Contents
• Integration Efforts• Program Specific Information
– Regional Maintenance
– Program Management
– Financial Management
– AvSCM/MM
Integrating the Programs
4
Programs & Integration Teams
AvSCM/MM NWCF
PM REG. MAINT
BCATBusiness CaseDevelopment
EDITData Integrationand Metadata
SME GroupsFIPT
Program MgmtAsset/ Maint. Mgmt
HATArchitectureCoordination
ESG
Integration Teams
5
SAP Module MatrixRegional Maint. Program Mgt. Financial Mgt. AvSCM/MM
Materials Management (MM) x x x xPlant Maintenance (PM) x x x xControlling (CO) x x x xProject Systems (PS) x x x xFinancial Accounting (FI) x x x xHuman Resources (HR) x x x oQuality Management (QM) x x oWorkflow (WF) x x oIndustry Solutions (IS) x x xSales & Distribution (SD) x x xAsset Management (AM) x x xProduction Planning (PP) x xFunds Management (FM) x xPurchasing (PR) xTravel & Expense (T&E) xInvestment Management (IM) xTreasury & Cash (TR) x
x = module to be included in SAPo = module under consideration
6
Integrators/Subcontractors/Bolt-OnsRegional Maint. PM Mgt. Financial Mgt. AvSCM/MM
SAP R/3 Version 4.6 4.6 4.6 4.6Integrator IBM KPMG (prime) PricewaterhouseCoopers EDS
SAIC (core)IBM (core)
Subcontractor SAP SAP SAP SAPLockhead Martin Lockhead Martin UII DeloitteDSIC Sierra Consulting LLC Logicon/INRI SAIC/AMSEC WDS CSCKPMG MATCOM
Bolt-Ons OROS OROS OROS Manugistics Oracle Oracle Prologix XelusDocumentum Documentum Major Procurement (TBD)Jet Form Jet Formi2 ESRIMQ - Series MQ - SeriesPlantware NAVAIR Corp. Sys.Abaco Abaco
7
SAP Terminology
• Interface - Data passing back and forth between a legacy system andSAP (or any COTS product). An interface solution passes data between twosystems that have not been designed to work together. Data retrieved will notbe “real time”. We will need to create interfaces for the following situations:external DOD mandated systems, internal systems not replaced by ERPsoftware and external entities such as vendors or customers.
• Bolt-on - Any complimentary application designed to be compatiblewith another application. Bolts-ons are not a part of the SAP software, but arepart of the suite of software that has been certified to work with SAP and toprovide the functionality required. Bolt-ons do work off of the same databaseas the SAP core software, therefore bolt-ons are fully integrated and “realtime”.
• Integrated - A seamless connection between data, the applications arerunning from the same database, eliminating duplication. Bolt-ons are anexample of integrated data and systems.
8
ERP Consolidated Timeline
Slide Source: HIT overview to ESG Given by: Greg A Huntington NAVAIR ESPO (HIT Representative) Date: 13 July 2000
9
Program Specific Information
10
All R/3 Modules Are Integrated
BASISInformation
Portal
SD
PP
MM
IS
WFPS
AM
COFI
HRPM
FMIM
Funds Management
InvestmentManagement
FinancialAccounting
Controlling
AssetManagement
ProjectSystems
QualityManagement
Plant Maintenance(MRO)
HumanResources
Supply & MaterialsManagement
PAY
FI
Workflow
QM
Regional Maintenance
CATS
Pitch: e-NSM, NETS Project Kickoff Event Date: 2-3 August 2000 Pitch located on NEMAIS website: http://nemais.navsea.navy.mil/
11S e c u r i t y
Core Solution
Activity BasedCosting OROS 99OROS 99
HazardousMaterial PlantWarePlantWare
DocumentManagement
Docu-mentumDocu-
mentum
JetFormsJetForms
MQ SeriesIntegrator
MQ SeriesIntegrator
AbacoAbaco RF Barcode
Forms
Legacy SystemInterface
Oracle
SAPR/3
SAPR/3
Our Vendor Partners
Pitch: e-NSM, NETS Project Kickoff Event Date: 2-3 August 2000 Pitch located on NEMAIS website: http://nemais.navsea.navy.mil/
