epc 2.1 lembah kiara park

14
NAME: FELIX VONG ZHI WEI STUDENT ID: 0318462 LECTURER: MS. PERSIS DINEEN RODRIGUES SUBJECT: EFFECTIVE PUBLIC COMMUNUCATION (COM30103)

Upload: felix-vong

Post on 19-Jul-2015

43 views

Category:

Education


1 download

TRANSCRIPT

NAME: FELIX VONG ZHI WEI

STUDENT ID: 0318462

LECTURER: MS. PERSIS DINEEN RODRIGUES

SUBJECT: EFFECTIVE PUBLIC COMMUNUCATION

(COM30103)

• Recreational Park

• Area: 300 football fields

• Completed: 2007

• Petaling Jaya. (central hub)

• 10-15 minutes drive away from 1 Utama Shopping Mall.

Location

Design

• Natural Beauty (Fresh, Nature, Green)

• Activity & Creativity

• Lake

Material

Activities

Uncommon Facilities

• Length: 20 meters

• Material: rope & wood

• Connect to Moutain Kiara

Lembah Kiara Hanging Bridge

YEAR: 2007

The Transformation of Hanging Bridge

YEAR: 2010

The Transformation of Hanging Bridge

YEAR: 2014

REST ROOM

CONCLUSION

THE END

References

• http://www.themalaysianinsider.com/sidevi

ews/article/is-kiara-park-makeover-worth-

the-millions-spent-lim-chui-choo

• http://www.malaysia-traveller.com/lembah-

kiara-park.html

• http://www.meetup.com/KLhiking/events/9

8194722/