Application for Registration for Construction Industry Contractors

Transport for NSW | August 2020

Page 2: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

TRANSPORT FOR NSW APPLICATION FOR REGISTRATION FOR CONSTRUCTION INDUSTRY CONTRACTORS

Information to Applicants:1. The conditions and guidelines are to be read by the Applicant prior to completing this

Application Form, and form the basis of acceptance of this Application.

2. Trust, Sole Trader and Family Partnership are ineligible to apply for registration.

3. All items on this Application Form relevant to the Applicant's submission are to be completed, and all the relevant documents requested by Transport for NSW are to be attached to this Form. Applicants may submit relevant documentation additional to that requested by Transport for NSW to support their application.

4. Where a “yes/no” option is provided, tick the appropriate box and proceed to the next item. Items not relevant to an Applicant's submission are to be marked "NA" (not applicable).

5. It would takes 6 weeks to complete the assessment. Failure to provide information requested in this Application Form will delay processing and may result in the application being returned to the Applicant.

6. Applicants must submit the application form in electronic format, not hard copy.

1. Business name of Applicant in full (as used on tender submissions)

3. Applicant's office address in full

5. Applicant's postal address for correspondence (if different to item 2)

7. Applicant's contact person Designation

9. Telephone 10. Facsimile 11. Mobile

12. E-mail Address

14. Web Site Address

16. Registration Category/ies Applied for

17. Current Transport for NSW’ Registration Category/ies

2

Page 3: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

Application for Construction Category 2 (CC2) only

☐ traffic barrier rails and posts☐ mast arm and overhead gantries less than 10m tall☐ variable message sign support structures☐ mast lighting poles less than 12m tall☐ sign and traffic control structures☐ signposting structures☐ monorails and supports☐ safety screens☐ pedestrian railings☐ pedestrian fences☐ pile casings☐ tubular piles☐ finger plate expansion joints (other than approved products)☐ other

18. CCF or VicRoads Registration Category/ies(Attach copies of approvals)

19. ABN

20. Registered name of Applicant in full (if different to item 1)

22. Registered address of Applicant in full (if different to item 2)

24. Is the Applicant lodging this Application a Trustee?Yes ☐ No ☐

26. ATTACH an organisation chart showing the relationships between the Applicant and parent and/or subsidiary companies, including names of principals, directors and partners.

27. If the Applicant has operated as a contractor under its present business name for less than 7 years, provide the previous business names used by the Applicant (include dates):

29. ATTACH a separate Declaration Form stating whether or not any company director or partner, or a business in which any company director or partner were involved, has ever been declared bankrupt, been wound up leaving unpaid creditors, been involved in a compromise or other arrangement with creditors, or had an administrator appointed. (Not applicable for urban design services).

30. If a company director / partner has been involved in a situation described in Item 19 above, provide details on the extent of indebtedness and the seriousness of the matter, the length of control the person exercised over the organisation concerned and the length of time that has elapsed.

32. Has the Applicant ever been declared bankrupt, entered into receivership, management agreement scheme or composition pursuant to the Bankruptcy Act or the Corporations Law? (Not applicable for urban design services).Yes ☐ No ☐If yes, provide details on the extent of indebtedness and the seriousness of the matter, and the length of time which has elapsed.

3

Page 4: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

36. Have any adverse judgements (excluding minor fines or notices) been made against the Applicant for any breaches of or unlawful acts under legislation covering Work Health and Safety, Anti-discrimination, Fair Trading, Industrial Relations? (Not applicable for urban design services).Yes ☐ No ☐If yes, state when and the circumstances resulting in the adverse judgements.

40. ATTACH the following information about current projects and for those completed since the last Application for Registration, or those completed in the past 5 years(a) name and location of projects;(b) description of work, indicate if QA Contract;(c) project client;(d) contract value;(e) Superintendent or Client's Engineer, include name and contact telephone and(f) estimated or actual date of completion.

41. Has the Applicant, under any business name, ever failed to complete a contract?Yes ☐ No ☐If yes, name the project, the Principal and state the circumstances

45. ATTACH information about the technical experience of the Applicant's key personnel including(a) names of personnel and their professional and technical qualifications;(b) experience in Category/ies of work, on which project and a brief description and(c) present designation and duration in the position.

46. ATTACH information about the plant / equipment available to the Applicant for contract work including (Not applicable for urban design or erosion, sedimentation and soil conservation services)(a) description of plant item, including model and capacity;(b) quantity on hand;(c) ownership or leasing details and;(d) condition of plant, including year of manufacture.

47. Traffic Control Contractors only(a) List staff who have completed the required training courses and attach copies of

course certificates.

(b) Provide evidence that traffic control devices comply with the Australian Standard and Transport for NSW requirements for reflectivity (a letter from your supplier will suffice).

51. Construction Industry Laboratories only

(a) NATA Accreditation no.

(attach certificate)

(b) List staff having NATA signatory approval

(c) Detail how minimum requirements will be met for each annex laboratory

4

Page 5: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

57. Urban Design Services only

U Urban Design Services

Provide separate responses to the following requirements. To be no longer than 8 pages.

1. Demonstrated experience and understanding of urban design, at site, corridor and network scales, with applicability to transport and/or road infrastructure.

2. Demonstrated expertise on government infrastructure projects, including a statement of the team’s design approach, which demonstrates an understanding of TfNSW urban design related processes and policies, including safety in design considerations.

3. Recognised professional qualifications and current institute registration (or working toward registration) is required of all proposed team members at all levels in relation to architecture and landscape architecture. Additional qualifications in urban design are beneficial to registration. (Other disciplines and expertise may be included.)

4. Demonstrated technical expertise relating to; analytical and design abilities in the built and natural environment; and experience in the conversion of design concepts into practical, cost effective outcomes.

5. Experience with the environmental assessment process of infrastructure projects.

6. Demonstrated experience in community participation and high level presentation, specifically addressing urban design.

7. Management qualities (including organisational structure of proposed team, seniority of team leaders, management systems, team support including electronic and graphics resources).

8. High quality of service performance (including client relationships and past performance in meeting time, cost, service and quality requirements).

5

Page 6: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

58. Erosion, Sedimentation and Soil Conservation Consultancy Services

Each individual proposed for selection must fulfil the selection criteria for the appropriate category below:

Category S1 – Each individual proposed to provide the services is required to meet the selection criteria 1 to 6.

