eq 3.1 - iaq mgt plan - during construction

Upload: nikolas-papadopoulos

Post on 06-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 EQ 3.1 - IAQ Mgt Plan - During Construction

    1/3

    LEED-NC 2.2 Submit tal Template | Last Modified: Apri l

    LEED-NC 2.2 Submittal Template

    EQ Credi t 3.1: Construction IAQ Management Plan:During Construction

    I, , from

    verify that the information provided below is accurate, to the best of my knowledge.

    (Company Name)(Responsible Individual)

    CREDIT COMPLIANCE

    A copy of the project's Construct ion Indoor Air Quality (IAQ) Management Plan has been uploaded. The plan hasbeen developed following the recommended Design Approaches of the Sheet Metal and Air Condit ioning National

    Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings under Construction, 1995, Chapter 3.

    The project's air handling units were operated during construction.

    Photos highlighting the IAQ Management Plan practices have been uploaded. The photos havebeen labeled to identify the highlighted approach.

    If the air handling units were operated during construction, please provide a listing of the installed fi lters and their locations

    in the table below.

    Yes No

    Yes No

    Fil ter Manufacturer

    FilterIdentification

    (Model #)

    Filter MERV

    Rating

    Location of

    Installed Fil ter

    Fil ter was ReplacedImmediately

    Prior To Occupancy

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

  • 8/3/2019 EQ 3.1 - IAQ Mgt Plan - During Construction

    2/3

    LEED-NC 2.2 Submit tal Template | Last Modified: Apri l

    LEED-NC 2.2 Submittal Template

    EQ Credi t 3.1: Construction IAQ Management Plan:During Construction

    Fil ter Manufacturer

    FilterIdentification

    (Model #)

    Filter MERV

    Rating

    Location of

    Installed Fil ter

    Fil ter was ReplacedImmediately

    Prior To Occupancy

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    Yes No

    NARRATIVE (Optional)

    Please provide any addit ional comments or notes regarding special circumstances or considerat ions regarding the

    project's credit approach.

    The project is seeking point(s) for this credit using an alternate compliance approach. The compliance approach,

    including references to any applicable Credit Interpretation Rulings is fully documented in the narrative above. (Indicatethe number of points documented in the field below).

    Alternative Compliance Points Documented

  • 8/3/2019 EQ 3.1 - IAQ Mgt Plan - During Construction

    3/3

    LEED-NC 2.2 Submit tal Template | Last Modified: Apri l

    LEED-NC 2.2 Submittal Template

    EQ Credi t 3.1: Construction IAQ Management Plan:During Construction

    Credit: Points Documented:

    Project Name:

    First Name Last Name

    READY TO SAVE THIS TEMPLATE TO LEED-ONLINE?Please enter your first name, last name and today's date below, followed by yourLEED-Online Username and Password associated with the Project listed above to confirm submission of this template.

    Date Username (Email Address) Password

    Letter Template Version .

    EQ Credit 3.1: Construct ion IAQ Management Plan: During Construction 0

    Stavros Niarchos Found'n Cultural Centre

    Chris Nunn [email protected]

    SAVE TEMPLATE TO LEED-ONLINE PRINT TEMPLATE

    A11000045