HERVE BARON © 2013 – Hervé Baron The execution of a Complex Project… A guided tour HERVE BARON

Upload: sanjeev

Post on 11-Nov-2015

79 views

Category:

Documents


17 download

TRANSCRIPT

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    The execution of a Complex Project

    A guided tour

    HERVE

    BARON

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    The actors

    The COMPANY

    Client The EPC Contractor

    The suppliers

    The sub-contractors

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Conceptual evaluation+ Pre-Project

    By COMPANY

    Basic EngineeringBy ENGINEERING

    Project Executionby EPC CONTRACTOR

    Sanction Sanction

    The phases

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nDesign Procurement Manufacturing Shipping

    Installation Construction & erectionInspection &

    testsHand-over

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nThe multiple sides of a Project

    Hu

    man

    Reso

    urces

    Man

    agem

    ent

    Project ControlPROJECT

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Engineering Sub-Contractor

    (India)

    Detail Engineering (part)

    Shipyard (Korea)

    Hull Engineering & Fabrication

    Shipyards (Singapore &

    Malaysia)

    Topsides Fabrication & Integration

    Home office (Paris)Project management

    Detail Engineering (part)

    Procurement

    Satellite office

    Detail Engineering (part)

    Fabrication yard (Nigeria):Fabrication (part)

    Offshore (Nigeria):Installation, commissioning, start-up

    The multiple sites of a Project

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process facilities:

    Feedstock and products flow

    Feedstock composition

    Battery limit conditions

    Equipment Spare

    Performance:

    Products specifications

    Energy efficiency, emissions

    Utilities:

    Electric power supply

    Other utilities

    Systems:

    Process control

    Fire/gas alarm

    Public address, LAN, PABX

    Infrastructure:

    Administrative and technical buildings

    Control room

    Access road

    Site fencing, gates, check point

    Design criteria:

    % of over design

    Environment data:

    Min/max temperature

    Rain/snow fall

    Wind

    Geological conditions

    Applicable codes and standards:

    International standards

    Local rules

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    -85 -80 -75 -70 -65 -60 -55 P

    r

    e

    s

    s

    u

    r

    e

    (

    b

    a

    r

    )

    The facilities design basis

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    EngineeringDocuments for Purchase:

    bill of quantity & specification

    Documents for Construction:

    Construction drawings & specifications

    Design basis:

    - Functional requirements

    - Client specifications

    - Design codes

    Engineeringin the Project

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProcess simulations

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nHeat & Material balance

    Thermodynamic calculations

    Process Flow Diagram (PFD)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nEquipment list

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Equipment duty

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process data sheet

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProcess Flow Diagram (PFD)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping & Instrumentation Diagram (P&ID)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping & Instrumentation Diagram (P&ID)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProcess control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nEmergency shut down

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nEmergency relief

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nOperating manual

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Rotating machinery

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPressure vessels

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Heat exchangers

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPackages,

    Fired Equipment

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process data sheet

    Mechanical data sheet

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nMaterial Requisition

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nFire fighting

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPassive fire protection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nFire & Gas detection layout

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Environmental Impact Assessment

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Equipment supporting structures

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping supporting structures (pipe-racks)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nStructural design

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Structural drawings

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Architectural drawings

    Equipment layout drawing

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Layout/

    principles

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nLayout/consideration for all networks

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    General Plot Plan

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping Layout drawing

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n3D modelling

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    3D model review

    3D model clash check

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping DesignANSI B31.8 (for gas pipelines and compressor stations)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping DesignANSI B31.8 (for gas pipelines and compressor stations)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nThickness (mm) Number of passes

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nIsometric drawing

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping Pre-fabrication

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Piping General Arrangement drawing

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nStandard Pipe Support drawings

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nMaterial Selection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nMaterial Specification

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Material Specification

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Instrument data sheet

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process Control System

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    System architecture drawing

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Mechanical Equipment Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    PT JB