1. Recognised professional and/or technical qualifications in relation to erosion and sedimentation, soil conservation and stormwater management.

2. Demonstrated technical expertise in the design, implementation and maintenance of erosion and sedimentation controls and preparation of Erosion & Sedimentation Control Plans for construction activities.

3. Demonstrated experience in communication of erosion and sedimentation/stormwater management principles and design advice to field staff at all levels.

4. Demonstrated understanding of the expectations of the NSW Environment Protection Authority in relation to construction erosion and sedimentation issues and their legislative context.

5. Service performance (including client relationships and past performance in meeting time, cost, service and quality requirements).

6. Management qualities (including organisational structure of proposed team, management systems, team support including electronic and graphics resources). The application should note the nominated specialist individuals and support available to provide the services.

Category S2 – Each individual proposed to provide the services must meet the requirements of selection criteria 1 to 8.

7. Certification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International Erosion Control Association.

8. A minimum of 10 years total professional experience with a minimum of 5 years demonstrated experience specifically providing erosion and sedimentation services to construction projects, applicable to linear road construction

59. Demolition of PropertiesApplicants must attach a copy of their Workcover licence to carry out demolition works.

Licence No61. Stabilisation

(a) AustStab Accreditation no.(Attach Certificate)

(b) List specialist equipment for stabilisation

(c) Detail how minimum requirements will be met for each stabilisation category

FINANCIAL INFORMATION TO BE SUBMITTED(Not applicable for Traffic Control, Laboratory level L1, Urban Design or Erosion, Sedimentation

and Soil Conservation services)Note: Where the Applicant is a Trustee, the financial information is required for both the Trust and the Trustee.

6

Page 7: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

65. ATTACH a statement from the Applicant's bank or other financial institution advising ofa) branch and account name;b) overdraft facility;c) overdraft balance;d) guarantee facility;e) guarantees outstanding andf) brief details of any other funding facilities available (term loans, commercial

bills, or letters of credit).

66. ATTACH audited Financial Statements (including notes) for the last 3 financial years including:

a) trading account;b) profit and lossc) balance sheet;d) statement of cash flows;e) signed auditor's report andf) signed director's report (where Applicant is a corporation).

67. ATTACH details of any significant changes in the nature of the Applicant's operations since its last balance date and any recent developments that are expected to substantially affect the operating results of the Applicant for the current financial year.

WHS AND ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS(Not applicable for urban design; erosion, sedimentation and soil conservation services)

68. ATTACH evidence of the Applicant’s ability to develop WHS Site Safety Management Plans and Environmental Management Plans, submit the WHS Management System and SWMS if the registration category requires it.

QUALITY MANAGEMENT SYSTEM REQUIREMENTS(Not applicable for traffic control; urban design or erosion, sedimentation and soil conservation services)

Applicants are required to indicate on Attachment 1 - Quality Management System Q3/2 Checklist appended to this form where in the Applicant's Corporate System and Project Quality Plan each item in the checklist is addressed. The completed checklist/s are to be submitted together with the documents required below.

69. Documents to be submitted:A copy of the Quality Manual (optional) and a copy of Procedures (including those referred to in the Quality Manual) that would normally be applicable to TfNSW projects to provide evidence that a quality system has been developed.

70. A sample Project Quality Plan/s for work appropriate to the Registration Category/ies applied for, to provide evidence that a quality system can be readily implemented at a project level.

71. The documents requested in this Application Form must be attached and labelled (check/ tick if attached)☐ 18 CCF or VicRoads Registration Category/ies (Attach copies of approvals)☐ 24 Trust deed, beneficiaries, articles of association☐ 26 Organisation chart of parent and subsidiary companies☐ 29 Declaration☐ 40 Current and completed projects☐ 45 Technical experience of key personnel☐ 46 Available plant and equipment☐ 47 Traffic Control – specific requirements as per page 8 of the Registration

Guidelines

7

Page 8: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

☐ 51 Construction Industry Laboratories – specific requirements as per page 9 of the Registration Guidelines

☐ 57 Urban Design Services – specific requirements☐ 58 Erosion, sedimentation and soil conservation services – specific

requirements☐ 59 Workcover Licence for demolition of properties☐ 61 Stabilisation – specific requirements as per page 15 of the Registration

Guidelines☐ 65 Bank / financial institutions☐ 66 Audited financial statements or unaudited statements and signed taxation

returns☐ 67 Changes to Applicant's operations☐ 68 Evidence of ability to develop WHS Site Safety Management Plan and EMP☐ Quality Management System/PQP Checklist☐ 69 Quality Manual and Procedures☐ 70 Sample Project Quality Plan* Applicants registered with the CCF or Vicroads need only submit financial

details to apply for registration in D, E and F categories.

Name Designation Signature Date

8

Page 9: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

Post a USB to:

Manager Policy, Systems and ProcessesCommercial Services SectionCommercial, Performance & Strategy BranchInfrastructure & Place DivisionTransport for NSWLocked Bag 928NORTH SYDNEY NSW 2059

OR

Deliver to:

Email to:

Manager Policy, Systems and ProcessesCommercial Services SectionCommercial, Performance & Strategy BranchInfrastructure & Place DivisionTransport for NSW20-44 Ennis RoadMILSONS POINT NSW 2061

OR

Pre-Qualifications [email protected] [email protected]: (02) 9462 6587

9

Page 10: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

Registration Category

Complete TfNSW WHS

checklist

Complete TfNSW Q3/2

checklist

Submission of Environmental

Management PlanFinancial

Assessment

BD1 No No No Not requiredBD2 No No No Not requiredBD3 No No No Not requiredD Yes Yes Yes RequiredE Yes Yes Yes RequiredF Yes Yes Yes RequiredG Yes No No Not requiredL1 No No No Not requiredL2 No No No RequiredL3 No No No RequiredRD1 No No No Not requiredRD2 No No No Not requiredS1 No No No Not requiredS2 No No No Not requiredCC2 No No No RequiredU No No No Not requiredX Yes Yes Yes RequiredZ1 No No No RequiredZ2 No No No Required

The applicant shall complete TfNSW’s WHS and/or Q3/2 checklist/s by filling out the document name, Clause and page number from their Management System in the “Reference / Section / page no.” column for each question. Do not fill in the “Finding” column and tick the check box in the checklist. Once completed, the TfNSW’s WHS and/or QMS3 checklist/s must be submitted in MS Word version for editing purpose.

10

Page 11: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Application Form for Registration August 2020

ATTACHMENT 1

QUALITY MANAGEMENT SYSTEM

&

PROJECT QUALITY PLAN

Q3/2 CHECKLIST

11

Page 12: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

4 QUALITY MANAGEMENT SYSTEM4.2.4 Control of RecordsISO 4.2.4 Is a procedure documented for identification, storage,

protection, retrieval, retention time and disposition of records needed to provide evidence of conformity in relation to project work and of the effective operation of the quality management system?

F [ ]RMS Q3 Does the quality system provide for preparation of a Records

Management Plan (RMP) in accordance with Clauses E1 and E2 of RMS Q3?

F [ ]RMS Q3 Annex Q/E

Does the RMP include procedures which address the requirements of Clause E1.3.1 for the following:

E1.3.1 (a) the systematic control of the creation, registration, indexing, filing, maintenance, storage, movement, retrieval and disposal of project records related to the Contract?

H [ ]

E1.3.1 (b) providing to the Principal the information required under the Contract?

H [ ]

E1.3.1 (c) submission and delivery of Identified Records as specified?

H [ ]

E1.3.1 (d) disaster management plan in accordance with ISO 15489?

H [ ]

E1.3.1 (e) providing a list of Identified Records relevant to the Contract which must be progressively handed over to the RMS?

H [ ]

RMS Q3 Is the RMP consistent with the PQP?H [ ]

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

12

Page 13: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

8.3 Control of Nonconforming ProductISO 8.3 Is a documented procedure established which describes the

controls and responsibilities to ensure that product which does not conform to requirements is identified and controlled to prevent its unintended use or delivery?

F [ ]Does the procedure provide for the organisation to deal with nonconforming product by:

ISO 8.3 taking action to eliminate the detected nonconformity?H [ ]

ISO 8.3 authorising its use, release or acceptance under concession by a relevant authority and, where applicable, by the customer?

H [ ]

ISO 8.3 taking action to preclude its original intended use or application?

H [ ]RMS Q3 8.3

ensuring submission of Nonconformity Report within 2 working days to Principal if repairs or concessions are proposed?

H [ ]RMS Q3 8.3

ensuring that reworked and repaired products are re-inspected and re-tested to demonstrate conformity to the requirements?

F [ ]ISO 8.3 ensuring records are maintained of the nature of

nonconformities and any subsequent actions taken, including concessions obtained?

G [ ]ISO 8.3 allowing for the organisation to take action appropriate to

the effects, or potential effects, of the nonconformity when nonconforming product is detected after delivery or use has started?

G [ ]RMS Q3 Has a standard form been prepared for use as a

Nonconformity Report?G [ ]

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

13

Page 14: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

8.5 Improvement8.5.2 Corrective ActionISO 8.5.2 Is a documented procedure established which describes the

action that will be taken to eliminate the cause of nonconformities in order to prevent recurrence?

F [ ]Does the procedure define requirements for:

ISO 8.5.2 reviewing nonconformities (including customer complaints)?

H [ ]ISO 8.5.2 determining the causes of nonconformities?

H [ ]

ISO 8.5.2 evaluating the need for action to ensure that nonconformities do not recur?

H [ ]ISO 8.5.2 determining and implementing action needed which is

appropriate to the effects of the nonconformities encountered?

H [ ]ISO 8.5.2 recording the results of action taken?

H [ ]ISO 8.5.2 reviewing the corrective action taken?

H [ ]4.2 QUALITY MANAGEMENT SYSTEM4.2.3 Control of DocumentsISO 4.2.3 Are all documents in the PQP identified and revision status

shown?F [ ]

4.2.4 Control of RecordsQ3 4.2.4 Does the PQP describe how the quality records shown in

Annexure Q/E will be stored and maintained so that they are readily retrievable, in facilities that provide a suitable environment to minimise deterioration or damage, and to prevent loss of the records?

F [ ]

5 MANAGEMENT RESPONSIBILITY5.5 Responsibility, Authority and Communication

Does the PQP:Q3 5.5 nominate the Project Quality Representative?

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

14

Page 15: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

F [ ]Q3 5.5 indicate the relationship between the Project Quality

Representative and the Management Representative? (only applies where the Project Quality Representative is not the Management Representative)

F [ ]

Q3 5.5 Does the PQP list the responsibilities and authorities of personnel for: receiving, in-process and final (or acceptance) inspection

and testing?H [ ]

identifying/recording quality problems?H [ ]

initiating/recommending solutions through designated channels?

H [ ] ensuring corrective action is implemented and effective?

H [ ]

controlling further processing/delivery/installation of nonconforming product until deficiencies or unsatisfactory conditions have been corrected?

F [ ]

7 PRODUCT REALISATION7.4 Purchasing7.4.1 Purchasing ProcessQ3 7.4.1 Does the PQP:

require the Contractor to evaluate subcontractor’s capability and record the results of the evaluation where subcontracted work involves work processes that require process validation?

F [ ]

document how the subcontract requirements identified in Annexure Q/F will be included in subcontracts and purchase orders whenever they apply?

F [ ]

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

15

Page 16: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

7.4.2 Purchasing InformationQ3 7.4.2 Does the PQP provide for subcontractor work process control

documentation to be included (when applicable)?H [ ]

7.4.3 Verification of Purchased ProductQ3 7.4.3 Does PQP include the methods of surveillance that will be

implemented for subcontracted work (when applicable)?F [ ]

7.5 Production and Service Provision7.5.1 Control of Production and Service ProvisionQ3 7.5.1 Does the PQP include work process control documentation

for work processes covered by the Specifications including the following?(Note: documentation for the main work processes is sufficient) details of controlled conditions (eg. sequence of

operations, work methods, inspection/test/control points)?F [ ]

the use of suitable equipment (including maintaining equipment in suitable condition and/or calibration)?

F [ ] special working environment aspects (when applicable)?

F [ ] competency and skills of personnel?

F [ ] product characteristics, tolerances, and workmanship

standards to be met?F [ ]

how work processes will be monitored to ensure their continuing suitability?

F [ ] records to be kept?

F [ ]

responsibility for implementing and monitoring process controls and rectifying any deficiencies?

F [ ]

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

16

Page 17: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

7.5.2 Validation of Processes for Production and Service Provision

Q3 7.5.2 Does the PQP identify work processes, including subcontracted work, where resulting output cannot be fully verified by subsequent monitoring and measurement in accordance with ISO 9001 Clause 7.5.2?

F [ ]Q3 7.5.2 Are these work processes documented to indicate operator

qualifications, equipment controls, method for validating process parameters and records to be kept (as appropriate)?

F [ ]Q3 7.5.2 Does the PQP make provision for performing validation and

keeping process validation records (when appropriate)?F [ ]

7.5.3 Identification and TraceabilityQ3 7.5.3 Does the PQP describe method for subdividing work into

Lots and to uniquely identify each Lot? (Alternatively, may apply a suitable product identification procedure)

F [ ]

Q3 7.5.3 Does the PQP describe how traceability of materials specified in Annexure Q/G will be maintained (where appropriate)?

F [ ]8 MEASUREMENT, ANALYSIS AND IMPROVEMENT8.1 General

Does the PQP explain how to carry out and record receiving, in-process and final inspection and testing for work processes controlled by the Contractor, and describes who is responsible?

F [ ]8.1.1 Inspection and Test PlanningQ3 8.1.1 & Q3 7.4.2

Are ITPs (and associated ITP forms) included for all inspection and testing required by the Specifications, including subcontracted work?(Note: documentation for the main activities is sufficient)

F [ ]

Q3 8.1.1 Do ITPs and ITP forms identify: who performs each inspection or test and at what stage of

the work?F [ ]

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

17

Page 18: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

how the inspection or test is to be carried out and recorded?

F [ ] frequency of sampling/testing and acceptance criteria?

(reference to specification clause alone is unacceptable)F [ ]

when statistical analysis of test results is required?F [ ]

Hold and Witness Points, time limits for testing and time constraints for submission, (when applicable)?

F [ ] who performs final review of all inspection/test results to

confirm that all inspections and tests have been carried out to completely verify conformity for each Lot?

F [ ]Do ITP forms include provision to indicate whether each Lot has passed or failed its inspections and/or tests?

F [ ]Do ITP forms include provision to indicate when nonconformity control is addressed?

F [ ]8.1.3 Inspection and Test StatusQ3 8.1.3 Does the PQP describe the method for identifying and

controlling the inspection and test status of all product and work under the Contract?

F [ ]8.2 Monitoring and Measurement8.2.4 Monitoring and Measurement of ProductQ3 8.2.4 Do ITPs (or PQP) document a method to show whether each

product or Work Lot has received the frequency of testing required by the Specifications?

F [ ]

Q3 8.2.4.1 Does the PQP document a suitable method for closing out Work Lots?

F [ ]Q3 8.2.4.2 Is provision made on inspection/test records to identify Work

Lots and keep traceability records (when applicable)?F [ ]

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

18

Page 19: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Assessment of a contractor’s quality management system (Q3/partial ISO 9001:2008) Quality Management System Evaluation Checklist for

ISO/RMS Q3 Clause

Requirement Reference / Section / page no.

Guide (1)

Finding(2)

Q3 8.2.4.3 Does the PQP describe the method of release of Hold Points?F [ ]

Q3 8.2.4.3 Does the PQP include an effective method for traceability/closure for any Work Lots that may have to be covered up before the results of all conformity tests are known?

F [ ]8.3 Control of Nonconforming ProductQ3 8.3 Does the PQP make provision to apply the corporate

nonconformity procedure, including the additional requirements of RMS Q3 Clause 8.3?

F [ ]Q3 8.3 Does the PQP document a method to ensure submission of

Nonconformity Reports within 2 working days of detection of the nonconformity?

H [ ]8.5 Improvement8.5.2 Corrective ActionQ3 8.5.2 Does the PQP make provision to apply the corporate

corrective action procedure?F [ ]

1. Guide to Assessors: F = Accreditation withheld rated “C”; G = Finding not considered for accreditation;H = Accreditation may be withheld if frequently rated “C”

2. Evaluation rating: A = Acceptable; C = Nonconformity – condition requiring corrective action; M = Marginal nonconformity or potential for improving guidelines/implementation

19

Page 20: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Transport for NSW Contractor WHS Site Specific Plan Assessment

Introduction

Project Contractor

Location Contract No.

TfNSW Representative Project Manager

Project Brief Description

Reviewer Title

Signature Date Contact

CONTRACTOR SITE SPECIFIC SAFETY PLAN ASSESSMENT SUMMARY

PREQUALIFICATION/ REGISTRATION RECOMMENDED: YES / NO

FURTHER DETAIL REQUIRED: YES / NO

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 1

Page 21: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Summary of the Elements of TfNSW WHS Site Specific Plan Assessment

Element Descriptor Level of Standards to be ObtainedThe Organisation shall ensure that:

1 Statement of Responsibilities

Responsibilities, accountabilities and commitment to Work Health and Safety (WHS) and resources to implement and verify the system are established and documented.

2 Risk Management Processes are established to ensure that WHS hazards are identified, assessed and controlled using mechanisms such as Risk Control Plans, Safe Work Method Statements and Hazardous Task and Hazardous Substances (Risk Management) procedures.

3 Safe Work Method Statements

Safe Work Method Statements are developed for the range of hazardous tasks associated with the project.

4 Communication Consultation and Training

Procedures are established for sharing relevant WHS information with workers and service providers and for receiving feedback from such communications. Processes are also in place to ensure that resources are allocated to identify and provide for the training needs of personnel.

5 Emergency and Incident Management

Procedures are established for inter-site and external emergency communications, emergency organisation and contingencies, key personnel accountabilities, the reporting of accidents and incidents including the implementation of corrective action and the effective management of injuries and rehabilitation.

6 Site Safety Rules Effective Site Safety Rules are developed and communicated to all workers, service providers and visitors to the work site(s).

7 Site Specific Hazard Management Tools

Hazards specific to the project in question are managed to minimum standards.

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 2

Page 22: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Identified Site Specific Hazards

Plan SectionReference

Hazard Section PageProposed Control/s

1            

           

           

           

           

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 3

Page 23: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Summary of Findings

1

Recommendations

1

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 4

Page 24: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 5

Page 25: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Seven Element Desktop Assessment of XXXXXXXX Site Safety Management Plan

The Site Safety Management Plan should contain the minimum provisions of allocation of responsibilities, effective risk assessment, consultation and emergency contingency planning, as articulated within the NSW WHS Regulation 2011.

1. Statement of Responsibilities

Question Does the Site Safety Management Plan define who will be responsible for:Findings Reference / Section

Identifying hazards and assessing risks, and documenting the risk control measures to be taken?

Managing compliance with WHS and injury management regulations, standards, codes, SWMSs and site safety rules?

Assessing and monitoring the capability of goods and service providers in the supply chain, and verifying they consistently meet WHS requirements?

Providing service providers with the Site-specific Safety Management Plan?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 6

Page 26: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Displaying Site Safety Rules and ensuring they are available to all persons on the site?

Managing WHS communication and consultation on the work site?

Conducting site-specific induction(s)?

Ensuring all personnel has attended general and site specific work activity WHS training before starting work on site?

Preparing, maintaining and making available the hazardous chemicals / dangerous goods register?

Managing injuries on the site?

Maintaining first aid stocks and providing first aid?

Keeping WHS records?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 7

Page 27: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

2. Risk Management

Question Does the Site Safety Management Plan contain clearly defined procedures and provisions for the:Findings Reference / Section

Identification of hazards on site including consideration of manual and material handling, hazardous tasks, confined spaces, excavations, heights, underground and overhead utilities and working with fixed and mobile plant and vehicles, hazardous substances and dangerous goods, where applicable?

Assessment of the risks for each hazard and/or hazardous activity?

Selection of the most effective risk control measures aligned to the hierarchy of controls?

Inspection of the worksite, utilised plant and equipment using standard hazard checklists before commencing work at the site?

Monitoring the effectiveness of risk controls through direct observation or inspection of the task or work area?

Work of a hazardous nature and High Risk Construction work to be undertaken with reference to SWMS - Safe Work Method Statements?

Safe handling, storage and use of plant and substances?

Assessment of other Service Provider SWMSs when engaged on site?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 8

Page 28: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

3. Safe Work Method Statements (SWMS)

Question Do SWMSs:

FindingsReference /

Section Include a description of the work to be undertaken?

Identify the work that is high risk construction work according to Clause 299 WHS Regulation 2011?

Specify the hazards associated with the activity, job or tasks?

Describe the measures to be implemented to control the risks?

Describe how measures are to be implemented, monitored and reviewed?

Include the step-by-step sequence of activities and tasks involved in doing the work?

Identify the relevant legislation, regulations, codes, standards and procedures applicable to the work?

List the names and qualifications of those who will supervise the work and also those who will inspect and approve work area conditions, work methods, protective measures, plant, equipment and power tools that are to be used?

Include a description of what training is given to people involved with the work?

Include details of any WorkCover permits, certificates and/or licences required to complete the work?

Include details of the inspection and maintenance checks that will be, or have been carried out on the plant and equipment listed for use?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 9

Page 29: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

4. Communication, Consultation and Training

Question Does the Site Safety Management Plan contain clearly defined procedures and provisions for the:

Findings Reference / Section

Effective consultation with all workers and duty holders prior to decisions affecting health and safety?

Identification of WHS training needs of management, supervisors and other personnel?

Induction and safety training for all personnel on the work site, including general and site specific induction training and task based training before starting work and refresher training where appropriate?

Delivery of any statutory prescribed consultation training including any required training for WHS Representative(s)?

Keeping of training records?

Appropriate supervision of personnel?

Supply of the Site Safety Management Plan to Service Providers when engaged on site?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 10

Page 30: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

5. Emergency and Incident Management

Question Does the Site Safety Management Plan contain clearly defined procedures and provisions for the:Findings Reference / Section

Consideration of possible emergency scenarios?

An effective means of communication of incidents/accidents to emergency services and relevant authorities?

Participation in emergency drills?

A list of key personnel including emergency services, business and after hours contact numbers?

The documenting and reporting of injuries and near miss incidents?

The presence of a first aid kit onsite?

The presence of a trained first aid officer onsite?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 11

Page 31: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

6. Site Safety Rules

Question Does the Site Safety Rules contain provisions for the:Findings Reference / Section

Safe access and egress to the work site and safe movement of vehicles and people on the work site with a plan for the separation of people on foot and plant?

Escorting of visitors by inducted persons while on the work site?

Wearing by personnel and visitors of appropriate personal protective equipment (PPE) when on the work site?

Use of First Aid facilities and illness/injury and emergency procedures, including the reporting and recording of illness/injury and incidents?

Effective protection for workers and the public, including barricades, fencing and overhead protection where applicable?

Identification of the location of the hazardous chemicals / dangerous goods register?

Prohibition of the consumption of alcohol and illegal drugs on the worksite?

Maintenance of effective housekeeping within the worksite?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 12

Page 32: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.1. Site Specific Hazard Management Tool (H1) – Manual Handling

‘Manual Handling’ is defined as any activity requiring the use of force or exertion by a person to lift, lower, push, pull, carry or otherwise move, hold or restrain any animate or inanimate object. Where manual handling is undertaken on site there should be a documented procedure that satisfies the minimum provisions articulated within the NSW WHS Regulation 2011.

Question Concerning the Manual Handling Procedure, does the procedure outline how:

Findings Reference / Section Assessments of potential for injury arising from manual handling tasks, including

potential injury from new work methods and equipment shall be undertaken? The effectiveness of manual handling risk controls shall be monitored?Assessments undertaken shall involve: Analysis of workplace injury records? Consultation with workers and all other duty holders? Direct observation or inspection of the task or work area? Known risk factors, including those listed in the Hazardous Manual Tasks Code of Practice

(2012) and Chapter 4, WHS Regulation 2011 shall be considered in the assessment of manual handling tasks? (These risk factors include: actions and movements, workplace and workstation layout, working posture, duration and frequency, location of loads and distances moved, weights and forces etc)?

Manual handling tasks shall be redesigned to eliminate or control the risk factors? Personnel shall be trained in safe manual handling techniques, and retrained when new

work methods or equipment are introduced into the workplace?Where risk factors are identified and redesign is not practical, the following shall be provided and workers trained in use: Mechanical aids and/or

Personal protective equipment and/or Arrangements for team lifting?

7.2. Site Specific Hazard Management Tool (H2) – Use, Installation, Inspection and/or Repair of Plant

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 13

Page 33: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

‘Plant’ is defined as any machinery, equipment or appliance. Where plant is utilised on site there should be a documented procedure that satisfies the minimum provisions articulated within the NSW WHS Regulation 2011

Question Concerning the Procedure on Plant, does the procedure outline how:

Findings Reference / Section

The identification of foreseeable hazards from the operation of plant/equipment shall incorporate the following considerations:

Contact or entanglement with the machinery or materials?

Being trapped between the machine and any material or fixed structures?

Being struck by ejected material from the machinery?

Noise and vibration from the machinery?

Release of potential energy?

Separation of mobile plant and people on foot?

The design limitations of the plant shall be assessed, with regard to the intended use of the plant?

Work with lasers shall be undertaken in compliance with Clause 223 WHS Reg 2011?

Cranes to have a risk assessment that identifies the operations to be performed including a movement plan, compliance of lifting equipment, attachments and slings and load capacity?

Findings Reference / Section

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 14

Page 34: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

The history of unsafe incidents or adverse health effects involving the plant/equipment shall be investigated and control responses applied?

The consequences of reasonably foreseeable misuse or malfunction shall be assessed?

A schedule of inspection, maintenance, repair and cleaning for all plant / equipment shall be implemented?

Records shall be kept of inspection, maintenance, repair and cleaning of plant / equipment?

Risk assessments shall be carried out on any modification to plant/equipment and the results of the risk assessment taken into account in the final modification?

All operators of plant/equipment shall receive appropriate training, hold certificates of operation where required, and have demonstrated their competence to operate the plant/equipment to the satisfaction of the contractor?

Records shall be kept to show that all operators have received appropriate training and instruction?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 15

Page 35: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.3. Site Specific Hazard Management Tool (H3) – Preventing Falls

The WHS Regulation 2011, Part 4.4 requires that persons are protected from the risk of falls.

Question Concerning the Procedure on the Prevention of Falls, does the procedure outline how:Findings Reference / Section

Site security in the form of perimeter fencing and signage shall be used according to the requirements of Clause 298, WHS Reg 2011?

A risk assessment shall be undertaken to control risks to people below the immediate work area as required in Clause 55 WHS Reg (Does it for example describe how provision shall be made to catch falling objects and barricade work areas to prevent public access, etc)?

A risk assessment is undertaken to determine any work with the risk of falling 2 meters and that the work has a SWMS (as described in Part 6.3, Div 2 WHS Reg, for high risk construction work)?

If there are no practical alternatives to preventing falls, fall protection devices shall be provided?

Contractors shall possess the appropriate training, competence and experience prior to the commencement of work with a risk of fall of 2 or more meters?

A firm level surface below the work area including the perimeter shall be prepared to facilitate the use of scissor hoists or rolling scaffold where these items of plant shall be used?

The work area shall be inspected prior to the commencement of work to ensure that all platforms and surfaces are stable and structurally sound?

Portable ladders are only used for access and egress, where no other options are practicable and then only as short term solution?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 16

Page 36: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Personal protective equipment shall be used to combat the risk of falling objects, glare, thermal stress, noise and other physical hazards where encountered while working at height?

Equipment used for accessing elevated works are regularly checked and maintained to a safe condition and where applicable have the required certificates e.g. scaffolds?

Specific risk areas shall be clearly signposted?

Relevant legislative requirements, regulations, Codes of Practice and Australian Standards shall be taken into consideration when selecting and using the appropriate fall arrest devices, safety mesh, scaffolding safety nets and guardrails, etc?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 17

Page 37: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.4. Site Specific Hazard Management Tool (H4) – Confined Spaces

Where tasks are undertaken in or near confined spaces on site there should be a documented procedure that satisfies the minimum provisions articulated within Part 4.3, NSW WHS Regulation 2011.

Question Concerning the Confined Spaces Procedure, does the procedure outline how:Findings Reference / Section

To comply with Part 4.3, WHS Regulation and demonstrate how to ensure safe + effective planning and supervision of work involving confined space entry?

A risk assessment and a SWMS will be conducted, in consultation with workers, for all hazards associated with entering the confined space, performing the planned work and for an emergency response?

A physical barrier is erected around the space to prevent unauthorised entry where practicable?

All hazardous activities including and not limited to hot works, hazardous chemicals and operating plant in or near the confined space have been identified, assessed and controlled?

A confined space entry permit is required to enter as articulated in Cl 67 WHS Reg?

The identification and nature of the substances last contained in the confined space shall be determined?

Air monitoring has been conducted and recorded (as required) for safe levels of oxygen and for flammable gases and vapour?

Rescue equipment for all persons likely to enter the confined space has been assessed?

Cleaning will be managed in the confined space?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 18

Page 38: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Arrangements for rescue, first aid and resuscitation shall be implemented?

Those entering confined space and stand by person have completed nationally recognised confined space training?

The soundness and security of the overall structure and the need for illumination and visibility shall be assessed?

When conditions change the risk assessment, controls and SWMS are reviewed and the changes communicated?

The relevant Legislation, Regulations, Codes of Practice and Australian Standards been be taken into consideration when undertaking confined space work?

Personnel shall be assessed for aptitude and fitness for task and confined space entry?

Personnel shall be trained in and received specific site induction for:Emergency exit and entrance procedures, use of applicable respiratory protection devices, first aid including cardio-pulmonary resuscitation (CPR), lockout procedures, safety equipment use, rescue drills, fire protection, communications.

The selection, training and competencies of the persons required as stand by person

outside the space are to:

Maintain equipment essential for the confined space task?

Ensure adequate communication with and observation of the persons within the confined space?

Properly initiate rescue procedures?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 19

Page 39: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.5. Site Specific Hazard Management Tool (H5) – Pedestrian and Vehicular Interaction

Question Concerning the Pedestrian and Vehicular Interaction Procedure, does the procedure outline how:Findings Reference / Section

A worker on foot plan is in place. Includes exclusion zones and safe pedestrian access routes?

Volume and type of traffic shall be considered, to determine the amount of road and/or footpath space which must remain open and, where applicable, the times of day when greater amounts of space are required, including the following types of traffic:

Pedestrians – including disabled persons?

Bicycles?

School children?

Emergency vehicles?

Buses and light rail, including stops and terminals?

Over-dimensional vehicles?

Type of traffic routing required shall be assessed?

Type of traffic control required shall be determined as per the requirements of the TfNSW Traffic Control at Work Sites Manual?

Traffic control requirements shall be determined for intermediary arteries?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 20

Page 40: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Requirement to use police or TfNSW personnel to institute diversions shall be determined?

Impact on any main arterial roads shall be assessed?

