Equipment Engineering Training
Welcome to this presentation.
It is part of a suite of Engineering training modules.
It shows the activities and deliverables of the Equipmentdiscipline.
Comments are most welcome ([email protected]),which I will incorporate for the benefit of all.
Hervé
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Engineering disciplines: activities and deliverables
� PROCESS
� EQUIPMENT
� SAFETY & ENVIRONMENT
� CIVIL
� PIPING LAYOUT & MATERIAL
� INSTRUMENTATION
� ELECTRICAL
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
A unique synthesis
200 pages, 250 illustrations
3000 copies sold to date
Order your copy on-line today:
Your reference
http://www.editionstechnip.com/U/baron_oil_gas_engineering_guide_the_1695.asp
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Process design
PFDs
H&M balance
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
Process
data sheet
Equipment specification
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment list
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
Which documents are issued to
• Specify
• Inquire
• Select
• Order
Equipment?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Rotating Equipment
Let’s start with rotating
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Rotating Equipment
Which documents are produced to specify Rotating Equipment ?
Let’s start with rotating
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Process Data sheet / Mechanical Data Sheet
What additional information does the
MDS contain compared to the PDS?
The starting point for the mechanical
engineer is the Process Data Sheet (PDS) it
receives from the Process discipline.
From this, the Equipment Engineer produces
a Mechanical Data Sheet (MDS).
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Process Data sheet / Mechanical Data Sheet
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Process Data sheet / Mechanical Data Sheet
What are the contents of the code ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Process Data sheet / Mechanical Data Sheet
What are the contents of the code ?
• Data sheet template
• The list of information to be
defined by Purchaser, e.g. cooling
medium, hazardous area
classification etc.
• Technical requirements for the
design, accessories, tolerances
etc.
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Data Sheet
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Data Sheet
Some data is highlighted in green while some data is highlighted in
orange. What is the difference?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Data Sheet
How and by whom are the Materials of Construction defined?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Engineering disciplines: activities and deliverables
� PROCESS
� EQUIPMENT
� SAFETY & ENVIRONMENT
� CIVIL
� PIPING LAYOUT & MATERIAL
� INSTRUMENTATION
� ELECTRICAL
Piping discipline
Plant LayoutPiping
installationPiping materials
Materials/corrosion,
insulation, painting
Piping
calculations
& supports
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material selection
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material selection
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Pressure Vessels
Which documents are produced to specify Pressure Vessels ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical design
Any other document ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Data Sheet
What additional information is contained in the Mechanical DataSheet that is not contained in the Process Data Sheet? What doesMechanical design entail?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Data Sheet
Process Data Sheet:
• design conditions
• skeleton drawings
• material (generic type) and corrosion allowance
• equipment dimensions
• definition of type of internals
• nozzles list
• height from ground
Mechanical Data Sheet:
• design conditions & code
• scaled drawing
• material grades and thickness of all parts
• all dimensions
• drawings of internals
• nozzzles position and elevation
• designed support
• weight
• loads on foundation
• limits of supply
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical design
The vessel wall thickness is calculated so that with all
loadings, i.e.,
• Internal pressure
• External pressure
• Weight
• Seismic
• Wind
• Other external loads, from connected pipes etc.
the maximum stress for the selected material is not
exceeded
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical design
The vessel wall thickness is calculated so that with all
loadings, i.e.,
• Internal pressure
• External pressure
• Weight
• Seismic
• Wind
• Other external loads
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical design
http://www.microprotol.com/demo_viewlet.htm
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical design
Calculation file
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Design
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Design
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical Design
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Mechanical data sheet
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchangers
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchanger
The starting point for the Equipment engineer is the Data Sheet received from
Process discipline. Depending on the type of Heat Exchanger, this data sheet
shows the duty only, i.e., flow + inlet/outlet conditions or the size of the heat
exchanger.
Plate & Frame heat
exchangers, Air coolers:
specified only – not sized - by
Process.Shell & tube heat exchangers: sized by Process.
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchanger
Shell & TubesSizing of Shell & tube heat exchangers by Process
https://www.htri.net/demo/
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchanger thermal sizing
TEMA Data Sheet
The Data Sheet issued by
Process to Equipment for a
Shell & Tube Heat
Exchanger is a Thermal Data
Sheet, it indicates the size
of the heat exhcnager:
numbers & length of tubes
etc.
