Page 1: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

Arindam MaitraIWC Meeting

March 28, 2012

EPRI’s Utility Direct DC Fast Charger –Development, Testing, Demonstration

Page 2: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

2© 2012 Electric Power Research Institute, Inc. All rights reserved.

Utility Direct “Medium Voltage” Fast Charger

• Conventional DC Fast Charger needs a new three-phase service

– Three-phase transformer– Three primary conductors and

associated medium voltage fuses– Three high-current service conductors– 208/480 Vac DC fast charger– Overall efficiency (w xfmr) ~88-91%– Installation costs

• Utility Direct Fast Charger

– Combines service transformer and DC fast charger into one unit

– Needs only one primary conductor, no isolation transformer and no secondary conductors

– Overall efficiency >95%– Installation costs

Page 3: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

3© 2012 Electric Power Research Institute, Inc. All rights reserved.

Configuration of Utility Direct Fast Charger

M-level AFEAC-DC &Isolated DC-DC

DC-DC

Charger400-V

DC

2.4 or8 kV AC +

• HV components are enclosed within thepad-mounted enclosure

• AC input can be interrupted with high-voltage vacuum switch

• DC voltage can be interrupted with a DCcircuit breaker

• Charger output is Chademo compatible

Page 4: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

4© 2012 Electric Power Research Institute, Inc. All rights reserved.

Pad-Mount Case for Medium-Voltage AFE Converter and Isolated DC-DC Stage (Box-A)

Photograph of the case and internal circuits

Page 5: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

5© 2012 Electric Power Research Institute, Inc. All rights reserved.

Utility Direct Fast Charger with CHAdeMOInterface

DSP

board

Medium

Voltage

DC-DC

Charger

Vehicle

Side

Battery

Management

System

Interface

PC Display

Control

Console

1,7

2

4

GNDd1

d2

RDY

8

9

10

CAN+CAN–

5

6

PWR+

PWR–

IrefVref

CMD

2.4kV

rms

Page 6: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

6© 2012 Electric Power Research Institute, Inc. All rights reserved.

2.4KV 50kW Medium Voltage IUT Based DC Charger –Efficiency Comparisons

Page 7: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

7© 2012 Electric Power Research Institute, Inc. All rights reserved.

EPRI Web/Mobile Application

CAN Listener

EPRI Server

Charger

Android Tablet

• Provides user interface to the charger

• Sends DC charging data to the EPRI Server

Bluetooth

Instrumentation

2.4 kV AC

500 VDC

CAN Bus

AC Charging Data

DC Charging

Data

Page 8: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

8© 2012 Electric Power Research Institute, Inc. All rights reserved.

Demo in Knoxville @March 6-7, 2012

• Medium Voltage IUT DC Fast Charger

– Fully functional 1-phase 2.4KV 45KVA IUT DC Fast charger (FC) system with the CHAdeMOcommunication protocols (CAN)

• Why is it valuable?– Utility owned asset for fast charging– Provide customers with a variety of

products and services that go “beyond the meter”

– Reduced energy losses versus conventional chargers

– Reduced weight versus fast chargers using conventional transformers

Page 9: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

9© 2012 Electric Power Research Institute, Inc. All rights reserved.

Installation Options

• Conventional FC installation

– Option 1: Underground installation (pad-mount)

– Option 2: Overhead installation (pole-mount)

• Medium Voltage FC installation (pad-mount)

The objective is to compare cost of installing a 480 Vac fast charger vs an EPRI MV fast charger

Page 10: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

10© 2012 Electric Power Research Institute, Inc. All rights reserved.

480 Vac Fast Charger vs MV Fast Charger Installations

480 Vac Fast Charger Installation – Option 1 480 Vac Fast Charger Installation – Option 2

Medium Voltage Fast Charger Installation

Page 11: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

11© 2012 Electric Power Research Institute, Inc. All rights reserved.

Key Installation Components

480 Vac FC (Option 1) 480 Vac FC (Option 2) EPRI MVDC FC3 long primaries (135 ft) 3 short primaries (5 ft) 1 long primary (135ft)1 three-phase 75 kVA pad-mount xfmr (13.8 kV/480 Vac)

3 single-phase 25 kVA pole-mount xfmrs(7.32kv/277 Vac)

-

Excavation, foundation, concrete pad, MV terminations

- -

4 underground service conductors (10ft) + 2underground DC service conductors (10 ft)

4 overhead service conductors (110 ft) + 2underground DC service conductors (10 ft)

2 underground DC service conductors (10 ft)

Trenching, conduits Some trenching, conduits Trenching, conduits

480 Vac service panel+ Secondary side metering

480 Vac service panel+ Secondary side metering

Primary side metering

Page 12: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

12© 2012 Electric Power Research Institute, Inc. All rights reserved.

Installation Cost

480 Vac FC (Option 1)

480 Vac FC (Option 2)

EPRI MVDC FC

Primaries $3937 $261 $1399

Transformer(s) $14776 $3638

Service conductor $752 $2284 $378

Service Panel $350 $350

Metering $365 $365 $1500

Foundation Cost for FC Main Box $3272 $3272 $3272

Total Cost $23452 $10170 $6549

* Approximate costs – these do not include unit price of the fast charger

Page 13: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

13© 2012 Electric Power Research Institute, Inc. All rights reserved.