12
Regional MaintenanceSchedule - 2 years
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan2000 2001
Preparation Phase
Redesign/Design Phase
Configure Phase
Deploy Phase
Contract Award
Comfirm Prepare Phase
Confirm Design Phase
Confirm Configure Phase
IOC FOC
Confirm DeployPhase
Slide Source: Regional Maintenance Enterprise Resource Planning Overview Brief to: Executive Steering Group Author: Robert Mitchell Date: 13 July 2000
13
P h a s e B a s e Y r .O n e
S e c o n dY e a r
T h i r dY e a r
F o u r t hY e a r
Fi f thY e a r
S ix thY e a r
S e v e n t hY e a r
N o . o f C o n c u r r e n tU s e r s
AM i d L A N T
3 0 0
BN N S Y
+ 1 5 0 0
CData Systems
DRemain ingDepots and
Regions
+ 5 4 3 7
ESUPSHIPS
+ 2 1 6 3
FOpr L v l
T B D
FY 00 01 02 03 04 05 06
Regional MaintenancePhases - 6 Years
Pitch: Notional Timeline (Regional Maintenance Phases) Date Posted to Web: 22 June 2000 Pitch located on NEMAIS website: http://nemais.navsea.navy.mil/
Phase A: I&D pilot Phase B: NNSYPhase C: National systems Phase D: regional deploymentsPhase E: Supships Phase E: shipboard (may be in A)
14
Regional MaintenanceOrg. Chart
EXCOMM
Navy MaintenanceExceutive Leadership Group
NEMAISProgram Manager
Functional DeploymentsManager
GS-343-14
Systems Integration ManagerGS-334-15
Cross Deployment EnablersPhase A Deployment Team LeaderPhase B Deployment Team LeaderPhase C Deployment Team LeaderPhase D1 Deployment Team Leaderetc.
COMNAVSEASEA 04
Phase A Deployment TeamLocal NavyPrime and Sub contractorsOther Fleet and NAVSEA
Participants
Acquisition ManagerGS-343/346-14
IV&V Team(Navy & Contractor)
NAVSEA PM OfficeOrganization
NEMAIS BPR Decision Hierarchy
Rep
ortin
g
Legacy AISrGS-343/346-13/14
ACO coordFinanceEVMSACQ Doc/ CARS
RMAISNDEFMPMISOMMS-NG
HIT CoordinationOther Pilot Rep andcoordinationIV&VCorp I/F
Pitch: Proposed Organization Date: 29 Febuary 2000 (Proposed Org 9/99 rev 1/00) Pitch located on NEMAIS website: http://nemais.navsea.navy.mil/
15
Navy CBP ERPWG Chair: VADM Lockard
NAVY Maintenance ExecutiveLeadership GroupChair: CNO N43SEA04 SEA08 SUP04CLF N43 CPF N43
COMNAVSEA
NEMAISProgram OfficeSEA04
ProjectImplementationManager - NSSG
Phase B Implementation
Phase C Implementation
Phase D Implementation
MA I&D WGChair: CAPT Stowell
MA RBO WGChairs: CAPT HelfenCAPT Schaum
MA ERP WGChair: Mike Roman
NEMAISPhase A ImplementationProject Team
I&D WG PATs FinancialEngineering & PlanningMaterial and TransportationMetricsPersonnel and AdministrationSafety / health / EnvironmentalFacilitiesQualityOrganization
is a member of
is a member of is a member of is a member ofprovides businesssubject matter experts for
NAVY Maintenance ExecutiveSteering Committee(06 or GM-14/15 Level Reps)
SIMARSG COsSUPSHIPsFISCFTSCNEMAIS PM
CLF N41CPF N41CLF N43CLF N43ACPF N43CPF N43ATYCOM N43s
CLF N6CPF N6SEA 08XSEA 04XSEA 04MSEA 04LNSY COs
CCB 2Imp Mgr.RSG LeadSIMA LeadNNSY LeadNuc Op Lead
CCB 1Proj. Mgr.RSG COSIMA CONNSY COSEA 04MSEA 08X
are membersof
are membersof
Figure 5.1 NEMAIS Management Structure
is a member o
f
Pitch: Proposed Organization Date: 29 Febuaryt 2000Pitch located on NEMAIS website: http://nemais.navsea.navy.mil/
Reg. Maint.Org Chart Detail
16
The e-NMS Team Organization
Integrated Product Teams
Configuration Mgt, Production Planning, Scheduling, PreventiveMaint., Corrective Maint., Overhauls, Mods Mgmt, Tech Docs
Assignments, Availability, Qualifications, SecurityClearance, Training History & Shortfall