    Process line

    Marshalling

    cabinet

    Controller

    cabinet

    Instrument room Control room

    VDU

    CPU

    LANSecondary cable

    Multi cable

    The instrumentation hardware

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Building detail drawing/

    Telecom and PAGA layout

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Cable routing drawings

    Cable list

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCable routing inside technical room

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering

    Instruments& Control

    Layout& Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Electrical consumer list

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Electrical Load Summary

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    General One Line Diagram

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Generators

    Switchgear

    Transformer

    Single line diagram

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nElectrical equipment layout

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Electrical Control System

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process design

    PFDs

    H&M balance

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process design

    PFDs

    H&M balance

    Rotating

    Pressure vessels

    Fired equipment

    Heat exchangers

    Packages etc.

    Process

    data sheet

    Equipment specification

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process design

    PFDs

    H&M balance

    P&IDs

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process design

    PFDs

    H&M balance

    Rotating

    Pressure vessels

    Fired equipment

    Heat exchangers

    Packages etc.

    P&IDs

    Piping

    Instrumentation

    Layout

    Civil

    Electrical

    Process

    data sheet

    Equipment specification

    Vendor

    drawings

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Process design

    PFDs

    H&M balance

    Rotating

    Pressure vessels

    Fired equipment

    Heat exchangers

    Packages etc.

    P&IDs

    Piping

    Instrumentation

    Layout

    Civil

    Electrical

    Process

    data sheet

    Equipment specification

    Vendor

    drawings

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Vendor

    Instrumentation &

    Control

    Electrical

    Layout

    Civil

    PipingProcess

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    What Engineering designed

    What the Vendor supplied

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Field Engineering

  • HERVE

    BARON

    For more information and

    to get on top of Engineering in hours, not years!

    A unique synthesis and

    reference manual

    200 pages, 250 illustrations

    To browse the book:

    http://goo.gl/dfDrS

    To order with a 30% discount:

    http://goo.gl/J3TkE

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProcurement

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Inquiry (Call for Tender)Short listing

    Bid analysis

    Clarifications

    Negotiations

    Purchase Order

    Expediting

    Inspection

    Delivery

    Warranty Period

    Procurement / Steps

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProcurement / Supplier selection criteria

    Technical Compliance

    Price

    Qualification of supplierSchedule

    Load of workshop

    References

    References with final Client

    Financial situation

    Annual turn-over

    Internal feed-back

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProcurement

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nExpediting

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nExpediting

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nInspection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nInspection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nShipping

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nShipping

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Shipping

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Project

    Engineering Procurement Construction

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nEarthworks

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPipeline

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPipeline

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nRoads

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nBuildings

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Admixtures

    Sand

    Aggregate

    Cement

    Civil Works

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCivil Works

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCivil Works

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCivil Works

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCivil Works

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCivil Works

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPre-fabrication

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nErection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nUnderground networks

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPlant erection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nSteel structure erection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nEquipment installation

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nEquipment installation

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPiping Pre-fabrication

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPiping erection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nPiping erection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nField Instrumentation Installation

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nElectrical equipment connection

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCable pulling

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nArrangement of Technical rooms

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCable connections

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nOther Systems Field Equipment Installation

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nControl room consoles installation

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nTesting

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Sub-System

    Junction

    Box

    Instrument

    Loop

    Instrument

    Cable

    Mech Equip

    Document Folder

    Handover System

    Elect EquipCircuit

    Instrument

    Tag

    Commissioning

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nThe multiple sides of a Project

    Hu

    man

    Reso

    urces

    Man

    agem

    ent

    Project ControlPROJECT

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProject Organisation

    Project Manager

    Engineering Manager

    Project Engineers

    Discipline Engineers

    Process

    Civil

    Instrumentation

    Electrical

    Equipment

    Procurement Manager

    Purchasers Expediters Inspectors

    Site Manager

    Construction Manager

    Construction Superintendent

    Construction supervisor

    Construction superintendent

    Construction supervisor

    Project Control Manager

    Contract Manager

    Scheduling Manager Cost Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProject procedures

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProject temporary facilities

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProject temporary facilities

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProject temporary facilities

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProject temporary facilities

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nProject temporary facilities

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nConstruction Procedures

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nQuality Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    SlumpSampling

    Temperature

    Quality Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nQuality Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nCost Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nInsurance

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nContracts

    P.O.