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchanger
The data Sheet issued by
Process for other types of
heat Exchangers indicates
the duty only, i.e., flow +
inlet/outlet conditions, no
sizing.
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchanger
Mechanical Design
The Equipment engineer performs the Mechanical design of Shell & Tube type heat exchangers only.
N1B
N2A
N4
N5 N3
N2B
N1A
V
DUC
HLLHLL
Ref[1]: 0
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchanger
Mechanical Design
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Heat Exchanger / Mechanical Data Sheet
The mechanical design results in the issue of the Mechanical Data Sheet
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
How are heaters specified ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
Heaters Process Data Sheet
What is particularly important while specifying a heater ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What are the miscellaneousequipment?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What is a package ?
Package = Set of equipment, accessories and services
� contracted or purchased to a single Vendor
� realizing a process function, with associated functional guarantees
� assembled on a single skid or multi skid, or shipped loose (bulk)
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What is a package ?
What is, for Engineering, the purposeto order as a package ?
Purpose
� to have a better efficiency (than if it was done by the Engineer)
� to minimize site erection work
� to have ONE single functional guarantee
� to have a party (vendor) who is able to bring a specific know-how
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What is a package ?
What is, for Engineering, the purposeto order as a package ?
What is usually ordered as a package ?
Common types of packages
� Turbo-compressor
� Heaters, boilers, incinerators,
� Air/nitrogen generation, chemical injection
� Water/gas treatment
� Solid handling, conveyors, cranes etc.
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Packages
Off-shore
Instrument air generation Air dryers skid
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Packages
Off-shoreGlycol regeneration
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Packages
On-shore
Cold boxStorage tank
(25m high)
Steam bath vaporizer
Nitrogen generation unit
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What is a package ?
What is, for Engineering, the purposeto order as a package ?
What is usually ordered as a package ?
Which is the responsible discipline ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
Which is the responsible discipline ?
� Packages requiring mainly know-how for one Equipment type,designed to ONE particular code: the concerned Equipmentdiscipline
� Turbo-compressor ROTATING
� Heaters, boilers, incinerators FIRED HEATER
� Desalter PRESSURE VESSELS
� Packages involving several Equipment type, the design of which isNOT dictated by ONE particular code: the PACKAGE discipline
� Air/nitrogen generation, chemical injection PACKAGE
� Water/gas treatment PACKAGE
� Solid handling, conveyors, cranes etc. PACKAGE
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What is a package ?
What is, for Engineering, the purposeto order as a package ?
What is usually ordered as a package ?
Which is the responsible discipline ?
Which document is produced to specifya package ? By whom ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
A duty spec rather than a
Data Sheet is issued for
packages.
It is issued by Process
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What type of guarantees
are requested?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What type of guarantees
are requested?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
� Applicable specifications: Manufacturer standard, a few Projectspecifications or all?
� Automation design: Independent control system or not ?
� Pre-assembly level / extent of site works
� Definition of limits of supply and interfaces in all disciplines, e.g. civil
� Involvement of Engineer: no / partial or full check ?
What are the key to consider whenspecifying a package?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
� Applicable specifications: Manufacturer standard, a few Projectspecifications or all?
� Automation design: Independent control system or not ?
� Pre-assembly level / extent of site works
� Definition of limits of supply and interfaces in all disciplines, e.g. civil
� Involvement of Engineer: no / partial or full check ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Local control Centralized control
Instrumentation Specification for packaged units
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What other documents besides the Data Sheet / Duty
specification are issued to specify and order Equipment ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
What other documents besides the Data Sheet / Duty
specification are issued to specify and order Equipment ?
2) THE SPECIFICATION
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Data sheet / Specification
What is the scope of each document?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Data sheet / Specification
Two types of specifications are issued. What are the two types?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
EP - 21799_a_A_ppt_01 - Eng. Mangement Part 2 - Engineering disciplines63
General
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
General specification:
� It does not apply to a particular equipment (tag) but to all items of this
family of equipment, e.g. fired heaters, S&T HX etc.