Receiving, Issuing, Stock Control, Inventory Control, Purchasing, Procurement, Cataloguing
Center Accounting, Activity Based Costing, Fixed AssetsAccounting, Life Cycle Costing, Ops Cost Budgeting
Ops LogsOps Logs
MaintMaint
Supply
Finance
HRHR
Ops LogsOps Logs
MaintMaint
HRHR
Supply
Finance
Work Brokering, Planning, Estimating, Resource Loading, WorkforceBalancing, Project Planning, Workflow, Readiness Monitoring, EIS
NavyIT Infrastructure
Manager
NavyIT Infrastructure
Manager
QA TeamQA
Team
Executive SteeringCommittee
Executive SteeringCommitteeAdvisory
TeamAdvisory
TeamJim Kamel
Project ExecutiveJim Kamel
Project Executive
Implementation TeamImplementation Team
Mike Petz Program Director
Mike Petz Program Director
Dick DardenIT Infrastructure
Manager
Andy HigginsImplementation
Manager
Sid SuarezDeputy
Project Exec
Bill SadlerBusinessIntegrator
Howell ThomasChange Mgt
Manager
Executive SteeringGroup
Executive SteeringGroup
NavyIT Infrastructure
Manager
Karen MaddockBus. Mgr
Karen MaddockBus. Mgr
Pitch: e-NSM, NETS Project Kickoff Event Date: 2-3 August 2000 Pitch located on NEMAIS website: http://nemais.navsea.navy.mil/
17
Regional MaintenancePhase A Project Team
Change ManagementBankes
BPE
Integrator PM
Navy AdvisorsNuclear Reps
CLF / CPF Reps
Contract Managememt
BCA Coordinator
Software Test Coordinator
IV&V Release Mgt
Software QA &Metrics
Schedule &Earned Value
TrainingO levelI levelD level
Process Mapping(Pre-Award)
AMS
CRP Coordinator
Phase A ImplementationZecchini
NSSG
SecurityD. JohnsonSPAWAR
System Interfaces Data Mgt
Configuration Mgt Gartner Group
IT InfrastructureMasonNSSG
Operations LogisticsI Level Process AgentsD Level Process Agents
MaintenanceI Level Process AgentsD Level Process Agents
Human ResourcesI Level Process AgentsD Level Process Agents
Supply & ProcurementI Level Process AgentsD Level Process Agents
Financial ManagementI Level Process AgentsD Level Process Agents
BusinessIntegration
Project Manager/DeputyRoman/Bracco
Pitch: Project Management Plan ver 1.3 Date: 7 June 2000 Pitch located on NEMAIS website: http://nemais.navsea.navy.mil/
18
R/3R/3Client / ServerClient / Server
ABAP/4ABAP/4
FIFIFinancialFinancial
AccountingAccounting
COCOControllingControlling
AMAMFixed AssetsFixed Assets
Mgmt.Mgmt.
PSPSProjectProjectSystemSystem
WFWFWorkflowWorkflow
ISISIndustryIndustrySolutionsSolutions
MMMMMaterialsMaterials
Mgmt.Mgmt.
HRHRHumanHuman
ResourcesResources
SDSDSales &Sales &
DistributionDistribution
PPPPProductionProductionPlanningPlanning
QMQMQualityQuality
Manage-Manage-mentment PMPM
Plant Main-Plant Main-tenancetenance
Program Management
19
Team KPMG
Prime Integrator
LogiconNorthrop Grumman
SierraConsulting LLC
WDS MATCOM
DSIC SAP Lockheed Martin
•Supply Chain Partner•E2C Prime Contractor
•SPS Experience
•US Navy MWR ERP
•SAP Experience
•MRP II Experience
•Supply Chain Partner•ERP Experience•Depth of Bench
•Logistics Experience•NAVAIR Experience
COREEach TeamMember WasChosen for aSpecific Role
Pitch given to: ESG By: MIKE ERK PILOT PROGRAM MANAGER ENTERPRISE SOLUTIONS PROGRAM OFFICE (ESPO) Date: 2 MARCH 2000
20
NAVAIR Proposed Solutions
ABACO(Bar-coding)
MQ - Series(Interface Mgmt)
OROS(ABC)
Documentum(Document Mgmt)
ORACLE DB(DBMS)
NAVAIRCorporateSystems
Jet Forms(Forms Mgmt)
ESRI(GIS - future waves)
Pitch given to: ESG By: MIKE ERK PILOT PROGRAM MANAGER ENTERPRISE SOLUTIONS PROGRAM OFFICE (ESPO) Date: 2 MARCH 2000
21
PilotPlanning
&Scoping
Updated 08 Nov 99
PM PILOT - 3 years
NAVAIR wide ERP Planning (Wave 1-4 Deployment, Functionality, Legacy Systems, ...)
