Plan (QMP)

EPA QA/R-2: QA Requirements for Quality Management Plans

• Quality Assurance Project Plan(s) (QAPP) EPA QA/R-5: QA Requirements for Quality Assurance Project Plans

Page 9: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

“A quality management plan (QMP) documents how an organization structures its quality system and describes its quality policies and procedures, criteria for and areas of application, and roles, responsibilities, and authorities. It also describes an organization’s policies and procedures for implementing and assessing the effectiveness of the quality system”.

EPA Requirements for Quality Management Plans – EPA QA/R-2 (March 2001).

Quality Management Plan

Page 10: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

No - An EPA approved QMP is good for 5 years.

When the five years are up, the grantee or contractor must resubmit a QMP for a new round of review and approval by EPA.

Are QMPs Good Forever??

Page 11: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

A QAPP is a project-specific document that contains a detailed description of environmental data collection activities and operations, the problems associated with a site, the sampling and analysis requirements, the decisions to be made, and the necessary QA/QC activities governing this effort.

Quality Assurance Project Plan

Page 12: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

“The QMP may be viewed as the ‘umbrella’ document under which individual projects are conducted. The QMP is then supported by project-specific QAPPs. The QAPP is the ‘blueprint’ by which individual projects involving environmental data are implemented and assessed and how specific quality assurance (QA) and quality control (QC) activities will be applied during a particular project”.

So What’s the Difference??

Page 13: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

The development of a rigorous quality system enables an organization collecting environmental data to have a higher level of confidence in this data so that it will be of known and documented quality and usable for its intended purpose.

The quality system reflects the organizations commitment to quality management principles and practices, tailored, when appropriate, by senior management to meet the organization’s needs.

A robust Quality System is important

Page 14: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

What’s Changing?

Page 15: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

“The draft Quality Standard for Environmental Data Collection, Production and Use by Non-EPA (External) Organizations contains no new requirements”

Page 16: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

The external standard is intended to document the specific requirements for addressing the QA language found in 40 CFR 46, 40 CFR 31 and 40 CFR 35. These regulations apply to external organizations that conduct activities that are funded by EPA and include the collection, evaluation and use of environmental data.

Organizations are required to have a quality system that conforms to ANSI/ASQ E4; to submit a Quality Management Plan which describes their quality system; and to prepare a Quality Assurance Project Plan for environmental data projects.

To promote efficiencies and more consistent documentation, EPA consolidated the requirements found in CIO 2105.0, EPA QA/R-2: QA Requirements for Quality Management Plans and EPA QA/R-5: QA Requirements for Quality Assurance Project Plans in the external standard.

What are the high points?

Page 17: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

When finally implemented, the new Quality standard will replace EPA QA/R-2: QA Requirements for Quality Management Plans and EPA QA/R-5: QA Requirements for Quality Assurance Project Plans)

The draft Standards provide greater clarity about QA requirements for environmental data projects; addresses modeling activities, which were not specifically addressed in the previous EPA Order CIO 2105.0 and provides greater alignment with the EPA Quality Policy (CIO 2106.0) EPA Quality Policy CIO 2106.0 (http://www.epa.gov/irmpoli8/policies/21060.pdf)

Other points

Page 18: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

Scope:  When there is Environmental Data Collection, Production, or Use.

When environmental data is produced by or for EPA (funds or expectation of acceptance/use/putting Agency name on it)

When does this apply?

Page 19: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

Draft Quality Management Plan Handbook:

This draft Handbook document will assist organizations in the development of a Quality Management Plan (QMP) that addresses the requirements found in the draft standard and Annex A.

This draft Handbook contains a description of the QMP review and approval process, combined QMP/QA Project Plans, and the general guidelines for QMP content.

  Appendix A contains a crosswalk to the draft QA

standard and annex.

Associated documents

Page 20: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

Draft QA Project Plan Handbook: This draft Handbook will assist organizations in the development of a QA

Project Plan (QAPP) that addresses the requirements found in the draft standard and Annex B.

This draft Handbook contains three distinct chapters. Chapter 2 is for projects requiring the collection of new data; Chapter 3 is for projects making use of existing data; Chapter 4 is for projects involving modeling. Each chapter is self contained and may be used in conjunction with the Internal and External Standards.

Section E1 contains a crosswalk of the draft Handbook to the draft standards.

Section E3 contains a crosswalk of the draft Handbook to the current Guidance for Quality Assurance Project Plans (EPA QA/G-5).

 

Associated documents continued

Page 21: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

Grandfathering of existing quality documents is written into this..

Whoever approves your QAPP now will continue to approve them. (OEI will not be changing that process)

The graded approach to QAPPs will still be allowed. (Simpler QAPPs for simple projects, more complex QAPPs for more complex, expensive projects)

Will existing QMPs and QAPPs have to be redone to comply with this?

Page 22: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

No changes to the approval processes for either QAPPs or QMPs are anticipated.

Will it change the approval process?

Page 23: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

OEI is still addressing comments. Some areas that will probably change include:◦ statistical or economic analyses using

environmental data.. Likely will have major re-write

Is OEI finished addressing comments?

Page 24: EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS

Danny France, Region 4 Quality Assurance Manager

◦ 706-355-8738◦ [email protected]

Marilyn Maycock, Chief Quality Assurance Section◦ 706-355-8553◦ [email protected]

Daniel Garver, Air, Pesticide & Toxics Division, QC Coordinator◦ 404-652-9839◦ [email protected]

Ray Terhune, DMR-QA/ATP Coordinator Quality Assurance Section◦ 706-355-8557◦ [email protected]

Region 4 QA Contacts