� Only lists the amendments to a code
� For standard supplies, it is enough, along with the MDS
� For packages, general specifications for all equipment types within the
package must be included
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment codes & Standards
Pressure Vessels
ASME Section VIII, Division 1 Rules for Construction of pressure Vessels
ASME Section VIII, Division 2 Rules for Construction of pressure Vessels
Fired Heaters and Steam Boilers
ASME Section I Power Boilers Code
API 560 Fire heaters for refinery services
Heat Exchangers
API 660 Shell & Tube
API 661 Air-cooled HX
Rotating Equipment
API 610 Centrifugal pumps for Petroleum and Natural Gas Industries
API 617 Centrifugal compressor for general refinery service
API 611 General purpose turbines for refinery service
Atmospheric Storage Tanks
API 650 Welded Tanks For oil Storage
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
Particular
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
General specification:
� It does not apply to a particular equipment (tag) but to all items of this
family of equipment, e.g. fired heaters, S&T HX etc.
� Only lists the amendments to a code
� For standard supplies, it is enough, along with the MDS
� For packages, general specifications for all equipment types within the
package must be included
Particular specification
� Specific to a particular equipment item (Equipment Tag)
� Issued for complex and extended scope of supply, including several types
of equipment, e.g. machinery auxiliaries, and for packages
� Issued when the supply is not standard, i.e. specific requirements etc. that
the general specification does not cover
� It is fully comprehensive... as shown on the TOC on the next slide
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
� Detailed scope of supply
� Scope of services
� Reference documents
� Applicable codes & standards
� Deviations & Exceptions
� Design Requirements
� Packing, marking and shipping
� Shop assembly and delivery conditions
� Inspection & testing
� Guarantees & warranty
� Data required with the bid
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
� Detailed scope of supply
� Scope of services
� Reference documents
� Applicable codes & standards
� Deviations & Exceptions
� Design Requirements
� Packing, marking and shipping
� Shop assembly and delivery conditions
� Inspection & testing
� Guarantees & warranty
� Data required with the bid
Deviations and exceptions are discussed with
Vendors, and incorporated in the specification
final revision IFP
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
� Detailed scope of supply
� Scope of services
� Reference documents
� Applicable codes & standards
� Deviations & Exceptions
� Design Requirements
� Packing, marking and shipping
� Shop assembly and delivery conditions
� Inspection & testing
� Guarantees & warranty
� Data required with the bid
In all concerned disciplines (to reduce the
number of other discipline specs
transmitted to the vendor)
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
� Detailed scope of supply
� Scope of services
� Reference documents
� Applicable codes & standards
� Deviations & Exceptions
� Design Requirements
� Packing, marking and shipping
� Shop assembly and delivery conditions
� Inspection & testing
� Guarantees & warranty
� Documentation
Strongly influences the amount of work on
site
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Specification
� Detailed scope of supply
� Scope of services
� Reference documents
� Applicable codes & standards
� Deviations & Exceptions
� Design Requirements
� Packing, marking and shipping
� Shop assembly and delivery conditions
� Inspection & testing
� Guarantees & warranty
� Data required with the bid
During bid stage (before PO)
information is required to Vendor for
Technical analysis. This paragraph is
deleted for IFP revision
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
Which document, issued to the bidders, summarizes the inquiry?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment ∕ Mechanical
Which document, issued to the bidders, encapsulates all
requirements for a particular supply?
1) THE MECHANICAL DATA SHEET
2) THE SPECIFICATION
3) THE MATERIAL REQUISITION
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material requisition
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material requisition
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material requisition
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material requisition
� 1 PIM, attendance to all checks and test points (HOLD)
� 2 PIM, optional attendance to checks and test points
� 3 Attendance to final tests only
� 4 Review of documents only
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material requisition
� 1 PIM, attendance to all checks and test points (HOLD)
� 2 PIM, optional attendance to checks and test points
� 3 Attendance to final tests only
� 4 Review of documents only
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Inspection requirements
Supplier class
Very critical
Critical
Low critical
Non critical
Eq
uip
me
nt
Cri
tica
lity
previous experience with this supplier (rating by
Engineering / Inspection / Expediting),
References, audits, NCR etc.
Operating Conditions,
Manufacturing Difficulty, Impact on
Design or overall Project Schedule.