1
Deployment
ReleaseFinal LOI
8 Oct
AwardContract
31 JanEvaluation
Receive S/W & Tools2
ABC Rebaselining10
X = Delivery Order #
Facilitate Legacy BPR11
8
Integration Testing7
WAVE 1
1999 2000 2001
O C T N O V D E C J A N F E B MAR A P R MAY J U N J U L A U G SEP O C T N O V D E C J A N F E B MAR
Change Management
ChangeManagement
9
• Change Management Plans• Readiness Assessment
• Communications & Training
HR Assessment
Program Budgeting
Metrics/Performance Tracking
• Project Management Plan• Gap Analysis• Tradeoffs• Initial Functional Requirements• Configuration Mgt Process• Update BCA
BPR/SW Configuring3
Interface Analysis & Design64
Functional Testing5
BPR/SW Configuring3
Interface Analysis & Design64
Functional Testing5
Program Management Financials
Asset Tracking
BPR/SW Configuring3
Interface Analysis & Design64
Functional Testing5
Weapon System Acquisition
SystemTAAF
SystemValidation
System DeployReadiness
PilotRqmtsFreeze
Functional & Tool TrainingDevelop Bus Process Models
Establish ERP Development Facilities
Coordinate Govt Process Reps
Baseline Legacy Systems
Baseline Technical Planning
Slide Source: NAVAIR’S Program Management Pilot Update To: Executive Steering Group (ESG) Given by: Ms. Carol A. Kurtz Date: 19 January 00
22
PM Pilot Schedule - 2 yearsFeb 00 Mar 00 Apr 00 May 00 Jun 00 Jul 00 Aug 00 Sep 00 Oct 00 Nov 00 Dec 00 Jan 01 Feb 01 Mar 01
ProjectPreparation
BusinessBlueprint
Realization
Final Preparation
Go Live& Support
BenefitsAnalysis
Apr 01Jan 00
Contract Award
14 Feb
Define ObjectivesDefine Success CriteriaDevelop StrategiesKick-Off Project
Project Team TrainingPrepare SystemProcess WalkthroughsDefine Scope
ProductiveSystem
End User TrainingPrepare Production
System
ConstructInterfaces, Conversions,Reports, EnhancementsIntegration Testing
Analyze PotentialBenefits
BCASubmission
Slide Source: NAVAIR BCA Draft Date: 31 July 00
23
NADEP Cherry Pt &NAWCWD Deployment
PROCESSES SAPMODULE
HQ Financials FI/CO,FM
HQ Acquisition &Procurement
PS, MM
NWCF Financials FI/CO,FM
ConfigurationManagement
PM
LogisticsManagement
MM, QM
Human ResourceManagement
HR
Inventory/SupplyChain Management
MM
MaintenanceManagement
PM
Purchasing MM
Shore StationManagement
PM
NAWCAD TSD DeploymentHQ Deployment
HQ, NADEP Cherry Pt &NAWCWD Deployment
HQ & NADEP JAX Deployment
HQ, NADEP NI, NADEP CP NAWCWD & NAWCAD Deployment
NADEP Cherry Pt &NAWCWD Deployment
NADEP NI &NAWCAD Deployment NADEP JAX DeploymentWork with SPAWAR
Pilot Wave 1 Wave 2 Wave 3 Wave 4
F Y 2 0 0 0 F Y 2 0 0 1 F Y 2 0 0 2 FY2003 FY2004 FY2005
1stQ 2ndQ 3rdQ 4thQ 1stQ 2ndQ 3rdQ 4thQ 1stQ 2ndQ 3rdQ 4thQ 1stQ 2ndQ 3rdQ 4thQ 1stQ 2ndQ 3rdQ 4thQ 1stQ 2ndQ 3rdQ 4thQ
NAWCAD TSD DeploymentHQ Deployment
HQ, NADEP NI &NAWCAD Deployment
HQ, NADEP NI &NAWCAD Deployment
NADEP Cherry Pt NAWCAD TSD
& NAWCWD DeploymentNADEP JAX Deployment
HQ & NADEP JAX Deployment
NADEP JAX DeploymentHQ, NADEP NI &NAWCAD Deployment
NADEP Cherry Pt &NAWCWD Deployment
NADEP NI &NAWCAD Deployment NADEP JAX Deployment
HQ, NADEP Cherry Pt &NAWCWD Deployment
HQ & NADEP JAX Deployment
HQ, NADEP NI &NAWCAD Deployment
ALL SITES
Work with SC/MM Pilot