Where this Technology Makes Sense

• Utilities who want to provide fast charging capability directly from their distribution system. This could be especially useful in dense cities where you place fast chargers that aren't hosted by a business

• Businesses could install Intelligent Universal Transformer (IUT) technology, as their building transformer and conveniently add fast charging service (and also integrate their onsite solar, energy storage, and building energy management system). This would help in managing the high peak loads of the DC charger and the impact both on the utility and to a business' own cost of service, specifically by reducing demand charges

• DC fast charging technology has the potential to significantly increase the range and versatility of battery electric vehicles, enhancing their commercial appeal

Page 14: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

14© 2012 Electric Power Research Institute, Inc. All rights reserved.

TVA iMieV CHARGING (Charging Event #1)March 6th, 2012

Page 15: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

15© 2012 Electric Power Research Institute, Inc. All rights reserved.

Page 16: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

16© 2012 Electric Power Research Institute, Inc. All rights reserved.

Charging Power as a Function of Time – iMieV

Time (minute)

Cha

rgin

g P

ower

(kW

)

Page 17: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

17© 2012 Electric Power Research Institute, Inc. All rights reserved.

Battery Capacitor and State-of-Charge – iMieV

Time (minute)

Bat

tery

Cap

acity

(kW

h)

Sta

te o

f Cha

rge SOC

Page 18: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

18© 2012 Electric Power Research Institute, Inc. All rights reserved.

Voltage and Current During Charging – iMieV

Time (minute)

Bat

tery

Vol

tage

(V)

Cha

rgin

g cu

rrent

(A)

Page 19: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

19© 2012 Electric Power Research Institute, Inc. All rights reserved.

EPRI LEAF CHARGING – Charging Event #2 March 6th, 2012

Page 20: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

20© 2012 Electric Power Research Institute, Inc. All rights reserved.

Page 21: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

21© 2012 Electric Power Research Institute, Inc. All rights reserved.

Charging Power as a Function of Time – Leaf

Time (minute)

Cha

rgin

g P

ower

(kW

)

Page 22: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

22© 2012 Electric Power Research Institute, Inc. All rights reserved.

Battery Capacitor and State-of-Charge – Leaf

Time (minute)

Bat

tery

Cap

acity

(kW

h)

Sta

te o

f Cha

rge

Page 23: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

23© 2012 Electric Power Research Institute, Inc. All rights reserved.

Voltage and Current During Charing – Leaf

Time (minute)

Bat

tery

Vol

tage

(V)

Cha

rgin

g cu

rrent

(A)

Page 24: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

24© 2012 Electric Power Research Institute, Inc. All rights reserved.

EPRI LEAF CHARGING – Charging Event #3 March 6th, 2012

Page 25: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

25© 2012 Electric Power Research Institute, Inc. All rights reserved.

Charging Power as a Function of Time – Leaf

Time (minute)

Cha

rgin

g P

ower

(kW

)

Page 26: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

26© 2012 Electric Power Research Institute, Inc. All rights reserved.

Battery Capacitor and State-of-Charge – Leaf

Time (minute)

Bat

tery

Cap

acity

(kW

h)

Sta

te o

f Cha

rge SOC

kWh

Page 27: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

27© 2012 Electric Power Research Institute, Inc. All rights reserved.

Voltage and Current During Charing – LeafB

atte

ry V

olta

ge (V

)C

harg

ing

curre

nt (A

)

Time (minute)

Page 28: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

28© 2012 Electric Power Research Institute, Inc. All rights reserved.

EPRI LEAF CHARGING – Charging Event #4

March 7th, 2012

Page 29: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

29© 2012 Electric Power Research Institute, Inc. All rights reserved.

Page 30: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

30© 2012 Electric Power Research Institute, Inc. All rights reserved.

Charging Power as a Function of Time – EPRI Leaf

Time (minute)

Cha

rgin

g P

ower

(kW

)

Page 31: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

31© 2012 Electric Power Research Institute, Inc. All rights reserved.

Battery Capacitor and State-of-Charge – EPRI Leaf

Time (minute)

Bat

tery

Cap

acity

(kW

h)

Sta

te o

f Cha

rge SOC

kWh

Page 32: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

32© 2012 Electric Power Research Institute, Inc. All rights reserved.

Voltage and Current During Charging – EPRI Leaf

Bat

tery

Vol

tage

(V)

Cha

rgin

g cu

rrent

(A)

Time (minute)

Page 33: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

33© 2012 Electric Power Research Institute, Inc. All rights reserved.

LEAF CHARGING – Charging Event #5 March 7th, 2012

Page 34: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

34© 2012 Electric Power Research Institute, Inc. All rights reserved.

Page 35: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

35© 2012 Electric Power Research Institute, Inc. All rights reserved.

Charging Power as a Function of Time – TVA Leaf

Time (minute)

Bat

tery

Cap

acity

(kW

h)

Sta

te o

f Cha

rge

SOC

kWh

Page 36: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

36© 2012 Electric Power Research Institute, Inc. All rights reserved.

Charging Power as a Function of Time – TVA Leaf

Time (minute)

Cha

rgin

g P

ower

(kW

)

Page 37: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

37© 2012 Electric Power Research Institute, Inc. All rights reserved.

Voltage and Current During Charging - TVAB

atte

ry V

olta

ge (V

)C

harg

ing

curre

nt (A

)

Time (minute)

Page 38: EPRI’s Utility Direct DC Fast Charger – Development, Testing, Demonstrationmydocs.epri.com/docs/publicmeetingmaterials/1203/JKN2SD... · 2012-03-28 · EPRI’s Utility Direct

38© 2012 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity