  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    Controls atJAERI - KEK Joint Project

    andEPICS at KEK

    Kazuro Furukawa, KEK

    forJoint Project Controls Group

    EPICS Group

    ❖ Joint Project❖ Control Systems at KEK❖ Controls at Joint Project

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    JAERI - KEK Joint Project

    ◆ At JAERI Site (50 km North from KEK)

    IPNS

    1000

    10000

    100

    10

    1

    0.01

    0.1

    0.1 1 10 100 1000 10000Energy (GeV)

    AGS

    CERN-PSFNAL-MI

    U70

    SPS

    ISISTRIUMF

    IPNS

    1000

    10000

    100

    10

    1

    0.01

    0.1

    0.1 1 10 100 1000 10000Energy (GeV)

    AGS

    CERN-PSFNAL-MI

    U70

    SPS

    ISISTRIUMF

    PSI(CW)

    KEK-12GeV PS

    Tevatron

    This Project3 GeV

    Existing

    Underconstruction

    Power

    KEK-500MeVBoosterC

    urr

    ent

    (

    )µ A

    SNS

    Proposed

    Materials-LifeSciences

    1 MW

    0.1 MW

    ESS

    Nuclear-ParticlePhysicsThis Project50 GeV

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    X-rays interact with electrons.

    ♦ X-rays see high-Z atoms.Neutrons interact with nuclei.

    ♦ Neutrons see low-Z atoms.

    Material for Li-battery seen by

    X rays (left) and

    Neutrons (right)

    Example of Study◆ Neutron Science

    Need Different Kinds of Probes to Study

    ◆ Nuclear Physics with Kaon, etc◆ Nutrino Physics (Kamiokande) ◆ Nuclear Transmutation

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    Control Systems at KEK◆ KEKB Ring -- e-/e+ Collider, EPICS, 1998~

    Establishing Luminosity RecordsControls of Utility System will be Based on EPICS

    ◆ PF-AR -- e- Light Source, EPICS, 2001~ (1987~)EPICS Conversion Went Well(+Channel Archiver, Delphi, ...)

    ◆ JAERI-KEK Joint Project -- EPICS, 2006~Just Started ...

    ◆ e-/e+ Linac -- RPC, PF -- DataChannel,PS -- Windows +VME/MAP, ATF -- V-System

    Their Own Control Systems

    ◆ EPICS Traversal GroupStandardization of EPICS Environment, etc

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    EPICSGroup

    JointProject

    KEKB

    PF-AR

    PS ATF

    EPICS (Traversal) Group at KEK◆ Standard EPICS Environment (Directory Structure, etc)◆ EPICS Document Translation?◆ Training

    Core MembersN.YamamotoN.KamikubotaJ.Odagiri

    e+/e—

    Linac

    PF

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    Controls for JAERI-KEK Joint Project

    ◆ EPICSNetwork-wide ControlsSuccess at KEKB (~100 IOC s)

    ◆ SAD + Python, etc.Application/GUI (for Rings)

    Linac: SAD + ? (with Space-charge)

    ◆ Sub-systemsDesigned mainly by Equipment GroupsSub-contract (with Interface to EPICS?)Detachable Sub-systems, preferable?

    ◆ IP/Network based ControllersNo Specific Local Field Network, but only EthernetSuccess at e+/e— Linac (~250 Controllers)

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    Network Based Controller (NC) under EPICS (1)◆ 5 Components

    ◆ NC (such as PLC) : Mostly Designedby Experts, Carrys Local Logics

    ◆ EPICS IOC : Carrys Logicsbetween Several Devices

    ◆ EPICS OPI : Normal OPIDo not See Existence of NCs

    ◆ Management Station : Software Downloadingand Monitoring

    ◆ Network : Switch TechnologyPhysical and Logical Views are Different

    NetworkSwitch(es)

    PLC managementstations

    PLC's(Network Controllers)

    IOC(VME or PC)

    CA access Maintenance

    OPI'sCA clients

    Polling, etc

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    Network Based Controllers◆ PLC :

    Yokogawa’s FA-M3 (Factory ACE)Maintenance Capability over Ethernet/IP

    Evaluating Basic EPICS Device Support

    ◆ Measurement Station :Yokogawa’s WE7000 for Now

    100ks/s, 100Ms/s, (1Gs/s,) 10MHz FG.Improving Device Support outsourced to Mitsubishi.Co.

    Simple Function: ~1ms

    ◆ DTL-Q Power Supply :Designed Dedicated Plug-in Ethernet Controller

    Mostly the Same Protocol as PLCProduced by Nichicon Co./Internix Co.

  • Controls at JKJ and EPICS at KEK

    K. Furukawa, KEK, EPICS Meeting, May.2002.

    Other Issues◆ Naming Convention

    Continueing Discussions, Mostly Fixed?Documentation

    ◆ Timing ModulesDesigning Improved Vesion, EPICS Integration50Hz Data Aquisition?

    ◆ Device SupportsDeveloping New Ones, Evaluating KEKB s Ones

    ◆ DatabaseCabling Management, Beam-line Components

    ◆ Application Development Environmentwith EPICS Group

    ◆ Trainingwith/by EPICS Group

  • Controls at JKJ and EPICS at KEK