Plan (Business Blueprint) Develop (Realization) Test Deploy
NAVAIR ERP Notional Deployment Schedule
Slide Source: NAVAIR BCA Draft Date: 31 July 00
24
NAVAIR PROJECT MANAGER
Dennis Distler Tab Warlitner
Carol Kurtz Tim Meyer Jim Kamel
Steering CommitteeDr. Somoroff - Chair
Dennis Distler - AdvisorCapt. Lilly
4 Key Process OwnersOther Pilot Rep’s
Tab Warlitner
AIR 00 - NAVAIRDan Johnson - KPMGRoland Harris - IBMBob Salvucci - SAP
FinancialJ. BeaulieuJ. Pracchia
G. TownsendM. Radar
Business Analysts
Technical Analysts
AcquisitionD. Helie
R. O’ConnellC. Haigmeyer
Business Analysts
Technical Analysts
Asset TrackingE. ChermanskyA. Robinson
Business Analysts
Technical Analysts
HRC. Cathcart
C. Bachman
Business Analysts
Technical Analysts
SC
EESC
Subject Matter Experts
Process Owners
Program Control- J. IncorviaFacilities Admin ContractsBF/M BCA Performance Measure
Pilot Management & DeploymentM. Erk E. Jarvis G. Stothard
H. CorumP. GreerL. Armstrong J. TomechkoK. LangM. Biver M. Young
SecretaryC. WakefieldK. Davidson
L. HecklerT. ZuckerJ. Moore
Tech. Requirements/Systems Design - T. Carpenter / C. Lewis / E. JarvisRequirements Integration - M. CusanelliSystem Integration - C. Feusahrens D. Hengemihle M. Lopez-EstradaDevelopment - J. TrentData Standardization & Reporting - C. RandallTest - M.K. Peterson Operations & Support - G. McKaySystems Engineering Mgmt - L. MellonIT&ERP Consultants - S. WilliamsR. Johnson D. MooreC. Holke A. KramerD. Hobbs
Change Management - T. MaddoxCorporate Strategy CommunicationsHuman Resources MeasurementTraining
J. Free M. HennessyS. Doragh J. YoungR. Owens S. LenderingH. Thomas K. Seymour
Business Process Integration - T. Hall / G. StothardABC - A. Gutierrez B. VanDerLinde J. KimBPR - R. Mattson J. Fair G. McDermottCross Pilot Integration - G. Huntington
RDML MassenburgP. O’Dell / J. DeckerP. O’Dell
B. Balderson / Capt. Cowley
Operations OfficerM. DeMoss-Coward
P. HaydenM. La Croix (PT)
Program Management Org Chart
Slide Source: PM Pilot Organization Chart (Jennifer Young)Date: 17 July 2000
25
COControlling
FMFundsMgmt
PSProject
and GrantMgmtTR
Treasuryand Cash
MMMaterials
Mgmt
HRHuman
Resources
SDSales and Invoicing
PRPurchasing
PMFacilities
MaintT&E
Traveland Exp
IS
FIFinancial
Accounting
R/3Infrastructure
Performance Monitoringand Reporting
BudgetaryControl
Capital ProjectPlanning/Reporting
Integrated CashManagement
Building/Office SpaceManagement
Billing and Customer Mgmt
Electronic Procurement
PreventativeMaintenance
Employee Self-Service
Training and Events
Payroll and Benefits
Inventory / WarehouseManagement
Vendor Evaluations
ContractManagement
Activity BasedCosting
GUIWorkflowInternet
ImagingReporting
R/3 Infrastructure
Financial Management
26
SSC-SD Proposed Solutions
Prologix(Bar-coding)
Mercury(Automated Testing)
Mercator(Interface Mgmt)
OROS(ABC)
BW(Future)
ORACLE DB(DBMS)
SSC-SDCorporateSystems
JetForms*(Forms/RptGenerator
Major Procurement
(TBD-Future)
“Achieves Short and Long Term Goals”*Currently proposed to be coded in ABAP. Use of Jet forms better choice ( leverage from NAVAIR)
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
27
Bar Coding(Prologix)
AssetManagement
