episode 33 : project execution part (4)
TRANSCRIPT
SAJJAD KHUDHUR ABBASCeo , Founder & Head of SHacademyChemical Engineering , Al-Muthanna University, IraqOil & Gas Safety and Health Professional – OSHACADEMYTrainer of Trainers (TOT) - Canadian Center of Human Development
Episode 33 : Project Execution
Part (4)
DOCUMENTATION
Documentation is a planning package but often underestimated in the planning phase.
General Documentation
Operation Manual
Technical Documentation
Quality documentation
Enclosures may be layout plans and suchlike.
This comprises a general description of the project.
most complex parts of the documentation
comprises the process description of individual components and the operating instructions (individual steps of start ‐ up, normal operation and shut – down)
Description of the failures and their possible causes, adequate measures for their remedy
Issue of a verbal description of the function plans may be included.KKKK6024
• complete quotations for spare and wear parts• instructions for maintenance and repair of
the whole plant• lists of lubricants in consideration of
the selected lubricant suppliers• coding of the operating resources
and equipments• establishment of special single data sheets
for the entire equipment• establishment of a complete plant index
resp. plant database (plant registration system)
Technical Documentation
Quality documentation
Includes the documentation of the equipment.
Technical documentation of the equipment comprises
A compilation of all quality ‐ relevant documents (Test certificates, test
protocols etc. of the quality)
Further requirements regarding the scope of documentation may be:
• assembly drawings with component description
• sectional and detail drawings
• parts lists• performance data• operating instructions• instructions for
maintenance and repair
KKKK6024
Construction
Important person is the construction manager
Coordination and control of site activities, communication with project management,
implementing safety measure.
Integrating construction manager as early as possible.
KKKK6024
Construction
office containers
workshop containers stock containers
team containerssanitary containers
Usually, the Construction of certain containers is involved. These include;
The first step of the actual Construction is the planning of site equipment.
KKKK6024
Construction’s Activities
- construction part- E/MC part- pipes- insulation- signage
Excavation and civil works
Component assembly
Pipe assembly
Assembly E/MC technology
Insulations
Plant marking
Subcontractors with Construction
activities may be:
Finally adequate places for the Construction of the site cranes
have to be found before the actual Construction activities commence.
KKKK6024
EXCAVATION AND CIVIL WORK
Personnel provided by CONSTRUCTION FIRM
Require special COORDINATION SKILL on the part of Construction management to maintain PARALLEL ACTIVITIES from different branches!
CIVIL WORKS
GROUND EXCAVATIO
N WORKFOUNDATIO
N WORKSTEEL CONSTRUCTION& BRICKLAYING WORK
CONSTRUCTION PHASE
KKKK6024
KKKK6024
Thanks for Watching Please follow me / SAJJAD KHUDHUR ABBAS