ephesians 2:21-22 esv / 31
DESCRIPTION
Ephesians 2:21-22 ESV / 31. “In whom the whole structure, being joined together, grows into a holy temple in the Lord. In him you also are being built together into a dwelling place for God by the Spirit.”. Capacity Campaign Report to Church Leadership August 24, 2014. Agenda Prayer Building - PowerPoint PPT PresentationTRANSCRIPT
“In whom the whole structure, being joined together, grows into a holy temple in the Lord. In him you also
are being built together into a dwelling place for God by the Spirit.”
Ephesians 2:21-22 ESV / 31
AgendaPrayer
BuildingStaffingMission
Financial DataQ&A
Next Steps
Capacity CampaignReport to Church Leadership
August 24, 2014
Building
•Roof and related Repairs•New Restrooms and Showers•Parking•Maintenance Reserve
Need:◦ Sanctuary roof needs to be re-roofed (re-
shingled) and will require some underlayment replacement
◦ Wood soffit has some areas of rot
Response:◦ Replace roof shingle and underlayment as
needed on Sanctuary◦ Repair/replace rotted wood at eave overhang
Roof and related Repairs
Need:◦ Additional and easily accessible restrooms ◦ Handicap accessible restrooms on the main floor
(Sanctuary/Narthex) level◦ Showers
Response:◦ New handicap accessible restrooms are proposed for the
main floor near the library. This will include a minimum of (4) new toilets for women and (2) new toilets for men
◦ Showers are proposed to be added. Location to be determined.
New Restrooms and Showers
Need:◦ Additional parking◦ City zoning regulations do not allow for reconfiguration or
changes of the existing parking lot (as it is currently non-compliant)
◦ City zoning requires that any new parking be located in the Southeast corner of the property behind the building
Response:◦ The Building Task Group along with Samsel Architects have
investigated the options of adding new parking.◦ The limitations by City zoning leave GCPC with an area for 26
parking spaces maximum◦ $200,000 to provide as many parking spaces as affordable
Parking
Need:◦ The building has a number of deferred maintenance
issues that should be addressed◦ Due to the age of the building and its systems (HVAC,
electrical, plumbing) problems which need to be repaired or replaced
Response:◦ Samsel Architects has recommended a minimum
annual budget allotment of $2.00 per square foot for maintenance and improvements. The facility is approximately 32,000 square feet equal to $64,000 per year.
Maintenance Reserve
Need: ◦ GCPC’s current Program Staff to fulfill the GCPC
Ministry Plan is inadequate, particularly in the areas of Youth and Young Adults and our growing mission work.
Response: ◦ Add 1 Fulltime Associate Pastor (by adding funds for additional ½ FTE)◦ This position effectively replaces all the part-time youth and young adult staff
budgeted during 2014 (equivalent to one-half of a full-time position, or $30,000)◦ Approximately $35,000 additional funds annually◦ Will assist current ordained staff in meeting the demands for pastoral care,
community engagement and daily church life◦ Will provide additional capacity to respond to programs and activities waiting in the
wings based on the Ministry Plan◦ Estimated to be on board on/about June 2015
Personnel
Need: ◦ GCPC utilizes contract handyman services for routine maintenance Staff
and volunteers are used for building set-ups. Staff expends 5 to 10 hours a week preparing rooms for Sunday activities
Response: ◦ Add 1 Part-Time Sexton (20 hrs/wk)◦ Non-benefit position scheduled to work 20 hrs/wk; Flexible work
days◦ Salary: $20,000 per year◦ Estimated to be on board on/about January 1, 2015.◦ Key duties:
Weekly job list and large room set ups (currently done by contracted custodian)
Sunday building opening and facility issues that arise Other duties now being done by Heather, Mark and Kristy
Personnel
Capacity: to serve God while serving others
Serve Council presents: challenges and opportunities for the future with Grace
Covenant.
Hospitality: within our walls, in our community, and GloballyNeed:
Make our Hospitality Space more useful and invitingImprove set up/flow from hospitality events to church events Continue support and important work that GCPC does within and outside our physical space
Response: Bathroom and shower facilities Parking Staff- sexton for setup/ take down; pastoral staff for
support of programming, and theological responses… TITHE of $ raised by campaign-for Local and Global mission
GCPC garden
Within the church building: Our building is used most days of every week for community outreach, and several times a year for special opportunities of service: AA meetings Youth gatherings, including out of town youth
needing overnight accommodations, etc. RITI(Room in the INN-for homeless women) 15 different groups meet regularly representing
over 400 persons Use has increased 3X’s over past 7 years!
Locally at GCPC
Caring for Creation/Earth Day
GCPC works with programs to end Homelessness
To feed local families Support children So much MORE-Serve Fair after worship Opportunities- tithe from any campaign;
staff/pastoral support, meeting space for planning events,
Outside our walls; but within our neighborhood/community
CROP WALK
After school programs, Guatemala
Guatemala
Our staff, members and $-support Haiti-sustainable gardening, clean water,
health services and more Partnership with Jerusalem Church in
Guatemala, and the children’s scholarship program there-building a church in Coatepeque.
Malawi- children’s hospital/clinic- support for Dr Nagy
Opportunity: Tithe support
Globally
Roof on Sanctuary $370,000 Restrooms and Showers $350,000 Parking (no more than) $200,000 Maintenance Reserve $ 64,000 Staffing: (seed $$ for 2 years)
Associate Pastor $ 70,000 Sexton $ 28,000
Mission (1/2 Local, 1/2 Global) $126,000 Consultant/Fundraising $ 50,000
Phase I Capital Campaign Estimated Total $1,260,000
August 31 Begin Information/dialogue sessions in various venues with groups and classes, etc.
September 6 Congregational retreat
September 7 Information/dialogue sessions in sanctuary after 10:30 worship
September 14 Information/dialogue sessions in sanctuary after 10:30 worship with Architects present
September 21 Information/dialogue sessions in sanctuary after 10:30 worship
September 28 Final packet completed and sent out to all members (testimonials, details, costs) Information/dialogue sessions in sanctuary after 10:30 worship
October 12 11:30 a.m. - Congregational meeting to vote on campaign
Timeline/Next steps
What additional information do you need?
Here’s how you can help:◦ Provide dates/times for O Team rep to attend your
group, council, class, etc.
Q & A