(AM)
Financial(FI)
Human Resources
(HR)
Materials Management
(MM)
Controlling(CO)
Project Systems
(PS)
Business Information Warehouse
Work Flow (WF)
ABC(OROS)
SAP Modules & Complementary Software Products
= SAP Module = Complementary Software Product
“Major Procurement”Add-on (TBD – future)
Procurement Asset Management Financial Program
ManagementBusiness Planning
Human Resources
Scope Business Function to SoftwareMapping
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
28
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
Financial Management - 1 year
ProjectPreparation Blueprint ------Realization------
FinalPreparation
GoLive
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Project Charter
Install Dev.System
DetailedProject Scope
Procedures
Kickoff
Team Trng. #1
DetailedProcess Design
Team Trng. #2
Configure/Prototype
Install QASystem
Setup ProductionEnvironment
Develop/Test Conversion Programs
Develop/Test Interface Programs
Develop/Test Report Programs
Create End User Training Train End Users
DataConversion
Cutover Plan
IntegrationSystem Test
Stress/VolumeTesting
Production Support Plan
Design Specs-Interface-Conversion-Reports-Forms
GOLIVE
ERP External Interfaces - 12 Months
Corporate
Database (CDB)
Defense AutomatedAddressing System
(DAAS)
Travel managerPlus (TMP)
Defense CivilianPayroll System
(DCPS)
SDMM
PP
QAPM
HR
FICO
AM
PSWF
IS
R/3R/3
Defense CivilianPersonal Data
Systems (DCPDS)
STARS One Bill Pay(STARSOBP)
ProcurementAdvertisement
(OPIS, CBD)
Non-Navy Federal
Billing (OPAC)
DoN Industrial
Budget InformationSystem (DONIBIS)
Standard AccountingAnd Reporting
System (STARS-HCM)
Program BudgetAllocation System
(PBAS)
Purchase Card(CITIBANK)
Cash Management(FRS, IFCDRS,
CERPS)
Pitch: FIPT System Interface Architecture Date: 8 June 2000 Pitch location: ftp://199.211.89.13/ERP%20RELATED/CBP_ESG/ESG_08June00/
Notional ERP External Interfaces – End State
DFAS Corporate
Database(DCD)
Defense AutomatedAddressing System
(DAAS)
DefenseDepartmental
Reporting System(DDRS)
Defense CivilianPayroll System
(DCPS)
SDMM
PP
QAPM
HR
FICO
AM
PSWF
IS
R/3R/3
Defense CivilianPersonal Data
Systems (DCPDS)
Defense ProcurementPayment System
(DPPS)
ProcurementAdvertisement
(OPIS, CBD)
Non-Navy Federal
Billing (OPAC)
DoN Industrial
Budget InformationSystem (DONIBIS)
Department of NavyEnterprise Resource
Planning System(NERP)
Program BudgetAllocation System
(PBAS)
Purchase Card(CITIBANK)
Defense CashAccountabilitySystem (DCAS)
Pitch: FIPT System Interface Architecture Date: 8 June 2000 Pitch location: ftp://199.211.89.13/ERP%20RELATED/CBP_ESG/ESG_08June00/
31
Program Organization
Project SponsorDr. R. Kolb/H.Porter
Steering CommitteeR. Kolb Exec DirH. Porter Dir Corp Bus OpsC. Keeney Tech. Dept. HdB. Frye ComptrollerK. Leung Supply & Cnts HdR. Pierson Dir ERP PMOPricewaterhouseCoopers
Program ManagementR. PiersonR. BurnettP. Marrone
Project ManagementM. Nguyen
K. Hanrahan
Change ManagementR. VolkerT. Cleary
Business Process TeamsR. Frye, B Alexander
D. Shanahan, K. Halbe
Technical Team (Sys. Engr.)G. Pennoyer (acting)
J. Tello
Resource ManagerD. Nienow-Smith
Other ActivitiesDFAS, Naval Audit,..