Traffic impact shall be assessed for work undertaken in proximity to traffic lights?

Requirements for special lighting shall be determined?

Positioning of cones and early warning signs shall be considered?

Training shall be provided to personnel working on roads, including:

Wearing the appropriate personal protective and safety equipment?

Being properly located?

Communicating effectively?

Assessing changes in traffic patterns?

Knowing what to do in an emergency?

Requirements for records shall be maintained concerning the:

Installation, alteration and removal of all regulatory signs and devices, including speed restriction signs?

Hours of operation and the surface conditions?

7.6. Site Specific Hazard Management Tool (H6) – Hazardous Substances and Dangerous Goods

The procedures must incorporate the documentation and classification of hazardous chemicals and dangerous goods in terms of general safe storage and handling requirements, safety data sheets (SDS) and purchasing requirements in accordance with the NSW WHS Regulation 2011.

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 21

Page 41: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Question Concerning the Hazardous Substances (HC) and Dangerous Goods (DG) Procedure, does the procedure outline how:Findings Reference / Section

All HC and DG on site shall be identified and included in a register that is accessible?

Safety Data Sheets (SDS) that are current shall be obtained for all HC and DG in use?

The risks associated with the use of HC and DG shall be assessed and the results documented?

Recommended risk control measures for HC and DG shall be developed and safe systems of work implemented and documented?

Those who may use or be exposed to HC and DG are trained in the nature of the hazards and means of controlling the hazard?

HC and DG are correctly labelled with the name and with appropriate health and safety information?

All HC and DG are correctly stored and according to Chapter 7 and Schedule 11, NSW WHS Reg 2011 and to Managing Risks of Hazardous Chemicals Code of Practice? (e.g. bunded / well ventilated are/ incompatible substances separated / not exposed to the weather)

Manifest quantities will be managed and notified to WorkCover according to requirements of Chapter 7, NSW WHS Reg 2011?

Findings Reference / Section

New substances are to be safely introduced to the workplace?

Spill kits will be provided and clean-up procedures implemented?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 22

Page 42: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Health surveillance is provided where required and records maintained. A competent person is appointed to do health surveillance checks under the supervision of authorised medical staff?

Emergency procedures are established and documented to prevent fire or explosion and control risks due to escape or spillage of HC and DG?

Regular emergency drills shall be scheduled and undertaken?

HC and DG shall be disposed of appropriately, in compliance with environmental laws?

An inspection/auditing process shall be in place which monitors the control of HC and/or DG, and which reviews whether SDSs are up to date?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 23

Page 43: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.7. Site Specific Hazard Management Tool (H7) – Electrical Safety

The procedure must incorporate the application of the WHS Regulation 2011 and relevant electrical Codes of Practice and AS/NZS 3012:2010 Electrical Installations on Construction and Demolition Sites.

Question Concerning the Electrical Safety Procedure, does the procedure outline how:Findings Reference / Section

A program is in place for regular inspection and testing of electrical installations and equipment including cords and carried out by suitably qualified persons in accordance with AS3760 and Part 4.7 NSW WHS Regulation 2011?

An Electrical Register identifying all electrical equipment, evaluating compliance and the results of testing is maintained?

A SWMS is used for all tasks involving interaction with electricity?

Effective control measures have been implemented to eliminate or minimise exposure to electrical energy?

Workers who work with or in the vicinity of electrical hazards receive training on the nature of the hazards and methods of control?

An “Electric Shock Response” protocol has been developed, documented and communicated to those exposed to the risk?

Any live electrical work is authorised and in the presence of a safety observer who is qualified and competent for the task, electrical rescue and cardiopulmonary resuscitation?

The isolation point of the relevant electrical supply has been clearly identified, and easily accessed and operated quickly?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 24

Page 44: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Findings Reference / Section

All switches on electrical equipment are correctly identified?

Adequate signage will be used to warn of electrical hazards and/ or restrict access to the area?

All circuits and electrical equipment are protected by an RCD device which is tested monthly?

All electrical leads are kept off walkways and raised off the ground away from water/ corrosives/heat/ friction and other forms of physical damage?

Inspections will identify obvious signs of damage to electrical equipment, signs of water exposure, damage or incorrectly replaced covers and damage or alterations to buildings that may expose an electrical risk?

All defective electrical equipment, tools or cords are tagged ‘Out of Service’?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 25

Page 45: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.8. Site Specific Hazard Management Tool (H8) – Traffic Control

Question Concerning the Traffic Control Procedure, does the procedure outline how:

Findings Reference / Section

A traffic control plan shall be developed which is compatible with requirements set out in sections 4 and 5 of the TfNSW manual ‘Traffic Control at Work Sites’?

The traffic control plan shall be relevant for the work?

Traffic control is designed, modified and controlled by persons trained to the TfNSW requirements?

The following issues shall be considered:

Appropriate sign sizes?

The need for pairs of signs?

The need to use portable traffic signs?

The need to use flashing arrow signs?

The need to use Traffic Controllers?

Work site speed limits shall be in place?

A Vehicle movement plan shall be developed and implemented?

Signs and devices shall be installed in accordance with the traffic control plan?

Any contradictory, distracting or superfluous signs or markings shall be identified?

Findings Reference / Section

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 26

Page 46: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Signs shall be suitably placed with regard to:

Sight distance?

Motorists approaching at high speed?

Queue lengths?

Visibility, shade, light glare?

Signs displayed shall be appropriate for the current conditions?

Only undamaged or non-defective signs shall be used?

The needs of pedestrians shall be considered?

The needs of cyclists shall be considered?

The requirements for safety barriers shall be considered?

Safety barriers shall be installed correctly?

Access to adjoining properties shall be provided?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 27

Page 47: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.9. Site Specific Hazard Management Tool (H9) – Gas, Liquid and Electrical Underground Utilities

Question Concerning the Underground Utilities Procedure, does the procedure outline how:Findings Reference / Section

Plans and other relevant information about the underground utilities shall be obtained from ’Dial Before You Dig’?

A site survey shall be undertaken to identify surface indicators of utilities?

Suitable cable and pipe locating devices shall be used to confirm the position of the utilities (remember these devices can’t detect plastic pipes)?

Persons locating underground utilities are trained in the operation of the locating devices?

Information concerning the location of utilities shall be given to the responsible supervisor or contractor at the work site?

The position of underground utilities shall be marked on the surface?