    Sub

    P.O.

    P.O.

    Main Contract

    Purchase

    Orders

    Sub-Contracts

    EPC

    Sub

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nContracts

    Main Contract

    EPC

    Terms and Conditions

    PriceSchedule

    Performance guarantees

    Technical basis

    Specifications, codes & stds

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nContracts

    E

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nContracts

    E P

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nContracts

    E P C

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nContracts

    + x%

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nConstruction contracts

    Civil

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nConstruction contracts

    Mechanical

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nConstruction contracts

    E&I

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nConstruction contracts

    General Contractor

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    ContractsTerms and Conditions

    Main Contract

    EPC

    Obligations of the 2 parties

    Limit of liability

    Penalties in case of bad performance

    Conflict resolution

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nQuality Assurance (QA)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nQuality Assurance (QA)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Quality Assurance (QA)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nQuality Assurance (QA)

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Discipline codeA Instrumentation & Control

    C Civil engineering

    E Electrical

    G Project general documentsJ Mechanical

    K Safety

    M Piping & Layout

    P Processes

    S Steel Structures

    V Vessels Heat exchangers

    W Materials Welding

    Document code1 Installation drawings

    2 Detail drawings

    3 Diagrams

    4 Lists Bill of Quantities5 Isometrics

    6 Calculation notes

    7 Specifications

    8 Data sheets

    9 Requisitions

    Document Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nDocument Control

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nDocument Control

    Engineering

    Documents submitted to client

    Client

    Approval/

    Comments

    Vendors

    Documents submission Comments

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Intranet / Internet

    Intranet / Internet

    Breakdown structures

    Projects

    Interfaces

    Reports

    Satellite Engineering

    Center

    Center 1 Sr. Mgmt Center 2 Sr.

    Mgmt

    Construction Site

    Electronic Document

    Management System

    Engineering

    documents

    Vendor

    documents

    Correspondence

    etc.

    Electronic Document Management System

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Interface Management

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36PLANT START-UPPIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X XPIPING MATERIAL & DRAWINGS AT SITEPIPING MATERIAL MANUFACTURING & SHIPPING X X X X X XPURCHASE OF PIPING MATERIALTECHNICAL & COMMERCIAL CLARIFICATIONS X XCALL FOR TENDER FOR PIPING MATERIALPREPARE PIPING MATERIAL TAKE-OFF XPIPING ROUTING STUDIES X X XPIPING & INSTRUMENTATION DIAGRAMS (PIDs)

    PROJECT SCHEDULEMONTH

    1

    1

    2 3

    3

    45

    2

    4 5

    5

    Scheduling

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nScheduling

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Progress Monitoring

    How would you measure progress?

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Progress Monitoring

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Progress Monitoring

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Progress Monitoring

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    15 years ago: 2D

    Today: 3D

    Tomorrow:

    3D & data

    IT

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    IT

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Safety

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Safety

    Guard Rail System with ToeBoards

    Cross Bracing

    Planking

    Runner

    Bearer

    Longitudinal Brace

    Post

    Sill

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    nSafety

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Human resources / career path

    3-5 yrs

    5 yrs

    Graduate Engineer, 25 years old

    5-7 yrs

    40-45 yrs oldProject Manager

    Engineering Manager/Deputy Project Manager

    Project Engineer

    Process Engineer

    Note: the career pattern shown here is a very fast track one to the PM position... One would enjoy oneself just as well taking more time!

  • HERVE

    BARON

    20

    13

    H

    erv

    B

    aro

    n

    Beyond this presentation

    http://www.toblog.fr/en/baron.html

    Share my new developments Find my other on-line and classroom training