Inter-Pilot CoordinationGale Pennoyer
Various
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
32
Financial Management Team
General LedgerAccounts PayableAccounts Receivable
Finance TeamChester Wong (SSC)Kevin Halbe (acting-PwC)
Cost Center AccountingABC/ABMBudgeting/PlanningProfit Center Accounting
Controlling TeamAlyce Shivers (SSC)Leslie Svensson (PwC)
Property TrackingProperty Management
Asset Mgmt. TeamJoe Espanol (SSC)Rob Lohr (PwC)
Navy Audit ServiceSharon Thorne
Financial Mgmt. TeamBruce Alexander (SSC)
Kevin Halbe (PwC)
Business Process LeadBob Frye/Bruce Alexander (SSC)
Dave Shanahan/Kevin Halbe(PwC)OPLOC
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
33
Project Team Organization
WBSCost Estimating
Project Management TeamGreg Lawrence (SSC)
Steve Lewis (PwC)
Warehouse ManagementPurchasingInventory Managment
Material Management TeamCherri Broyles (SSC)
Ken Baker (PwC)
Time & Attendance
Human Resources Mgmt. TeamHana Li-Torres (SSC)
Bill Heisch (PwC)
CSCLogicon/INRIUIISAP
Business Process LeadBob Frye/Bruce Alexander (SSC)
Dave Shanahan/Kevin Halbe(PwC)
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
34
Technical Team
SAP System AdministrationDatabase AdministrationNetwork AdministrationOperations AdministrationmySAP.com
Tech InfrastructureDoug Hamaguchi (SSC)Brian Glover (PwC)
InterfacesConversionsWorkflowReports/Forms
Application DevelopmentScott Fagergren (SSC)Nic Lira (PwC)
Help DeskTBD (SSC)TBD (PwC)
CSCLogicon/INRIUIISAP
SecurityMargaret Cobleigh (SSC)Greg Granger (PwC)
Technical TeamGale Pennoyer (acting-SSC)
Juan Tello (PwC)
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
35
Change Management Team
Change Management TeamDr. Gabe Lengua (SSC)
Laura Bonnett (PwC)
Training TeamDr. Mel Moy (SSC)
Dr. Jeff Besser (SSC)Catherine Tuck (PwC)
Change Management/Training TeamRandy Volker (SSC)
Tim Cleary (PwC)
•Knowledge Transfer•Communications•Organizational Development & Change Mgt.•Roles Development
•Project Team•End user (Curriculum Dev)
Slide Source: FINANCIAL MANAGEMENT at SSC SAN DIEGO To: Executive Steering Group (ESG) Given by: Bob Frye-Comptroller Date: 13 June 00
36
Enterprise-widebusiness process
solutions
Open system
Client/serverarchitecture
Designedor all typesof business
Multinational
Comprehensive,fully integrated
functionality
R/3R/3Client / ServerClient / Server
ABAP/4ABAP/4
FIFinancial
Accounting
COControlling
AMFixed AssetsManagement
PSProjectSystem
WFWorkflow
ISIndustry
Solutions
MMMaterials
Management
HRHuman
Resources
SDSales &
Distribution
PPProductionPlanning
QMQuality
ManagementPM
PlantMaintenance
AvSCM/MM
12/15/00 37
July 00
Aug 00
Sept 00
Oct 00
Nov 00
Dec 00
Jan 01
Feb 01
Mar 01
Apr 01
May01
Jun 01
Project Prep
Nov01
Jul 01
Aug 01
June 00
SAP R/3 A&D Business Scenarios
Manugistics Transportation
SAP Gap ID SAP Development and Unit Test SAP Integration Test
Xelus/Manu: Data Load
SAP - Sample Data Load
SAP - Data Conversion SAP - Data Load
EAG Training
Project Team Training
Navy To Develop Training Materials User Training
APS User Training
Phase IWrap up
Xelus /Manugistics Forecasting Process Xelus/Manu “Go-Live”
Final PrepRealizationBlueprint
“Go Live&
Support”
Turn OverUser ValidationThru November
AvSCM/MM Phase IITimeline
Project Program Management Reviews
Slide Source: AvSCM/MM Pitch to ICP 04 Date: 16 Aug 2000
38
OrganizationProgram Officers
Ross Haines/Paul PetersExecutive Advisory Group Executive Steering Group
Dep Program OfficerCDR Migliore/Fred Tillack
Program ManagerDavid Borg
Horizontal IntegrationTeam
ConfigurationControl Board
Supply ChainMaintenance
(Joe Catlett)
MaintenanceManagement (CAPT Laszcz)
Financial
(CDR Ahern)
Change Mgmt(Margaret Ely/Traci Maddox)
Extended Team
Business Case(Tim Curry)
Info Tech(Joyce Lerch/John Mishler)
Integrated Project Team (IPT)
Integrated Workstreams:
Process (Kelly Marchese)Technical (Phil Hayes)Legacy (Brian Keefer)
5%..DecisionsWithin 72 Hrs.