The location of utilities shall be plotted on the work area plan?

The relevant authorities shall be notified of any inconsistencies between the information they provided and the actual location of the utilities?

Onsite assistance shall be sought from the relevant authorities if utilities cannot be located according to the plans provided?

Persons involved in the work shall be trained in controlling risks associated with underground utilities in the vicinity of work sites?

Findings Reference / Section

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 28

Page 48: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Safe work method statements shall be developed for working near underground utilities and how workers shall be trained in the requirements of these work methods?

Manual tools shall be used to dig trial holes to positively identify position of the utilities?

Power tools and mechanical excavators shall be used with care and at a safe distance from the utilities?

All workers shall be kept clear of the excavator bucket while digging work is conducted in the vicinity of utilities?

During excavations work is undertaken in accordance with WorkCover Guide ‘Work Near Underground Assets’ and a watch kept for evidence of cables not previously identified?

Underground utilities near machine excavation have been positively identified through potholing with non- conductive tools and a competent safety observer is in place?

Approval from the asset owner has been obtained for excavations within 10m of Single Wire Earth Return transformer poles?

If heavy plant is required to cross an area where underground utilities are known to exist, the cross points shall be kept to a minimum and shall be clearly marked?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 29

Page 49: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.10. Site Specific Hazard Management Tool (H10) – Overhead Utilities

Question Concerning the Overhead Utilities Procedure, does the procedure outline how:Findings Reference / Section

Staff involved in the work shall be trained in controlling risks associated with overhead utilities in the vicinity of work sites?

Safe work method statements shall be developed following risk assessment for working near overhead utilities and workers shall be trained in the requirements of these work methods?

Plans and other relevant information about the overhead utilities shall be obtained?

A site survey shall be carried out to identify the precise location of overhead utilities and the location of overhead utilities shall be plotted on the work area plan?

Information concerning the location of utilities shall be given to the responsible supervisor or contractor at the work site?

The relevant authorities shall be notified of any inconsistencies between the information they provided and the actual location of the utilities?

The possibility shall be considered to have the supply authority de-energise the overhead lines while work is being carried out in the vicinity?

Only qualified personnel shall be allowed to operate plant and equipment near overhead utilities? In this case personnel who have completed a ‘Crane and plant electrical safety’ course conducted by a suitably industry experienced trainer with an approved RTO?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 30

Page 50: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Findings Reference / Section

An observer shall be present to watch the operation of the plant and equipment at all times while it is being operated in the vicinity of overhead utilities?

All plant and equipment to be used in the vicinity of overhead utilities shall be appropriately insulated?

The minimum working distances specified in NSW COP 2006 Working Near Overhead Powerlines for unauthorised persons shall be complied with:

8m for > 330kV, 6m for >132kV but < 330kV, 3m for < 132kV?

Allowance shall be given to variations in the sag of the line at different times of the day?

Allowance shall be given to the sway of the lines, particularly if wind conditions change during the work period?

The supply authority shall be told when work in the vicinity of overhead utilities has been completed and a record of the notification shall be kept?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 31

Page 51: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

7.11. Site Specific Hazard Management Tool (H11) – Excavation

Excavation is defined to include the excavation or filling of trenches, ditches, shafts, drifts, rises, wells, tunnels and pier holes or work involving the use of caissons and cofferdams or any similar work involving excavation depths greater than 1.5 metres.

Question Concerning the Excavation Procedure, does the procedure outline how:Findings Reference / Section

The nature and condition of the ground or working environment and all foreseeable hazards arising from the excavation work shall be subject to a risk assessment, in particular:

The possibility of the fall or dislodgement of earth/rock or other materials?

The instability of the excavation or adjoining structure?

The in rush of water (or any other substance e.g. sewer)?

The placement of excavated material?

Instability due to person or plant working adjacent to the excavation?

Contact with overhead utilities?

Effect of mobile plant on the stability of the excavation?

Contact with persons or other machinery?

Ejection of material?

Possibility of overturning?

Findings Reference / Section

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 32

Page 52: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

The possibility of the excavation becoming a confined space?

Procedures will demonstrate how:

A geotechnical engineer shall be consulted where appropriate and where the angle of repose is greater than 45 degrees a written certification is required?

A written SWMS shall be developed and all excavation workers shall be trained on its requirements?

An adequate system of safety (including, benching, battering, shoring, or other forms of earth retention) shall be used to control the major hazards associated with excavations?

Excavations (actual, previous or planned) in the near proximity shall be identified and their impact on the works assessed?

Underground and overhead services shall be identified, marked, and located prior to excavation commencing?

Provision shall be made to adequately secure the site at all times including when left unattended?

A competent person shall be appointed to supervise all excavation work at a depth of more than 1.5 metre, work in tunnels, on caissons and cofferdams or compressed air work in an excavation?

Safe access and egress shall be provided for in the excavation (including to and from caissons and cofferdams) throughout the duration of the works?

Findings Reference / Section

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 33

Page 53: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Persons will not work alone in or around an excavation ranked as high or medium risk?

An inspection schedule shall be developed and completed by a competent person during the excavation?

Checks are undertaken to identify any heaving or swelling of the ground at the bottom of the excavation, or any changes to soil conditions where water is seeping in, and work methods are modified where required?

Provisions for a stand by person shall be implemented?

The placement of excavated material shall be considered and planned for?

Excavations in, or adjacent to roads shall be adequately shored or supported to:

Ensure the stability of residual road slab after excavation is complete?

Provide support for all pavements or road surfaces whilst the excavation is open?

Control for instability due to adjacent or overhead traffic?

Trench covers and shoring shall be approved by a structural engineer?

Safety barriers or delineations used on road sites shall comply with the TfNSW Traffic Control at Worksites Manual and/or any other relevant standards or specifications?

Findings Reference / Section

The emergency procedures shall address all foreseeable major hazards, particularly the following:

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 34

Page 54: Erosion, Sedimentation and Soil Conservation Consultancy ... · Web viewCertification of Certified Professional in Erosion and Sedimentation Control (CPESC) from the International

Acceptable Require Attention NA Not Applicable Version 2

Collapse of excavation?

Unplanned contact with underground or overhead services?

Inrush of water or other substance into excavation?

Exposure to hazardous substances?

Emergency procedures shall be communicated to all persons working in or near the excavation works before work commences?

Review of XXXXXX Site Safety Management Plan. Reviewed on XX/XX/20XX 35