Very good Good Fair Bad
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Inspection requirements
Very good Good Fair Bad
Supplier class
Very critical
Critical
Low critical
Non critical
Eq
uip
me
nt
Cri
tica
lity
1 PIM, attendance to all checks and test points (HOLD)
2 PIM, optional attendance to checks and test points
3 Attendance to final tests only
4 Review of documents only
2
not
qualified
1
3
1
3
4
4
22
2
333
not
qualified
not
qualified
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Material requisition
What are thedifferent typesof documentsrequested fromthe vendor ?
� 1 PIM, attendance to all checks and test points (HOLD)
� 2 PIM, optional attendance to checks and test points
� 3 Attendance to final tests only
� 4 Review of documents only
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Vendor documents
� Design documents, such as mechanical calculation note etc.
� Interface documents, such as loads on foundation, Purchaser's
connections drawing etc.
� Manufacturing documents such as welding and testing procedures,
inspection and test reports,
� Installation documents, such as preservation procedure, lifting
instructions etc.
� Operating and maintenance manual, spare parts list
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Vendor documents
� Design documents, such as mechanical calculation note etc.
� Interface documents, such as loads on foundation, Purchaser's
connections drawing etc.
� Manufacturing documents such as welding and testing procedures,
inspection and test reports,
� Installation documents, such as preservation procedure, lifting
instructions etc.
� Operating and maintenance manual, spare parts list
Which type of documents is the most critical for Engineeringdevelopment ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Vendor Documents Requirements & Schedule (VDRS)
What do you do to ensure these documents will be submitted on-time ?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Vendor Documents Requirements & Schedule (VDRS)
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
WRAP-UP !
Documents issued by Equipment discipline:
� Mechanical Data Sheet
� Specification (General / Particular)
� Material Requisition
Another document is issued by the Equipment discipline, whichone?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Bid technical evaluation
Supplier 1 Supplier 2Requirements
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
What is the work of the Equipment engineer after the purchase order isplaced?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
What is the work of the Equipment engineer after the purchase order isplaced?
� Review of vendor documents
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
What is the work of the Equipment engineer after the purchase order isplaced?
� Review of vendor documents
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
Scope of supply: counter
flange to be supplied by
vendor, as per contractual
specification
Decision during a clarification meeting
with vendor, for instance to allow
maintenance
Comments on Instrument
numbering and
installation: Vendor P&ID
shall use the same
nomenclature than
project’s P&ID
Missing information: setting pressure of
PCV shall be indicated on P&ID
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
What is the work of the Equipment engineer after the purchase order isplaced?
� Review of vendor documents
� Coordination with other disciplines
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
What is the work of the Equipment engineer after the purchase order isplaced?
� Review of vendor documents
� Coordination with other disciplines. There are many interfaces…
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Interfaces
Discipline Provider Receiver
Piping Nozzle elevation,orientation, loads
Nozzleexactposition
Plant layout Elevation &position ofmanholes, heightof skirt/support
Civil Platform supports(location and load)
Loads onfoundation
Piping supports Pipe supportlocation
Instrumentation Elevation of levelconnections
Internals vendor Internals supports
Electrical Earthing lug /lightning lug
Which engineering data is exchangedwith the Vendor of a column?
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
Other Engineering disciplines / Project
functions will also be involved….
Discipline Involvement
Materials/Corrosion Review materials,
coating, insulation
cathodic protection
Inspection Tests, NDE, RBI
Construction Reviews, site assembly,
heavy lifts
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Equipment / Mechanical
A column is vendor is also at interface
with another vendor. Which one?
� That of the column internals…
Illustation courtesy of Sulzer
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
Wrap-up
Dcouments issued to order various types of equipment
Equipment Process discipline Equipment/Mechanical discipline
PDS Duty
spec
MDS Particular
Specification
General
Specification
MR
Pressure Vessel X X X X
Rotating equipment X X For
extended /
complex
supplies
X X
Heat Exchanger – Shell &
Tube
X X X X
Air-coolers X X X
Fired heater X X For
extended /
complex
supplies
X X
Package X X X
HERVE
BARON
© 2
01
4 –
He
rvé
Ba
ron
http://www.toblog.fr/en/baron.html
You enjoyed this presentation?
Share my experience on other topics:
� Engineering
� Contract Management
� Project Control
Attend my classroom training
The list and schedule of coming sessions is on my blog at:
Going further