95% Decisions
NA V AL A VIATION SYSTEMS
oo MAET MAET MAET
Slide Source: NAVSUP/NAVAIR AvSCM/MM Given by: CDR Stephen Migliore Date: 09 Nov 99
39
Core Team Organization
Program Control Change Leadership & Training
B C A Pilot Integration
Supply Chain Maintenance F inance Team Interfaces & Conversions Reports & Extensions IT Technical Team
Program Management Off ice
Extended Team Members as RequiredExtended Team Members as Required
Monitor project progress and budget. Ensure projectintegration, tracking, and administration. Ensurelinkage with other initiatives and communicate issues.
Monitor project progress and budget. Ensure projectintegration, tracking, and administration. Ensurelinkage with other initiatives and communicate issues.
Provide administrative and clericalsupport. Maintain project plan.Update project budget.
Provide administrative and clericalsupport. Maintain project plan.Update project budget.
Develop Phase II Change ReadinessAssessment. Develop communicationplan. Develop training materials anddeliver training to end users.
Develop Phase II Change ReadinessAssessment. Develop communicationplan. Develop training materials anddeliver training to end users.
Coordinate with other pilots. Understandingof each pilot's process/technical integrationpoints and facilitate cross-pilot agreement.
Coordinate with other pilots. Understandingof each pilot's process/technical integrationpoints and facilitate cross-pilot agreement.
Update Phase I BCA costsand benefits (creating the"Phase II BCA") to reflect
further definition of Phase IIand Phase III scope.
Update Phase I BCA costsand benefits (creating the"Phase II BCA") to reflect
further definition of Phase IIand Phase III scope.
Gather and propose pilot design. Configure design decisionswithin the selected applications. Write test scripts and performunit test. Define and implement application and process gapsolutions. Team will prepare, execute and document the resultsof integrated scenarios. Deliver training to end users. Providesupport to users during Go Live.
Gather and propose pilot design. Configure design decisionswithin the selected applications. Write test scripts and performunit test. Define and implement application and process gapsolutions. Team will prepare, execute and document the resultsof integrated scenarios. Deliver training to end users. Providesupport to users during Go Live.
Determine existinginterfaces. Complete
build of dataconversions. Writelegacy and COTS
interfaces. Conduct testof interfaces and
conversions.
Determine existinginterfaces. Complete
build of dataconversions. Writelegacy and COTS
interfaces. Conduct testof interfaces and
conversions.
Infrastructure:Coordinate logistics
for pilot team.Manage hosting
environment.Support desktopsduring Go Live.
Infrastructure:Coordinate logistics
for pilot team.Manage hosting
environment.Support desktopsduring Go Live.
Reports andextensions. Developapproved reports andextensions based onIPT design reqmts.Test and support
pilot.
Reports andextensions. Developapproved reports andextensions based onIPT design reqmts.Test and support
pilot.Assist in the developmentof "to-be" design. ProvideSME support. Participate infinal integration testing.
NA V AL A VIATION SYSTEMS
oo MAET MAET MAET
Slide Source: NAVSUP/NAVAIR AvSCM/MM ERP Pilot Given to:NAVICP 04 Date: 16 Aug. 2000
40
Technical SupportRoles
Program Control Change Leadership & Training
BCA Pilot Integration
Supply Chain Maintenance Finance Team Interfaces & Conversions Reports & Extensions IT Technical Team
Program Management Office
Interfaces & Conversions• Inventory interfaces• Prioritize and scoperequired interfaces• Design data conversionspecs• Build data conversion• Write legacy and COTSinterfaces•Conduct unit and integratedtesting
IT Technical Team• Coordinate ITinfrastructure• Support contractorhosting requirements
•Connectivity•Communication•Security•Desktop support
Reports & Extensions• Develop R & E standards• Establish methods
and prioritize• Develop approved reports• Develop approvedextensions