erosion control legend b6 north
TRANSCRIPT
1878
1879
1880
1881
1882
1883
1
8
7
6
1
8
7
5
1
8
7
4
1873
1
8
7
4
1
8
7
5
1
8
7
6
1
8
7
7
1
8
7
8
1
8
7
9
1
8
7
6
1
8
7
7
1
8
7
8
1
8
7
8
1
8
7
7
1
8
7
6
1
8
7
6
1
8
7
5
1
8
7
8
1
8
8
0
1
8
8
2
1883
1
8
8
2
1882
1883
1
8
8
3
1883
1
8
8
2
1
8
8
1
1
8
8
0
18791879
1880
CONCRETE PAVING & STORM DRAINAGE SYSTEMF.F.E. = 1883.75
105,000 SF (300' x 350')
EX-D1A
EX-C1
EX-A3
EX-A4
EX-A9
CoCoCoCoCoCoCoCoCoCoCoCoDs2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3
Ds2Ds3Ds2Ds3 Ds2
Ds3Ds2Ds3
Ss
Ss
Ss
Ss
Ss
Ss
Ss
Ss
SsSs
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
S
F
Sd-1CSd1-S
Sd-1CSd1-S
Sd-1CSd1-S
Ds2Ds3Ds2Ds3Ss
Ds2Ds3Ds2Ds3Ss
B6Sd2-Ex
B5Sd2-Ex
B3Sd2-Ex
B2Sd2-Ex
B1Sd2-Ex
DATE:
PROJ NO:
DRAWN BY:
RE
VIS
IO
NS
P:\P
ro
je
cts\1
70
8-A
DC
-B
la
irsville
G
a P
ro
je
ct\1
70
8-B
AS
E-3
(S
TA
TE
).d
wg
, C
-4
.2
, ro
dn
ey, Ju
l 2
6, 2
01
7 - 5
:4
4:2
9p
m
FO
R
THIS SEAL IS VALID ONLY IF SIGNED AND DATED
BY THE LICENSED PROFESSIONAL SHOWN.
435 S
ECON
D ST
REET
, SUI
TE 20
1MA
CON,
GEO
RGIA
3120
1OF
FICE
478.7
42.36
16FA
X 47
8.742
.3569
Cunn
ingham
& Co
. Engi
neers
CIVIL EN
GIN
EERIN
G - CO
NSU
LTIN
G - PRO
JECT M
AN
AG
EM
EN
T
C C
6-14-17
C-4.2
INTERMEDIATE
ESPCP
1708
RCC
UN
IO
N C
OU
NT
Y D
EV
EL
OP
ME
NT
A
UT
HO
RIT
Y
UN
IO
N C
OU
NT
Y, B
LA
IR
SV
IL
LE
, G
EO
RG
IA
32
6 A
IR
PO
RT
IN
DU
ST
RIA
L D
RIV
E
C
ON
CR
ET
E P
AV
IN
G &
S
TO
RM
D
RA
IN
AG
E S
YS
TE
M
"ALL UTILITIES, WATER, FIRE, SANITARY, GASAND ELECTRICAL LINES, AND LATERALS MUSTBE MARKED WITH LOCATOR WIRE ANDDETECTOR TAPE".
Ds2
Ds1
Ds4
CODEPRACTICE
MAP SYMBOL
SF
SF
CONSTRUCTION EXIT
CHECKDAM
TEMPORARY DOWNDRAIN
PERMANENT DOWNDRAIN
LEVEL SPREADER
ROCK DAM FILTER
RETROFITTING
CURB INLET PROTECTION
MAP SYMBOLPRACTICE
CODE
Lv
Rd
Rt
Dn2
Dn1
Co
Sd3
St
Du
FILTER RINGFr
Ds2
Ds1
Ds4
Ss
Du
Sd2-F
Sd2-P
Cd
Ch-V
DISTURBED AREA STABILIZATIONWITH MULCHING ONLY
DISTURBED AREA STABILIZATIONWITH TEMPORARY SEEDING
DISTURBED AREA STABILIZATIONWITH PERMANENT VEGETATION
CHANNEL PROTECTIONWITH VEGETATION
FILTER FABRIC WITHSUPPORTING FRAME
TEMPORARY SEDIMENTBASIN
STORM DRAIN OUTLETPROTECTION
EROSION CONTROL MATTINGAND BLANKETS
Ds3 Ds3
DISTURBED AREA STABILIZATIONWITH PERMANENT VEGETATION
Ss
EROSION CONTROL LEGEND
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES.
IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT
PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION
AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO
CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER
THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY
SEEDING.
EROSION CONTROL AND TREE PROTECTION MEASURES SHALL BE
INSTALLED PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY AND
MAINTAINED UNTIL PERMANENT GROUND COVER IS ESTABLISHED.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED
BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL
MEASURES AND PRACTICES PRIOR TO OR CONCURRENT WITH
LAND-DISTURBING ACTIVITIES.
MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION
CONTROL PRACTICES, WHETHER TEMPORARY OR PERMANENT,
SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE PROPERTY
OWNER.
THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS
TO INSPECT THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE
REQUIREMENTS AND PERIMETER CONTROL BMPs WITHIN 7 DAYS
AFTER INSTALLATION.
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25
OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM
THE POINT OF WRESTED VEGETATION WITHOUT FIRST ACQUIRING
THE NECESRCCY VARIANCES AND PERMITS.
AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A
SIGNIFICANT EFFECT ON BMPs WITH A HYDRAULIC COMPONENT
MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF
THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT.
SILT FENCE - TYPE 'SENSITIVE'
SILT FENCE - TYPE 'NON-
Sd1-S
Sd1-NS
SENSITIVE'
CONTROLLING THE SURFACEAND AIR MOVEMENT OF DUST
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
30 30 60
30
12015
N
O
R
T
H
LIMITS OF CONSTRUCTION
AREA = 5.90 ACRES
LIMITS OF CONSTRUCTION
AREA = 5.90 ACRES
CONSTRUCTION EXITGPS LOCATION34.86138 N83.9850 W
INSTALLED BY JMWILLIAMS
STORM WATERMONITORING LOCATION #2
STORM WATERMONITORING LOCATION #1
PROPOSED CONCRETE DRIVEWAY-GRADING:
Concrete Paved Driveway Scope of Work:
1. State of Georgia Site Contractor shall be responsible to install new 25-feet wide
concrete driveway, including fine tune grading/proof-rolling of sub-grade, 6-Inches
graded aggregate base course and 6-Inch concrete paving, 4,000PSI fiber mesh with
welded wire fabric per detail on Sheet C-9.0.
2. Expanded concrete paving near the north/northeast corner of site, will be included as
part of this paved concrete driveway scope of work.
3. Concrete Paving Limits are shown in detailed hatching on Sheet C-5.0.
4. Specifications for concrete paving are included in separate documents.
Concrete Paved Driveway - Rough Grading Scope of Work:
1. Proposed grading plan shown on Sheet C-6.0 will be rough graded by UNION
COUNTY DEVELOPMENT AUTHORITY General Contractors.
2. State of Georgia Site Contractor shall be responsible to provide fine tune grading as
required to construct the new concrete paved driveway to finished surface elevations as
detailed on Sheet C-6.0.
PROPOSED STORM DRAINAGE SYSTEM:
Storm Drain Piping and Drain Structures Scope of Work:
1. State of Georgia Site Contractor shall be responsible for all required
trenching/excavation to install proposed storm drain pipes and drainage structures as
shown on Sheet C-6.0 and detailed in the Storm Drain Pipe Profile on Sheet C-6.1.
2. State of Georgia Site Contractor shall conform the storm pipe installation as detailed on
Sheet C-9.0 for HDPE Storm Piping Manufacture's recommendations.
3. Specifications for storm pipe system are included in separate documents.
PROPOSED EROSION CONTROL BMP'S:
Erosion Control Best Management Practices (BMP's) Scope of Work:
1. State of Georgia Site Contractor shall be responsible to install and maintain
during construction, over-excavated sediment traps as shown on Sheet C-4.2
and detailed with sizing requirements on Sheet C-4.2A, and in accordance with
details and specifications shown on Sheet C-8.5.
2. UNION COUNTY DEVELOPMENT AUTHORITY General Contractors will be
responsible to install the perimeter silt fence and construction exit and to
maintain these two BMP's during construction.
3. UNION COUNTY DEVELOPMENT AUTHORITY General Contractors will be
responsible for permanent grassing upon final site stabilization.